Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6191201_Plan (Set)_20200210
Approval of this Plat/Plan does tee capacity or ewa er cap city. Utilities Notes ZOt gudrIonl water -cap t Jhve opm t may require tiona improvements to the existing approval. -- All utilities and drainage easements are to be It r%e�d in a Public Dedlc ted Utility or Drainage Easement w s capacity may n�_��ailoble. JThis d I a idi water system qndlor wastewatqr- systpm to et future water and waste water demands prior to a _ ___ \ a preliminary pat, construction Tan �ndlor n CDI 0 p en t, Town of Angie 0 refer t roved construct pans r ize locations. Minimum Build* g Set a i7� Min Zoned -6 ck IZP 1: 20' Line: 5' to Comer Lot by Street: I') F r LO Q A,,dr? q3 Rea Line: 11\b� ell 11� 15 uo-A 1505 FYMA FLOOD HAZARD A TEMEN T shownn this plat are no cc), 4,"ctasted t in the FEMA Flood Hazard "Z ne AE" as,01h wn in 1500 0 40 0 FEMA map No. 37. 68 �?� Effecti Date: 10103I06 X t le Z"- 7n el no c a/ d e Set IT 0yr_c, �v C-) . Nxm;�\ r__ WV PR _$VV 0 NOTE. TE: 00 'M -iw Cb \ p- 306 A IQ! x 70' Sig ft Tria gle --Z Z3 Z3 e C) h5 I be place t a// C�d 0 C3 KD 'eXo Section J, hose 2 -03 03 reet =tions as e' VICINITY MAP 1, , Benton lace 1�1�1 ctlz wn 0 No Scale Plot (ablnet Slide 5 OD J ,ce-% I V11ey A, AltmoN, LEGEND:o Lines Surveyed Telephone 'D B 9 42, Pag 1 Te Pedestal 10,962 P\P sq. ft. Lines Not Surveyed \13 Qi// / e� Monhol Tie or Adjoining Lines WV Water Meter 6 --/------ �_ 11 R-30 01 . r Right of Way Lines FH Fir ill Nancy A. Williams �/J V Pines t 9 Hydrant L= 6 p or _5 a Esm t. Daniel G. Willid 939,79 C), ti E(PIDS Existing Iron e !�6sement 65. ,,,Common ECM Existing ConcreteMo"m nt R .01'14 65.0, We t1an ds 7 819 C�W lRight-of-Wo D B J452,OpenL 0-- 2�89 N 81 EPK Existing P.K. Nail Cen terlin e N L, 5. - L sq. ft. n1, Preliminary Subdivision Plan L vnn Ridge Subdivision Town of Angier Black River Township Harnett County North Carolina Scale: I " = 100' Date: 8-22-19 Currently Zoned: R-6 (Angier ETJ) PIN: 0684-42-8059, 0684-41-8996, 0684-41-JIOJ PID: 040684 001J, 040684 0013 26, 040684 00271 0 100 200 GRAPHIC SCALE PREPARED 8 Y S TA NCIL & A SSO CIA TES PROFESSIONAL LAND SURVEYOR, P.A. C-083I 98 Depot Street, P.O. Box 730, Angier, N.C. 27501 (919) 639-2133 (919) 639-2602 (FAX) stoncilsurvey@gmaff com Developer Lynn Ridge of Angier, LLC 10305 Penny Road Raleigh, NO 27606 919-868-3586 DOT Comments 12-5-19 911 Comments 1-6-2020 Town Comments 1-10-2020 PKS P.K. Nail Set lot Cab* et Wesley wn I rot). 1-1 8 1 65.0 4 EMN Existing MAG Nail D.B.Plat Book M B 65.0 0 __1_1 .- 0. 625 A 3 0: P.B.,ok 7,15 MNS MAG Nail Set rppo. D 8 48J, age 2 sq. rt. . . . 15' 7 Plat of M 109 lk Maps D 0 /SS Iron Stoke Set B. M. 8� @0 -6 WV PIN arc, 48 715- s CSS Cotton Spindle Set 00 48.5' (6D9 21 15U 00 oqlque,_� ro Fire Hyd. Ay P 15� ECS E,,= Cc �(,,n Spindle Number 67506 S, Acres 27----- q. ft. Fiber Optics N ',Z,' fN. RRS sq� f I r N 0' 10,214 ELS Existing 41ghtwood Stake Ft. square feet PP Power P61e �Cq� 8 5. sq. ft. m 6 Poin t 10,224 tX Compute Xddres, '----QHE Overhead Elect n tr,, 00 20' iJ 799 Electric es S�. ft. ___000 N. C. G. S. North Carolinadti, AUTO -FLUSH 4_- --16,812 10,640 q. ft. HYDRANT 4b,6' ft sq. ft. NAD__27 North Americ0 a S ey sq, D 3 ;____N am 5 '-Commo E) R1W NA orth_A_m Datum of 927 Tracy Esc //a �7. 11 .7 0 198J American Datum D B 19J7, Page PP NOTES: — I D -Open -- N • Iron Stakes set at a// pr corners 67* _D , - I q - 9 0� XPJ Rood 00 Space unless noted other�e. 0=t0 3 __N�f I 12,592 ft. \I--/- 1 698 -0.6J8 Ac. c) (6 sq. ft. Q,' Q Typical Sign asement 4� • A7wc_s defer ;Linedeby. coordinate method. 7,150 1465 9q. All distance dim n slons are Horizontal hose 1 Simon McLaQb sq. ft. ft. No Scale Q1) B ton Selina McLamb sq. 5.01 — - ,around distances unless other lso-�icoted. 874 ?I Point 5.0 7O.-L (b 41 13 No s ft. 228... _15,OJO wptla A 10' x 170' Sight Triangle takes P15t_�Gbinet "F, Pe 782D D B J631, Page 6 6 103.5 precedence_'c�,� sign easeme 153,0' -sq. ft. t-:L Th I la a prell*,Minary an only. GI C) 8a, 7 4 N3 8,159 V) 13,849 sq. ft. -GtTd is no-t--;nten-6�d for sales or f6c-o-r—dati6n. 10, all 6.4, L 4- sq. ft. V/ Q) sq. -60-- 1 -393, M _ - Due to the geforded ,Z?�?Id ngtrurg,-of this plot, -5t,70 U-0- U I,--,-,---,--- )e d 2 3 r We t1on ds Note ,It doe,�i_.not Conform't���S.047-JO as omen z [IR14 45.0' 0 7 89-2626- 29-6' IeAar4� and _SUb_ie C_t-� Any impact to include,,, but not limited to, 110r--NHn___-J 7/ b g W/ e, lots shown ma ormay n-557-represent actuoJI lot layout. Refer subdivi plo-Ts-Yor final -1-1 HO 40-7 prior inspection, permitting aapproval lot dimemslons and ocreagre-s. 2J, IJO P bo, P q Ln 8 sq, ft by the Army Corps of Engineers,-__a�r 10,825 sq. ft. 11�1 1) 0 ent 0' DrainageDENR cn�lor NC D WQ. 0. 294 sq. ft. 0 10\1 0 19 1;1 7 7,794 ON 0 8 rn GJO 8,086 sq. ft. Course Bearing Distance L-I S 31*55'30" E 45.64' L-2 S 33'54'21 " E 52.55' L-3 S 35'31'54" E 5 1. BJ' L-4 S 36'564J" E 4 7. 75' L-5 5 36 *564J " E 5.70' L-6 5 38'32'43" E 5 1. J9, L-7 5 40'1,348" E 41.56' L-8 5 40*1,3'48" E 1. 66' L-9 S 42*01'10" E 55.76' L-10 S 43'2J44 E 27.50' L-11 S 727 522 W 149. 18' L-72 N 51 33 29" W 76.75 L-73 S 88*17'17" W 9.45' L-14 S 66*5020" W 55.55' L- 15 N 62*27'28" W 62.63' L-16 S 58 *17'10 " W 40.14' L-17 N 77*51'29" W 61.62' L-18 N 71'4444" W 92.75' L-19 N J6*44'74" W 21.59' L-20 S 81'29'38" W 36.76' L-21 N 64'37'14" W L-ZZ N 56JJ,38" W 108.88 L-23 N 4548,34 " W 66.56' L-24 S 85'59'IJ" W 32. 1 L-25 N 71 *1456 " W 104.04' L-26 S 49*23'57" W 31.01' L-27 N 53 *38J4 " W 24.32' L-28 N OJ*22J8" E 15.62' L-29 N 75'32'55" W 153. 16' L-30 N 264326" W 59.64' 1 073 sq, ft, Wetlands 7 17545wetlands L-31 N 27 *454,9" W 9J. J7' 0 s ft. 105.5' ft. L-J2 N cc- Z_ 165.4' 71.9' 70.5' 40'19'48" W 117. 62' -8 104.9' 1 0 e t1an ds L-J,3 N 68*23'30" W 248,61' 0 10. 55 P �&. I r 0. 20 253 sq. ft. AqPhase 2 SW y S M.M.I. sq. ft, a- PVC .0 J)roi -S-ite Dalb, an 533) ui 122 Benton Point 2 LhTd� Co d Note I Out 29171 8� PVC _gL bb D B J744,'Page 57Q, D B J744, Page 574, DB J746, Poge,673 and Map Number 2019-J40 -5- 65.0 Ir _::� Plat Cabinet "F, 1311de 50 Rachel L 15,788 AVh.1t C.6 optk q. Property h wn here`b—,not I ded In a watershed district. r1l C_ r.�ernenr --sq. D B JJ89, Po�"geO S 0 51 01 75 VIA 11�'roperty sh wn hereon is locate in Meduim Density Residential L d Use. P C "D Slide 9A 5, 98, � 6 No lot sh hereon shall ect access to SR 1504. Larry Curly and Mat� LLC .4,296 ----------- V_ �0 Ac. N t (T"overs4) In Su livision sq. ft. -16 692 1 D B 20 Page 44 1- M - 291.24 W PVC S, ft. c. Op en ace B.tt— - 28 93 ' 1 * 278 A Net Required 20. r)116 6. 