HomeMy WebLinkAbout23_NCS000250_SW I+M Manual_May2015NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
STORMWATER CONTROL
INSPECTION AND MAINTENANCE MANUAL
(LAST UPDATED: MAY 2015)
ow,
North Carolina
Department of Transportation
Highway
S l orni�04
NCDOT- HSP- 2010- 01
Table of Contents S[c�r117YVclfQr
ACRONYMS
GLOSSARY
CHAPTER 1
INTRODUCTION..................................................................................................... 1-1
1.1
Background..........................................................................................................
1-1
1.2
Purpose.................................................................................................................1-2
1.3
How to Use this Manual......................................................................................
1-2
1.4
Disclaimer............................................................................................................1-3
1.5
Contact Information.............................................................................................
1-3
CHAPTER 2
INSPECTION..........................................................................................................
2-1
2.1
Inspections...........................................................................................................
2-1
2.2
Frequency of Inspection.......................................................................................
2-2
2.3
Site Visit Preparation...........................................................................................
2-2
2.4
Safety Considerations..........................................................................................
2-3
2.5
Reporting and Record Keeping............................................................................
2-3
CHAPTER 3
MAINTENANCE.....................................................................................................
3-1
3.1
Maintenance of Stormwater Controls..................................................................
3-1
3.2
Routine Maintenance...........................................................................................
3-2
3.3
Emergency Maintenance......................................................................................
3-9
CHAPTER 4
REPORTING AND RECORD KEEPING...................................................................
4-1
4.1
Reporting Overview.............................................................................................
4-1
4.2
Inspection Documentation...................................................................................
4-1
4.3
LOS Ratings.........................................................................................................
4-2
4.4
Reporting Special Circumstances........................................................................
4-3
4.5
Stormwater Control Management System(SCMS).............................................
4-3
CHAPTER 5
BIORETENTION BASIN..........................................................................................
5-1
5.1
Stormwater Control Overview.............................................................................
5-2
5.2
Bioretention Components....................................................................................
5-2
5.3
Inspection and Maintenance................................................................................
5-3
5.4
Inspection and Maintenance Summary..............................................................
5-13
CHAPTER 6
FILTRATION BASIN...............................................................................................
6-1
6.1
Stormwater Control Overview.............................................................................
6-2
6.2
Filtration Basin Components...............................................................................
6-3
6.3
Inspection and Maintenance................................................................................
6-4
6.4
Inspection and Maintenance Summary..............................................................
6-10
CHAPTER 7
INFILTRATION BASIN............................................................................................
7-1
7.1
Stormwater Control Overview.............................................................................
7-2
7.2
Infiltration Basin Components.............................................................................
7-3
7.3
Inspection and Maintenance................................................................................
7-4
7.4
Inspection and Maintenance Summary..............................................................
7-11
ii NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Highway
Table of Contents (continued)
CHAPTER H
DRY DETENTION BASIN....................................................................................... 8-1
8.1
Stormwater Control Overview.............................................................................
8-2
8.2
Dry Detention Basin Components....................................................................... 8-3
8.3
Inspection and Maintenance................................................................................
8-4
8.4
Inspection and Maintenance Summary.............................................................. 8-14
CHAPTER 9
WET DETENTION BASIN....................................................................................... 9-1
9.1
Stormwater Control Overview.............................................................................
9-2
9.2
Wet Detention Pond Components........................................................................ 9-3
9.3
Inspection and Maintenance................................................................................
9-4
9.4
Inspection and Maintenance Summary.............................................................. 9-13
CHAPTER 10
HAZARDOUS SPILL BASIN................................................................................. 10-1
10.1
Stormwater Control Overview........................................................................... 10-2
10.2
Infiltration Basin Components...........................................................................
10-3
10.3
Inspection and Maintenance.............................................................................. 10-4
10.4
Inspection and Maintenance Summary............................................................
10-12
CHAPTER 11
STORMWATER WETLAND..................................................................................
11-1
11.1
Stormwater Control Overview........................................................................... 11-2
11.2
Stormwater Control Components......................................................................
11-3
11.3
Inspection and Maintenance.............................................................................. 11-4
11.4
Inspection and Maintenance Summary............................................................
11-14
CHAPTER12
SWALE................................................................................................................
12-1
12.1
Stormwater Control Overview...........................................................................
12-2
12.2
Swale Components............................................................................................. 12-3
12.3
Inspection and Maintenance..............................................................................
12-4
12.4
Inspection and Maintenance Summary.............................................................. 12-8
CHAPTER 13
LEVEL SPREADER.............................................................................................. 13-1
13.1
Stormwater Control Overview........................................................................... 13-2
13.2
Level Spreader Components..............................................................................
13-3
13.3
Inspection and Maintenance.............................................................................. 13-4
13.4
Inspection and Maintenance Summary..............................................................
13-9
CHAPTER 14
PERMEABLE PAVEMENT....................................................................................
14-1
14.1
Stormwater Control Overview.......................................................................... 14-2
14.2
Permeable Interlocking Concrete Paver Components .......................................
14-3
14.3
Inspection and Maintenance.............................................................................. 14-4
14.4
Inspection and Maintenance Summary.............................................................
14-8
CHAPTER 15
PREFORMED SCOUR HOLES....................................................................
15-1
15.1
Stormwater Control Overview..........................................................................
15-2
15.2
Preformed Scour Hole Components.................................................................. 15-3
15.3
Inspection and Maintenance..............................................................................
15-5
15.4
Inspection and Maintenance Summary............................................................. 15-8
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Table of Contents
REFERENCES
APPENDIX A INSPECTION CHECKLISTS
APPENDIX B NCDOT STORMWATER CONTROLS NAMING CONVENTION
sioriam-mer
iv NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Acronyms
ARC
Atlanta Regional Commission
BMP
Best Management Practice
DEO
Division Environmental Officer
DSO
Division Safety Officer
EPA
Environmental Protection Agency
FEMA
Federal Emergency Management Agency
HSB
Hazardous Spill Basin
LOS
Level of Service
NCDENR
North Carolina Department of Environment and Natural Resources
NCDLR
North Carolina Division of Land Resources (NCDENR)
NCDOT
North Carolina Department of Transportation
NCDWQ
North Carolina Division of Water Quality (NCDENR)
NCHRP
National Cooperative Highway Research Program
NPDES
National Pollutant Discharge Elimination System
NRC
National Response Center
PSH
Preformed Scour Hole
PSRM
Permanent Soil Reinforcement Matting
PVC
Polyvinyl Chloride
REU
Roadside Environmental Unit (NCDOT)
SC
Stormwater Control
SCMS
Stormwater Control Management System
iv NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
HNIM'in,
Glossary
Glossary
Attenuate
The reduction of flow in volume and/or force.
Best Management
A general term most often used to describe methods that are the most
Practice (BMP)
effective and practical means of preventing or minimizing pollution. The
term BMP is often used to describe the structures that are built to reduce
stormwater pollution.
Channelization
The process by which concentrated flow erodes a channel through areas in
or around a stormwater control that can lead to compromised performance
of the control or even failure.
Concentrated Flow
Water that is flowing in a channel or pipe, or that has otherwise collected
and is flowing in a manner not consistent with sheet flow.
Confined Space
A space that (1) is large enough and so configured that an employee can
bodily enter and perform assigned work; (2) has limited or restricted means
for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers,
vaults, and pits); and (3) is not designed for continuous employee
occupancy (29 CFR 1910.146).
Diffuse Flow
Another term used to describe sheet flow.
Drawdown
The lowering of a water level in a controlled manner.
Dredging
Most often done with a machine (commonly on a boat) used to scoop up
sediment, gravel, or obstructions from submerged areas (in this case,
stormwater controls), so as to deepen them or restore them to their original
volume.
Embankment
An earthen berm, constructed from fill material, used to store runoff in
basins.
Erosion The process by which a surface is worn away. In the context of this
manual, erosion refers to the process by which runoff washes away soil.
Impervious Surface A land cover through which water cannot infiltrate; examples include
concrete, asphalt, rooftops.
Infiltration The act of water soaking through the surface of the soil.
Intermittent Stream An intermittent stream has flowing water during certain times of the year,
when groundwater provides water for stream flow. During dry periods,
intermittent streams may not have flowing water. Runoff from rainfall is a
supplemental source of water for stream flow.
Level of Service (LOS) A rating system used by NCDOT that is assigned to each stormwater
control based on its condition after inspecting. Ratings are A, B, C, D,
and F. See Chapter 4 for a description of each rating.
Percolation The act of water traveling downward through the soil.
Perennial Stream A perennial stream has flowing water year-round during a typical year.
The water table is located above the stream bed for most of the year.
Groundwater is the primary source of water for stream flow. Runoff from
rainfall is a supplemental source of water for stream flow.
NCDOT SC Inspection and Maintenance Manual v
NCDOT- HSP- 2010- 01
Glossary
Permanent Soil A material used to hold soil in place so that vegetation can take root and
Reinforcement Matting prevent erosion; commonly used in areas with steep slopes or other erosive
(PSRM) conditions.
Riparian Buffer The term riparian refers to an area adjacent to a body of water. Riparian
buffers are naturally vegetated (undisturbed) areas through which
stormwater runoff passes as sheet flow so that infiltration of runoff and
filtration of pollutants occur before stormwater reaches the body of water.
Runoff Precipitation on land that eventually reaches streams and rivers.
SA Waters Tidal salt waters that are used for commercial shellfishing or
marketing purposes and are also protected for all Class SC and Class
SB uses. All SA waters are also High Quality Waters by
supplemental classification.
Sediment
Soil that has been eroded and deposited elsewhere; typically contains
pollutants and has a negative impact on aquatic environments.
Seepage
The slow discharge or escape of water.
Sheet Flow
A shallow layer of water flowing over land at a low velocity, enabling
pollutants to settle out.
Stormwater
A term used to describe water that originates from precipitation; often used
interchangeably with the term runoff.
Stormwater Control
A structure designed to manage stormwater and/or treat stormwater
(SC)
pollutants in an effort to reduce surface water pollution.
Suspended Solids
Small particles carried in stormwater as a result of erosion; regarded as an
indicator of water quality.
Toe (of embankment)
The bottom of the embankment where it meets the natural ground.
Vegetated Shelf
Also known as aquatic benches or shelves, vegetated shelves are those
shallow areas around the edge of stormwater controls with permanent
pools that support aquatic vegetation, both submerged and emergent.
