Loading...
HomeMy WebLinkAboutNC0006190_9-27-2019 CEI Response_20200130Southqcftbw i 100 West Pine street,�jvr -'' AN 3 0 2_01 '\40p s LVITU PS1.1:111� NC DEQ - DIVISION OF WATER RESOURCES 610 EAST CENTER AVENUE SUITE 301 MOORESVILLE NC 28115 ►VITI4.1 I:111� Telephone 828-428-9921 Fax 828-428-9964 Maiden, North Carolina 28650 I AM WRITING THIS LETTER IN REPONSE TO THE NOTICE OF VIOLATIONS WE RECEIVED AFTER YOU COMPLETED THE COMPLIANCE EVALUATION INSPECTION ON SEPTEMBER 27, 2019. FIRST OF ALL, I WOULD LIKE TO THANK YOU FOR ALL YOUR HELP AND COOPORATION WITH SOUTH FORK INDUSTRIES WASTE WATER FACILITY. I ALSO WANT TO ASSURE YOU WE WILL BE DOING EVERYTHING POSSIBLE TO RESPOND TO AND REPAIR EVERYTHING CONTAINED IN THE REPORT. AS YOU KNOW WE ARE FAIRLY NEW AT RUNNING THIS TYPE WASTEWATER FACILITY BUT HAVE TRIED TO EMPLOYEE PROPER PERSONEL TO INSURE PROPER OPERATIONAL PROCEDURES. SOUTH FORK INDUSTRIES PERSONNEL HAVE MADE STRIDES IN ASSURING THAT ALL TESTING AND REQUIRED PAPERWORK HAS BEEN DONE IN TIMELY MANNER, WITH PROPER PROCEDURES, AND RECORD STORING.AFTER THOROUGHLY GOING THROUGH THE REPORT I THINK WE HAVE FAILED IN PREVENTATIVE MAINTENANCE PROCEDURES. I AM NOT MAKING ANY EXCUSES FOR THIS BUT WE HAVE SPENT THE LAST THREE YEARS MOVING OUR OPERATIONS FROM OUR LINCOLNTON LOCATION TO THE MAIDEN FACILITY. WE ALSO HAVE ADDED MANY PIECES OF NEW EQUIPMENT TO MEET OUR PRODUCTION DEMANDS. WE HAVE BEEN DOING MAJOR REPAIRS TO ALL AREAS OF THE FACILITY INCLUDING OUR WASTEWATER FACILTY.BUT WE HAVE LOTS OF WORK STILL TO COMPLETE. I HAVE NEGLECTED TO ENSURE PROPER WASTEWATER FACILITY PREVENTATIVE MAINTENANCE, BUT WILL INSURE YOU WE WILL NO LONGER DO SO. I WILL LIST BELOW ITEMS THAT WE HAVE REPAIRED AND A PLAN TO ADDRESS ALL ITEMS IN THE REPORT. DUE TO COLD WEATHER AND THE AMOUNT OF RAIN WE HAVE HAD, SOME OF THESE ITEMS MAY TAKE A FEW MONTHS TO COMPLETE AND SOME A FEW WEEKS. BUT WE HAVE MADE ALL THE ITEMS A PRIORITY FOR OUR FACILITY AND OUR PERSONEL. 1. WE NOW HAVE THREE AERATORS OPERATIONAL IN BASIN NUMBER ONE AND NUMBER TWO. WE HAVE ALSO HAVE ORDERED ANOTHER MOTOR AND MIXER TO HAVE A SPARE READY TO REPLACE ANY AERATOR FAILURES IN THE FUTURE.WE WILL DO SO IN AN URGENT MANNER IN WHEN REQUIRED IN THE FUTURE. 2. DUE TO THE WET AREA SURROUNDING THE STORM DRAIN WE WILL HAVE TO WAIT TIL DRIER CONDITIONS TO DO PROPER REPAIRS. WE HAVE TEMPORARILY ADDED SOME DIRT, HAY, AND NETTING TO THE AREA TO SLOW THE EROSION DOWN. WHEN CONDITIONS ALLOW, WE WILL ADD MORE DIRT, GRAVEL AND ROCK TO THE AREA TO CONTROL FUTURE EROSION IN THE AREA OF STORM DRAIN. 