3y _ 4@2 J g"3 3 7.286 Ac. In Traverse Provided Op Space (2J.07.) fo 2 e QJ htt�; 9,12,319 4.122 Ac. In Proposed P W Engineering Design . 50 g V >_,11 Cp t sq 1-1, 5� 4-- J 8,758 . ft. pol. ft. 01 ft Lots pykinne w wn , Angier Municipal Sewer or u Water 2.4 L/ sq. t. lol-size 6� Maximum lot size q. ft 9,295 e J, 1JO bi Averc e lot Size = 77 444 S ft. \A ft. 44� Minim 0, h m lot width R141 on\Cul—de—sa 40.0 Minim m lot width Rl� = &0. 00' sq. ft. 12,415 co 11�1 U6 Appro imately 868 near feet k7 Lynnridge Dr e D ee 8, J-96 �otely 1230 ineor feet in Meadow Vista Lane Common Open Space AUTI 11ro UO .91 Ap# sq. ft, <; 39 11,25-1 Approximately 147 linear fket in White Hart Court Nl"v/- .0, 1* 11 A c* Traverse HYDRANT sq, ft. "I \toly 417 ear ft in \Ashley Oaks Curt 7, 91 Approximate -sq ft. 61% Approximate) ear f tin �Vden Glen C urt - _� _IV_ 1 0, 20,796 12,000 0) Approximately 163 lin or feet In moss Oaks C, U t ♦ sq. ft. sq. ft. 7,165 6 L=Zd. t�,Ir \ApproximatelyJ052 linear feq Total in Develop ent 7 1 987--- noch ngineers , P.A. CONSULTING ENGINEERS & SURVEYORS 1403 NC Highway 50 South - Benson, NC 27504 Phone: (919) 894-7765 Fax: (919) 894-8190 E-mail: general@enochengineers.com NC Him License #C-2061 S. L) wn here n are ff) be 9 Public edicate R/ vv. H construct* 7 shalle in occtordan e with wn of Angier, Harnett County and/or -74 8,445 8 NO DOT Standards a applicable. vy Hands P sq. ft. 0 1 1 1 17,642 All lots shall b served by To of Angler Municipal Water and Sewer. Any utilities not located AUTO 10,5 5� U sq. ft. HYDRANT 150 sq, ft. in the � 0 lity Easement sha// 1have a public de icatdnde,dicoted on the recorded plots. Tft. h0, �'o. 31 9 All Drainage ea t are t be p manen & publi� maintenance of a// said drainage ea er ts 16 6, 4_ (�) 01 .1.1 shall be resp nsibili of t Homtowners Association an shall be enforced by restrictivet, 36 4 'JO L_ U, i d � =en �ants. t 8, 824 8' V1, 00 Refer to approved co struct n plans for a// final utility on,\dr 16,201 b sq. L, 6 CP olnage locations. q. ft. C-16. ZO ,-Q i0o &,Iult - \ Developer sh /Z -'on to t o 4// Town of Angi r, Horne �n 'd n d10 r N \1� 01X_ 8,41 11 0 @sq. Count V 9 0 ft - as a licable 12" soil and e sion regulations t t ` �± The hom e w ers a soc/ar/o shall b respon ible for 01� g all the Open Space, streat 16 r61 16,492 any or 0 drainage - ag I Yain n _k trees. and ft. d n easemen s acros any to or open space. Street --Trees, I-p&r-perMAY NOT be removed. a...:. Roll dwo AUTO -RUSHY 90 2' L 't Station No UNPEI�MITTED disturbon e is permitted within thsi� JO f Blueline stream buffer as shown hereon. io C) HYDRANT 21 01 U,//U Hydl ?t fights h // b installed qier-B-egula tio� ��=22- dth an ts and Street e 6 er Town wn pf-An 0 1 f IN 245.1' sq. ft. a I e K17 n V % f Yvonne r G ry Public Utility Easement,-, A at lines z�a// be d signe4dso d seal d by 0111censed engineer 2'-6" — �Tvn of A ier ring the perr��tting a d const ction phase. This is for planning re tren� only. All water lines tha serve fire hydrant shall e fire meet flow req*ements`� B 2447, Pa e 644--- 61�1' 8,888 a// b �7-976 X 0, sq. ft. _4 M Number J 17,188 VQI no ss than 6 eter and ♦V_� 6 10 2'-6" ROLLED TYPE GUTTER 24 e'walks shall bo�s* s an fire per\ Town OX Angier Standards and Specifications- ♦7 :7, 11,177 sq. t. V 8,264 01 - \ 'a-. I 15J,3 HHYDRAN \ % Sq. ft, ft. GENERAL NO TES. . 1 4 \IX 16,116 ZN 3 50' Right -of- ay J 1. CONTRACTOR SHALL VERIFY THE LOCH sq. 146 10, StreetStreet t & Tree, Utilit 4'-0- '�l 5'-0" 4'-O"Orainage Ysm O\, ALL EXIS NG 2 S Tree, UTILITIES, AND SHALL BE RESPONSIBLE FOR ANY D A Drainag 5 N 182 7' Wetland PaT�ement RESULTING FROM HIS ACTIVITIES. CALL UTILITY L ID -,i Isidewalk �1� 0 V J /I SERVICE 48 HOURS PRIOR TO EXCAVATION. 155.5'cn 0 11 -4 4 1112" 2. ALL CONSTRUCTION AND MATERIALS SHALL BE A CC ORL:� 114 114" lit ft THE TOWN OF ANGIER AND/OR NCDOT STANDA A E�C A L-13 LIffer N \CE W1 TH J. TOPOGRAPHICAL INFORMATION AS PER NO LIDA D TA. Greek 2" 3- .5 B Superpove s halt Mix P CIFIC \8" ABC, Type B Curb & Gutter 4. NO CONSTRUCTION SHALL BE STARTED PRIOR TO GRADING PERA�ff\ 9" STBC, Type A or 2'-6')�7 3 1-1/< S-9.5xsupe ave spholt ix BEING OBTAINED FROM HARNETT COUNTY EROSION CONTkTOLX IQ VIn, �, -9--R 4 _-T I D\\k? 978, ) V I - VP AT 90 ROAD cp?twn NT e 4 1-4— 1--- of To TO ca t LHBR-927 P sT LU Z J ri O 0 L w O D Z Z J r O 0 16 V A) 0 Q VICINITY A11AP No Scale -� -a TEMPORARY DIVERSION BERM (TDB (7 DAY STABILIZATION TIME FRAME -•-•-_-•--•-_-•-•- TEMPORARY SILT FENCE (TSF) D sonoon D LIMITS OF DISTURBED AREA TOTAL DISTURBED AREA=19.8 ACRES 100 EXISTING CONTOUR 100 FINISH GRADE CONTOUR CATCH BASIN DRAINAGE AREA me TEMP. SILT FENCE OUTLET (TSFO) REMP. ROCK CHECK DAM (TRCD) Phase 1 Ben ton Poin t Plat Cabinet "F". Slide 782D AV ^---,.1E74PORARY SKIMMER BASIN 11 W/BAFFLES \ 3 DA=1.2AC. 0S ik to \ TOTAL DRAINAGE AREA=2IAC. �, ASS r 1 Q10=(0.3)(7.2IN/HR}(2.1AC.)=4.5CFS PP VOL REQ'D=1,60 F/AC*(1.2AC)=2,16QGF SURFACE AREA REQ'D=325SF/CFS*(4.5CF5)-- 1,463SF TEMP. ROCK CHECK W R CO TOP L=50', TOP W=30', D=2' ` Sec t%On Jam, Ph aSE 1 r � � \ DRAINAGE AREA-0.7 (2:1 SIDE SLOPES - 7 DAY STA8IUZATION TIME FRAME TYP.) Ben ton Place �� DA=0.5 AC. \ 7-�- s�'CP�nD� 1'500SF Plat Cabinet "D'; Slide 199A/�� :< _' ��'' WEIR LN GT - \ / ( / \ SKIMMER SIZEWEIR -- 1.5' ` ^B :,\ VOLR REQUIRE 2.5' \ / ` YREQUIRED=3,fi00AGf(0.5AC)-1 SOOCF SKIMMER ORIFICE DVAMETER=1" ` / w.ti 3 \ 3t5 UPSTREAM SIDE QF CHE DAM DEWMERING TIME: 2.6 DAYS 1 \ 00- / fQIE: CLEAN BASIN WHEN 50% FULL DURING CONSTRUCTION. SILT FENCE WH * p Sect 3, Phase UPSTREAM AREAS ARE STABLE AGAINST EROSION AND PERMISSIOHN HI AS \ l ll Ben n Place BEEN OBTAINED FROM NCDEQ. REMOVE TEMP. BASIN INSTALL PER ENT oUt� PPS' TEMP. AND SEED ALL DISTURBED- PER SEED SPECS. l Plat Cabinet "E", Slide 50FZS ` \ cr / •ae / \ _ _- _- \� i - �CE awl I ------- �.. �, �, . � .•;.��.�� :.� W„v _� ; •r.-- Q11----------- ---- Common Ex G CONC. WASH OUT de � 0 / ------ f t „6fd3 h_,." a• ^ \., �i NPDES PERMIT BOX G ._ _ 4 �.=9?��>.�;_.,usE •CB� ,_^u. ,.�,t,. � �+ , cJg' Q �\ R/Q\i �/ t _ O f , l ..� --/f `! / ,._ Ex. dire H Fiber , Z� TEMP. ROCK CHECK DAM W R DRAINAGE ARFA=0.5 AC. A 5 AC. 010=1.4CFS '3r WEIR LENGTH-2.0 VOL REQUIRED--3,600CF ACi(0.5AC)-1,6000E ,. �g EX VATS 15'X40'X3'DEEP STORAGE ON 2. , 1 , W _ ^i+1Q'-73s„-'COmrklOn G'"i P U SIDE OF CHECK DAM _ 0 OJ PP 1 _ _. peen ti , - d� / _ _r ;,. 67 „" '4 / 3 3 i t Space:_ dt0 1, 4 c�\�d _ to --- •s.. OUTLET PRO N {� , ..1,.,�,/,.� _:..', /'. +_ f ,FT -,I -`a � _. --_--' r'I ) hf.