VI
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
CHAPTER 1 Introduction
i
11111�!!Il1i111'
1.1 Background
Introduction
When it rains or snow melts, part of the water soaks into the ground, part of it evaporates, and
part of it flows over land. The part that flows over land is called stormwater runoff. In natural
settings, water from storm events is slowed by vegetation and other obstacles as it flows over
land. As a result, most of the stormwater infiltrates into the soil. This is beneficial to the
environment because it helps to maintain a relatively constant source of groundwater to streams,
rivers, and other bodies of water.
Unfortunately, this is not the case in developed areas. In developed areas, much of the land is
covered by hard surfaces such as buildings and pavement. These hard surfaces, due to their
impervious nature, allow little to no infiltration and stormwater in essence becomes a
transportation system for pollutants. As stormwater flows over hard surfaces it picks up oil,
antifreeze, salt, cigarette butts, paper and other pollutants. It also picks up soil and organic
material as it flows from hard surfaces and erodes less stable surfaces. Pollutants transported by
stormwater are deposited into streams, rivers and other bodies of water where they destroy
habitat and have a detrimental effect on aquatic insects, fish, birds, and mammals.
NCDOT SC Inspection and Maintenance Manual 1-1
NCDOT HSP 2010-01
Introduction ...w
The North Carolina Department of Transportation (NCDOT) has installed a number of
stormwater controls (SCs) across the state, within NCDOT rights -of -way, to reduce the amount
of pollutants found in stormwater. These are engineered structures or devices that are generally
designed to slow down or hold the water for a short time and remove pollutants before it is
released to a stream. Stormwater controls are widely referred to as best management practices or
BMPs. They are also called "post -construction" stormwater controls because they are designed
to stay in place and treat runoff after an impervious surface is built, as opposed to temporary
erosion control practices used during a construction project (such as silt fences and sediment
basins).
1.2 Purpose
Stormwater controls must be routinely inspected and maintained to ensure they continually
function as designed. If proper maintenance is not provided, adverse environmental impacts
such as the discharge of pollutants into ground and surface waters may occur.
In 1998, the NCDOT was issued a National Pollutant Discharge Elimination System (NPDES)
permit by the North Carolina Department of Environment and Natural Resources (NCDENR)
Division of Water Quality (DWQ). The NPDES permit authorizes NCDOT to discharge borrow
pit wastewater and stormwater runoff from its roadways and industrial facilities into North
Carolina's waterways, following proper stormwater management methods. Part II.B.4.b.(b) of
NCDOT's NPDES Permit requires that NCDOT develop a BMP Inspection and Maintenance
Manual. It states, "NCDOT will develop a written procedure outlining the inspection and
maintenance requirements for various types of stormwater BMPs. This document will outline
the regular inspection frequency, an inspection checklist, `how-to' instructions for regular
maintenance, evaluation and reporting procedures for nonroutine maintenance, and an inspection
and maintenance tracking mechanism."
This manual, entitled North Carolina Department of Transportation Stormwater Control
Inspection and Maintenance Manual, fulfills this requirement of the NPDES permit and its
intended use is to serve as a source of guidance to those individuals responsible for the
inspection and maintenance of SCs on NCDOT's rights -of -way.
1.3 How to Use this Manual
This manual is intended to be a practical tool to aid in the inspection and maintenance of SCs.
As such, the first several chapters include a general discussion of inspection requirements,
maintenance considerations, and reporting requirements for structural SCs. The remainder of the
manual features chapters on individual stormwater controls.
CHAPTER 2 — INSPECTION
Chapter 2 lists some of the common inspection procedures required for most stormwater
controls; however, it is critical that one refer to the individual chapters for specific inspection
guidance. On occasion, one may encounter control types with unique features that are not
covered in this manual.
1-2 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
Hi�Fh�•�n�
I� 5trirrrn��rt�
CHAPTER 3 — MAINTENANCE
Introduction
Chapter 3 outlines routine and emergency maintenance procedures that may be needed when
maintaining highway stormwater controls.
CHAPTER 4 — REPORTING AND RECORD KEEPING
Chapter 4 discusses the procedure for reporting and documenting inspection and maintenance
activities in the Stormwater Control Management System (SCMS, pronounced "skims").
CHAPTERS 5 THROUGH 13 — STORMWATER CONTROLS
Chapters 5 through 13 provide an overview of different types of stormwater controls. Included is
a general description of the SC and its components, guidance on inspection and maintenance
requirements for each component of the SC, photos of the SC in the highway setting, and
detailed diagrams of the SC.
APPENDIX A — INSPECTION CHECKLISTS
Appendix A provides an inspection checklist for each type of SC. This inspection form, which
covers structural components and areas of maintenance, is to be filled out at the time of the
inspection.
APPENDIX B — NCDOT STORMWATER CONTROLS NAMING CONVENTION
Appendix B provides a list of acceptable terms used to describe SCs, this memo includes a field
guide with photos and descriptions of the different types of post -construction stormwater
controls used by NCDOT.
1.4 Disclaimer
This manual provides guidance for inspection and maintenance procedures for typical
stormwater controls owned by the North Carolina Department of Transportation. These
guidelines are not intended to be a comprehensive reference on SC inspection and maintenance.
Additional references should be consulted as needed to maintain a safe and functional structural
control. Further, it would not be possible to properly address every configuration or issue that
might arise. Unique circumstances may require deviation from this guidance. Sound
professional judgment, resourcefulness, and ingenuity are expected and encouraged.
1.5 Contact Information
The information provided in this manual is intended to serve as a guideline to those individuals
responsible for maintaining stormwater controls. If a particular situation should require
deviation from the methods, procedures, and/or criteria presented in this manual, contact the
NCDOT REU at (919) 733-2920 for additional guidance.
NCDOT SC Inspection and Maintenance Manual 1-3
NCDOT HSP 2010-01
S:onnwaier•
CHAPTER 2 Inspection
IL
f 3P
r
•}' �L
2.1 Inspections
Inspection
Stormwater controls (SCs) must be routinely inspected and have the necessary maintenance
performed on them to be certain that they continually function as designed. Specific inspection
details for each SC are presented in Chapters 5-13 of this manual. Refer to the appropriate
chapter when completing the inspection checklist. The following is a list of problems that may
be encountered during an inspection.
General Site Conditions
■ Trash and debris
■ Animal burrows
■ Algae, stagnation, and odors
■ Vandalism
Structural/Mechanical
■ Obstructions of the inlet or outlet devices by trash, debris, and vegetative growth
■ Cracks and deterioration of inlets, outlets, pipes, and catch basins
■ Malfunctioning valves, sluice gates, locks, and access hatches
NCDOT SC Inspection and Maintenance Manual 2-1
NCDOT- HSP- 2010- 01
Inspection
■ Slow -draining infiltration devices
■ Inadequate outlet protection
■ Water seepage or ponding
Vegetation
■ Distressed aquatic shoreline vegetation
■ Poor and distressed stands of grass
■ Unwanted weeds, grasses, and woody plants
■ Bare ground
Ff iushwav
Sion!ixvaier
Earthworks
■ Excessive erosion or sedimentation, particularly in emergency spillways, filter strips,
or forebays
■ Cracks or settling in the embankment or berms
■ Deterioration of downstream channels
Spills/Releases
■ Hazardous spill
■ Illicit discharge
■ Illegal dumping
2.2 Frequency of Inspection
NCDOT stormwater controls shall be inspected annually at a minimum (unless otherwise
specified by environmental permits) and after any major rainfall event such as a hurricane,
tropical storm, or flooding.
2.3 Site Visit Preparation
Before going into the field to conduct inspections, one should be adequately prepared. The
following list summarizes items that may be needed when conducting SC inspections.
■ A copy of this manual
■ Copies of appropriate inspection checklists
■ GPS unit and local maps (if available)
■ Trash bags
■ A digital camera (if available)
■ A shovel, bush axe, and/or rake
■ Hand pruners and/or loppers
2-2 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
Higil�w an -� 'xr nwaier
2.4 Safety Considerations
Inspection
Safety considerations must be a constant focus during stormwater control inspections. Prior to
conducting the inspection, anticipate any potential hazards based on recent or current conditions
(i.e., flooding after a heavy rain). Always avoid hazardous conditions and document them on the
inspection checklist.
The following list highlights common safety concerns when performing stormwater control
inspections:
■ Never conduct inspections of confined spaces alone, without proper training.
■ Take precautions around standing water; depths are likely unknown and the ground
may be unstable.
■ Be alert and take proper precautions when entering and exiting the highway.
■ Park in areas that provide safe entrance and exit of work area; do not create potential
conflicts with other vehicles/equipment operating in the work area; and provide
maximum protection for workers entering and exiting the vehicle, especially along
open highways.
■ Always wear protective clothing, boots, and safety vests.
■ Be aware of large vertical drops and avoid standing on retaining walls or other
structures that present a fall hazard. Make a note of hazard areas on the inspection
form.
■ If toxic, hazardous or unknown substances are discovered in the area, leave the
vicinity and report the findings by contacting 911 and Division Safety staff.
■ Be aware of loose material (such as riprap), excavation drop-off, tripping hazards,
uneven ground, and other obstructions.
■ Be aware of poisonous plants, insects, and snakes.
Refer to NCDOT's Workplace Safety Manual (2004) for additional safety guidelines.
2.5 Reporting and Record Keeping
Observations made at the time of inspection pertaining to the status of the stormwater control
shall be documented according to the reporting procedures presented in Chapter 4 of this manual.
All inspection findings and maintenance activities should be noted on the appropriate inspection
form (see Appendix A), then entered into SCMS. Refer to Chapter 4 for further guidance on
documentation and entering information into SCMS.
NCDOT SC Inspection and Maintenance Manual 2-3
NCDOT- HSP- 2010- 01
S:onnwaier•
CHAPTER 3 Maintenance
3.1 Maintenance of Stormwater Controls
Maintenance
Stormwater controls (SCs) require two basic types of maintenance: (1) routine maintenance and
(2) emergency maintenance. All routine maintenance and/or emergency repair needs found at
the time of inspection should be identified and reported. Visual observations, contacts made,
maintenance performed, and any maintenance recommended at the time of inspection must be
documented using the reporting procedures presented in Chapter 4 of this manual.
