Loading...
HomeMy WebLinkAbout20160979 Ver 2_Construction Planting Complete Rpt_20200211ID#* 20160979 Version* 2 Select Reviewer:* Katie Merritt Initial Review Completed Date 02/11/2020 Mitigation Project Submittal - 2/11/2020 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* r Stream r Wetlands W Buffer V Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Jamey McEachran Project Information .................................................................................................................................................................. ID#:* 20160979 Existing IDr Project Type: r DMS r Mitigation Bank Project Name: Poplar Creek County: Johnston Document Information Email Address:* jmceachran@res.us Version: *2 Existing Version Mitigation Document Type:* Mitigation Bank Information File Upload: Poplar Creek Construction Planting Complete 1.82 MB Report.pdf Rease upload only one RDFof the corrplete file that needs to be subrritted... Signature Print Name:* Ryan Medric Signature:*        302 Jefferson Street, Suite 110 Raleigh, NC 27605 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400   res.us   February 11, 2020 Katie Merritt NCDEQ – Division of Water Resources 512 N. Salisbury Street, Archdale Building 9th Floor Raleigh, NC 27620 RE: Poplar Creek Construction and Planting Complete (DWR # 2016-0979v2) – 20 Percent Credit Release Ms. Merritt, Resource Environmental Solutions, LLC (RES) is pleased to inform you that mitigation earthwork, planting, and installation of monitoring devices has been completed at the Poplar Creek Buffer/Nutrient Offset and Stream Mitigation Bank. RES acquired 404 (SAW-2016-01985), 401 (DWR # 16-0979), and NPDES Erosion and Sediment Control Plan (JC# 19-003-P) permits prior to construction. Stream construction and planting was first completed in May 2019. RES originally setup the vegetation plots in June 2019. Based on a site visit conducted by NCDWR on July 9th, construction was determined to be incomplete until the IRT recommended updates were made. Reaches YB1-C and YB2-B were repaired in the fall of 2019. In December 2019, the areas affected by construction were replanted and RES remeasured the Stream Vegetation Plots 6, 7, 8, and a random plot. After all site work was complete, it was determined that the original four vegetation plot monitoring devices, Vegetation Plot 1, 2, 3, and 4 for the Poplar Creek Riparian Buffer and Nutrient Offset sections of the project were not impacted during site work and therefore were not remeasured in December. Sixteen tree species were planted, and the site yielded an average of 1,083 stems per acre and 26 stems per plot. Photos of the four fixed vegetation plots are attached as well as a map depicting the locations of the vegetation plots. All fencing was installed in July 2019. A Baseline Monitoring Report will be submitted once the updated As-Built Survey is finalized. The Baseline Monitoring Report will include updated buffer and nutrient crediting areas based on the surveyed stream and easement. No major modifications of the stream alignment were made during stream construction. Should you require further documentation, please let us know. Thank you, Ryan Medric | Ecologist Attachments: Planted Species Summary, Poplar Creek Baseline Stem Count, Vegetation Plot Photos, Vegetation Plot Locations   Poplar Creek Planted Species Summary Common Name Scientific Name Total Stems Planted Sycamore Platanus occidentalis 2,000 River Birch Betula nigra 1,500 Persimmon Diospyros virginiana 1,500 Water Tupelo Nyssa aquatica 1,200 Overcup Oak Quercus lyrata 1,200 Swamp Chestnut Oak Quercus michauxii 1,200 Willow Oak Quercus phellos 1,200 Bald Cypress Taxodium distichum 1,200 Green Ash Fraxinus pennsylvanica 1,000 Tuliptree Liriodendron tulipifera 1,000 Water Oak Quercus nigra 1,000 Buttonbush Cephalanthus occidentalis 600 Silky Dogwood Cornus amomum 500 White Dogwood Cornus florida 400 Blackgum Nyssa sylvatica 400 American Hazelnut Corylus americana 200 Total 16,100 Poplar Creek Baseline Stem Count Plot # Planted Stems/Acre Volunteers Stems/Acre Total Stems/Acre Success Criteria Met? Average Stem Height (ft) 1 1174 0 1174 Yes 1.8 2 1174 0 1174 Yes 1.7 3 1174 0 1174 Yes 1.6 4 809 0 809 Yes 1.6 Project Avg 1083 0 1083 Yes 1.7   Poplar Creek MY0 Vegetation Plot Photos Vegatation Plot 1 Vegatation Plot 2 Vegatation Plot 3 Vegatation Plot 4 1 3 2 4 ©0 250125 Feet Date: 2/6/2020 Drawn by: MDE Checked by: RTM Document Path: R:\Resgis\dropboxgis\projects\NC\Poplar Creek (bank site)\MXD\Monitoring\MY0\DWR\Figure 2 - CCPV - DWR.mxdLegend Proposed Easement Vegetation Plot Non-BPDP FixedVegetation PlotNon-BPDPRandomVegetation Plot Buffer Mitigation Restoration (0-50 ft) Enhancement (0-50 ft) Preservation (0-50 ft) Nutrient (0-50 ft) Stream Alignment Figure 2 - Current Conditions Plan View Poplar CreekBuffer Mitigation Site Johnston County,North C arolina 1 in = 250 feet YB2-A YB2-B YB3 YB1-C