�� �� .,n ,.., ,..;•- i3 s� � •4aa 5d ''I J,.. I" \qe \ 0 I tS p \ Ex. Sanitary S@wer Manhole Rim = 303.05 \ Inv in = 291.78 f PVC \ '' Inv Out = 291.71 \8 PVC Phase 2 Ben ton Point Plat Cabinet "F'; Slide SODALL INSTALL FORCE MAIN \ "� rM IN CUL-DE- OPEN cur METHOD. T\ SEE PAVEMENT�, REPAIR DETAIL 1 h •�.. � �' t;../ "" � � h s., r we _,..,_: ���� � v'�, SEEDING SPECIFICATIONS u ,� . c -'� •'' SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF O f :4.- ...,,. AGRICULTURAL LIME PER ACRE AND 1,000 LBS. OF 10-10-10 OR EQUIVALENT cy `;� `fCommon Open S ^e FERTILIZER PER ACRE. ace p Space ti TEMPORARY SEEDING WHERE TEMPORARY SEEDING IS REQUIRED PRIOR TO SEEDING OF PERMANENT LAWNS OR FILL SLOPES, PROCEED AS FOLLOWS: !' �'� `;; '`I y`✓ '� ` AUG. 15TH-MAR. 1ST SOW RYE GRAIN AT THE RATE OF r/ 120 LBS. PER ACRE .. MAR. 1ST-AUG. 15TH SOW GRAIN MILLET AT THE RATE ^:}l OF 40 LBS. PER ACRE. PERMANENT SEEDING rj SEASON VARIETY RATE(}I BS/ACRE) AUG 15 - NOV 1ST KOREAN LESPEDEZA 50 OR KOBE LESPEDEZA 50 ti AND TALL FESCUE 60 ' NOV 15 - MARCH 1ST TALL FESCUE 120 AND ABRUZZI RYE 25 MARCH 1 - APRIL 15 TALL FESCUE 120 , APRIL 15 - JUNE 30 HULLED COMMON BERMUDA 12 ; JUNE 30 - AUG 15 TALL FESCUE 60 --` AND BROWNTOP MILLET 25 MULCHING IMMEDIATELY AFTER SEED AREA SOWN, MULCH THE ENTIRE AREA EVENLY WITH A LAYER OF WHEAT STRAW TO PROTECT AREA FROM EROSION. MULCH TO BE APPLIED AT A RATE OF 75-100 LBS. PER 1000 SQUARE FEET. SECURING MULCH: Yvonne Y. Gregory � THE MULCH SHALL BE HELD IN PLACE BY EMULSIFIED ASPHALT BINDER ON D B 2447, Page 644 SLOPES 2 TO 1 OR STEEPER, OR AS REQUIRED. APPLY ASPHALT AT 0.10 Map Number 2007-976 GALLON PER SQUARE YARD. IN HEAVY TRAFFIC AREAS, USE TYPE "RS" OR "CRS" TO MINIMIZE REMOVAL OF TACK COAT. SYNTHETIC BINDERS MAY BE / TURER TO ANCHOR THE MULCH USED AS RECOMMENDED BY THE MANUFAC TEMPORARY CHANNEL LININGS IF REQUIRED SHALL BE INSTALLED IN AREAS AS SHOWN ON PLANS, OR AS REQUIRED TO PREVENT EROSION. LININGS AREA TO BE LEFT IN PLACE THROUGHOUT PERMANENT SEEDING PROCEDURE. MAINTENANCE I. TEMPORARY SEEDING: RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. Il. PERMANENT SEEDING: GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND "JUTE NET" TEMP. MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF SWALE LINER AS POSSIBLE. SHOWN RESEEDING --IF A STAND HAS INADEQUATE A UATE COVER RE-EVALUATE CHOICE OF PLANT MATERIALS I LS AND QUANTITIES OF LIME AND FERTILIZER. ?' 2 :• 1 1 RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE X5 4, 5 1 TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. SEE PER NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills PERMANENT SWALE "A" PROJECT SPECS shall be no greater than the angle that can be retained by vegetative cover NTS or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 14 calendar days of completion of any phase of grading be planted or otherwise provided with temporary or permanent ground SWALE CALCULATION TABLE cover devices or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 14 working days or 90 calendar days (whichever is shorter) following completion of construction or development. \ l VEGETATION MANTAINANCE: IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF THE YEAR IS NOT Q APPROPRIATE FOR PERMANENT SEEDING. ,�WetJanclxs` ; r �C fflllw,sol� TOTAL DRAINAGE AREA=2.9AC. 410=(0.3)(7.21N/HR)(2.9AC.)=6 CFS s VOL REQ'D=1,80DCF/AC*(2.9Aq)=5,220CF SURFACE AREA REQ'D=325SF/ *(6.3CFS)=2,048S'F` TOP L=70', TOP W=35', D=3'f ^- ^ (2:1 SIDE SLOPES - 7 DAY UZATION TIME FRAME TYP.) ^� SURFACE AREA PROMDED=Z459SF - VOL PROVIDED=5,604CF WEIR WIDTH=V y- SKIMMER SIZE 1.5' y- SKIMMER ORIFICE DIAMETER=4- DEWATERING TIME: 2.8 DAYS ✓ f f y� SEE NOTE O TSB#1 1 1 "JUTE NE ' TEMP. SWALE LINTER AS SHOWN I • 1 5A 15 6' SEE PER PERMANENT SWALE "B" PROJECT NTS SPECS LOT Q1O(CFS) SWALE SLOPE n NORMAL DEPTH (FT) VELOCITY (FT/S) SHEAR STRESS REQUIRED (PSF) SHEAR STRESS PROVIDED (PSF) SWALE TYPE 4/5 1.2 2.5% 0.03 0.14 1.9 0.22 0.45 A 8/9 4.0 0.9% 0.03 0.38 2.0 0.21 0.45 A 11 /12 6.0 0.7% 0.03 0.41 2.0 0.18 0.45 B 14/15 3.2 0.5% 0.03 0.39 1.6 0.12 0.45 A 16/17 2.9 1.5% 0.03 0.22 2.0 0.21 0.45 B 19/20 3.2 0.9% 0.03 0.33 1.9 0.19 0.45 A 22/23 1.2 2.4% 0.03 0.15 1.8 0.22 0.45 A OF Y. I 10 -V(P- ^ 1 -Wetlands- CO � t3 V10=4.9fps ' ID G CL Qfuli=.8.tcfs Z I-: Vfull=4.6fps 4 ' OUTLET P EG �N 2 _^ a 04 CLASS 1 Qfufl , _yf?�tE 3 7fpsl v Lo=4xD=Bit O Z CZ D50=3' ' / f, DEPTH=12' WW1=3XDO=4.W -1 1t W2=1.25XW1=6' _ � :_, � 11 i =,3" --��- -'"`•� - - - •]TEMPORARY SKIMMER BASIN W BAFFLS DA=2SAC. _ kkP4{♦=12' W1=3XDO=3.75' W2=1.25XW1=5' TOTAL DRAINAGE AREA=2.5AC. 010=(0.3)(7.21N/HR)(2.5AC.)=5.4CFS\• VOL REQ'D=1,8000F/AC*(2.5AC)--4500C1� SURFACE AREA REQ'D=325SF/CFSR(5 4CFS)-1,`55SF TOP L=60', TOP W 35', 0=3 ^ (2:1 SIDE SLOPES - 7 DAY STABIUZATION TIME FRAME TYP,) -^- SURFACE AREA PROVIDED=2,100SF VOL PROVIDED=4,734CF OUTLET PROTECTION J3 WEIR WIDTH-6' SKIMMER SIZE 1.5' �- - Q/0-4.Ocfs y� VI0=4.2fps SKIMMER ORIFICE DU+METER=1.25' DEWATERING TIME: 3.5 NAYS SEE NOTE O TSUJI Qfull=4.6cfs 31� G Vfult=3.7fps ^`ands ;. DO=1.25' ?` ZONE=1 CLASS=A ^ ^. La=4XDO=5ft ^ ' D50=3' lEM SKIMMER BASIN #3 W BAFFES `^ DEPTH=12' DA=2.7AC. ` W1=3XDD=3.75' TOTAL DRAINAGE AREA=2.7AC. W2= 25XW7=5 Q10=(0.3)(7.21N/HR)(27AC.)=5.8CFS VOL REQ'D=1,800CF/AC*(2.7AC)=4,86OCF -": OUTLET PROTECTION I4 Lindsey Cobb SURFACE AREA REQO--325SF/CFS*(5.8CFS)=1,885SF l Rachel Lilly Y TOP L=65', TOP W=35', D=3' 410=6.Ocfs D 8 3389, Page 760 (2:1 SIDE SLOPES - 7 DAY STABILIZATION TIME FRAME TYP.) ID", V1O=4.2fps P C Slide 9A SURFACE AREA PROVIDED=2,275SF Qfull=4.6cfs VOL PROVKD=5,169CF Vfull=3.7fps WEIR WIDTH-4 v .. DO=1.25' SKIMMER SIZE Le t U _ ZONE=1 s {. CLASS�4 OUTLET PROTECTION #5 SKIMMER ORIFICE DIAMETER=1.25' DEWATERING TIME 3.8 DAYS Lo=4XDO=5ft DA=T.tac _ D50=3" Q10=3.2efs SEE NOTE O TSB¥t DEPTH=12' V10=4.Ofps I Wt=3XD0=3.75' Qfull=4.6cfs _ W2=1 25XW1=5' VfWi 25fPs ZONE=1 =A . n,-��� _ _ Lo-_4X�-5ft _^ v^ D50=3' DEPTH=12' ^ W1=3XDO=3.75' i W2=1.25XW1=5' TEMPORARY SKIMMER BASIN #4 W BAFFLES 0 1 OUTLET PROTECTION 6 D TOTAI_ DDRRAL'C AINAGE AREA=2.9AC. =1.Oac Q10=2.9cfs 410=(0.3)(7.21N%HR)(2.9AC.)=6.3CFS ,. V10=3.fps Qfull=4.6cfa VOL REW D=1,800CF/AC*(2.9AC)=5,22OCF SURFACE AREA REQ'D=325SF/CFS*(6.3CFS)=2,048SF _ f Wuli=3.7fps TOP L=70', TOP W=W. D=3' DO=1.2W (2:1 SIDE SLOPES - 7 DAY STABIUZATION TIME FRAME TYP.) ZONE=1 -A SURFACE AREA PROVIDED=2,450SF CLASS VOL PROVIDED=5,604CF `^N ^� La=4XD0=5ft WEIR WIDTH=6' \ D50--3' SKIMMER SIZE: 1.5' DEPTH=12' SKIMMER ORIFICE DIAMETER=1.5' 8 - , Wt=3XDD=3.75' DEWATERINO TIME 2.8 DAYS _Q --. X i W2=1.25XW1=5' SEE NOTE O TS0l1 , TR D OUTLET PROTECTION 7 Juc Q10=3.2cfs ` ` V10=4.Dfps \ ; Qfull=4.6cfs Vfuli=3.7fps 20 DO=1.25' ig CLinns-a La=4XD0=5ft DEPTH=12' W1=3XDO=3.75' W2=7.25XW1=5' CONSTRUCTION SEQUENCE _ 1) INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE. 2) INSTALL EROSION CONTROL MEASURES AS SHOWN ON PLANS. 