If emergency maintenance needs are found, the inspector should either take immediate action to
correct the problem(s) or alert the responsible parties of maintenance and/or repair needs. A
follow-up inspection should be made to ensure that corrective actions have been satisfactorily
completed and normal operation has been restored. All correspondence and corrective actions
shall be documented.
This chapter describes the maintenance activities most commonly required when maintaining
highway stormwater controls. Actual maintenance needs may vary, depending on specific site
conditions.
NCDOT SC Inspection and Maintenance Manual 3-1
NCDOT- HSP- 2010- 01
Maintenance
3.2 Routine Maintenance
Routine maintenance is any procedure performed on a regular basis to maintain the proper
working order of a stormwater control. Tasks associated with routine maintenance include, but
are not limited to, the following:
■ Periodic maintenance of grasses, trees, shrubs, and other desirable plant species
■ Removal of undesirable plant species
■ Removal of trash and debris
■ Upkeep of mechanical/structural components
Since routine maintenance predominately involves some type of vegetation management
practice, it is anticipated that the majority of the routine maintenance will be performed by
Division Roadside Environmental forces.
Care should be taken to avoid using equipment that can cause soil compaction in or around
stormwater controls. Heavy equipment with narrow tracks or narrow tires, rubber tires with
large lugs, or high-pressure tires can cause excessive compaction resulting in reduced infiltration
and damage to underdrain systems. When mowing in or around a stormwater control, use riding
mowers or tractor mowers with turf -type tires, push mowers and/or weed eaters.
Safety considerations must be a constant focus when conducting routine maintenance. Refer to
section 2.4 for a list of common safety concerns.
3.2.1 DESIRABLE VEGETATION MAINTENANCE
Desirable vegetation is an important component of many stormwater controls. Turf -type grasses,
native/ornamental grasses, trees, shrubs, and herbaceous plants help control erosion, provide
structural stability, and remove pollutants from stormwater runoff. Desirable vegetation can also
enhance the aesthetic appeal of stormwater controls and enable them to blend into the landscape.
Periodic maintenance of desirable vegetation is required to ensure that it remains healthy and
established. Climatic conditions, lack of proper maintenance, storm events, vehicular/equipment
traffic, and vandalism can have a detrimental effect on plant material. Provisions may be needed
to supplement or replant some vegetated areas due to plant loss. Supplemental and replacement
planting should occur during the appropriate planting season for the particular plant species
being utilized. These new plantings will require additional care until they are established.
The following are general guidelines for the maintenance of turf -type grasses, native/ornamental
grasses, trees, shrubs, and herbaceous plants used in association with stormwater controls.
Additional information and guidance can be found in NCDOT's Vegetation Management
Manual (NCDOT, 1998).
3-2 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
HigIllwaN,
Maintenance
Turf -Type Grasses
Turf -type grasses are common to most stormwater controls. They can be the major component
in a stormwater control's makeup or simply used to stabilize the areas surrounding a stormwater
control.
Turf -type grasses provide soil stability, reduce water flow velocities, and help maintain the
structural integrity of stormwater controls. They serve as pretreatment for stormwater controls
by slowing the overland runoff and filtering out sediment and pollutants. If maintained properly,
turf -type grasses can also improve access to stormwater controls, making inspection and
maintenance tasks easier. The following is a list of the turf -type grasses most commonly used in
association with stormwater controls.
Turf -Type Grasses
Eremochloa ophiuroides
Centipedegrass
Cynodon dactylon
Bermudagrass
Zoysia japonica
Zoysia
Festuca arundinacea
Tall Fescue
Paspalum notatum
Bahiagrass
Poa pratensis
Kentucky Bluegrass
CENTIPEDEGRASS, SOURCE: ViRGiNiA TECH WEED ID GUIDE
Provisions should be made to reestablish a uniform cover of turf -type grass on those areas
damaged by sediment accumulation, stormwater flow, and/or vehicular/equipment traffic.
Failure to maintain a uniform turf -grass cover could result in structural failure and sediment loss.
Any turf found not in a healthy growing state should be evaluated to determine the maintenance
needs (i.e., fertilization, repair seeding, sodding).
Mowing should be tailored to the specific site conditions, turf -grass type, and seasonal
variations. Ideally, turf -type grasses should be mowed at a frequency to maintain a maximum
height of 4 inches for warm -season grasses and 6 inches for cool -season grasses. However, on
highway right-of-way facilities, it is more practical to maintain grass height between 6 and
15 inches. Mowing activities should include trimming grass around fences and structures. All
clippings discharged from mowers or string trimmers should be directed away from the
stormwater device so they do not add nutrients to the water.
Herbaceous Plants and Native/Ornamental Grasses
Some stormwater controls have as a part of their makeup a carefully designed mixture of
herbaceous plants and native/ornamental grasses. This plant material is essential to the operation
and function of the stormwater control. Planted within certain stormwater controls, this plant
material not only stabilizes the soil and prevents erosion, but it also removes nutrients, metals,
and other pollutants from stormwater runoff. The following is a list of the native/ornamental
grass and herbaceous plant species most commonly used in association with stormwater controls.
NCDOT SC Inspection and Maintenance Manual 3-3
NCDOT- HSP- 2010- 01
Maintenance
Herbaceous Plants
Aster laevis
Smooth Aster
Echinacea purpurea
Purple Cone Flower
Eupatorium fistulosum
Joe Pye Weed
Helianthus angustifolius
Swamp Sunflower
Heliopsis helianthoides
Ox Eye Sunflower
Hibiscus moscheutos
Marsh Mallow
Iris virginica
Blue Flag Iris
Lobelia cardinalis
Cardinal Flower
Monarda fistulosa
Wild Bergamot
Rudbeckia subtomentosa
Sweet Coneflower
Solidago speciosa
Showy Goldenrod
Tradescantia virginiana
Virginia Spiderwort
Verbena noveboracensis
New York Ironweed
Native/Ornamental Grasses
Andropogon gerardii
Big Bluestem
Andropogon glomeratus
Bushy Bluestem
Chasmanthium latifolium
River Oats
Juncus effusus
Soft Rush
Muhlenbergia capillaris
Pink Muhly Grass
Panicum virgatum
Switch Grass
Scirpus cyperinus
Wool Grass
Sorghastrum nutans
Indian Grass
Spartina alternifolia
Smooth Cord Grass
Spartina bakeri
Cord Grass
JOE PYE WEED, SOURCE: NCDOT
WOOL GRASS, SOURCE: NCDOT
Herbaceous plant material should be allowed to die -back at season's end. Stalks and other dead
plant material may be cut as needed to maintain the stormwater control's aesthetic appeal. All
cut material should be removed from the site and disposed of properly.
Native and ornamental grasses, with the exception of evergreen species, should be cut back every
two to three years based on the plant's growth during that period. Use a chain saw, hedge
trimmer, or any other cutting device that will not pull the crown from the ground. Top growth
should be cut to a height of 4-12 inches, and all cut material should be removed from the site and
disposed of properly.
Cut back of native and ornamental grasses should be delayed until the late winter months (mid -
February to mid -March) to take advantage of their ornamental quality. While in their dormant
state, most native and ornamental grasses have an ornamental quality that is desirable until new
growth begins in the spring. If these grasses are cut back too early, this added benefit will be lost.
3-4 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
Higill�� �n
5trirI \i �rrA
Note: Evergreen native grass species such as
Juncus should not be cut back. Evergreen
species have ornamental qualities year round and
provide an added bonus of pollution uptake while
other native grasses are in their dormant state.
Cutting back can be detrimental to evergreen
grass species. Established plant material is very
slow to recover when compromised, and the end
result is often death of the plant.
Trees and Shrubs
Maintenance
JUNCUS, SOURCE: NCDOT
Trees and shrubs are essential to the operation and function of certain stormwater controls.
Often used on the floor of wetlands and wet detention basins, trees and shrubs provide valuable
shade which helps regulate water temperatures. High water temperatures can be harmful to
aquatic animals and direct sunlight upon the water's surface can cause an increase in algal
blooms. Sometimes trees and shrubs are used on the side -slopes and outside edges of those
stormwater controls (i.e., bioretention basin) that contain underdrain systems. Trees and shrubs
used in this capacity can increase safety by discouraging people from entering the stormwater
control. They can also enhance the aesthetic appeal of stormwater controls enabling them to
blend into the landscape. The following is a list of the tree and shrub species commonly used in
association with some stormwater controls.
Shrubs
Aronia arbutifolia
Callicarpa americana
Cephalanthus occidentalis
Clethra alnifolia
Cornus sericea
Ilex glabra
Ilex vomitoria
Ilex verticillata
Itea virginica
Myrica cerifera
Sambucus canadensis
Red Chokeberry
Beautyberry
Buttonbush
Summersweet
Redosier Dogwood
Inkberry
Yaupon Holly
Winterberry
Virginia Sweetspire
Wax Myrtle
American Elderberry
BEAUTYBERRY, SOURCE: NCDOT
NCDOT SC Inspection and Maintenance Manual 3-5
NCDOT- HSP- 2010- 01
Maintenance
Trees
Amelanchier arborea
Cornus Florida
Ilex opaca
Juniperus virginiana
Magnolia virginiana
Nyssa sylvatica
Quercus lyrata
Quercus prinus
Quercus nuttallii
Taxodium distichum
Downy Serviceberry
Flowering Dogwood
American Holly
Eastern Red Cedar
Sweetbay Magnolia
Black Gum
Overcup Oak
Chestnut Oak
Nuttall Oak
Bald Cypress
YAUPON HOLLY, SOURCE: U.S. FxSH & WILDLIFE
Trees and shrubs should be maintained in a healthy condition. Check routinely for any disease
or insect infestation problems and treat accordingly. Prune dead, broken, and damaged branches
and stems as needed. Remove pruning debris from grounds and dispose of properly.
Turfgrasses, native/ornamental grasses, trees, shrubs, and herbaceous plants should be
maintained in a healthy growing state and mulch plays an important role in the performance of
most plantings. Mulch also helps to maintain soil moisture, promotes infiltration, prevents soil
erosion, and provides a habitat for microorganisms in a stormwater control. A mulch layer of
aged, double -shredded hardwood bark should cover the entire surface of the planted area and
should be maintained at a maximum depth of four inches.
