Loading...
HomeMy WebLinkAboutNCC200534_ESC Approval Submitted_20200212 J ROY COOPED ' covernor ' MICHAEL S.REGAN ,a�` • Secretary' „" BRIAN WRENN NORTH CAROLINA Acting Director Environmental quality .February 7,2020 LETTER OF APPROVAL Caviness Land Development,Inc. ATTN: Watson G. Caviness,President 1041 B Robeson Street Fayetteville,NC 28305. RE: Project Name: Brookwood Phase la—Lot 17 Acres Approved: 0.51 Project ID: MOORE-2020-038 County: Moore City: McNeill Township Address: Enfield Drive River Basin: Cape Fear Stream Classification: Other Submitted by: Larry King&Associates,RLS PA Date Received by LQS: January 24, 2020 Plan Type: NEW-Residential Dear Mr. Caviness: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 4B.0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(NOI) forth requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc. og v/NCG01. Please direct questions about the N01 form to Annette Lucas at Annette.lucas a,ncdenr.gov or Paul Clark at Paul.clark2ocdenngov.After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. North Carolina Department of Environmental Quality E Division of Energy,Mineral and Land-Resources 4::5f D. Fayetteville Regional office 1 225 Green Street.Sprite 7141 Fayetteville.North Carolina 28301 �rrsc cawcu ryy n,pn xurEa. �n®i 40"� 9tO,433.3300 Letter of Approval Caviness Land Development,Inc. February 7,2020 This letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .011 S(a)requires that a copy of the approved erosion control plan be on file at the job site. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Norm,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance,as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Timothy L. La B nty, PE Regional Engineer DEMLR Enclosures: Certificate of Approval NPDES NCGOI Fact Sheet cc: Larry King&Associates,RLS PA(via email) Debra Ensminger, Moore County(via email) Fayetteville Regional Office—DEMLR file