Loading...
HomeMy WebLinkAbout310413_Plan of Action_20200207Strickland, Bev From: Jonathan Miller <agrimentservicesjmiller@yahoo.com> Sent: Friday, February 7, 2020 4:45 PM To: Coburn, Chad Cc: Tharrington, Tom; West, Brian S Subject: [External] High Freeboard Notice for Farm 31-413 Attachments: Richard Lanier (31-413) Brown Farm 30DayPoA (2-7-20).pdf • 1 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov After all the rain both lagoons at 31-413 are in red. 1-13" 2-15" See attachment for PoA. Thanks, Jonathan K. Miller Office: (252) 568-2648 Fax: (252) 568-2750 Cell: (910) 289-0393 www.agrimentservices.com This electronic message contains information generated by Agriment Services Inc. and is solely for the intended recipients. Any unauthorized interception of this message or the use or disclosure of the information it contains may violate the law and subject the violator to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email immediately. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 2/7/2020 1. Structure Name/Identifier (ID): I Richard/William Lanier #1 FN: 31-413 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 13.0 inches 1 Q-, 5-11 inches 6.5 inches 43920 ft2 177949 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 61320 ft3 h. current herd # 1860 certified herd #1 1860 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/2/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) F1:19n ft' Oft3 26616 ft3 109627 gallons 1.92 Ibs/1000 gal. 552.1 Ibs. PAN PoA (30 Day) 2/21 /00 2/7/2020 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 2/7/2020 1. Structure Name/Identifier (ID): I Richard/William Lanier#2 FN: 31-413 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period 15.0 inches 19.5 inches 4.5 inches 42636 ft2 119594 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 47589 ft3 h. current herd # 1440 certified herd # 1440 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/2/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 475Rq ft' 0 ft3 26337.5 ft3 92162 gallons 1.08 Ibs/1000 gal. 228.7 Ibs. PAN PoA (30 Day) 2/21 /00 2/7/2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Richard/William Lanier#1 line m = 552.1 lb PAN 2. Structure ID: Richard/William Lanier#2 line m = 228.7 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1 +2+3+4+5+6= 780.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 3275 1 Small Grain 3.31 23.87 79.0 Oct. - Mar 3275 2 Small Grain 2.55 50.00 127.5 Oct. - Mar 3275 3 Small Grain 2.13 50.00 106.5 Oct. - Mar 3275 4 Small Grain 1.93 25.83 49.9 Oct. - Mar 3275 5 Small Grain 2.32 50.00 116.0 Oct. - Mar 3275 6 Small Grain 2.61 50.00 130.5 Oct. - Mar 3275 7 Small Grain 2.94 20.58 60.5 Oct. - Mar 3275 8 Small Grain 2.54 50.00 127.0 Oct. - Mar 3275 9 Small Grain 2.59 50.00 129.5 Oct. - Mar 3275 10 Small Grain 1.64 21.55 35.3 Oct. - Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 961.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 780.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 961.7 lb. PAN y. Overall PAN balance (w - x) = -181 lb. PAN PoA (30 Day) 2/21 /00 2/7/2020 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Pumping will occur as conditions permit. Have had almost 8" rain in past week. PoA (30 Day) 2/21/00 2/7/2020