Loading...
HomeMy WebLinkAbout250049_30-Day POA_20200131PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Faison Smith Farms #21 FN: 25-49 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard 1 /30/2020 a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 138266 ft2 e. line c/12 x line d x 7.48 gallons/ft3 258557 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 161410 ft3 h. current herd # 4896 certified herd #1 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/17/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1Fi14in ft' 0 ft3 83416 ft3 305216 gallons 1.92 Ibs/1000 gal. 1082.4 Ibs. PAN PoA (30 Day) 2/21 /00 1 /31 /2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Faison Smith Farms #2 line m = 1082.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1 +2+3+4+5+6= 1082.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. PAN balanceā€¢ .. - . . u. application window' 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3132.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 1082.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3132.8 lb. PAN y. Overall PAN balance (w - x) _ -2050 lb. PAN PoA (30 Day) 2/21 /00 1 /31 /2020 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Farm has new manager and operator that is taking over. Having pump issues at this time but are actively working to repair so lagoon can be pumped. PoA (30 Day) 2/21 /00 1 /31 /2020