3) COMPLETE INSTALLATION OF SITE DRAINAGE NETWORKS AND SITE SWALES WITH ASSOCIATED EROSION CONTROL PROTECTION BEFORE BEGINNING SITE GRADING. 4) STRIP TOPSOIL. 5) GRADE SITE. 6) GRASS AREAS THAT WILL NOT BE: DISTURBED. 7) INSTALL UTILITIES. 7) PLACE BASE -COURSE 8) SEED AND MULCH ALL AREAS TO PROVIDE PERMANENT GROUNDCOVER WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, AND WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER PERIOD IS SHORTER, FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 9) MAINTAIN ALL TEMPORARY MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 10) NO SEDIMENT OR EROSION CONTROL MEASURES ARE TO BE REMOVED WITHOUT THE APPROVAL OF AN NCDEQ INSPECTOR: NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH I PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEAS URES ACCORDING TO THE APPROVED PLAN. THE : INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED.AT: HTTP://PORTAL.NCOENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. NOTE. A SEPARATE EROSION CONTROL PERMIT WILL BE REQUIRED FOR EACH INDIVIDUAL LOT PRIOR TO LAND DISTURBANCE. NOTE: NO SURFACE WATERS, WETLANDS, OR FLOOD ZONES ARE TO BE DISTURBED DURING CONSTRUCTION. PURSUANT TO G.S. 143-215.1 ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. 1) Ground Stabilization* Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions • Perimeter dikes, swales, ditches 7 days None and slopes • High Quality Water (HQW) 7 days None Zones If slopes are 10' or • Slopes steeper 7 days less in length and are than 3:1 not steeper than 2:1, 14 days are allowed. • Slopes 3:2 or 7-days for slopes hatter 14 days greater than 50 feet in length • All other areas None (except for with slopes flatter 14 days perimeters and than 4:1 H W Zones "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable" (Section IL3(2)(b)) NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGIER, NC 27501 NC LICENSED SOIL SCIENTIST LSS #1247 _ r 9'• ' 2 2 V10=5.Ofps O V ? 1� 'c3 , Qfull=8.9cfs Wull=7.3fps ZONE5' =1. ZONE1 CLASS=A _ y 1 La=4XDO=5fL ___ - , \ � D50=3 DEPTH=12' W1=3XDO=3.75' Wetlands W2=1.25XW1=5' ✓y,�^r.. ,� u ,.1 ` ,,,, s ..•i, TEMPORARY SIMMER BASIN IS W BAFFLES DA=2Z9AC. TOTAL DRAINAGE AREA=2.9AC. / t ,� Q10=(0.3)(7.21N/HR)(2.9AC.)=6.3CFS VOL REQ'D=1,80OCF/AC*(2.9AC)=5,22OCF SURVEYED BY SURFACE AREA REQ'D=325SF/CFS*{6.3CF5}=2.046SF 74P L=70', TOP W=35', D S TA NCIL & A SSOCIA TES Clara S. Young 9 =3' SURFACE AREA PROVIDED=2,450SF2:1 SIDE SLOPES - 7 DAY LIZATION TIME FRAME TYP.) PROFESSIONAL LAND SURVEYOR, P.A. C-0831 DB978 Pae414 g YOL PROVIDED=5f04CF WEIR WIDTH=6' ' 98 Depot Box t Street, P.O. B730, Angier, p g N. C. 27501 SKIMMER SIZE: 1.5' SKIMMER ORIFICE DIAMETER=1.5' (919) 639-2133 (919) 639-2602 (FAX) DEWATERING TIME 2.8 DAYS SEE NOTE O M%j stan cilsurvey©gmaii. com Developer Montague Development, Inc. 10305 Penny Road Raleigh, NC 27606 919-362-7336 GRAPHIC SCALE 100 0 50 100 200 400 ( IN FEET ) I inch - 100 ft. O • �o 4.4 ✓ N 5110 r 00 ol N u W U•�a`�� O Mw�°w bi)� U i Uoa W O 1¢- z ll 02 O w 0 _ 2 0 � LLJ > o0 ¢ CN U U N Q I o z O z � m 0 ¢ m ¢ m 0 75 Of a z ° LLJ le ILL z O (5 W Lj �w 0 z w W v } z 0 � C An z w O Ca w � d O a N O N I co O I N O ts" ZU z > C:)~� � ryO -�>v O OIf) \1W Q Cn � p ��¢ -u �..m= C.0 J w a CD c4 W G ( LL- w 0 -N Z wZ 5 c��z O 1i1 �L0 uW z0J W %Z-OQ a rz a> � z w _ 0 z Goa G Q a W W z z w C) W W 2-1 0 cm W G J m G �' o L) O 0 rA 1�1 a � Q 0 a� 5 U 7. S. G E a v 0 EE PROJECT:~ y0 VICINI TY MAP No Scale 100 EXISTING CONTOUR too FINISH GRADE CONTOUR CATCH BASIN DRAINAGE AREA Phase 2 Ben ton Point Plat Cabinet "F". Slide 809A LU z z 0 (D Lr) 0 z z C> C) 0' CL X V yv 11000' Clara S. Young D B 978, Page 414 in trot E A Conmkig Engnms S 1403 NC Hwy 50 South Berwti NC Z75041 (919)894-5731 CL 2 4 LU LU z LU A 0 2: LU 0 (D on • OP) 0 z -0 'j 00 4- 0 V (18 3 in gp� c) 0 Cn -0 U Cd 00 z ?fi Iz-1 E ZCn oo S 75 E 46i Et ensfy-Dtiabon-Frequency Data 5-Xe ti) + 0.5(End Section Codon-ring to FiltSlope) =1-5 Tfrne 6-; HW(4* Gortrded) + (112fte Dian-etef + jfQ(Gd`A),&(2"q)k 5 rnin. If) nin. 15 min- 30 ruin I hr 7.22 6.13 525 371 2A1 H=hf+hm 819 7.01 6.03 1 4.32 224 ff _4 9.96 7.71 &64 1 4+8 317 hM E,22Ke,(y)D j h1tensit", ofifty l Duration low'. 25'ff. 50 yr. STORM DRAINAGE -PIPE SCHEDULE Pipe Beg. hv+ ft, End trw End@ Len. DZ Slope Material W' Rat. C D.A. per CS Total DA, 010 025 050 cWt (ft) in. ( %) (SF) (acres ) (ds) (cfs) (cfs) WS) - PIA 292,55 24"NV 292.41 CB4A 18 24 0.8 RCP 0,013 0.30 257004 5.90 12.8 14.5 15.9 19.9 P1 292,41 CB1 29219 CB2 27 24 0.8 RGP 0-013 0.33 IW44 8.30 19-5 22.1 24-2 204 P2 292-19 CB2 292.05 FESI i8 24 08 RCP 0.013 0.33 17424 6.70 20.8 23.6 215.8 199 P3 295.1I r-63 294.9a CP3A 27 15 0.5 RCP 0 013 6.40 13068 0.30 0.9 1.0 1-1 4.5 P4 294-90 CP34 294..88 FES2 20 I5 0.5 RCP 0-013 0.40 4356 a 40 12 13 1.4 4.6 P5 291-96 CB5 291.82 CB& 1 27 1 15 0.5 RCP 0.013 0,40 1 52272 1 1.20 1 3.5 1 3.9 1 4,3 1 P6 291.22 CB6 291.72 FES3 1 20 1 15 1 0.5 RCP 0.013 MG 1 17424 1 1,60 1 4.6 1 5.2 1 5.7 1 46 P7 289,,03 cK 288.83 GB8 1 40 1 15 1 0.6 RCP 0,013 1 040 1 B7120 1 2.00 5.8 1 6.6 1 T2 4.fi 73 FES4 20 15 0.5 Rr- P 0.013 OAG 1 43,% 1 2,10 6.1 1 62 1 7.5 4. P9 287.56 CQ9 287,43 GBIG 27 15 0.5 RCP 0.013 0.40 1 43560 1 1,00 2.9 1 3.3 1 3.6 45 P10 287-43 CRIG 287.23 FES5 20 15 0,5 RCP 0-013 0.40 1 4356 1 110 12 1 3-6 1 19 4+6 P1 f 28613 CB11 280.60 CR12 27 1 15 1 0-5 RCP 1 0,013 040 1 39204 1 0.90 2.6 1 2.9 1 3.2 4-5 P12 2196,60 CB12 286.50 FESS 1 20 1 15 1 0,5 RCP 1 0.013. 1 0,40 1 143% 1 1.23 16 1 4.0 1 4.4 46 P13 295.71 CB13 286.55 CB14 1 32 1 15 1 05 RCP 0,013 040 435W 1.00 2-9 1 3.3 1 3, f, 46 P14 285.55 CB14 285.45 FES7 20 is 0.5 W IAA 1 3-2 1 3.6 1 3-9 4.6 P15 2,94.80 GB15 28400 1 FEW 1 69 j 15 1 1.2 1€MCP 0.013 GAG 1 17424 1 0.40 1 1-2 1 1-3-T 1A 1 7.0 . .. .... .. .. . ... Project Lynn Ridge Locafi.Gn Harnett Courdy, North Carolina Project No, 6007 Date -r4,2018 Na%mnbL ... .... .. . .... Repat�:d Byi Fleet Temple :Area (acres) H = Head Loss Due To Friction (ft) Hetao Loss Dile To Mimr Lossels, (k). -.-Ittensity anlft Fil£til,�'.Ss Coeffident .... .... ........ K,- Arrnrpnats I n-m Cnpffir iprl Pipe Leqqh (ftj Cd,= HiN = Headmiter Diameter ((in) ... 