HomeMy WebLinkAboutNC0004626_BIMS Report_20180731United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3� NC0004626 I11 121 18/07/31 I17
18 [Sj 19 L G j 20I I
21111111 11111111111 1111111 1111111
11111111111 r6
Inspection Work Days Facility Self -Monitoring Evaluation Rating 61 QA
— -Reserved —
67 70 Ij 71 IJ 72
J,
73I 74 751 —IL1 _1I _LL80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
08:10AM 18/07/31
18/01/01
PPG Industries Fiber Glass Products
Exit Time/Date
Permit Expiration Date
473 New Jersey Church Rd
08:25AM 18/07/31
22/05/31
Lexington NC 27293
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
///
Darrell Horner/ORC/910-428-9052/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Alan Toney,473 New Jersey Church Rd Lexington NC 27293//336-357-8151/
Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Self -Monitoring Program
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
Paul DiMatteo WSRO WQ//336-776-9691/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers
Date
EPA Form 3560-3 (Rev 9-94) Previous edttiLs are obsolete.
Page#
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NC0004626 I11 12 18/07/31 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mr. Horner called on Thursday, July 26 to say that he got the sampler set up correctly. He spoke to
Siemens who walked him through the flow meter's system and determined that 1 pulse was set at 100
gallons. At the known composite sampler setup, this means that the sampler was programmed to take
50 ml every 600 gallons, or approx. 45 litres of sample per 24 hour period. Mr. Horner said he
programmed it to take 115 mL every 113 pulses, which would yield approx. 5.5 litres of sample.
Mr. Horner called again on Monday, July 30 to say that he checked the sampler's pull volume and was
consistently getting closer to 250 ml, and had tried calibrating the volume but it did not help.
When I arrived for the follow up inspection to verify the sampler setup, Mr. Horner said that he spoke
with ISCO the previous day and they helped him troubleshoot the issue with the sampler volume. He
said that the tubing was routed incorrectly into the sampler, so it was running in reverse (the purge
cycle would pull a sample, and the sample cycle would purge water from the sample if it were high
enough). He rerouted the tubing and the sampler was now correctly set at 115 ml per 113 pulses, with
each pulse being 100 gallons. Aliquot volume was verified using a graduated cylinder. Mr. Horner said
he had not modified the sampler tubing since he became operator in February.
Page#
Permit: NC0004626 Owner - Facility: PPG Industries Fiber Glass Products
Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment:
Yes No NA NE
❑ ❑ ❑
Page# 3