Loading...
HomeMy WebLinkAbout20200225 Ver 1_PCN Form Submission_20200211DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200225 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: U-4424 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@ncdot.gov Date Submitted 2/11 /2020 Nearest Body of Water Folly Creek Basin Tar -Pamlico Water Classification C NSW Site Coordinates Latitude: 35.88387 A. Processing Information County (or Counties) where the project is located: Edgecombe Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: U-4424 WBS#M 39062.1.2 1a. Type (a) of approval sought from the Corps: Longitude: - 77.56914 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (252)640-6427 U W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of NC 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address PO Box3165 Address Line 2 city Wilson Fbstal / Zip Code 27895 2e. Telephone Number: (252)640-6427 2g. Email Address:* State / Rovince / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: 3c.Address Street Address PO Box3165 Address Line 2 City Wilson Postal / Zip Code 27895 3d. Telephone Number: (252)640-6427 3f. Email Address:* tccoggins@ncdot.gov State Rovince/ Fegion NC Country USA 3e. Fax Number: C. Project Information and Prior Project History O Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Tarboro 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Holly Creek 3b. Water Resources Classification of nearest receiving water:* C NSW 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201030202 4. Project Description and History 2b. Property size: State / Province / Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site consists mostly of agricultural and forestry land but there are some single family residential and commerical development areas as you approach Tarboro. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) U-4424 TOPO.pdf 1.04MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) LA424 Soils map.pdf 1.81MB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 258 4h. Explain the purpose of the proposed project:* The purpose of the project is to improve the safety and mobility for industries, residences and Edgecombe Community College along NC 111 (West Wilson Street) in Tarboro. The need is to provide pedestrian and bicycle facilities on NC 111 (West Wilson Street) to connect to key centers along the roadway. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* STIP Project LI-4424 proposes to widen NC 111 (West Wilson Street) to a three -lane section from NC 122 (McNair Road) to US 64 Alternate (Western Boulevard). The proposed typical section from US 64 Alternate (Western Boulevard) to US 64 will have two through lanes with a median left -turn lane, curb and gutter section, with a multi -use path along the south side of NC 111 (West Wilson Street). Typical road building equipment will be used. 4j. Please upload project drawings for the proposed project 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown f N/A Corps AID Number: Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chad Coggins Agency/Consultant Company: NCDOT Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries [7 Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type *]3f. Type of 3g. S. width * 3h. Impact ❑ (?) Jurisdiction* length* S1 Site 1 Permanent Culvert Ur to Holly Creek Y Intermittent Both 3 21 Average (feet) (liriearfeet) S2 Site 1 Permanent Bank Stabilization J UT to HollyCreek Intermittent Both 3 10 Average (feet) (linearfeet) S3 Site1 Temporary Dewatering UT to Holly Creek Intermittent Both 3 9 Average (feet) (linearfeet) Site 2 Permanent Culvert UT to Holly Creek Intermittent Both 3Average 3(li (feet) �rfeet) S5 Site 2 Permanent Bank Stabilization J UT to Holly Creek Intermittent Both 3Aver�ge 20 (feet) x�rfeet) S6 Site 2 Temporary Dewatering LIT to Holly Creek Intermittent Both 3 9 Average (feet) (linearfeet) S7 Site 3 Permanent Culvert LIT to Holly Creek Y Intermittent Both 3 57 Average (feet) (linearfeet) S8 Site 3 Permanent Stabilization LIT to HollyCreek Intermittent Both 3 64 Aver�ge(feet) (liriearfeet) S9 Site 3 Temporary Dewatering LIT to Holly Creek Intermittent Both 3 10 Aver�ge(feet) (linearfeet) S10 Site 4 Permanent Culvert LIT to Holly Creek Y Intermittent Both 2 13 Average (feet) (lin�rfeet) S11 Site 4 Permanent Stabilization LIT to Holly Creek Intermittent Both 2gverage 6(linearfeet) (feet) flSite 4 Temporary Dewatering Ur to Holly Creek Intermittent Both 2 8 Average (feet) (linearfeet) 31. Total jurisdictional ditch impact in square feet 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 222 36 31. Total stream and ditch impacts: 258 3j. Comments: Site 3 and 4 are really the same crossing just separated into North side of the road and South side of the road. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r Neuse r Catawba r Goose Creek r Other P Tar -Pamlico r Randleman r Jordan Lake 6b. Impact Type 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact 6c. Per or Temp Site 2 P Ui to Holly Creek No 1,575 946 Site 3 P Ui to Holly Creek No 1,825 992 Site 4 P Ui to Holly Creek No 2,687 592 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 6,087.00 2,530.00 Zone 1 Zone 2 Total combined buffer impacts: 6,087.00 2,530.00 6i. Comments: B1 = Site 2 which matches site 2 on stream drawing 32 = Site 3 which matches site 3 on stream drawing B3 = Site 4 which matches site 4 on stream drawing Supporting Documentation 114424_hyd_prm_set.pdf 3.92MB LA424_hyd_buffer_set.pdf 2.83MB Site 1.pdf 5.41MB Site 2.pdf 5.51 MB Site 3.pdf 5.9MB Site 4.pdf 51MB E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: This project was essentially symmetrical widening throughout. No wetland impacts and relatively minor stream impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment will be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to the project. Safety fencing will be used to delineate jurisdictional and environmentally sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Under nationwide permit thresholds. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SMNT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation SMP.pdf 161.38KB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments:* MCDC available upon request 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This upgrade of NC 111 by providing center turn lanes and pedestrians facilities are not anticipated to produce additional development in the area that would affect downstream water quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR forth is project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? An IPAC species list from Feb 5th lists 6 species potentially occurring within this project. For the five aquatic species on this list, there are no streams present that are large enough to support these species. All of the streams impacted by this project are intermittent in nature and very small with little flow. Furthermore programmatically a MA-NLAA conclusion can be reached because this project consists of culvert replacements that are greater than .25 miles from an identified stream reach. For Red Cockaded Woodpecker (RCW), they are listed as "Historic" for Edgeoombe County and therefore detail surveys are not required for this species due to its historic status within Edgecombe County. However marginal foraging habitat is located in the northern end of the project just outside of the project study area off the intersection of NC 111 (Wilson Road) and Barlow Road. However, no nesting habitat is present in the project area or within a mile of the project study area. Also, NHP records review indicates no documented nest sites within 1 mile of the study project study area. Programmatic BO of MA/LTAA for NLEB Consultation Documentation Upload project_report _u_4424_0_23227_23227.pdf 1.19MB USFWS species list.pdf 214.92KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* GIS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU clearance 7c. Historic or Prehistoric Information Upload 18-03-0039Effects. pdf AR18-03-0039 NoSitesPresent. pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* NC FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. 6.57MB 7.09MB U Signature u * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature Date 2/11 /2020