'PJV= Tailwater HEADWATER CALCULAnONS I CWfd owe( �fd Controlling Headnter mea&Aer Elevation T.G. Elevation Over - topping Pipe Cd HIN Tw H Ke Irn H HW PIA 0.6 29426 3.77 O. 1.5 039 0,44 296,62 cult 296,62 29TOG no P1 0,13 295-07 2,89 020 1,5 0.90 1AD 29618 Ckkiet 29610 296.35 to P2 0,6 295,08 1,00 0,15 1.5 1,02 1,17 29422 1 Wet 295,08 296,35 na P3 0.6 295.76 0.66 0,00 1.5 G.Oi 0,02 295.66 Wet 295.76 2-%.61 no P4 0.6 295-64 0-63 0,01 1.5 0-02 OM 295.53 Met 295,64 298.61 no PS 0.6 292,93 124 0.00 1-5 1 0.19 026 1 29332 1 OL4L-t 29332 295A6 w P6 1 0.6 293,06 0.63 0.10 1,5 1 0,33 GA3 29238 kkt 293.06 295A6 nG P7 0,6 290B1 168 0.32 1,5 1 052 0,B4 291,35 Cait f 29 P6 0,8 290.51 0.63 0 290.51 292.88 no P4 1 0.6 288,42 0.91 OD5 1 1,5 1 0.2 1 0.18 28&52 Outfe-t 209.52 2-91-06 no P10 1 0.6 28&34 OM 0,05 1 1-5 1 016 1 0,20 288.16 291.06 no Pill OB 28T65 0.99 0.04 1 1-5 1 0,10 1 O. 28734 CqL-t 287 74 1 290-23 1 no P12 0,6 287-59 0,63 0,06 11.5 020 026 257.38 tr*-A 297,59 1 290.23 1 no P13 0 L, 286,57 1 0,91 0D8 1!5 0,13 1 0,19 286.68 Odlet 286.615 289,21 no P14 OB MA6 1 0-63 005 1 1-5 0A6 1 020 28628 f et 286.A6 289M no 0,6 205-46 1 063 0-02 1 1-5 0,02 1 0:04 284.67 Wet 29546 IMPERVIOUS CALCULATIONS 1378171 SQ. FT. SUBDIVISION 6685 SQ. FT. SURFACE WATER (DITCH) TOTAL PROJECT AREA= 1 378171-6685= 1371486 SQ. FT, 1371486 X 0.24=329157 SF TOTAL IMPERVIOUS ALLOWED 329157 MAX ALLOWED -32031 SF SIDEWALKS -107865SF ROAD 189261SF FOR LOTS/77 LOTS =2457SF/LOT=189189SF SURVEYED BY STANCIL & ASSOCIA TES PROFESSIONAL LAND SURVEYOR, P.A. C-08JI 98 Depot Street, P.O. Box 730, Angier, N.C. 27501 (919) 639-2133 (919) 639-2602 (FAX) s tan cilsurveyggm ail. coin Developer Montague Development, Inc. 10305 Penny Road Raleigh, NC 27606 919-362-7336 GRAPHIC SCALE 100 0 50 100 200 400 ( IN FEET ) I inch = 100 ft 000� 6i 0 - CD CD Z 02 N- R 0 w < 0 co -i Z < 0 it U3 > LU t-- E; < C-4 Uj 0�'-' 0"'4 w I O 0 < < < M < m ry LU 0- Z z r) i�: LU �-' 0 LL Z 0 LL OW < Li LLJ 0 W Z w 0 Q 0 LLJ > < IL Cf) LLJ O LIJ O to CD CN CD CD I C14 O - P eoo� Cn Cu n Lij 0 z *0 wUj 0 F- <0(0 ry ry LLI 0 0 >- LLJ C.) LLI M > 0 0 0 M :2 0 F- 0 p LLJ >- a- -r ct� 0 OaV LLJ 0Lf') 0 .2 0 C) U z < ry LLJ Z o W 0 a- z tr) I 0 n --1 < X C) < 0 ry CU O EE PROJECT: 500�7 cD w S-4 0 OF 16 ) DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE. DIMENSIONS OF GRAVEL PAD: THICKNESS: 61NCHES MINIMUM WIDTH: 12-FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IF GREATER LENGTH: 50-FEET MINIMUM LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SiTE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES, �p so ,Pv4, AND ENTRANCES AT CURVES IN PUBLIC ROADS. 4O WASHING - iF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE �� •. ".;.:.;.::; . ; , MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING Q� OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING .: ,,.,`.; , . •t ..`"°:.:..: SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE ^' "• ••:'THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL s" Alta. ` ''' , '' *..• " 01 AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. 2-3" COURSE CONSTRUCTION SPECIFICATIONS AGGREGATE 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY EXISTING SLOPE FOR VEHICULAR TRAFFIC GRADE IT. PAVEMENT EE MAINTAIN BERM &VALLEY DG 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS TO PREVENT SEDIMENT LADEN SHOWN ON THE PLANS, AND SMOOTH IT. WATER FROM LEAVING ITE 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR 12" 10" OTHER SUITABLE OUTLET. -- 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY 24" 6» MIN ILTER FABRIC OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCUTRE USED TO TRAP SEDIMENT AND TEMPORARY CONSTRUCTION ENTRANCE CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO (NOT TO SCALE) PUBLIC ROADWAYS. CONSTRUCTION SPECIFICATIONS STORM PIPE - PLACE RIPRAP SO THAT IT FORMS A DENSE, WELL -GRADED MASS OF STONE WITH A MINIMUM OF FABRIC FABRIC BEGIN FILTER IC ��� VOIDS. THE DESIRED DISTRIBUTION OF STONES � END OF Pl RIP RAP APRON THROUGHOUT THE MASS MAY BE OBTAINED BY THICKNESS AS - ON77NUE FILTER FABRIC SELECTIVE LOADING AT THE QUARRY, AND PER PLAN BEYOND RIP RAP APRON CONTROLLED DUMPING DURING FINAL PLACEMENT. PLACE RIPRAP TO ITS FULL THICKNESS IN ONE RIP RAP GRAVEL SIZED & PLACED OPERATION. DO NOT PLACE RIPRAP BY DUMPING AS PER PLAN , ' THROUGH CHUTES OR OTHER METHODS THAT FE*S,-\ i CAUSE SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE THE UNDERLYING BASE OR % FILTER WHEN PLACING STONES. STORM PIPE � / � W2 MAINTENANCE RIPRAP SHOULD BE INSPECTED PERIODICALLY AND AFTER HEAVY RAINFALLS FOR SCOUR OR WI DISLODGED STONES. CONTROL OF WEED AND (3-Do) " " BRUSH GROWTH MAY BE NEEDED IN SOME La LOCATIONS. IMMEDIATELY MAKE ALL NEEDED (Apron Length) REPAIRS TO PREVENT FURTHER DAMAGE. R1P RAP APRON STABILIZATION DETAIL (NOT TO SCALE) .' . r` 4 Filter Cloth J ,-S 4' to 6' Cross -Section View CHECK DAM WITH WEIR (NOT TO SCALE) CONSTRUCTION 1.PLACE STRUCTURAL STONE (CLASS B) TO THE LINES AND DIMENSIONS SHOWN ON THE PLAN ON A FILTER FABRIC FOUNDATION. THE CREST WIDTH OF THE DAM SHOULD BE A MINIMUM OF 2 FEET. 2.KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW THE END WHERE THE DAM ABUTS THE CHANNEL BANKS. 3.PLACE SEDIMENT CONTROL STONE (#5 OR #57) ON THE UPSTREAM SIDE OF THE DAM THAT IS A MINIMUM OF 1 FOOT THICK. 4.PROVIDE AN APRON THAT IS 3 TIMES THE HEIGHT OF THE DAM. THE APRON WIDTH IS AT LEAST 4 FEET LONG, UNDERCUT THE APRON SO THAT THE TOP OF THE APRON IS FLUSH WITH THE SURROUNDING GRADE. 5.EXTEND THE STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 6.EXCAVATE SEDIMENT STORAGE AREA TO THE DIMENSIONS SHOWN ON THE PLAN. MAINTENANCE. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (J INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. UPSTREAM END OF OVERFLOW UPSTREAM END OF STORM DRAiN iI_II STORM DRAIN 11=III-"- "-III=1il Ii=III-" 1f3 PIPE i �l g DIAMETER 'Hill ij f I- I�III" I _ 11� 1I °> 3 j4» EXTERIOR PLYWOOD 3/4" EXTERIOR PLYWOOD -Ili-_ "=IIj-I1111 1T- II -III ' l __ =III i- 1 I �JII- BURY BOTTOM OF PLYWOOD PLYWOOD INLET PROTECTION ALL PARTIALLY COMPLETED STORM DRAINS, UP TO 24" PIPE SIZE, SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WITH STEEL FENCE POST UPSTREAM END OF THESE DETAILS. (TYPICAL) STORM DRAIN ZZIII-IIL- lid" UPSTREAM END OF It- STORM DRAIN OVERFLOW J Eiji i 1/3 PIPE u n u Ih DIAMETER Ill! ii I a WASHED STONE FILTER ll IIIII) 4 a .� ACROSS PIPE INLET 11 aJ WASHED STONE FILTER ACROSS PIPE INLET (I HARDWARE CLOTH III_ !