1 WILL SEND PICTURES Mw-11:l�e\1,y/:1:101 role] ►ylIaI � 3. WE THINK THAT WE NEED TO KEEP THE DUMPSTER AT THE BAR SCREEN AREA BUT DO AGREE THAT BETTER CONTAINMENT NEEDS DO BE DONE. WE BUILT A CONTAINMENT WALL AROUND THE DUMPSTER BUT FAILED TO SEAL THE AREA FOR PROPER CONTAINMENT. SEALER REQUIRES WARMER WEATHER TO APPLY. WE HAVE SURROUNDED THE AREA WITH ABSORBTION MATERIAL WE WILL MONITOR DAILY UNTIL AREA PROPERLY SEALED FOR CONTAINMENT. IF AFTER COMPLETED YOU DO NOT CONSIDER IT CORRECT, WE WILL EXPLORE ALTERNATIVE OPTIONS BUT THIS PROCEDURE WAS INSTALLED AND BEING USED BY DELTA APPAREL AS PART OF BAR SCREENING PROCESS AND LINT CONTAINMENT. 4. THE SECONDARY CONTAINMENT AREA FOR THE HYDROGEN PEROXIDE IS IN NEED OF MANY REPAIRS. WE HAVE NOT USED THE BRINE TANKS AND HAVE NO PLANS TO DO SO AT THIS TIME. OUR PLANS FOR THE CONTAINMENT AREA IS TO REPAIR CRACKS IN WALLS. SEAL ALL WALLS AND AREA INSIDE WALLS AND FLOOR WITH CHEMICAL RESISTANT SEALER THAT WILL CONTAIN ANY SPILLS IF FUTURE. THIS PROCESS ALSO REQUIRES WARMER WEATHER. WE NEED TEMPERATURES IN THE 60 DEGREE RANGE TO GET PROPER APPLICATION AND SEALING PROPERTIES. WE WILL DO THESES REPAIRES AS SOON AS WEATHER ALLOWS. I WILL SEND PICTURES OF REPAIRES AS SOON AS AVAILABLE. AS TO THE SMALL AMOUNTS OF RESIDUAL BUBBLING OF PEROXIDE IN THE AREA, WE HAVE COMPLETED REPAIRS AND CLEANING OF AREA. THIS WAS FROM SMALL LEAK AT PUMP WHEN PUMP IN OPERATION. THE VALVE IN QUESTIONS HAS A LOCK OUT DEVICE AND IS SECURED IN THE CLOSED POSITION TO ONLY BE OPENED BY PROPER PERSONEL. 5. DONALD BURKEY OUR WASTEWATER ORC HAS CONTACTED AN OUTSIDE VEDOR TO PROVIDE US WITH ESTIMATES FOR REPAIRING ITEMS LISTED IN THE CLARIFYING AND WEIR AREAS. ONCE WE RECEIVE THE ESTIMATES AND RECOMMENDED REPAIRES, I WILL INFORM YOU OF THE RESPONSE AND OUR PLANS FOR REPAIRES. WE WILL DO NECESSARY REPAIRES IN A TIMELY MANNER AS REQUIRED IN OUR PERMIT. I HOPE THIS LETTER ASSURES YOU THAT SOUTH FORK INDUSTRIES INC. TAKES THIS NOTICE OF VIOLATION VERY SERIOUSLY AND WILL MAKE ALL EFFORTS TO REMMEDY ALL ITEMS IN AS TIMELY MANNER AS ALLOWED BY CONDITIONS AT THIS TIME. IF YOU FIND ANY ITEMS LISTED AND REPONDED TO INSUFECIANT PLEASE CONTACT ME AT EVERETTE SOUTHFORKIND.COM OR 828-428-9921 AGAIN, THANK YOU FOR YOUR ASSISTANCE. EVERETTE OWENS PLANT MANAGER