HomeMy WebLinkAboutPOA_2.7.2020_BS Turner Farm (00000003)PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 52 - 14 Facility Name: B&S Turner Farm Certified Operator Name: Billie Turner County: Jones Operator # 16838 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): _.1 —2 _ Spillway (Yes or No) Level (inches): 2. Check all applicable items no no 17 24 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Ran of Action is attached. Agronomic balance is within acceptable rang6 Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 12/19/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Billie Rave Turner Facility Owner/Manager (print) Phone: 252-939-5024 ', Ze,4.�� Date:02/07/2020 Facility Owner/ nager (signature) PoA Cover Page 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 1134.4 lb PAN 2. Structure ID: 2 line m = 860.8 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure., ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1995.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract i� p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 73 1 Oats 6.96 2.40 16.7 8/1 - 4/30 73 2 Oats 0.66 50.00 33.0 8/1 - 4/30 73 3 Oats _ 19.07 30.32 578.2 8/1 -4/30 73 4 Oafs 0.97 1.16 1.1 8/1-4/30 _ 73 5 Oats 8.06 26.68 215.0 8/1 -4/30 73 6 Oats _ 4.28 _ 50.00 214.0 8/1 -4/30 73 7 Oats 4.12 4.44 18.3 _ 8/1 -4/30 z+ 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1076.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1995.2 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1076.4 lb. PAN y. Overall PAN balance (w - x) = 918.8 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Farm has adequate PAN deficit at this time to land apply waste. Due to recent rainfall over the past week including rain in excess of 4 inches on 2/6/2020, sprayfields have beer saturated, and operation has not been able to irrigate. Given no more rainfall, anticipates resuming irrigation and did begin pumping on 2/11/2020. POA based on waste analysis dated 12/19/19. This thirty -day POA was prepared by Kyle Smith with Jones Co. SWCD. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr'. storm & Structural freeboard 19.51 inches c. line b - line a (inches in red zona) = 2.5 inches d. top of dike surface area according to design _ (area at below structural freeboard elevation) 87804 ft 2 e. line c/12 x line d x• 7.48 gallonsfft3 13u828 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design �1160�:7 ft3 h current herd # 352U certified herd # 3520 actual waste produced = current herd # x line = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/19/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 11 Fn47 ft3 0 ft3 53322.5 ft3 211147 gallons 3.26 Ibs/1000 gal. 1134.4 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 24.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 27.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 64500 ft2 e. line c/12 x line d x 7.48 gallons/ft' 120615 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 58023 ft3 h. current herd # 1760 certified herd # 1760 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/19/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 58023 ft' � 1ft 55094 ft' 141019 gallons 3.29 Ibs/1000 gal. 860.8 Ibs. PAN PoA (30 Day) 2/21 /00