Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
November 12, 2009
Subject: Inspection-NCSR 1102
Pearson Falls Road
DWQ Project 08-1020
TIP No. B-4239
Polk County
Dear Mr. Setzer:
On November 5, 2009, I inspected the construction work at the new,bridge site on NCSR 1102, Pearson Falls
Road in Polk County. Construction work appears to be going well. Both of the new MSE walls are almost
complete. Rip rap has been placed at the base of each MSE wall. The erosion and sedimentation control
structures, vegetative covering, and matting appear to be working properly.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Niki Maher, NPS Assistance and Compliance Oversight Unit
Mike Parker, Asheville Regional Office
(Setzer) NCSR 1102 Inspection Letter November 2009
SURFACE WATER PROTECTION SECTION - Achav lle Regional Otrra
2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX: 828-299-7043 One
Customer service: 1-877-623-6748 NorthCarOllna
Internet: www.rumatemuality.ora
An Equal Opportunity \ Affirmative Action Employer ?/ V- "Ill 11?
4
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: November 5, 2009
County: Polk Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 4014: 08-1020 NW Permit #:0 IP #:
Project Name:
Location of Project:
FNCSR 1102 Pearson Falls Road B-4239
From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately
1 mile to the new bridge site
Project Complete: ?Yes X No
XU Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other
If no, estimated date of completion:
Water Quality Concerns (DWQ):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone I Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
low
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
North Pacolet River
Basin/ Subbasin: Broad 030501
Wetland Type: ?Isolated ?Non-Isolated (Waters of US)
Stream Class: ?Class B
X?Class C
?HQW
?303d Listed ?WS-II
?ORW X?Trout
?WS-I ?WS-IV
?WS-V ?SB
?WS-III ?NSW
?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
X?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts:
Authorized Stream Impacts:
Additional comments:
?0-1/IOd'acre ?1/11i1to1/3rd acre
?1/3`d to 1.0 acre ?> 1.0 acre
X?< 150 linear feet ?> 150 linear feet
Reviewed project with DOT staff. Construction is underway on both end bents with both MSE walls almost
complete. Sediment and erosion control structures appear to be working properly. Seeding and/or matting
should be performed as needed. Rip rap has been placed at the base of both MSE walls.
Maintain erosion control devices and continue with seeding and matting as required to protect State surface
waters.
NCSR 1102 Pearson Falls Road Inspection November 2009