Loading...
HomeMy WebLinkAbout20081020 Ver 1_Site Inspection_20091112NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Colleen H. Sullins Director Dee Freeman Secretary Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 November 12, 2009 Subject: Inspection-NCSR 1102 Pearson Falls Road DWQ Project 08-1020 TIP No. B-4239 Polk County Dear Mr. Setzer: On November 5, 2009, I inspected the construction work at the new,bridge site on NCSR 1102, Pearson Falls Road in Polk County. Construction work appears to be going well. Both of the new MSE walls are almost complete. Rip rap has been placed at the base of each MSE wall. The erosion and sedimentation control structures, vegetative covering, and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office (Setzer) NCSR 1102 Inspection Letter November 2009 SURFACE WATER PROTECTION SECTION - Achav lle Regional Otrra 2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 One Customer service: 1-877-623-6748 NorthCarOllna Internet: www.rumatemuality.ora An Equal Opportunity \ Affirmative Action Employer ?/ V- "Ill 11? 4 DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: November 5, 2009 County: Polk Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 4014: 08-1020 NW Permit #:0 IP #: Project Name: Location of Project: FNCSR 1102 Pearson Falls Road B-4239 From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately 1 mile to the new bridge site Project Complete: ?Yes X No XU Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac low Name of Waterway(s): DWO Site Visits for DOT Projects Background Info North Pacolet River Basin/ Subbasin: Broad 030501 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B X?Class C ?HQW ?303d Listed ?WS-II ?ORW X?Trout ?WS-I ?WS-IV ?WS-V ?SB ?WS-III ?NSW ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: Authorized Stream Impacts: Additional comments: ?0-1/IOd'acre ?1/11i1to1/3rd acre ?1/3`d to 1.0 acre ?> 1.0 acre X?< 150 linear feet ?> 150 linear feet Reviewed project with DOT staff. Construction is underway on both end bents with both MSE walls almost complete. Sediment and erosion control structures appear to be working properly. Seeding and/or matting should be performed as needed. Rip rap has been placed at the base of both MSE walls. Maintain erosion control devices and continue with seeding and matting as required to protect State surface waters. NCSR 1102 Pearson Falls Road Inspection November 2009