Loading...
HomeMy WebLinkAboutNCG150061_NOV Response_20200131_�� —,,,s Harnett C 0 U N T, Y NORTH CAROLINA January 28, 2020 General Services / Regional Jetport Mr. Timothy L. LaBounty, PE Regional Engineer NC Department of Environment Quality Division of Energy, Mineral and Land Resources 225 Green Street, Suite 714 Fayetteville, NC 28301 Subject: Notice of Violation Harnett Regional Jetport NPDES Stormwater General Pernit-NCG150000 Certificate of Coverage NCG150061 Dear Mr. LaBounty: www.harnett.ora PO Box 940 615 Airport Road Lillington, NC 27546 Office Ph: 910-893-7536 Jetport Ph: 910-814-2740 Fax: 910-814-8263 /2 ;..0 OED-FAYETTEVILLE REGIONALOHICE This letter is in response to the violation notice the Harnett County Jetport received because of the site inspection of January 15, 2020. I wish to emphasize our commitment to address and correct the Action Items listed on the January 22, 2020 notice, and fully comply with all the requirements of the NPDES Stormwater General Permit- NCG 150000. As your letter indicates, both the Stormwater Pollution Prevention Plan (SPPP) updates and qualitative monitoring were not in compliance. This failure owned by the county will be corrected immediately and in partnership with our day-to-day airport operations contractor. Nevertheless, I am confident the failure resulted from new contractor personnel, less emphasis on SPPP training, lack of communication between myself and the jetport manager, and probably changes in operations. As we move forward, the contractor will perform the qualitative monitoring and together we will update the SPPP when and where needed. Finally, I will ensure SPPP training remains current, maintain up-to-date documentation and provide change and monitoring oversight. In order to ensure both the county and contractor maintain compliance, we are adding scheduled meetings, normally once a month, to discuss overall operations including SPPP actions, changes and any qualitative monitoring events/opportunities. These scheduled meetings will tracked using electronic calendar reminders and updates sent to both the contractor and county participants. Finally, our plan of action does include regularly scheduled meetings to discuss operations and provide oversight including SPPP actions, changes, and qualitative monitoring events. strong roots - new growth I do want to emphasize we are committed to correcting the violations and maintain compliance without further violations. We are committed to working hand -in -hand with our contractor and the Department of Environmental Quality to ensure correct discharge of stormwater from the jetport. Thank you for your consideration in this matter. If you need any additional information, suggestions or concerns, please contact me at 910-893-7536. Sincerely, Barry A. Blevins Director cc: Paula Stewart, County Manager Coley Price, Asst. County Manager Gary Peacock, Warren Aviation file strong roots - new growth