September 17, 2019
LETTER OF APPROVAL
Yadkin County
ATTN: Lisa L. Hughes, County Manager
P.O. Box 220
Yadkinville, North Carolina 270SS
RE: Project Name: Yadkin Memorial Park Phase Two Improvements
Acres Approved: 8.0 Project ID: YADKI-2020-002
County: Yadkin City: Yadkinville Address: Old US 421
River Basin: Cape Fear Stream Classification: other
Submitted By: Yadkin County
Date Received by LQS: August 23, 2019
Plan Type: Recreational - New
Dear Lisa L. Hughes,
The subject erosion and sedimentation control plan has been approved by default. The
Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a
minimum of 30 days (15 days for revised plans) prior to the activity and the approving
authority must approve or disapprove the submitted plan within 30 days (15 days for
revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving
authority fails to approve or disapprove the submitted plan within the 30-day (15 days for
revised plans) period, the plan will be deemed approved. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above-named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas(&ncdenr.goy or Paul Clark at
Paul.clarkftncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation
be kept on file at the job site:
D �� North Carolina Department of Environmental Quality I Division of Energy.Mineral and land Resources
E
512 North Salisbury Street I 1612 Mail Service Center i Raleigh.North Carolina 27699-1612
« � /'� 919.707.9200
Letter of Approval
Yadkin County
September 17, 2019
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this Ietter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on
file at the job site. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right
of periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. in addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. This permit
allows for a land-disturbance, as called for on the application plan, not to exceed the
approved acres. Exceeding the acreage will be a violation of this permit and would require
a revised plan and additional application fee. In addition,it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Sincerely,
Dyl Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: Alfred Benesch &Company
ATTN: David Gusty, El
2359 Perimeter Pointe Parkway, Suite 3S0
Charlotte, NC 28208
Regional Office file