3.2.2 FERTILIZATION
Fertilizer should only be used when necessary and not as a routine seasonal practice. Spread
fertilizer uniformly over the targeted area; during application, use extreme care to prevent the
fertilizer from contaminating the stormwater control or adjacent streams, ponds, lakes, or other
bodies of water. Immediately incorporate fertilizers into the soil when seeding. Do not apply
topdressing fertilizers to grass swales, filter strips, or buffer areas that drain to nutrient sensitive
water bodies unless allowed by rule or approved by the appropriate resource agency.
When working in river basins subject to riparian buffer rules, consult with the NCDOT Division
Environmental Officer prior to applying fertilizer. The buffer rules generally limit fertilizer
applications to one time only within 50 feet of intermittent or perennial streams, ponds, or lakes.
Note: The Randleman Rules prohibit any fertilizer application within Zone 1 (within 30 feet) of
any stream or water body subject to the rules. North Carolina's Neuse and Tar -Pamlico "Buffer
Rules" (Sections .0233 and .0259 of NCDWQ's Redbook of Surface Waters and Wetlands
Standards [NCAC 2007]) provide the following guidance for riparian buffer areas:
■ No fertilizer shall be used other than a one-time application to reestablish vegetation.
■ Ongoing fertilizer application is prohibited.
3-6 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
HigIl lwav
5mr nwaier
Maintenance
For one-time applications of fertilizer for reestablishment of vegetation in riparian buffer areas
that allow such application, place slow -release fertilizer into the hole dug for the plant rather than
broadcasting fertilizer after planting.
For guidance with fertilizer application, contact the Roadside Environmental Unit at (919) 733-
2920 or your Division Environmental Officer, or refer to NCDOT's Vegetation Management
Manual (NCDOT 1998). Some environmental permits might prohibit the use of fertilizers for
maintenance purposes. For information pertaining to site -specific fertilizer restrictions, contact
the Division Environmental Officer.
3.2.3 UNDESIRABLE VEGETATION REMOVAL
If proper maintenance is not provided, undesirable vegetation such as weeds, grasses, and woody
plants (trees and shrubs) will invade the vegetated areas of stormwater controls. In time, this
vegetation can inhibit the ability of a stormwater control to store, treat, and/or convey water.
Desirable plant material can even become undesirable if it becomes established in areas where it
is not wanted. For example, turf -type grasses become undesirable vegetation when they invade
planted/mulched areas. Trees and shrubs become undesirable when they invade and establish
themselves on the floors of stormwater control systems that have under -drain piping.
The following is a list of the most common undesirable plant species found during stormwater
control inspection and maintenance activities. Although some of these plants are native species
to North Carolina, due to their aggressive nature and/or seeding habits they are not wanted where
species diversity is desired.
Broadleaf Weeds
Ambrosia artemisiifolia
Common Ragweed
Cardamine hirsute
Hairy Bittercress
Cerastium vulgatum
Chickweed
Chamaesyce maculate
Spotted Spurge
Chenopodium album
Lambsquarter
Conyza canadensis
Horseweed
Diodia virginiana
Virginia Buttonweed
Geranium carolinianum
Carolina Geranium
Glechoma hederacea
Ground Ivy
Ipomoea sp.
Morning Glory
Lactuca serriola
Prickly Lettuce
Lamium amplexicaule
Henbit
Lespedeza striata
Common Lespedeza
Mollugo verticillata
Carpetweed
Plantago sp.
Plantain
Polygonum aviculare
Prostrate Knotweed
Portulaca pilosa
Pink Purslane
Rubus spp
Blackberry
COMMON RAGWEED, SOURCE: USDA
NCDOT SC Inspection and Maintenance Manual 3-7
NCDOT- HSP- 2010- 01
Maintenance
Broadleaf Weeds( continued)
Ambrosia artemisiifolia
Cardamine hirsute
Cerastium vulgatum
Chamaesyce maculate
Rumex acetosella
Rumex crispus
Stachys floridana
Trifolium spp
Vicia sp.
Common Ragweed
Hairy Bittercress
Chickweed
Spotted Spurge
Red Sorrel
Curly Dock
Florida Betony
Hop Clover
Vetch
Grasses, Sedges and Grass -like Plants
Cynodon dactylon Common Bermudagrass
Cyperus esculentus Yellow Nutsedge
Cyperus rotundus Purple Nutsedge
Microstegium vimineum Japanese Stiltgrass
Typha sp.
Trees
Acer rubrum
Ailanthus altissima
Liquidambar styraciflua
Paulownia tomentosa
Salix nigra
Cattail
Red Maple
Tree of Heaven
Sweetgum
Princess Tree
Black Willow
YELLOW NuTSEDGE, SOURCE: NCCES
Remove undesirable vegetation before it becomes established. Once established, this plant
material can have an adverse effect on the survivability of desirable plants and the aesthetic
appeal of stormwater controls. The best time to do this is during routine mowing or plant
maintenance activities. Undesirable plants can be removed by physical, mechanical, and/or
herbicidal practices. Dispose of the trimmed plant material properly; do not discard into
waterways because the material could clog the waterways and add nutrients to the water.
Additional information on removal of invasive species can be found in NCDOT's Invasive
Exotic Plants of North Carolina (NCDOT 2008a).
3.2.4 TRASH AND DEBRIS REMOVAL
Trash and other debris can pollute surface waters and damage stormwater control devices. The
removal of floating trash and other debris will not only improve water quality, it will reduce the
potential for outlet clogging during storm events and improve the overall aesthetic appeal of a
SC. Trash should be removed on a routine basis as part of the maintenance activities. Remove
trash and debris from outlet orifices, trash racks, basin and swale floors and side slopes, and
other components, as well as from the area surrounding the SC.
3-8
NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
Higll lwaV
it �
Maintenance
3.2.5 MECHANICAL/STRUCTURAL COMPONENT MAINTENANCE
Mechanical/structural components need to be maintained regularly in accordance with the
manufacturer's recommendations to ensure that they remain functional at all times. All
mechanical components, including valves, sluice gates, pumps, fences, gates, trash racks, and
access hatches, should be operated during each inspection to ensure that they function properly.
Check security components such as fences, gates, and locks for soundness. Repair any fence,
gate, or lock found damaged in a timely manner in order to restore site security and safety.
3.3 Emergency Maintenance
Emergency maintenance is a nonroutine repair performed to correct a problem and restore a
stormwater control to its proper working order. Tasks associated with emergency maintenance
include, but are not limited to:
■ Sediment removal
■ Structural repair
■ Erosion repair/bank stabilization
Since emergency maintenance needs (i.e., berm failure) often require both structural repair and
soil stabilization work, it is anticipated that most emergency repairs will performed jointly by
Division Maintenance and Roadside Environmental forces. If emergency maintenance needs are
found, the inspector should either take immediate action to correct the problem(s) or alert the
responsible parties of maintenance and/or repair needs.
Care should be taken to avoid using equipment that can cause soil compaction in or around
stormwater controls. Heavy equipment with narrow tracks or narrow tires, rubber tires with
large lugs, or high-pressure tires can cause excessive compaction resulting in reduced infiltration
and damage to underdrain systems. When mowing in or around a stormwater control, use riding
mowers or tractor mowers with turf -type tires, push mowers and/or weed eaters.
Safety considerations must be a constant focus when conducting routine maintenance. Refer to
section 2.4 for a list of common safety concerns.
3.3.1 SEDIMENT REMOVAL
Sediment will eventually accumulate in every type of stormwater control. The degree to which it
accumulates will depend on the upstream sediment source, rainfall intensity, and the amount of
runoff that a SC receives.
Any sediment found blocking the inlet or outlet of a stormwater control should be removed. If
sediment buildups are allowed to block inlets or outlets, stormwater may be diverted to areas of
the SC not designed for concentrated water flow and cause these areas to erode.
Sediment that has accumulated and is inhibiting the function of a SC must be removed. In
general, sediment should be removed when it exceeds 50% of the forebay's storage capacity or
the original design sediment storage depth. The dredged or removed sediment must be
NCDOT SC Inspection and Maintenance Manual 3-9
NCDOT- HSP- 2010- 01
Maintenance
transferred to a waste pile or area that is protected from stormwater run-on. Make sure the
removed sediment is not left in the vicinity of the SC where stormwater could come into contact
with it and transport it back to the SC or nearby receiving waters. If there is evidence of
pollution (a sheen on the sediment or odor), contact your Division Environmental and Safety
Officer for assistance with disposal.
3.3.2 MECHANICAL/STRUCTURAL REPAIR
Mechanical/structural repairs should be made promptly by qualified personnel. Equipment,
materials, and personnel should be readily available to perform repairs on short notice. The
following conditions could lead to structure failure and may necessitate an emergency repair: a
broken sluice gate; cracks in concrete outlet structures; settling, scouring, cracking, sloughing, or
furrowing on embankments; or seepage around an outflow pipe.
3.3.3 EROSION REPAIR/SOIL STABILIZATION
It is necessary that a uniform vegetative cover be maintained to prevent soil loss, to maintain
structural integrity, and to enhance the pollutant removal benefits of a SC. Failure to maintain a
uniform vegetative cover could result in structural failure and sediment loss.
Take corrective actions when erosion is found. Repair activities should be tailored to the specific
site conditions, grass type, and seasonal variations. Repair may include the use of one or a
combination of the following measures: erosion control blankets, riprap, matting, sodding, and/or
seeding and mulching.
3.3.4 UNDESIRABLE WOODY VEGETATION REMOVAL
Although plant roots are important for soil stabilization, they can present problems if volunteer
trees and shrubs are allowed to mature in locations they are not wanted. Mature trees and shrubs
can impede and redirect water flow in inlet and outlet ditches. As trees and shrubs mature, their
root systems can penetrate deep into the basin and clog the underdrain system. Decaying plant
roots can create voids in the dams and embankments when mature trees die or are cut. This can
result in structural failure if the situation is not addressed. Woody vegetation not removed can
also impede access to SC control structures. This can prevent proper operation of such devices
as hazardous spill basins.
Remove undesirable woody vegetation when found and dispose of it off -site. Any void created
by removal activities should be completely filled in and properly compacted using an appropriate
earthen material. Reestablish desirable vegetation to stabilize the area and prevent erosion.
