Loading...
HomeMy WebLinkAbout28d_NCS000250_DewateringBasinDewatering Basin Design *items in red are inputs Version 2.27.09 The volume of the borrow pit dewatering basin will be based on a 2 hour retention time. Using the formula V= 8.0203 * Q * t where, V is volume in cubic feet, Q is the pump rate in gallons per minute (GPM), and t is the retention time in hours. The pump rate is not to exceed 1,000 GPM (60,000 GPH). STEP 1: Input required variables Pump Rate: Retention Time: Required Volume: 1000 GPM 2 hours 16040.E ft' STEP 2: Design of the Dewatering Basin The volume of the borrow pit dewatering basin will be based on a 2 hour retention time. The pump rate shall not exceed 11000 GPM (60,000 GPH). The contractor may desire a greater retention time for managing turbidity; however, work associated with this increased volume will be considered incidental. Final Required Volume: 16040.E lft,5 Design Depth: *not to exceed 3 feet Proposed Basin Side Slopes: :1 side slopes *must be at least 1.5:1 or flatter OPTIONS 2:1 (L:VIO 3:1 (L:VIO Suggested Top Width (ft): 52 43 Suggested Top Length (ft): 104 129 Final Design Top Width (ft): Final Design Top Length (ft): 112 138 Final Design Depth (ft): 3 3 Verify Storage (ft 16629.00 OK 16641.00 OK The dewatering basin shall be designed in accordance with the Borrow Pit Dewatering Basin Detail Drawing. Comments: