Loading...
HomeMy WebLinkAboutSW3200201_Calcs_20200212DOLLAR GENERAL — STORE #21867 NEWTON, NC HYDROLOGIC AND HYDRAULIC ANALYSIS REPORT Prepared By: Prepared For: Project Site: BREC, P.A. Teramore Development, LLC TBD Providence Mill Road 1520 Meadowview Drive Joe Strickland, Dir. of Ops., NC Newton NC Wilkesboro, NC 28697 214 Klumac Rd., Ste. 101 NCBELS Firm #C-3448 Salisbury, NC 28144 (336) 844-4088 (704) 224-7364 justin@brec.biz jstrickland@teramore.net 4 February 2020 �•`` �H CARP oFEsSjC; SEAL - 035736 = "G .'cc!yG�NE��•' Gam: C. C\A')�\ `�� Justin Church, PE , f,WO``� Principal Engineer BREC, P.A. Dollar General - Store #21867 Table of Contents 1.0 General Information........................................................................................3 2.0 Methodology...................................................................................................3 2.1 Curve Number Calculations 2.2 Time of Concentration Calculations 2.3 Rainfall Data 2.4 Hydrology Calculations 2.5 Modified Curve Number Calculations 2.6 Sand Filter Design 2.6.1 Chamber and Filter Sizing 2.6.2 Underdrain Sizing 2.6.3 Anti -floatation Calculations 3 4 5 6 6 7 7 8 8 3.0 Results............................................................................................................9 Appendix.............................................................................................................11 List of Figures Figure 1 - System Storage of First Flush..............................................................9 List of Tables Table 1 - Pre -Construction Drainage Area............................................................3 Table 2 - Post -Construction Drainage Areas........................................................4 Table 3 - Pre -Construction ToC............................................................................5 Table 4 - Post -Construction ToC...........................................................................5 Table 5 - NOAA Rainfall Depths...........................................................................5 Table 6 - NOAA Rainfall Intensity.........................................................................5 Table 7 - Modified SCS Curve Numbers...............................................................6 Table 8 - Sand Filter State-Storage......................................................................7 Table 9 - 10 Year Pipe Discharges.....................................................................10 BREC, P.A. Dollar General — Store #21867 2 1.0 General Information This document contains hydrologic and hydraulic calculations demonstrating compliance with post -construction state and local stormwater regulations for the construction of a 9,100 ft2 Dollar General retail store at the intersection of Providence Mill Road and NC Highway 16 in Newton, NC. Specifically, regulations for this area require water quality treatment of the first flush (1") storm. The subject tract is composed of a partially wooded vacant lot. No jurisdictional features are present on the site. The site is almost entirely composed of CaB soils which are hydrologic soil group A. Post construction stormwater requirements will be satisfied with an above ground sand filter which is approved by NCDEQ as a primary stormwater control measure (SCM). 2.0 Methodology One pre -construction drainage area and six post -construction drainage areas covering the subject tract and adjacent off -site areas were identified. See plansheets for delineation. The pre -construction drainage area outlets at OUTFALL-1 located at an existing NCDOT drainage ditch in the northeast corner of the site. All proposed impervious areas are routed to the sand filter for treatment prior to discharge. Two drainage areas, POST-CON:4 and POST-CON:6, are not routed to the sand filter due to topographic limitations. 2.1 Curve Number Calculations Composite SCS curve numbers were calculated as weighted averages using values of 49 for fair grass coverage (pre -construction) and 39 for good grass coverage (post -construction, maintained), 30 for wooded areas, and 98 for impervious surfaces in HSG A soils. For pre -construction drainage areas, the composite curve number is calculated as: (Almp x 98 + Agrass x 49 + Awooded x 30) CNComhpre Atotal Table 1 - Pre -Construction Drainane Area Name Atotal (acres) Aimp acres Agrass acres Awooded (acres) CNcom ppre PRE-CONA 2.621 0.19 1.42 1.01 45.3 BREC, P.A. Dollar General — Store #21867 3 For post -construction drainage areas, the composite curve number is calculated as: (Almp x 98 + Agrass x 39 + Awooded x 30) CNcompositepost Atotal Table 2 - Post -Construction Drainage Areas Name Atotal Aimp Agrass Awooded CN n = Manning's coefficient PZ = 2 yr, 24 hr rain f all (in) ft S = slope ( ) t f l Tscf _3,600V V = shallow concentrated flow velocity ( f ) Table 3 - Pre -Construction ToC Table 4 - Post -Construction ToC 2.3 Rainfall Data Rainfall data was taken from NOAA Atlas 14, Volume 2, Version 3 for Concord, NC. Rainfall depths for each design storm are summarized below. Table 5 - NOAA Rainfall Depths Table 6 - NOAA Rainfall Intensit Name Length S10�7e Tc—talc Tc—assumed t t min min PRE-CON:1 190 0.02 14-18 16 Name Length t Slope t Tc—talc min Tc—assumed min POST-CON:1 - - - 5 POST-CON:2 - - - 5 POST-CON:3 - - - 5 POST-CON:4 - - - 5 POST-CON:5 135 0.02 9-15 11 POST-CON:6 - - - 5 Storm Rain all Depth in First Flush 1.00 1 Year, 24 Hour 2.92 Storm Rainfall Intensit in hr 10 Year, 5 Min 7.01 2.4 Hydrology Calculations The water quality volume (WQV) required to be treated from the first flush was calculated using the Schueler method outlined in the NCDEQ Stormwater Design Manual'. The Schueler method utilizes the following equations: R„ = 0.05 + 0.9IA WQV = 3630RDRvA Where IA is the impervious fraction of the drainage area, R„ is a runoff coefficient, RD is the rainfall depth, A is the drainage area, and WQ„ is the runoff volume. The following parameters are used for the drainage routed to the sand filter. la = 0.69 R„ = 0.05 + 0.9(0.43) = 0.67 RD = 1.0 inch A = 0.99 acres WQV = 3,630(1.0)(0.67)(0.99) = 2,392 f 0 WQVadj = 0.75WQ„ = 0.75(2,392) = 1,794 ft3 2.5 Modified Curve Number Calculations To route the WQV through the sand filter, it is necessary to calculate a modified SCS curve number to avoid underrepresenting the first flush. The modified curve number is calculated as follows: CN,,, = 1000/ 110 + 5RD + 10R„ — 10 RV2 + 1.25R„RD] The modified curve numbers were used to route the first flush using an SCS 6 hour balanced storm distribution. The remaining design storms were routed with standard curve numbers and an SCS type II 24 hour storm distribution. Table 7 - Modified SCS Curve Numbers https:Hdeq.nc.gov/sw-bmp-manual BREC, P.A. Dollar General — Store #21867 6 Name R CNmod POST-CON:1 0.95 99.57 POST-CON:2 0.67 96.54 POST-CON:3 0.88 98.94 POST-CON:4 0.05 77.22 POST-CON:5 0.18 85.08 POST-CON:6 0.09 80.47 2.6 Sand Filter Design The combined area of the sediment chamber and sand chamber is determined from the relationship of the max water depth observed during the water quality event, Hmax7 and the adjusted water quality volume. The design value for Hmax was chosen as 1.0 ft. When coupled with the adjusted water quality volume, WQVadj = 0.75WQV = 1,794 ft37 the resulting stage storage for the sand filter is summarized below. Table 8 -Sand Filter State -Storage Stage At Elevation = 1033 f t, Hmax = 1.0 f t, WQVprovided = 2,100 f t3 > WQVadj. 2.6.1 Chamber and Filter Sizing The sediment chamber and filter chamber are equally sized. The sediment chamber has an additional 1.0 ft depression to assist with maintenance and primary sediment deposition; however, this added volume is not considered in calculations to meet minimum design criteria requirements. Given the filter chamber area, the sand media area, Asand, was selected as 375 ft2. This value maximizes the available filter chamber area and preserves an easily installable geometric shape for the sand media while providing space for installation of the outlet structure outside of the sand media and preventing the sand media from being installed adjacent to the toe of slope grading. Discharge through the sand media is governed by Darcy's Law. Asandk(hf + df) Asand = d f Where, Asand = Sand media surface area (f t2) = 375 f t2 ft _ da k = Sand media permeability (day) 4.0 ft Y df = Sand media depth (f t) = 1.5 f t hf = Height of water above sand media BREC, P.A. Dollar General - Store #21867 7 /Elevation Area Sediment Vol Filter Vol Total Vol fation (ft) ll t� f t2 ft3 ft3 ft3 0.0 1032 1,776 ! 0 ! 0 0 ! 1.0 1033 2,423 1,049 1,051 2,100 2.0 1034 3,151 2,440 2,446 4,887 3.0 1035 3, 960 4, 216 4, 226 8, 442 4.0 1036 4,850 6,416 6,43� 12,847 2.6.2 Underdrain Sizing Drawdown time is calculated as: WQVdf t k(ha + df)Asand Discharge rate is calculated as: 2,392(1.5) _ 28.7 hours 4.0(0.5 + 1.5)375 WQV 2,392 f t3 Qunderdrain — t = 28 7 = 0.023 S After applying a safety factor of 10, ft3 Qsand = 10Qunderdrain = 0•23 t The diameter of a single pipe is calculated as: Where, 3 D = 16 nQsand 8 C -3 n = Manning's roughness f or pipe S = pipe slope 3 (0.011(0.23) $ D = 16 = 4.6 inches 0.005 Per Table 1 of Section A-5 of the NCDEQ Stormwater Design Manual, use (2) 4 inch pipes. 2.6.3 Anti -floatation Calculations The outlet structure is a 5.0 ft tall 3 ft x 3 ft precast concrete box with 6 in side and bottom wall thicknesses. Including concrete and reinforcing steel, the structure has an empty mass of Moutletempty = 5,184 lb. Assuming the total height of the box is exposed to buoyant forces, the volume of water displaced by the box is calculated from the outside dimensions. BREC, P.A. Dollar General — Store #21867 N. Vboxwater = 4.0 f t x 4.0 f t x 5.50 f t= 88.0 f t3 The buoyant force on the box is defined from the hydraulic forces acting lb Fb = VboxwaterPW = 88.0 f t3 x 62.4 ft3 = 5,491 lb Additional mass was added to the outlet structure by pouring a 6 in concrete slab over the bottom. Moutlettotal = 5,184lb + (3 ft)(3 ft)(0.5 ft) C150- = 5,895 lb > Fb 3.0 Results The first flush (1") storm is routed through the sand filter and reaches a max storage depth of 0.93 ft which does not exceed the design Hmax = 1.0 ft. The water quality volume is discharged over a period of 30.0 hours. — Storage: System (POST -CON- ROUTH& BALANCED 2020-01-2816:27:58) 2100 2000 1900 1800 1700 1600 1500 1400 1300 w 1200 0 1100 1000 U) 900 800 700 600 500 400 300 200 100 0 0 5 10 15 20 25 30 35 40 45 Time (hrs) Figure 1 - System Storage of First Flush BREC, P.A. Dollar General — Store #21867 9 Routing the 10 year, 24 hour storm yields the following pipe outlet discharges: Table 9 -10 Year Pipe Discharges See plansheets for outlet protection calculations. BREC, P.A. Dollar General — Store #21867 10 Pipe ft3 Q10 - s PIPE — 1 0.58 PIPE — 3 3.33 PIPE-4 4.55 Appendix BREC, P.A. Dollar General — Store #21867 11