�Il--HI=III ILI�I1=1Ih=III - -'r=1Il--IIi�{mill Ill IIL- '� lli,�llll �1I- �I �flilll Il1=Il1I III il11-7 I II-111i�ll-III Illir HARDWARE CLOTH ~III1 r=Ii EI LI II -111Ell U U U STONE FILTER INLET PROTECTION STANDARD PIPE INLET PROTECTION (PLYWOOD & STONE) a4• steel Poe aa• I Flgure6.62a Hatdateii ofaeedimentfer". Re 6W Practice stmWw ds and Spedf-do- Filter fabric 150-iSection View Filter f�r� aid b Natural m SILT FENCE DETAIL (NOT TO SCALE) Naturgroura 6AU t CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHE77C FILTER FABRICS 2. ENSURE THAT 77-IE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) J. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THT BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON 7HE UPSLOPE SiDE OF THE FENCE POST. WIRE OR PLAS77C ZiP 77ES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOE NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS WIRE OR PLASTIC ZiP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.620). 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SiDE OF THE TRENCH. 9. BACKFiLL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRi77CAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXIS77NG TREES 11. NO MEASURES ARE TO BE REMOVED UN77L DENR APPROVAL. INSTALLATION SPECIFICA77ONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART iN CRITICAL AREAS AND 6'FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH 7HREE TiES, ALL SPACED WITHIN THE TOP 8 INCHES OF FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES 7HROUGH THE FABRIC, Wl774 EACH PUNCTURE AT LEAST i INCH VER77CALLY APART. ALSO, EACH 77E SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN 77GHTENED TO PREVENT SAGGING 6. WRAP APPROXIMA TEL Y 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE W TH 3 77ES Z NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEWA77ONS BEFORE COMPACTION 9. COMPACTION IS VITALLY IMPORTANT FOR EFFEC77VE RESULTS. COMPACT THE SOiL IMMEDIATELY NEXT TO 774E SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKiD STEER, OR ROLLER EXERTING AT LEASY 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 ]RIPS MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFEC77VE, REPLACE iT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAiN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBU77NG DRAINAGE AREA HAS BEEN PROPERLY c Ye Flu 17r-n First Chamber Second Chamber 25%of surface area 25%of surface area Outlet zone 25% of surface area inlet zone, 259/b of surface area 5'Crest Width x Inflow Structure Skimmer V Dewatering Riprap s s, Device or Slope Drain Earthen embankment - Emergency with stabilized side slopes Spillway Baffles Compacted soil 22 min s \O\N 18 min i-- 6' typical Figure 6.20a Temporary earthen diversion dike. CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. 2. ENSURE THAT THE MINIMUM CONSYRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3, ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOWAREA AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED TO AVOID GULLY FORMATION. WHEN THE AREA ABOE THE TEMPORARY DIVISERSION IS PERMANENTLY STABILIZED, REMOVE THE DIVERSION AND FILL AND STABLIZED THE CHANNEL TO BLEND WITH THE NATURAL SURFACE. TEMPORARY DIVERSION DITCH (NOT TO SCALE) Arm Assambly •C' Enclosure Entry PERSPECTIVE VIEW wmunit ,WC End PVC Elbow PvVent Schedule 40 Cap Pipe PVC Pipe Water Surface PVC End Cap Schedule 40 PVC Tea PVC Pipe PVC Pipe }•Hoke in Y PVC Tea orifice underside M.Able Plate Hose s Bottom Surface END VIEW FRONT VIEW Plan View Inflow YJ structw^e 6.20.1 1 a • Dewateriag--Atlmv the maximum rea mnabiedetondon periodbefore the basin is completely dowatered (at least 24 hours). • Inflow rate --Reduce d,e mHow velocity and divert all sedmanafreo runoff. Emvgenry spillway Average > Area" Width W L • Armor basin water safe. at Baffles top of prinsital ilwov elevation Inflow Baffles r Freeboard Embankment CONS7RUCT10NN SPECIFICA77ONS structure 1 Grade the basin so that the bottom is level front to back and side to ide. . Install the coir fiber baffles immediately upon excavation of the basins. n 1 n Extend 9 gauge wire to basin side or install T-past to anchor 3. install posts cross the width of the sediment trap (Practice 6.62, S�,„� Sedtkn Drape baffle material overwire strand and baffle to side of basin and secure to vertical post Sediment Fence). i storage- View secure with plastic ties at posts and on wire every 12' 4. Steel posts should be driven to a depth of 24 inches and spaced O Figure s."cExaampleofasediment basin wthaakmmarmost and emergency spilvay.Fro. Pennsylvania maximum of 4 feet apart. The top of the fabric should be a minimum of 6 ernalo, am sediment Pollution Control Manual, March, 20as. -+--4`Max. inches higher than the invert of the spillway. Tops of baffles should be a minimum of 2 inches lower than the top of the earthen embankment. �,-•' . Install at least three rows of baffles between the inlet and outlet &64.6 P_ discharge point. Basins less than 20 feet in length may use 2 baffles. 9 Gauge Min High -a"�►'. Attach a 9 gauge high tension wire strand to the steel posts at a ties SKIMMER SEDIMENT BASIN Tension Wire Strand YMIN, Variable Depth of 6 inches above the spillway elevation with plastic or wire fasteners to prevent sagging. if the temporary sediment basin will be Shall SeSecuredconverted to a permanent stormwater basin of a greater depth, the baffle To Post To Support 1 Secure bottom of baffle to ground with eight should be based on the pool depth during use as a temporary sediment basin. CONSTRUCTION SPECIFICATIONS Baffle Material 1 ; ; 1 rstaples at 12" maximum spacing. 't I'"" Extend 9 gauge minimum high tension wire strand to side of basin or 'nstall steel T-posts to anchor baffle to side of basin and secure to 1. Clear, rub, and strip the area under the embankment of ail vegetation and root mat. 9 P 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from the bare areas. Complete the embankment before the area is Baffle Material erticol end posts as shown in Figure 6.65b. e the coir fiber mat over the wire strand mounted at a height of 6 . Drop 9 Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it property. Haul all objectionable material to the designated disposal area. Place temporary cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest the principal spillway immediately after construction(References: Baffle Material inches above the spillway elevation. Secure the coir fiber mat to the wire sediment control measures below basin as needed. Surface Stabilization). /��/^''*��-��• strand with plastic ties or wire fasteners. Anchor the matting to the sides and floor of the basin with 12 inch wire staples,approximately roximatel 1 ft o pP 1` part, Ethat fill material for the embankment is free of roots, woody vegetation, organic Z Ensure 10. Install porous baffles as specified in Practicel6.65, Porous Baffles. P p long the .bottom and side slopes of the basin. matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and . Do not splice the fabric, but use a continuous piece across the basin machine compact it. Over fill the embankment 6 inches to allow for settlement. 