Loading...
HomeMy WebLinkAbout090169_Inspection_20200204U"Division of Water Resources Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance 0 Reason for Visit: ioutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0Denied Access Date of Visit: � _� Arrival Time: Departure Time: County: �je_L__ Region: Farm Name: /)6';�'je— i a</!�'lj Owner Email: Owner Name: G1?�/`��S (�"i / f �✓f #`�i e_- Phone: Mailing Address: Physical Address: % n _ Facility Contact: L. al jr 'I /M 'C Title: Phone: Onsite Representative: 7iuv Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Integrator: Certification Number: Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Pullets Other Poults Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes Ej"No ❑ NA ❑ NE ❑ Yes ❑ No DNA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [ o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes �lo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 - 21412015 Continued Facility Number: 2-7 - Date of Inspection: — -� Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Stricture 3 Structure 4 Structure 5 Identifier: Spillway?: _ Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? 2-No ❑ NA ❑ NE ❑No ❑NA ❑NE Structure 6 ❑ Yes �No[:j ❑ NE ❑ Yes Z No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E3 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [/r`No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ E cessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ePAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence off Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): /tee 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [rNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [2rNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [?] No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes dNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 21-NO ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [EKNNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes [No ❑ NA ❑ NE [T Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes (No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E�No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - la Date of Inspection: — 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E] No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes EJ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑NA ❑NE ❑ NA ❑ NE 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [� No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [] No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [3No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [l]'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) No 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes E ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes El"No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? dyes 5 o ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). y-- olle l e9i1,e `✓u� h�q4—i727-�i2flczl i r'�r�c2 — / " ' 2 1 e�/ `"a s cv�� k � u�f 1 I � is %/r,t �'-S �;�dz 2A, /-, �7� x-119 Reviewer/Inspector Name: Reviewer/Inspector Signatur Phone: Date: Page 3 of 3 21412015