HomeMy WebLinkAbout20190800 Ver 1_Mit Plan Approval Letter_20200211ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Division of Mitigation Services
Attn: Jeremiah Dow
1652 MSC
NORTH CAROLINA
Environmental Quality
February 11, 2020
Raleigh, NC 27699-1652
(via electronic mail: jeremiah.dowPncdenr.gov)
Re: Boseman Buffer Mitigation Plan Approval
Dear Mr. Dow,
The Division of Water Resources (DWR) received a draft Mitigation Plan from the Division of
Mitigation Services (DMS) for the Boseman site (Site) in 2019, for review and approval under
15A NCAC 02B .0295 to be used as a buffer mitigation project in the Tar -Pamlico River Basin.
DWR reviewed the Mitigation Plan and provided comments and recommendations. DWR
received a revised Mitigation Plan that addressed all comments and recommendations. The table
below summarizes the timeline of the Mitigation Plan:
Project Site Name
DWR Project
Initial Mitigation
Revised
Public Notice
ID #
Plan
Mitigation Plan
Date
Received
Received
(Final Draft)
Boseman
2019-0800
November 21, 2019
January 24, 2020
N/A
By copy of this letter, the subject mitigation plan is approved. A copy of the final draft can be
found online at:
https:I/edocs.deq.nc.gov/WaterResourcesIDocView.asl2x?id= 1075869&dbid=O&repo=WaterResources
Please feel free to call Katie Merritt at (919) 707-3637 if you have any questions regarding this
correspondence.
Sincerely,
q U Ir
LMVA
Katie Merritt
401 & Buffer Permitting Branch
cc: DWR File Copy (Katie Merritt)
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NC CAROLINA _
"^tea /� 919.707.9000