3.3.5 ANIMAL BURROW REPAIR
Voids created by animal burrows can weaken dams and embankments, and result in structure
failure. Animal burrows found in the dams, berms, and embankments of SCs should be filled in
as soon as possible. Burrows should be completely filled in and properly compacted using an
appropriate earthen material. Reestablish desirable vegetation to stabilize the area and prevent
erosion. If burrowing problems persist, local wildlife officials should be consulted for
information regarding preventive tactics or animal removal.
3-10 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010-01
5mr rimer•
CHAPTER 4
Reporting and Record Keeping
Reporting and Record Keeping
General Hydrologic Roads Regulations _-onta -ts Design Construction
Documents Images
Quick Links
Reports
Add Inspection Report
Add Maintenance Report
AddNiew Research
:View Maintenance Reouests
View Control Ma
TimeLine
General Information
Control I7: I14-CO-92-L"11
'County: 92-Wake
mr— Control Type: Level Spreader(LS) .
Retrofit: I]
Research: ❑
State Stormwater Permit: ❑
TIP:
'Route Type:110 SR
`Route: SR-1656 (Trinity Rd.)
Inspection Frequency: Months LrJ
Nearest Town: Raleigh
Latitude: 35.80004
4.1 Reporting Overview
Part II.B.4.b.(b) of NCDOT's NPDES Permit requires that NCDOT develop a BMP Inspection
and Maintenance Manual "outlining the inspection and maintenance requirements for various
types of stormwater BMPs. The document will outline the regular inspection frequency, an
inspection checklist, `how-to' instructions for regular maintenance, evaluation and reporting
procedures for non -routine maintenance, and an inspection and maintenance tracking
mechanism." This manual and the website described in the following paragraph were developed
to comply with this requirement.
4.2 Inspection Documentation
Each inspection must be documented using the corresponding inspection report form presented
in Appendix A of this manual. Proper documentation ensures that NCDOT is adequately
performing its inspection and maintenance responsibilities as required by the stormwater NPDES
Permit.
NCDOT SC Inspection and Maintenance Manual 4-1
NCDOT HSP 2010- 01
Reporting and Record Keeping
Each completed report should contain the following information:
■ Date of inspection
■ Type of inspection (routine or follow-up)
If a Level of Service (LOS) of a "D" or "F" was issued and maintenance was
necessary, a follow-up inspection must be performed after the maintenance
has been completed.
■ Name of the inspector
■ Type of stormwater control (SC) and location
■ Current condition of the stormwater control
■ Description of necessary maintenance (if applicable)
■ Description of any corrective actions taken at the time of inspection (if applicable)
■ Names of contacts made (if applicable)
A copy of each completed inspection report must be maintained at a central location in the
division for a period of five years and made available to the Director of the Division of Water
Quality, or an authorized representative, immediately upon request.
4.3 LOS Ratings
After each inspection, the SC must be given a Level of Service rating. The following table
describes the ratings; however, it is important to note that ratings are subjective, and the overall
functionality of the SC must always be considered. For example, debris preventing the sluice
gate of a hazardous spill basin from closing may initially appear as a minor impediment; but,
until that debris is removed, the LOS should be rated as an "F" because the debris is inhibiting
the function of the basin. If a spill occurred and the basin could not contain the spill, the device
would not be functional.
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning properly.
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the
device has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
4-2 NCDOT SC Inspection and Maintenance Manual
NCDOT HSP 2010- 01
Ii�FI��•�n'
Reporting and Record Keeping
4.4 Reporting Special Circumstances
If you discover any type of accidental spill while conducting an inspection of a stormwater
control, assess the situation and contact your Division Safety Officer (DSO). If the spill appears
to be a hazardous substance, call 911 in addition to your DSO. At no time should an inspector
attempt any hazardous material cleanup, or enter a spill area, unless he or she is properly
trained.
4.5 Stormwater Control Management System (SCMS)
The Stormwater Control Management System or SCMS (pronounced "skims") is available on
the NCDOT Intranet at https:Hintranet.dot.state.nc.us/Hydro/SCMS. This is an online
management tool used to track stormwater control inspection and maintenance activities. SCMS
is to be used in conjunction with the hard copy inspection checklists provided in Appendix A of
this manual. The general process for documenting inspection and maintenance of stormwater
controls is as follows:
I . Perform the inspection and complete the hard copy of the appropriate inspection
checklist. Note any necessary maintenance on the checklist, as well as any notable
findings or observations.
2. Upon returning to the office, log in to SCMS and transfer the inspection information
to the online inspection form for each specific stormwater control inspected. SCs can
be searched by type or county, or by typing in the partial identification code (select
the desired control from the automated dropdown list).
3. Enter any relevant or notable information into the description text box below the
inspection questions. Assign the LOS in the space below the inspection checklist.
4. If maintenance is necessary, enter the maintenance needed or maintenance that was
done (see the "Maintenance Needed" and "Maintenance Done " text boxes) in the
appropriate space at the bottom of the screen and select "Save." You will have the
option to check an "Outstanding Maintenance" checkbox so that an "Outstanding
Maintenance" report can later be generated to determine what maintenance has not
been completed.
a. If maintenance is performed NOT in association with an inspection, this
information can later be entered and the LOS can be changed IF the respective
maintenance improved the LOS of the control.
A follow-up inspection must be conducted and entered into SCMS after all significant
maintenance is performed on a control with an existing LOS of a D or F to verify that each
need has been properly addressed and to ensure that the LOS is properly updated.
It is suggested that photos be taken and stored on SCMS to track the status of the stormwater
control and document the maintenance activities conducted. Preferably, photos should be taken
before and after maintenance is performed to document the improvements made to the SC. In
addition, photos can be taken at each inspection to document the general condition of the SC.
Upload the appropriate photos to the "Images" tab on the SCMS website when you are viewing
the relevant stormwater control.
NCDOT SC Inspection and Maintenance Manual 4-3
NCDOT HSP 2010- 01
�i[]rili��'�11[•r
CHAPTER 5
Bioretention Basin
Overview
Bioretention Basin
A BIORETENTION BASIN (BB) is a type of filtration basin (see Chapter 8) with landscaped shrubs and
other various plants, filter media, and a mulch cover to enhance pollutant removal.
PURPOSE AND DESCRIPTION
■ Bioretention basins are structural stormwater controls (SCs) designed to temporarily capture
stormwater runoff, filter and retain pollutants, and reduce peak flows.
■ Inflow to the bioretention basin is filtered through engineered media or amended soil. The filtered
water exits through an underdrain system at the bottom of the filter media.
■ Specially selected plants enhance the pollutant removal capabilities of the basin.
INSPECTION
■ Ponded water should infiltrate into the filter media within 48-72 hours of a storm event;
prolonged ponding indicates that the filter media or underdrain system requires maintenance.
■ The mulch layer and vegetation should be carefully inspected. Use landscaping plans as an aid
during the inspection.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Trash and debris should be removed from inlet grates, forebays, the basin, and trash racks.
Note: This is a specialized device and if major maintenance is needed, such as the flushing of the
underdrain system, please contact the Hydraulics and/or Roadside Environmental Units in Raleigh
for guidance.
NCDOT SC Inspection and Maintenance Manual 5-1
NCDOT- HSP- 2010- 01
Bioretention Basin
5.1 Stormwater Control Overview
A Bioretention Basin (BB) is a soil and plant -based filtering system designed to remove
pollutants from stormwater runoff. It works by temporarily retaining stormwater runoff and
allowing it to slowly infiltrate into the soil over a period of 48-72 hours. As stormwater slowly
passes through the soil, it comes in contact with soil particles and plant roots where pollutants
are absorbed and removed. The filtered water then enters the basin's underdrain system where it
exits the bioretention basin and flows to the nearest stream, river, or lake.
Figure 5-1 illustrates the flow path and treatment processes in a typical bioretention basin.
Figure 5-1. Cutaway of a bioretention basin layout and treatment processes
5.2 Bioretention Components
Figure 5-2 illustrates the various components of a typical bioretention basin. Note that layouts
vary. Some bioretention basins are designed to include a flow bypass structure. For these
systems, runoff enters the bioretention basin via a flow bypass structure, which is designed to
divert a set amount of runoff to the bioretention basin. Excess flow bypasses the bioretention
basin and is discharged downstream via a filter strip and/or swale. This configuration is typical
of infiltration basins. See Chapter 10 for inspection and maintenance information and figures for
flow bypass systems. The typical bioretention basin configuration includes the following
components:
5-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
■ Inlet Drainage System
■ Forebay
■ Basin
■ Landscaping
■ Underdrain System
■ Outlet Control Structure
■ Outlet Drainage System
Bioretention Basin
Figure 5-2. Bioretention basin layout and components
All filtration basins, including bioretention basins, have underdrain systems. If an underdrain
system is present, cleanouts will be found within the basin.
5.3 Inspection and Maintenance
Bioretention basins should be inspected periodically to determine whether they are functioning
as intended. If any part of the bioretention basin is not functioning properly, determine the cause
and restore to working order as soon as possible. Figures 5-3 and 5-4 illustrate a plan and profile
view of the areas that should be inspected and maintained in a typical bioretention basin
configuration.
NCDOT SC Inspection and Maintenance Manual 5-3
NCDOT- HSP- 2010- 01
Bioretention Basin
TRANSITION BERM
FOREBAY
INFLOW
VARIOUS PLANT
SPECIES
FILTER MEDIA
EMERGENCY SPILLWAY
TOP OF
EMBANKMENT
------------�.-,
rk
i
_._.______ ____J
UNDERDRAIN
S
UTFALL o
o
RECEIVING
CHANNEL
OUTLET CONTROL
STRUCTURE
Figure 5-3. Plan view of a bioretention basin and its components
TRASH RACK
VARIOUS PLANT
SPECIES
I NFLOW
FOREBAY J� 41
TRANSITION �/ CLEANOUT
BERM UN❑ERDRAIN
FILTER MEDIA
EMERGENCY
ZIF
PILLWAY
EMBANKMENT
7 OUTLET
PROTECTION
.f I —
OUTLET CONTROL
STRUCTURE
Figure 5-4. Profile view of a bioretention basin and its components
5-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
Bioretention Basin
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for
further guidance.
The following sections describe the function of a bioretention basin and provide guidance on the
inspection and maintenance of its major components.
