Loading...
HomeMy WebLinkAboutNCC200330_ESC Approval Submitted_20200211 ROY COOPER Governor Mf CHAEL S.REGAN secretary S.DANIEL SMITH NORTH CAROLINA Interim Directar Environmental Quality September 17, 2019 LETTER OF APPROVAL Yadkin County ATTN: Lisa L. Hughes, County Manager P.O. Box 220 Yadkinville, North Carolina 270SS RE: Project Name: Yadkin Memorial Park Phase Two Improvements Acres Approved: 8.0 Project ID: YADKI-2020-002 County: Yadkin City: Yadkinville Address: Old US 421 River Basin: Cape Fear Stream Classification: other Submitted By: Yadkin County Date Received by LQS: August 23, 2019 Plan Type: Recreational - New Dear Lisa L. Hughes, The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas(&ncdenr.goy or Paul Clark at Paul.clarkftncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: D �� North Carolina Department of Environmental Quality I Division of Energy.Mineral and land Resources E 512 North Salisbury Street I 1612 Mail Service Center i Raleigh.North Carolina 27699-1612 « � /'� 919.707.9200 Letter of Approval Yadkin County September 17, 2019 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this Ietter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. in addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition,it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Sincerely, Dyl Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: Alfred Benesch &Company ATTN: David Gusty, El 2359 Perimeter Pointe Parkway, Suite 3S0 Charlotte, NC 28208 Regional Office file