Loading...
HomeMy WebLinkAboutSW3200201_Supplement-EZ Form_20200212SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION roject Name R4Surface roject Area acoastal Wetland Area Water Area (a Dollar General - Newton (Store #21479) 2.11 5 1 Is this project High or Low Density? High 6 1 Does this protect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of ve etated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 lis streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Justin Church, PE / Principal Engineer 28 Organization: BREC, P.A. 29 Street address: 1520 Meadowview Drive 30 City, State, Zip: Wilkesboro, NC 28697 31 1 Phone numbers : 336.844.4088 32 Email: justin@brec.biz Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. �H CARO '�'G.'. o ••F ESsio 9 SEAL 035736 = `�G'•�NGIN���'�G� ///T/Al C. C\A 0 11111\\\\\\ of Designer 02/04/2020 Date 1995 rules S L 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: Parking (sq ft Sidewalk (sq ft Roof (sq ft Roadway s ft Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 1 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19 Design volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION 21 JPlease use this space to provide any additional information about the drainage area(s): SAND FILTER 23 Volume that can be retained in the sediment chamber (cubic feet) 1049 cf 24 Will there be a permanent pool in the sediment chamber? Yes 25 Bottom of the sediment chamber (fmsl) 1031.00 26 Area of the sediment chamber (square feet) 887 sf 27 Physical depth of the sediment chamber (inches) 24.0 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 12.0 in 1033 29 jElevation of top of weir between chambers (fmsl) Chamber Volume that can be retained ii Bottom of the sand chamber 33 rnysicai aeptn or the sans cnamaer kincnes) i z.0 in 34 Ponding depth in the sand chamber, above any permanent pool (inches) 12.0 in 35 Elevation of the bypass device (fmsl) 1033 36 Type of bypass device orifice 37 Mechanism for distributing flow over the sand surface stone dam 38 Sand specification for sand chamber astm c33 39 Depth above underdrain pipe (inches) 12 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes use this space to provide any 43 ISand Sand Filter 1 4:05 PM 2/4/2020