11. After all the sediment -producing areas have been permanently stabilized, remove the If the temporary sediment basin will be 11 Gauge 0. Adjustments may be required in fire stapling requirements to in J Y conditions. 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling structure and all the unstable sediment. Smooth the area to blend with the adjoining converted to a permanent stormwater basin Landscaping Staple p p ndividual site into the mud by excavating a shallow pit under the skimmer or providing a low support under areas and stabilize property. (References: Surface Stabilization). of greater depth, the baffle height should be the skimmer of stone or timber. based on the pool depth during Use as a p g I a , 1 i 1 3 t > 1. .. 1 1 _ I t' I _w . ) A i MAINTENANCE 4. Place the barrel (typically 4-inch Schedule 40 PVC pipe) on a firm, smooth foundation of Do such as sand, or crushed stone as backfiil MAINTENANCE temporary sediment basin. p �J impervious soil. not use pervious material gravel, around the pipe. Place the fill material around the pipe spillway in 4-inch layers and compact it INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT AND REPAIR Inspect baffles at least once a week and after each rainfall. Make an p y under and around the pipe to at least the same density as the adjacent embankment. Care SIGNIFICANT ONE-HALF INCH OR GREATER ( ) IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL required repairs immediately. must be taken not to raise the pipe from the firm contact with its foundation when compacting DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE Note: Install three (3) coir fiber baffles in basins _ i "`� Steel Post ; i T-ON Depth Be sure to maintain access to the baffles. Should the fabric of a baffle under the pipe haunches. FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT EXCAVATE THE SEDIMENT FROM THE at drainage outlets with a spacing of 1 /4 the collapse, tear, decompose, or become ineffective, replace it promptly. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before UNDERNEATH IT CAN BE EXCAVATED. basin length. Two (2) coir Tiber baffles can be Baffle Material should be secured to the bottom Remove sediment deposits when it reaches half full, to provide adequate crossing it with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE installed in the basins less than 20 ft in length and sides of basin using 12"landscape staples storage volume for the next rain and to reduce pressure on .the baffles. SKIMMER. with a spacing of 113 the basin length. Take care to avoid damaging the baffles during cleanout, and replace if damaged during cleanout operations. Sediment depth should never exceed 5. Assemble the skimmer following the manufactures instructions, or as designed. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER half the designed storage depth. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet iS FLOWING UNDERNEATH OR AROUND THEM. POROUS BAFFLES DETAIL FIGURE 6.65b After the contributing drainage area has been properly stabilized, remove all of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach rope to the skimmer and anchor it to the side of IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE WITH A PLUMBER'S SNAKE OR BY baffle materials and unstable sediment deposits, bang the area to grade, the basin. This will be used to pull the skimmer to the side for maintenance. REMOVED AND THE OBSTRUCTION CLEARED; FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE (NOT TO SCALE) and stabilize it. 7. Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. REPOSITIONING THE SKIMMER. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The THE EMBANKMENT,SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS edges may be secured with 8-inch staples or pins. The fabric must belong enough to extend down the slope and exit onto the stable ground. The width of the fabric must be one piece, not IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND joined or spliced; otherwise water can get under the fabric. If the length of the fabric is POOL AREAS. insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so that water cannot FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL flow under the fabric. Secure the upper edge and side of the fabric in a trench with staples or PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER pins. (Adapted from "A Manual for Designing, installing and Maintaining Skimmer Sediment FROM PLUGGING WITH ICE. Basins." February, 1999. J.W. Faircloth & Son). 8. Inlets -Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. (References: Runoff Control Measures and Outlet Protection). • rn Q 0 zo 00 00 G N O Qaf� W5 o T z5��� L © , [�Z U iw � ,-; Z z p W Z 0 011 rr V W QLULU 2 Q 2 Wo Z U cV O Q I O > 3 = o Q) an E O U -oo O m m G) �� Z0 LU I-_ O Q c` LL - o zrn (D W LV U LU v Ud o W } o z a U) Ca v m O 0 U N aa) �I I I I i I Ig 0 J J = 0 Lu LY LJ Z _J J � (O Q CO 0� t Q N ry WO LU z �wzc.) ,.>v © 0Z LLJ LID d z "5; 0 I r-) _ LLJ O 0 L0 LfJ Cc� 0 0-0ZLUZ (n ry O J _J C) O Q O JJ (1) = �OQ J - Er a a 0 c 0 E 0 -a a EE PROJECT: 5007 ~ LLI S 9 OF 16 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet g Y g1 may not apply depending on site conditions and the delegated authority having jurisdiction. i � • Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales ditches and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50 In p length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes swales (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 10 days for Falls lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary round stabilization shall be converted to permanent round stabilization as soon as g p g practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during. construction, selecting from the NC DWR List of Approved PAMS/Flocculants . 