Loading...
HomeMy WebLinkAboutWQ0034367_RESP to NOV-2020-LV-0059, 0060_20200213February 13, 2020 Morella Sanchez -King, Regional Supervisor NCDEQ — Division of Water Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RE: Notice of Violation & Intent to Assess Civil Penalty Permit No. WQ0034367 Northwest Regional Water Reclamation Facility Onslow Water & Sewer Authority, Onslow County Ms. Sanchez -King: 4 ONWASA onwasa.com 228 Georgetown Rd Jacksonville, NC 28540 This letter is sent in response to Notice of Violations (Tracking Numbers NOV- 2020-LV-0059 and NOV-2020-LV-0060) issued to the above -referenced facility due to exceedance of permit limits during October and November 2019. While ONWASA does not dispute the basis for these NOV's (as the test results were self -reported), facility staff have worked diligently to determine the cause of the elevated Total Suspended Solids (TSS) readings and have taken both immediate and long-term actions to address this issue. These actions have included: • Repeated cleaning and replacement of individual filter panels within a temporary disc filter assembly installed after Hurricane Florence. • Cleaning and re -calibration of the turbidimeter monitoring this flow. • Cleaning the post -equalization basin, effluent contact chamber and effluent pumping station to remove possible solids sources. • Contracting with the supplier of the temporary disc filter assembly to perform an extensive service on this unit, including replacement of all filter panels and several gaskets/seals, as well as rebuilding the backwash pump. • Initiation of several minor treatment process changes (such as increasing SBR decant depth) and conducting additional TSS sampling to provide more data on how the plant is performing and the need to make process adjustments before problems occur. In addition to these actions, ONWASA is also working with an outside Professional Engineering firm (WK. Dickson and Company) under multiple contracts to assist with plant operation and design of repairs to various systems (including the permanent disc filtration system) that were damaged by flooding during Hurricane Florence. As an update to the Page Two February 12, 2020 recovery effort, a construction contract has been awarded for the first repair project (restoration of the plant's disc filtration and UV disinfection systems), and a second construction contract to restore electrical and control systems will be bid and awarded later in 2020. If you have any questions of need additional information please feel free to contact me directly at 910-937-7521 or dmohr(@-onwasa.com. Sincerely, .4""t4l Pe - David M. Mohr, P.E. Chief Operations Officer Onslow Water & Sewer Authority C: Mark Young, NWRWRF ORC Jim McDonnel, Treatment Facilities Administrator Jim Holland, WK Dickson