Loading...
HomeMy WebLinkAboutNCG130071_Inspection_20200211 ROY COOPER NORTH CAROLING Governor Environmental Quality MICHAEL S.REGAN Secretary WILLIAM E.(TOBY)VINSON,JR, interim Director February 11,2020 Nelco Recycling&Aggregate Co Attention: Garen Nelson 165 McLeod Dr Mooresville NC 28115 Subject: Compliance Evaluation Inspection Nelco Recycling&Aggregate Co NPDES Stormwater Certificate of Coverage- NCG130071 Iredell County,North Carolina Dear Mr. Nelson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Nelco Recycling & Aggregate Co on February 6, 2020. Please note that in the Stormwater inspection report summary we ask that you develop and implement a Stormwater Pollution Prevention Plan and conduct qualitative monitoring. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely, r oore Assistant Regional Engineer Enclosure:NCG13 permit c: Stormwater Permitting Branch ti15Mrf7+Hketr419lm&Y North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 J Mooresville,North Carolina 28115 704.663,1699 Compliance Inspection Report Permit: NCG130071 Effective: 06/01/18 Expiration: 05/31/23 owner: Nelco Recycling&Aggregate Co SOC: Effective: Expiration: Facility: Nelco Recycling&Aggregate Co. 165 McLeod Dr County: lredell Region: Mooresville Mooresville NC 28115 Contact Person: Don Mason Title: Phone: Directions to Facility: From the Intersection of NC 150 and Hwy 21 in Mooresville,travel approximately 500 feet to McLeod/Iredell County solid waste facility. The site is located at the end of the road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 02/06/2020 Entry Time: 03:00PM Exit Time: 03:35PM Primary Inspector: Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge COC Facility Status: ❑ Compliant 11 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG130071 Owner-Facility:Nelco Recycling&Aggregate Co Inspection Date: 02/06/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: A SWPPP has not been developed or implemetned and qualitative monitoring has not been conducted. A copy of the permit is included with this inspection with the details of the SWPPP. Qualitative monitoring guidance can be found at https://files.nc.gov/ncdegM/ater%20Quality/Surface%2OWater%2OProtection/SPU/SPU%20- %20N PDES%20Permit%20Monitoring%20Forms%20and%20Data/Qual-Monitoring-Guide-20080618-DWQ-SPU.pdf If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at(704) 235-2137. Page 2 of 3 Permit: NCG130071 Owner_Facility:Nelco Recycling&Aggregate Co Inspection Date: 02/06/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? #Does the Plan include a General Location(USGS)map? #Does the Plan include a"Narrative Description of Practices"? #Does the Plan include a detailed site map including outfall locations and drainage areas? #Does the Plan include a list of significant spills occurring during the past 3 years? #Has the facility evaluated feasible alternatives to current practices? ❑ #Does the facility provide all necessary secondary containment? #Does the Plan include a BMP summary? #Does the Plan include a Spill Prevention and Response Plan(SPRP)? #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? El 0 El EJ #Does the facility provide and document Employee Training? El E El El #Does the Plan include a list of Responsible Party(s)? #Is the Plan reviewed and updated annually? #Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? El 0 El El Comment: A Stormwater Pollution Prevetion Plan was not available at the time of inspection. (Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® 0 ® ❑ Comment: No qualitative monitoring reports were available at the time of inspection. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? #Were all outfalls observed during the inspection? ® ® #If the facility has representative outfall status,is it properly documented by the Division? El 0 El El #Has the facility evaluated all illicit(non stormwater)discharges? Comment: All storm drains at the facility connect to a small pond or sump that collects sediemnt and is cleaned a few times a year. Page 3 of 3