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. identify leaks and repair as soon as feasible or remove leaking equipment from th e project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bringused fuels lubricants coolants hydraulic fluids and other petroleum products , Y p to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash ) rece tacle on site to contain construction and domestic wastes. receptacle) 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to reventoverflow. Clean u immediately if pY p p t Y containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. if 50 foot offset is not attainable provide relocation of portable toilet behind silt fence or lace ,p p p on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. i ,ems • I A i- � CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewateri r r' ng o storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets n a n ets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals drums or bagged materials direct) on the round. gg Y g NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days an which no rainfall occurred shall be recorded as 'zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of _ At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per if the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, item (2)(a) of this permit. _ (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as - soon as possible.____ NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART iII SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. PART 11, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7colendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d).list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGOI SELF -INSPECTION, RECO:E�DKEEPING AND I\.EPORTING EFFECTIVE: 04/01 / 1 9 Figure 6.17e Channel Installation and Slope installation; Washington State Ecology Department rim•. � l i T Longitudinal anchor *.. Terminal slope and g P trench 1, channel anchor trench 6" Stake at 3"-5' intervals - a, p9 01 w r4 ot°ft+fr Gslot at 25' °p intervals Initial channelF07 ro Intermittent anchor trench check slot a" NOTE: 1. Check lots o be constructed e h s t onstruet per manufacturers specifications. 2. Staking or stapling layout per manufacturers specifications. Slope surface shall be smooth before If there is a berm at the top of placement for proper soil contact, slope, anchor upslope of the berm. %; Stapling pattern as Min. 2„ overla .` '�' Anchor in 6"x6" min. Trench per manufacturers and staple at 12" intervals. recommendations. Min. 6" overlap. Stople overlaps max. 5" spacing. Do not stretch blankets/matting tight -allow Bring material down to a level area, turn the end under 4 and staple at 12' the rolls to conform to any irregularities. intervals. For slopes less than 31-10, rolls Lime, fertilize, and seed before installation. Planting may be placed in horizontal strips. of shrubs, trees, etc, should occur of ter installation. Figure 6.17d Temporary Channel Liners; Washington State Department of Ecology J Excavate channel to design h4 Overlap 6" min. grade and crass -section Design depth ? Longitudinal I anchor trench Overcut channel 2" to allbw` t Ig a Il i,ttAr�: Ar I during seedbed preparation' f 6" Typical installation with erosion control blankets or turf reinforcement mats 6" 6„ Intermittent check slot Longitudinal anchor trench Shingle -lap spliced ends or begin new roll in an intermittent check slot Prepare soil and apply seed befog installing blankets, mats or of temporary channel liner. syst" r SEE PLANS FOR MATTING TYPE NoLwol 6r ,. otnd x �9 ;k r i "r 4 tip Yv v� lk 10;s q a" Filtzr Bzrm NC DCIIT #5., #57 ��s k3� shwa sto�z mr I 1• IBC CT td7 0-11 8.R(prop tJII5W2G St�11._ ROCK DOUGHNUT INLET PROTECTION (NOT TO SCALE) MAXIMUM PLACEMENT OF POST USING HOGWIRE WITH APPROVED EROSION CONTROL FABRICS TO BE 10 FEET. MAXIMUM PLACEMENT OF POST WITHOUT HOG WIRE USING APPROVED EROSION CONTROL FABRICS TO BE 6 FEET TO 8 FEET APART. POST METAL T-POST 5 FEET OR 6 FEET IN HEIGHT SILT -FENCE DEPENDING ON FiLL SLOPE.. OVER HOG WIRE FABRIC 36 INCHES IN WIDTH (MUST MEET ENGINEERS SPECIFICATIONS FOR EROSION CONTROL) CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS 1 RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5, WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. VARIES (SEE PLAN) SiLT-FENCE OVER HOG WIRE STONE #4 WASHED STONE TO BE PLACED 12 INCHES /a s 1g11.1. my-y w1 DEEP AT SILT FENCE TOP VIEW HOG WIRE 4%.4O W��"'TvAI l?!IMS'C' SILT FENCE-11� --Tf METAL FENCE POST METAL 1 SEDIMENT f CONTROL STONE CROSS SECTION NOTES: 1. Design velocities exceeding 2 ft/sec require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 2. Grass -lined channels with design velocities exceeding 6 ft/sec should include turf reinforcement mats Maintenance 1. Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. If erosion occurs due to poorly Controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover is established. NCb0T #5 or #f washed stone CONSTRUCTION SPECIFICATIONS 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WiTH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE LEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATION. 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUNDCOVER. ,P!'!'Yr!'!i'!"4i'Y•i'W'i!`Y4'4'4�'�i: `,VFi1YC!'YF4Y'IY4'Y4' `♦'4'!V'11PY' �414l14f4'!!4!4l1i�+4�4l1+f+414141f1t41141f14i44414�!<44ft4s4i4lfff4ll4i4f4f144444ff4�i4!llflff44f144 ♦4!i if ! t!l+i+{!lti/ !4!i♦+ffil4li+14!!i�{!1!{1t 11lMl1t14lNii4!!i1lNM !lN4H+1!liilliiiil4{iii flMtlf+44i lH4f{44f4lf{!{I 1!li1+{Nfi4HiiilllNti li �01149fi4f•44f49i414!•14i41f4444444a44!!4l+14,, rMNFON a'ii7!!`l4l/f1444f441f!ll44f14+1414441ff44+lf14144f41� f4144ff4f4{l1444l1If4414/44/44464f144f4l14441fi ;af Y•Y+�@'�Y.3P0.71a+toys aFj�'fdrd-+A•41414144!!!!l114f�1441444�f41tff4l/f4ff4f4t °!+l44+itflff414144l1fi4t414444+tfi4i,! ti E:o r14i1414�4!l4fi1444�f1444,Yt144f44{4+ , ° ♦ y .Y ��+ �'sPoW�3'ajlk'�y y� �c�'�'r"t�f� r ° ;4 a,Y �f�ialQ+1f4�1�41f1�t�I h�4ol�4�it1f �+ 1,4 ii.l4.i.!#.•:1.i.4A.l.•;iIAG tir„/Y..{,.r�Y.ffiY.,84Y. t'9xY/YY'g„(Y�. �q�:.,iS qer. :YA: iYilr.t Y.iisa.i.f.•!.!l.l.i�l4A r i • TEMPORARY STONE NUTLET FOR SILT PENCE ware cloth enings) STEEL r#5 0R #57 ED STONE ti f `ti'S MAINTENANCE INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE ARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. HARDWARE CLOTH & GRAVEL PROTECTION (NOT TO SCALE) 11:� ' e � W LL1 i Z Z W e, f $*i T,tee` C) J `e f '� O t r 1 .� /l%I € w / o o s � >/ r- � 00 5 U 00 g �Z00 00 inU r� rn M v U �WWJYw o ;3 Yn S~r N a� � U Vr..qo on aU �z ow Cr 0� U 0 0 U W O �C O J to W N E- Z U z � 4 o Udl Lu Q © >� a a Z O c' Z O CD F- to y I 00 U Of LLLI a- Z Lu LL O Z o O 0W LiU W W CL 2 Z � >- LIJ o Z:o ca > a U A ID ID N [p Q7 0 U 0 0 p co to ~; Cb N fY Cb 0 �- 0 c :i a� a) Z 06 -c C.) J c- tY Lu ry a- LLJ Z z 0>- i c- o w O� Qp-0 o r�N W u- � W O > Z ©ZU .>i� 3: OZZ M 0 0 LLI �1.0 O O LL0yij 0 P 0 c)Z (L rY ��I< w Z0Ld n-J © Zr7Q v E 0 EE PROJECT: 5007 \ '- E�1J