5.3.1 INLET DRAINAGE SYSTEM
Function
The inlet drainage system collects and conveys water to the bioretention basin. Inlet drainage
systems can consist of open channels, pipes, curb and gutter, and catch basins. Some
bioretention basin designs use flow bypass structures to divert a predetermined amount of runoff
to the SC while bypassing excess flow so that the basin, outlet control structure, and
embankment do not fail. If this is the case, refer to Sections 10.3.2 through 10.3.4 in Chapter 10,
Infiltration Basin, for inspection and maintenance guidance on flow bypass systems.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect all ditches, pipes,
and/or catch basins draining to the bioretention basin for trash, sediment, and debris. Inspect the
ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Bioretention basins are particularly susceptible to sedimentation. The area draining to the basin
should be carefully inspected for bare soil (NCDWQ, 2007). Desirable vegetation includes grass
cover in an open ditch to prevent soil erosion. Undesirable vegetation includes any woody plants
or invasive species that may impede the inlet drainage system.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
5.3.2 FOREBAY
Function
A forebay is a basin located at the inlet of an SC that pretreats stormwater (see Figure 5-5). A
forebay reduces the runoff velocity of stormwater, which in turn allows sediment in the
stormwater to settle before the stormwater enters the bioretention basin. A transition berm is the
component located at the downstream end of the forebay that acts as a weir and releases runoff to
the stormwater control. The presence of a forebay reduces the risk of SC failure.
NCDOT SC Inspection and Maintenance Manual 5-5
NCDOT- HSP- 2010- 01
Bioretention Basin
Some forebays within bioretention basins have been designed with special transition weirs that
function much like a level spreader lip. A hard, flat material is used to convert concentrated
water flow into sheet water flow. This process prevents mulch from being washed out of the
area immediately downstream of the forebay, which would lead to erosion within the basin.
Figure 5-6 illustrates two examples of transition weirs.
Inspection
Inspect forebays for trash, debris, and undesirable vegetation. Inspect to determine whether
forebays are structurally sound and that they do not contain excessive amounts of accumulated
sediment. Inspect the embankment and transition berm for structural integrity and signs of
erosion. Inspect the forebay for undesirable vegetation. Forebays may have grass -covered
embankments and berms, but they are not designed to support vegetation. Minimal plant growth
is tolerable, but if it becomes excessive, the storage volume for sediment is reduced and dredging
becomes more difficult. If any invasive species are present, it is generally preferable to remove
them before they become well -established.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Replace erosion protection materials (i.e., riprap) as needed. If the surrounding soil is
disturbed during cleanout of the forebay, or at any other time, reseed any areas of bare soil with
grass to prevent erosion. Repair the transition berm as necessary, taking care to maintain the
original elevation of the berm. Refer to Chapter 3 for additional guidance on sediment disposal.
Consult the North Carolina Department of Transportation Stormwater Best Management
Practices Toolbox (NCDOT, 2008b) or the Hydraulics Unit if major repairs are required.
Figure 5-5. Typical forebay (foreground)
5-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ii�F���•�n'
S:ormwaier•
- ems-• Yif
. � ' �ln
Figure 5-6. Two examples of transition weirs
5.3.3 BASIN AND SURROUNDING AREA
Bioretention Basin
Function
The basin is the component of the bioretention basin that reduces the rate of runoff and filters out
contaminants (see Figure 5-7). The basin bottom has special filter media and an underdrain
system. See Section 5.3.5 for further information regarding underdrain systems. Filter media in
bioretention basins is typically well -mixed engineered media consisting of washed sand, fine
clay and silt, and organics. The media is covered with a layer of mulch and planted with
landscape vegetation. See Section 5.3.4 for further information regarding the mulch layer and
vegetation.
Ponded water should take 48-72 hours to infiltrate into the filter media. This is known as the
drawdown period. Some basins are designed with a shorter drawdown period. If available,
consult design drawings to determine whether this is the case for a given bioretention basin.
Inspection
Inspect the basin for structural integrity. Note any signs of erosion (see Figure 5-8) or burrowing
animals. Inspect the embankment or berms for settling, scouring, cracking, sloughing, and
furrowing, and for invasive shrubs and trees. Also, inspect the downstream toe of the
embankment for seepage (NCDWQ, 2007). Note trash, debris, and/or sediment found in the
basin or surrounding areas. Sediment should be removed if it is clogging the filter media or if it
has reached a depth of 3 inches (NCDWQ, 2007). Refer to Chapter 3 for guidance on sediment
removal.
NCDOT SC Inspection and Maintenance Manual 5-7
NCDOT- HSP- 2010- 01
Bioretention Basin
Figure 5-7. Typical basin area
Figure 5-8. Examples of erosion within a bioretention basin
1 ]iglI\� ov
�i[ �rill�t �11[•��
Inspect the basin for evidence that water remains in the basin longer than the design drawdown
period. Cattails and other wetland vegetation are good indicators that water is remaining in the
basin longer than intended. If this is the case, try to determine the cause of the standing water.
Likely causes include a clogged underdrain system or clogged filter media.
Maintenance
The permeability of the filter media must be maintained or the bioretention basin will not
function properly. Vehicles and construction equipment should not be driven on the basin
bottom (NCDWQ, 2007). Use best professional judgment when selecting landscaping
equipment for use in the basin and minimize foot traffic on the basin bottom.
5-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
Smi' w.al(.•r
Bioretention Basin
Flush the underdrain system if the basin is not draining properly (see Section 5.3.5). Consider
flushing the underdrain system annually as a preventative maintenance measure if the system
appears to have the tendency to plug. If the problem persists, remove and replace the first few
inches of the filter media. Finally, as a last resort, excavate the underdrain system and repair or
replace it if necessary, and replace the original filter media with new media (NCDWQ, 2007).
These components should be repaired or replaced to meet the original design specifications
unless they are deemed insufficient. For additional guidance, consult the North Carolina
Division of Water Quality Stormwater Best Management Practices Manual.
Repair areas with erosion, channelization, or animal burrows by regrading and reestablishing the
proper cover (see Section 5.3.4). Take care to preserve the filter media's grade and mixture.
Consult the design drawings or landscaping plan if necessary. If soil testing indicates a pH
problem or toxic conditions, the addition of lime or replacement of the filter media may be
warranted. If the filter media is to be replaced, consult the original design specification to ensure
that the correct mixture and testing procedures are followed. Contact the NCDOT Roadside
Environmental Unit (REU) for guidance.
5.3.4 LANDSCAPING
Function
The mulch layer and vegetation in the basin are important in the removal of stormwater
pollutants. Mulch regulates soil conditions, prevents weed establishment, and protects plants.
Mulch also plays an important role in removing heavy metals from runoff. Other stormwater
pollutants are filtered out as runoff soaks through the filter media.
Contact with vegetation allows for biological treatment of metals and nutrients through primarily
microbial processes (NCHRP, 2006). Plant roots improve soil structure and enhance the soil's
ability to filter out stormwater pollutants (NCDWQ, 2007). Photos of some plants appropriate
for use in bioretention basins are presented in Figure 5-9. For further information on appropriate
plants, contact the NCDOT REU.
Inspection
Note any undesirable vegetation. Consult the design drawings or landscaping plan to determine
whether the appropriate vegetation appears to be present. Bioretention basins may have several
species of plants and identifying them all may not be practical. If this is the case, verify that
there is a variety of healthy species, making sure that one species is not out -competing the others.
Inspect the basin to verify that desirable vegetation is healthy. Note any areas in and around the
basin that have exposed soil. All areas should be covered with mulch, landscaped vegetation,
grass, or erosion protection materials (i.e., riprap).
The basin floor should be covered with a layer of mulch 3 to 4 inches thick. Note areas that
require additional mulch. The surrounding area should be stabilized with at least a cover of
grass. Inspect the grass to ensure that it is being mowed at a frequency to maintain a height of
6 to 15 inches.
NCDOT SC Inspection and Maintenance Manual 5-9
NCDOT- HSP- 2010- 01
Bioretention Basin
Figure 5-9. Examples of plant species used in North Carolina bioretention basins
Maintenance
The permeability of the filter media must be maintained or the bioretention basin may fail.
Vehicles and construction equipment should not be driven on the basin bottom (NCDWQ, 2007).
Use best professional judgment when selecting landscaping equipment for use in the basin and
minimize foot traffic on the basin bottom.
Mow grass to the ideal height. Turfgrass is typically mowed at a frequency to maintain a
maximum height of 4 inches for warm -season grasses and 6 inches for cool -season grasses.
However, on highway right-of-way facilities, it is more practical to maintain a grass height
between 6 and 15 inches.
Add mulch and reestablish grass or herbaceous groundcover where cover is insufficient. Use
double -shredded hardwood bark where mulch is needed. Remove undesirable vegetation, taking
care not to damage desirable vegetation. Replace dead or unhealthy plants using the original
design drawings or landscaping plan if necessary. Fertilize turfgrass and/or plants upon
reestablishment if necessary. The use of fertilizer may be restricted at some locations. Refer to
Chapter 3 when considering the use of fertilizer and for additional information on caring for
vegetation.
5-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
5.3.5 UNDERDRAIN SYSTEM
Function
Bioretention Basin
Bioretention basins are equipped with underdrain systems to drain runoff that has passed through
the filter media. Positioned beneath the filter media, the underdrain system is usually
constructed of perforated PVC pipe. The perforated pipe is wrapped in filter fabric to prevent
clogging and installed in a shallow layer (typically less than 12 inches) of No. 57 stone.
Cleanouts provide access to the underdrain system for inspection and maintenance activities.
Inspection
Inspect the cleanouts to ensure that their caps are in place and undamaged. Damaged or missing
caps will allow stormwater to exit the basin untreated. Cleanouts can also be used to drain the
basin if the filter media has become clogged. To inspect, remove the caps from the cleanouts
and observe the inside for sediment or standing water using a flashlight. If water is available,
pour water in the cleanouts using a bucket or hose and observe the flow in the outlet control
structure or outlet pipe. If the water does not exit freely, the underdrain system may be clogged.
If sediment is flushed from the underdrain system, the filter fabric may have been damaged and
will need to be excavated and repaired. Also, the basin should be inspected for depressions,
which is another indication that the filter fabric is damaged and soil is entering the underdrain
system.
Maintenance
A high-pressure hose can be used to flush out underdrain system by spraying water into
cleanouts. Replace all cleanout caps that are missing, cracked, or otherwise damaged. Consider
flushing underdrain systems annually if they appear to have a tendency to plug. If roots or soil
are present in the underdrain system, it is likely that the filter fabric protecting the perforated
PVC pipe is damaged. If this is the case, the underdrain system should be excavated and
repaired or replaced. All repairs should be made in accordance with the original design
specifications. To avoid crushing the underdrain system, heavy equipment should not be driven
in the basin. Refer to Chapter 3 for additional information.
