HomeMy WebLinkAbout230009_Plan of Action_20200207PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIEc
Facility Number: 23_ - _00009_ County: Cleveland
Facility Name: Clover Ridge Dairy
Certified Operator Name: Jeffrey Max Cornwell
Operator#_988045
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to t
lowest point on the top of the dam for lagoons without spillways; and from the current liquid le,
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure E
Lagoon Name/Identifier (ID): Lower wsp
Spillway (Yes or No): _Yes_
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Fig
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
/Liquid
level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
pumped and hauled is reflected in section III tables. Included within this plan is a list of I
proposed sites with related facility number(s), number acres and receiving crop informatil
Contact and secure approval from the Division of Water Resources prior to transfer
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the attached Ple
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Fa ility
t el'?" . C l
ner/Manager (print)
Facility Owner/M
r (signature)
Phone: 766 J.
Date: Z
412,e
PoA Cover Page 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lower WSP
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x line d x 7.48 allons
12 ft3
85.5 feet elev.
87 feet elev.
2.75 inche
-7C, 7y ft2
1.3 /4-�7 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design / 2. days
g. volume of waste produced according to structural design 5 0, 3 7-0 ft3
h. actual waste produced = current herd # x line g Z ft3 c4'r,s
certified herd #
i. volume of wash water according to structural design 4 `j 9 ft3
j. excess rainfall over evaporation according to design y Z72 N ft3
k. (lines h + i +i) x 7.48 x 30 days = Z S" 39 5' gallons
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated ZO 11 P/',-I _ 57l Ib/1000 gal.
m. (lines e + k) x line I = Z 9 3 Ib PAN
1000
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./2,
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21/00 1
1.
structure ID: �� Jar �` ��
line m = -Z S
lb PAN
2.
structure ID:
line m =
lb PAN
3.
structure ID:
line m =
lb PAN
4.
structure ID:
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line m =
lb PAN
in.
lines 1+2+3+4+5+6
-I-S3
lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT RF APPI IFS ni IRINr. THIS sn
nnv p;:Qirm
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
U.
application
window'
I ZG3
-z
12-9
,state current crop enaing application date or next crop application beginning date for available receiving crc
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _ 2-9 1 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section II) _ s lb. PA
PoA (30 Day) 2/21/00 2
x. Crop's remaining PAN balance (line v from section 111) = la �7 1 lb. PA
y. Overall PAN balance (w - x) _ -- ! 03? lb. PA
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table an
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARR(ATIV'Et : y
I rF.f t 263 -I- i et CIj it r6. , Je c��Pri uz
e, Sup, Cc,tfi $�r c't•tI 6--, 510C N ti
t?rrLt'
L,4_ r
PoA (30 Day) 2121/00 3