Loading...
HomeMy WebLinkAboutNCC200520_NOI Application_20200211 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 2/7/2020 5:23:39 PM(NCG01 NOI Submission) Approve by Morman,Alaina 2/10/2020 12:01:05 PM(Review-Construction NOI 21672) • The task was assigned to Morman,Alaina by round robin distribution 2/7/2020 5:23 PM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 11,2020 5:00 PM 2/7/2020 5:23 PM Submit by McCoy, Suzanne 2/11/2020 7:26:23 AM(Payment Verification for NCC200520) * Johanna Taylor • McCoy,Suzanne assigned the task to McCoy, Suzanne 2/11/2020 7:26 AM • The task was assigned to DEMLR NCG01 Payment Team.The due date is: March 23,2020 5:00 PM 2/10/2020 12:01 PM �ThF1 1Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System 'D application for•• - .•-under NorthCarolina's General Permit 1 1111:STORIVWATER DISCHARGES associated with construction activities(or NORTH CAROLINA Enrlrnnmenfu�Qr�arlry A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Lot 79 Mount Vernon 2.County* Wake 3. Highway or Street 2028 Bowling Green Trail Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Raleigh 5.State* NC 6.Zip Code* 27613 7. Latitude* Enter the latitude in decimal degrees 35.9731 8. Longitude* Enter the longitude in decimal degrees(M.ST be negative) -78.7055 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/05/2020 Estimated Construction Project Start Date 10. Date to End* 01/05/2021 Estimated Construction Project End Cute 11.SIC(Primary)* Residential, Single Family Houses(SFE) (1521) Standard Industrial aassification for Development 12.Acres to be 0.81 disturbed* (including off-site borrow and waste areas) 13.Total site area 4.78 (acres)* 14. Post- 0.17 construction (Estimated) impervious area (acres)* NCC Project NCC-WAKE-2020-Lot 79 Mount Vernon Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Upper Barton Creek Wate rbody* t\brre of waterbody into which storrrwater runoff will discharge 15b.Waterbody 27-15-(2) Index No.* NC Waterbody Index I Lrrber Stormwater V No discharges will flow r Yes to additional wate rs* 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration-Legally Fbsponsible Entity and Individual Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Snyder-Hankins Custom Homes, Inc. Name* 2. First Name* Daniel L ff Corporation,enter Fbgistered Agent First Barre 3. Last Name* Snyder ff Corporation,enter Faegistered Agent Last%rre 3b.Title Vice President 4. Permitee E-mail johanna@snyderhankins.com Address* 5. Permittee 9192150712 Telephone No.* 6. Permittee Mailing Street Address Address* 8368 Six Forks Road Address Line 2 Suite 202 City State/Frovince/Region Raleigh NC Fostal/Zip Code Country 27615-5083 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 8368 Six Forks Road Address Line 2 Suite 202 City State/Frovince/Fbgion Raleigh NC Fbstal/Zip Code Country 27615-5083 us 8.Type of Individual Ownership* C. Site Contact Information Part C. ^ Roject Site Contact Inforrration ....................................................................................................................................................................................................................................................................................................................................................................................... 1. Primary Site Daniel L Contact-First Name* 2. Primary Site Snyder Contact-Last Name* 3.Title Vice President 4.Site Contact E- johanna@snyderhankins.com mail Address* 5.Site Contact 9192150712 Telephone No.* 6.Organization Snyder-Hankins Custom Homes, Inc. Name 7.Site Contact Street Address Mailing Address* 8368 Six Forks Road, STE 202 Address Line 2 STE 202 aty State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27615 United States 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. D. E&SC Plan Part D. ^ Erosion&Sediment Control(E&SC)Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 02/04/2020 Approved* 2. E&SC Plan Project SEC-031681-2020 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan Lot 79 Mount Vernon Approval- Approval 267.32KB S&E_SingleLot_PlanReviewChecklist_Septic.pdf letter/documentation Mast be R7Fforrrat Notes(Optional) Frovide any additional information that might help the reviewer better understand how uploaded documents support the application. 6. NOI Certification 79 Mount Vernon NCG01-eNO1-Certification-Form- Form 117.64KB 20190919-DEMLR-SW.pdf Mist be FDFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66(1) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Artcle;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* Daniel L. Snyder Title Vice President Organization Snyder-Hankins Custom Homes, Inc. Date* 02/07/2020 F. Tracking and COC Info NOI Tracking No. 21672 NC Reference No. NCG01-2020-0520 Uses'count_nurrber'variable(increrrented by SP) Certificate of NCC200520 Coverage (COC) Uses'count number'variable(increrrented by SP) No.* Count Number 520 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed(used to assign YY digits after"NOC'in COCno.)