5.3.6 OUTLET CONTROL STRUCTURE (BOX)
Function
Typically, the underdrain system connects to an outlet control structure, which is designed to
release excess stormwater during large storm events. Outlet control structures for bioretention
basins generally resemble catch basins that are elevated, typically 12 inches or less (NCDWQ,
2007), above the basin bottom. Figure 5-10 shows two examples of outlet control structures.
NCDOT SC Inspection and Maintenance Manual 5-11
NCDOT- HSP- 2010- 01
Bioretention Basin
Figure 5-10. Bioretention basin outlet control structures
Inspection
Swrmn4aler
Inspect the outlet control structure thoroughly for any sign of damage such as cracks, holes, or
leaks. Confirm that the outlet box remains covered with a trash rack or grate and that the trash
rack or grate is structurally sound. Note the amount of trash and debris buildup on the trash rack.
Maintenance
Repair any damaged areas of the outlet control structure, and remove sediment and debris.
Replace metal components if necessary.
5.3.7 OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Components of this system can include channels, pipes, catch basins, manholes,
culverts, and other structures.
Inspection
Inspect pipes and drainage structures for cracks or leaks. Inspect the ground surface above
buried pipes and structures for depressions or other signs that might indicate pipe breakage or
separation. Inspect ditches for signs of erosion and undesirable vegetation. If outlet protection
materials (i.e., riprap) are present, verify that these materials are adequate to protect against
erosion.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Replace outlet protection materials
as necessary. Refer to Chapter 3 for additional guidance on maintenance techniques.
5-12 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
Bioretention Basin
5.3.8 EMERGENCY SPILLWAY (IF PRESENT)
Function
The emergency spillway serves as an overflow structure that is typically constructed as a channel
in natural ground.
Inspection
The emergency spillway should remain free of trash and debris at all times. Emergency
spillways are typically covered with grass, but concrete and riprap are also used. For grass
channels, verify that grass is maintained between 6 and 15 inches. Inspect concrete to verify that
it is in good condition, or verify that adequate riprap is present. Note all erosion and undesirable
vegetation.
Maintenance
Emergency spillways must be free of trash, debris, and undesirable vegetation or they may
become blocked and will not function properly. Remove these if present. Grass should be
carefully maintained at a height of 6 to 15 inches. If applicable, repair concrete or replace riprap
as necessary. Repair areas of erosion.
5.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
NCDOT SC Inspection and Maintenance Manual 5-13
NCDOT- HSP- 2010- 01
Higl sway
Filtration Basin
CHAPTER 6 Filtration Basin
Overview
A FILTRATION BASIN (FB) is a stormwater control (SC) that captures and temporarily stores runoff,
allowing it to percolate through filter media to an underdrain system, where it is conveyed downstream.
PURPOSE AND DESCRIPTION
■ Filtration basins are structural SCs designed to temporarily capture stormwater runoff, filter out
pollutants, and minimize peak flows.
■ Inflow to the SC is detained and filtered through a natural or engineered media, which removes
pollutants.
■ Filtration basins are designed with an underdrain system that typically conveys filtered runoff to
an outlet control structure.
INSPECTION
■ Filtration basins should drain within 40 hours after a storm event; prolonged ponding indicates
that the filter media or underdrain system requires maintenance.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Trash and debris should be removed from inlet grates, forebays, the basin, and trash racks.
■ The underdrain system should be flushed and its components replaced or repaired as
necessary.
■ Undesirable vegetation, especially woody vegetation on the embankment, should be removed.
NCDOT SC Inspection and Maintenance Manual 6-1
NCDOT- HSP- 2010- 01
Filtration Basin
6.1 Stormwater Control Overview
A Filtration Basin (FB) is a stormwater control that uses a filter media (typically sand) to remove
pollutants from stormwater runoff. It works by temporarily detaining stormwater runoff and
allowing it to slowly soak into the filter media. As stormwater slowly seeps through the filter
media, pollutants are absorbed and removed as it makes contact with soil particles. The filtered
water then enters the basin's underdrain system where it exits and flows to the nearest river, lake
or stream (see Section 6.3.4).
Filtration basins are effective in removing many of the common pollutants found in stormwater
runoff, especially finer sediments and sediment -bound pollutants. Filtration basins are currently
designed to drain within 40 hours following a storm event (NCDWQ, 2007). Previous designs
may have used a 2-5 day drawdown period. The stormwater flow path and treatment process
described here are illustrated in Figure 6-1.
Figure 6-1. Cutaway of a filtration basin flow diagram and treatment processes
6-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Slormwaler
Filtration Basin
6.2 Filtration Basin Components
Figure 6-2 illustrates the various components of a typical filtration basin; however, layouts can
vary. Some systems will have additional components, whereas others may lack certain
components. Filtration basin may include the following:
■ Inlet Drainage System
■ Forebay
■ Basin
■ Filter Media
■ Underdrain System
■ Outlet Control Structure
■ Outlet Drainage System
■ Emergency Spillway
Figure 6-2. Filtration basin layout and components
NCDOT SC Inspection and Maintenance Manual 6-3
NCDOT- HSP- 2010- 01
Filtration Basin
The underdrain system is the component that sets a filtration basin apart from an infiltration
basin. If it is unclear whether an underdrain system is present, cleanouts should be visible in the
basin. Sand filters and bioretention basins are types of filtration basins. Because bioretention
basins are well known and widely used, a separate chapter on bioretention basins has been
developed (see Chapter 5).
6.3 Inspection and Maintenance
Filtration basins should be inspected at least annually to determine whether they are functioning
as intended. If a filtration basin is found to not be functioning properly, determine the cause and
restore to working order as soon as possible. Figures 6-3 and 6-4 illustrate a plan and profile
view of the areas that should be inspected and maintained in a typical filtration basin
configuration.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS) on
NCDOT's Intranet. Photos should be taken to track the status of the stormwater control (SC) and
document the maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to
Chapter 4 for further guidance.
The following sections describe the function of a filtration basin, and provide inspection and
maintenance guidance for its major components.
TRANSITION BERM
FOREBAY--- -----------
i
--
•----------- ----+
•----------- INFLOW- --
J--------- ----J
FILTER MEDIA
UN❑ER❑RAIN
SPILLWAY
TOP OF \
EMBANKMENT
RECEIVING
CHANNEL
OUTLET CONTROL
STRUCTURE
Figure 6-3. Plan view of a filtration basin and its components
6-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Stormwater•
INFLOW
FOREBAY
TRASH RACK
FILTER MEDIA
CLEANOUT
TRANSITION 1
UNDERDRAIN
BERM
Filtration Basin
EMERGENCY
SPILLWAY
EMBANKMENT
OUTLET
PROTECTION
- l
OUTLET CONTROL
STRUCTURE
Figure 6-4. Profile view of a filtration basin and its components
6.3.1 INLET DRAINAGE SYSTEM
Function
The inlet drainage system collects and conveys water to the filtration basin. Inlet drainage
systems can consist of open channels, pipes, curb and gutter, and catch basins. Some filtration
basin designs use flow bypass structures to divert a predetermined amount of runoff to the SC
while bypassing excess flow so that the basin, outlet control structure, and embankment do not
fail. If this is the case, refer to Sections 13.3.3 and 13.3.6 in Chapter 13, Level Spreader, for
inspection and maintenance guidance.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect all ditches, pipes,
and/or catch basins draining to the filtration basin for trash, sediment, and debris. Inspect the
ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Filtration basins are particularly susceptible to sedimentation. The area draining to the basin
should be carefully inspected for bare soil (NCDWQ, 2007).
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Reseed the area draining to the basin if necessary to maintain a dense stand of
vegetative cover. Repair all eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
6.3.2 FOREBAY
Function
A forebay is a basin located at the inlet of a SC that pretreats stormwater. A forebay reduces the
runoff velocity of stormwater, which in turn allows sediment in the stormwater to settle before
the stormwater enters the filtration basin. A transition berm is the component located at the
NCDOT SC Inspection and Maintenance Manual 6-5
NCDOT- HSP- 2010- 01
Filtration Basin
'��: r.�h6n a�s.n•
downstream end of the forebay that acts as a weir and releases runoff to the stormwater control.
The presence of a forebay reduces the risk of SC failure.
Inspection
Inspect to ensure that all forebays remain free of trash, debris, and undesirable vegetation.
Inspect to determine whether forebays are structurally sound and that they do not contain
excessive amounts of accumulated sediment. Inspect the transition berm to determine whether it
is structurally sound and shows signs of erosion.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Replace erosion protection materials (i.e., riprap) as needed. Reestablish vegetation
for earthen forebays. Repair the transition berm as necessary, taking care to maintain the
original elevation of the weir. Refer to Chapter 3 for additional guidance on sediment disposal.
Consult the North Carolina Department of Transportation Stormwater Best Management
Practices Toolbox if major repairs are required.
6.3.3 BASIN AND SURROUNDING AREA
Function
The basin is the component of the filtration basin that reduces the rate of runoff and filters out
contaminants. The basin bottom has special filter media and an underdrain system. See Section
6.3.4 for further information regarding underdrain systems. Filter media can consist of synthetic
material, amended soil, or sand. The filter media is typically covered with a layer of topsoil and
grass.
Inspection
The interior and exterior side slopes of the basin and all areas surrounding the basin should be
stabilized with at least a cover of turf -type grass. Typically, a uniform cover of grass will be
established on the floor of the basin, however, filtration basin designs can vary; for example,
some filtration basins use sand as a filter media and have no additional cover. Consult the design
drawings to determine the intended configuration and note any differences from the original
cover.
Inspect grass to ensure that it is being mowed at a frequency to maintain a height of 6 to
15 inches. Inspect the basin for structural integrity. Note any signs of erosion, burrowing
animals, or undesirable vegetation. Inspect the embankment for settling, scouring, cracking,
sloughing, and furrowing, and for invasive shrubs and trees. Also, inspect the downstream toe of
the embankment for seepage (NCDWQ, 2007). Note trash and debris found in the basin or in
surrounding areas. Currently, filtration basins are designed to drain within 40 hours; however, a
2-5 day drawdown period has been used in the past. Use design drawings to determine the
drawdown period and inspect the basin for evidence that water remains in the basin longer than
intended. Cattails and other wetland vegetation are good indicators that water is remaining in the
6-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higll lwaV
Filtration Basin
basin longer than intended. If this is the case, try to determine the cause of the standing water.
