Loading...
HomeMy WebLinkAbout20200225 Ver 1_SMP_20200211Highway North Carolina Department of Transportation Stor"weit r Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 39062.1.2 TIP No.: U-4424 County(ies): Edgecombe Page 1 of 2 General Project Information WBS Element: 39062.1.2 ITIP Number: U-4424 Project Type: Roadway Widening Date: 2/10/2020 NCDOT Contact: Russell Broadwell, PE Contractor / Designer: WSP-USA / John F. Watson, PE Address: 509 Ward Blvd. Address: 434 Fayetteville Rd. Suite 1500 PO Box 3165 Raleigh, NC 27601 Wilson, NC 27895 Phone: (252)-640-6409 Phone: (919)-376-2704 Email: rbroadwell(a)ncdot.com Email: lohn.f.watson(aDwsp.com City/Town: Tarboro County(ies): Edgecombe River Basin(s): Tar -Pamlico CAMA County? I No Wetlands within Project Limits? No Project Description Project Length (lin. miles or feet): 2.33 Surrounding Land Use: Residential, Agricultural, and Industrial Proposed Project Existing Site Project Built -Upon Area (ac.) 11.3 ac. 9.0 ac. Typical Cross Section Description: -L- includes 3-12' paved lanes with 2.5' curb and gutter. Along the length of the project all -L- includes 2-11.5' paved lanes with grass shoulders and grass lined "v" ditches on ditch front and back slopes have a minimum grade of 3:1. A 10' side walk starts at 26+02 both sides. RT and continues along the length of the project. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 10,400 Year: 2045 Existing: 9,100 Year: 2016 General Project Narrative: State project U-4424 is a widening project for NC-111 that adds a shared center lane, curb gutter for closed drainage systems, and a 10' side -street trail along the length of the (Description of Minimization of Water project. Quality Impacts) Drainage from the beginning of the project will flow away from the project site and tie into two existing roadside ditches. Drainage from -Y- and LT of -L- alignment and drainage from -Y1- and RT -L- alignment will be collected in two seperate systems, each replicating the existing stormwater pattern without introducing any new drainage area to the outfall. The proposed drainage system along NC-111, -L- Sta. 20+15 to 32+60 will feature catch basins on both sides that outlet from a closed drainage system into UT to Holly Creek at -L- Sta. 28+23. This replaces the sheet flow runoff into roadside ditches, while maintaining existing drainage patterns. Toe protection will be installed along the fill slopes from -L- Sta. 25+00 to 27+50 LT to protect the toe of the fill slope from eroding due to any runoff coming from nearby agriculture fields. Currently along NC-111, drainage from -L- Sta. 35+90 to 47+07 outlets into UT to Holly Creek at -L- Sta. 40+30. The proposed closed drainage system along this stretch maintains existing drainage patterns and outlets into standard tail ditch to ensure positive drainage away from the road. From -L- Sta. 54+35 to 57+97 most of the existing closed drainage system has been retained with some new additions and the cross pipe being upsized to a 48" from a 36". The two crosspipes at -L- Sta. 96+61 have been replaced with 2-54" RCP filling in the existing ditches from -L- Sta. 96+30 to 96+99 and now outletting onto a riprap lined special lateral variable width base ditch parallel to -Y5-. The proposed outfall is to be protected with riprap as the existing grass lined outfall is slighty eroded. At the intersection of -Y8- and -L- there is an existing closed drainage system that outfalls at -L- Sta. 118+10. This system will be replaced with a comparable closed drainage system that directs roadway drainage to the same location as the existing condition. The new outfall discharges into a defined tail ditch to ensure positive drainage away from the road. Stormwater from the left shoulder of the -Y8- alignment to the end of the project will be captured in a closed system along the -L- line and outfall into an existing concrete lined ditch that discharges into Holly Creek just as in the existing condition. Waterbody Information Surface Water Body (1): UT to Holly Creek NCDWR Stream Index No.: 28-81-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: SA, SIB, & SC Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? INo IDeck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Highway North Carolina Department of Transportation Stormwa11 Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 39062.1.2 TIP No.: U-4424 County(ies): Edgecombe Page 2 of 2 Swales Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width (ft) Front Slope (H:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length ft Longitudinal Slope % Q2 (cfs) V2 (fps) Q10 cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? 4 -L- STA. 14+21 to 16+82 LT (1)UT to Holly Creek 0.0 3.0 3.0 0.2 22 263 1.23% 3.0 0.9 0.4 1.0 No No 4 -L- STA. 16+82 to 18+79 LT (1)UT to Holly Creek 0.0 3.0 3.0 0.3 26 200 0.75% 0.4 1.0 0.5 1.1 No No 4 -L- STA. 14+23 to 18+00 RT (1)UT to Holly Creek 0.0 3.0 3.0 1.8 176 378 1.00% 2.4 1.8 3.1 1.9 No No 4 -Y1- STA. 13+89 to 14+10 RT (1)UT to Holly Creek 0.0 6.0 3.0 9.3 930 1952 1.43% 8.8 2.8 12.1 3.0 No No 4 -Y- STA. 10+50 to 10+97 RT (1)UT to Holly Creek 2.0 3.0 3.0 8.7 870 1325 2.29% 13.2 1.9 16.8 2.0 No No 5 -L- STA. 23+00 to 25+00 LT (1)UT to Holly Creek 0.0 3.0 3.0 0.3 25 200 0.52% 0.3 0.9 0.4 1.0 No No 5 -L- STA. 29+50 to 32+50 LT (1)UT to Holly Creek 0.0 3.0 3.0 2.0 204 300 0.50% 1.6 1.4 2.2 1.5 No No 6 -Y3- STA. 11+00 to 11+30 LT (1)UT to Holly Creek 0.0 3.0 3.0 0.2 21 21 0.80% 0.6 1.3 0.8 1.4 No No 6 -Y4- STA. 10+67 to 11 +00 RT (1)UT to Holly Creek 0.0 4.0 3.0 1.0 102 414 2.33% 4.2 2.9 5.5 3.2 No No 7 -L- STA. 59+20 to 61+00 RT (1)UT to Holly Creek 0.0 3.0 3.0 0.2 19 160 3.54% 0.5 1.0 0.7 1.1 No No 11 -Y7- STA. 11+50 to 11+94 LT (1)UT to Holly Creek 0.0 4.0 3.0 0.2 21 47 0.50% 0.3 0.9 0.4 0.9 No No 11 -Y8- STA. 12+58 to 13+00 LT (1)UT to Holly Creek 0.0 3.0 3.0 0.3 30 289 1.37% 1.0 1.7 1.3 2.6 No No 11 -Y8- STA. 12+58 to 13+04 RT (1)UT to Holly Creek 0.0 3.0 3.0 2.2 220 270 2.53% 3.4 2.6 4.3 3.4 No No Additional Comments