Likely causes include a clogged underdrain system or clogged filter media.
Maintenance
The permeability of the filter media must be maintained or the filtration basin will fail.
Vehicles and construction equipment should not be driven on the basin bottom (NCDWQ, 2007).
Use best professional judgment when selecting mowing and other landscaping equipment for use
in the basin. Avoid the use of riding lawnmowers and minimize foot traffic on the basin bottom.
Mow grass to the ideal height. Turfgrass is typically mowed at a frequency to maintain a
maximum height of 4 inches for warm -season grasses and 6 inches for cool -season grasses.
However, on highway right-of-way facilities, it is more practical to maintain a grass height
between 6 and 15 inches.
If erosion has occurred, reestablish grass (seed or sod) and fertilize if necessary. The use of
fertilizer may be restricted at some locations. Refer to Chapter 3 when considering the use of
fertilizer. Repair all animal burrows. If there is channelization, consult the design drawings and
restore the proper grade and cover.
Remove undesirable vegetation (using an approved mechanical or herbicidal treatment). If
cattails and other undesirable wetland vegetation are present, the underdrain system or the filter
media could be clogged. Flush the underdrain system if the basin is not draining properly (see
Section 6.3.4). If the problem persists, remove and replace the first few inches of the filter
media. As a last resort, excavate the underdrain system and repair or replace it if necessary, and
replace the original filter media with new media (NCDWQ, 2007). These components should be
repaired or replaced to meet the original design specifications unless deemed insufficient. If
additional guidance is needed consult the North Carolina Division of Water Quality Stormwater
Best Management Practices Manual (NCDWQ, 2007).
6.3.4 UNDERDRAIN SYSTEM
Function
Filtration basins are equipped with underdrain systems to drain runoff that has passed through
the filter media. Positioned beneath the filter media, the underdrain system is usually
constructed of perforated PVC pipe. The perforated pipe is wrapped in filter fabric to prevent
clogging and installed in a shallow layer (typically 12 inches) of No. 57 stone. Cleanouts
provide access to the underdrain system for inspection and maintenance activities. To avoid
crushing the underdrain system, heavy equipment should not be driven in the basin. Refer to
Chapter 3 for additional information.
Inspection
Inspect the cleanouts to ensure the caps are in place and undamaged. Damaged or missing caps
will allow stormwater to exit the basin untreated. Alternatively, the cleanouts can be used to
drain the basin in the event that the filter media has become clogged. To inspect, remove the
caps from the cleanouts and observe the inside for sediment or standing water using a flashlight.
NCDOT SC Inspection and Maintenance Manual 6-7
NCDOT- HSP- 2010- 01
Filtration Basin
If water is available, pour water in the cleanouts using a bucket or hose and observe the flow in
the outlet control structure or outlet pipe. If the water does not exit freely, the underdrain system
may be clogged. If sediment is flushed from the underdrain system, the filter fabric may have
been damaged and will need to be excavated and repaired. Also, the basin should be inspected
for depressions, which is another indication that the filter fabric is damaged and soil is entering
the underdrain system.
Maintenance
A high-pressure hose can be used to flush out underdrain systems by spraying water into
cleanouts. Replace all cleanout caps that are missing, cracked, or otherwise damaged. NCDWQ
recommends flushing underdrain systems annually (NCDWQ, 2007). If roots or soil are present
in the underdrain system, it is likely that the filter fabric protecting the perforated PVC pipe is
damaged. If this is the case, the underdrain system should be excavated and repaired or replaced.
All repairs should be made in accordance with the original design specifications.
6.3.5 OUTLET CONTROL STRUCTURE (BOX)
Function
Typically, the underdrain system connects to an outlet control structure, which is designed to
release excess stormwater during large storm events. Outlet control structures can have several
components, including a riser, trash rack, sluice gate, and outlet pipe. If standing water is
present and it is inhibiting the inspection, the basin can be drained or pumped out; however, the
water must first be visually inspected for obvious signs of pollutants. Check for an oily sheen or
excessive suspended solids. If either of these is present, do not drain the basin. Call the Division
Safety Officer or the Roadside Environmental Unit for guidance. The sluice gate should be
returned to the closed position when inspection and maintenance activities are completed.
Figure 6-5 illustrates the configuration of a typical outlet control structure.
141v _U ALS •
Figure 6-5. Components of an outlet control structure
6-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
l� S:oril waier
Inspection
Filtration Basin
Inspect the outlet control structure thoroughly for any sign of damage such as cracks, holes, or
leaks. Inspect to ensure that the outlet box remains covered with a trash rack and that the trash
rack is not excessively corroded. Note the amount of trash and debris buildup on the trash rack.
If a sluice gate is present, open and close it to ensure that it can be operated through its entire
range of motion. Inspect the sluice gate for excessive corrosion. Verify that there is no sediment
or debris below the sluice gate that could prevent it from being fully closed.
Maintenance
Repair any damaged areas of the outlet control structure, and remove sediment and debris if it is
accessible. Replace metal components if necessary. Lubricate sluice gates with a marine -type
grease as needed. It is recommended that a cover be fabricated to protect the sluice gate's worm
gear from corrosion and increase the visibility of the device. The cover can be made by placing
a cap on one end of a section of PVC pipe (see Figure 6-6). If the sluice gate is damaged beyond
repair, replace it with one that meets the requirement presented in NCDOT Standard Drawing
No. 838.02 (NCDOT, 2006). Perform additional maintenance and repairs as described in the
manufacturer's instructions. If the outlet is clogged or blocked and standing water prevents
access to the structure, hip waders or a small boat may be needed to make the necessary repairs.
Ensure that the proper NCDOT safety procedures are followed when working in or around
standing water.
Figure 6-6. Two large sluice gates with PVC covers
NCDOT SC Inspection and Maintenance Manual 6-9
NCDOT- HSP- 2010- 01
Filtration Basin
6.3.6 OUTLET DRAINAGE SYSTEM
Function
^ Yaliia.1v.m
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Components of this system can include channels, pipes, catch basins, manholes,
culverts, and other structures.
Inspection
Inspect pipes and drainage structures for cracks or leaks. Inspect the ground surface above
buried pipes and structures for depressions or other signs that might indicate pipe breakage or
separation. Inspect ditches for signs of erosion and undesirable vegetation. If outlet protection
materials (i.e., riprap) are present, verify that these materials are adequate to protect against
erosion.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Replace outlet protection materials
as necessary. Refer to Chapter 3 for additional guidance on maintenance techniques.
6.3.7 EMERGENCY SPILLWAY (IF PRESENT)
Function
The emergency spillway serves as an overflow structure that is typically constructed as a channel
in natural ground.
Inspection
Note trash and debris collected in the emergency spillway. Emergency spillways are typically
covered with grass, but concrete and riprap are also used. For grass channels, verify that grass is
maintained between 6 and 15 inches. Inspect concrete to verify that it is in good condition, or
verify that adequate riprap is present. Note all erosion and undesirable vegetation.
Maintenance
Emergency spillways must be free of trash, debris, and undesirable vegetation to maintain their
functionality. Remove these if present. Grass should be maintained at a height of 6 to 15 inches.
If applicable, repair concrete or replace riprap as necessary. Repair areas of erosion.
6.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
6-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
t-ligl sway
CHAPTER 7
Infiltration Basin
Overview
Infiltration Basin
An INFILTRATION BASIN (IB) is a stormwater control that uses the natural filtering ability of the soil to
remove pollutants from stormwater runoff.
PURPOSE AND DESCRIPTION
■ Infiltration basins are structural stormwater controls (SCs) designed to temporarily capture
stormwater runoff, allowing it to soak into the soil.
■ Infiltration helps to reduce peak flows and recharge groundwater.
■ As runoff percolates through the soil, fine sediment and associated pollutants are absorbed and
removed from the runoff.
INSPECTION
■ Infiltration basins should drain completely during dry periods; standing water in the basin may
indicate the need for maintenance.
■ Pretreatment SCs, such as forebays, are of particular importance to the function of the infiltration
basin. If pretreatment SCs are neglected, excessive sedimentation in the basin can occur, which
may require intensive maintenance to correct.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ A four -inch layer of clean sand or a dense cover of turf grass must be maintained at all times.
■ Any structural deficiencies should be corrected.
■ Undesirable vegetation, especially woody vegetation in the embankment, should be removed.
NCDOT SC Inspection and Maintenance Manual 7-1
NCDOT- HSP- 2010- 01
Infiltration Basin
7.1 Stormwater Control Overview
An Infiltration Basin (IB) is a shallow impoundment constructed over a permeable soil that uses
the natural filtering ability of the soil to remove pollutants found in stormwater runoff. During
storm events, runoff is directed into the basin where it is temporarily detained and allowed to
infiltrate slowly into the soil and eventually into the water table. As runoff slowly passes
through the soil, fine sediment and associated pollutants are absorbed and removed from the
runoff as it makes contact with soil particles. This stormwater control (SC) has high pollutant
removal efficiency and can also help recharge the groundwater.
In North Carolina, infiltration basins are more common in the coastal region where sandy soils
promote infiltration. All of the stormwater in the basin should infiltrate into the soil within five
days after a storm.
Figure 7-1 illustrates flow entering the basin, being detained, and infiltrating into the soil. The
figure also shows the treatment processes that occur in a typical dry detention basin.
Figure 7-1. Cutaway of an infiltration basin flow diagram and treatment processes
7-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
5:r„'rrn��rl Infiltration Basin
7.2 Infiltration Basin Components
Figure 7-2 illustrates the various components of a typical infiltration basin. Infiltration basins
are typically designed to include a flow bypass system. Runoff enters the infiltration basin via a
flow bypass structure, which is designed to divert a set amount of runoff to the basin. Excess
flow bypasses the infiltration basin and is conveyed by ditch or pipe directly downstream.
In contrast, infiltration basins without a flow bypass system will receive all runoff regardless of
the flow rate. Both configurations may or may not have an emergency outlet control structure.
Infiltration basins may include the following components:
■ Inlet Drainage System
■ Flow Bypass System
■ Forebay
■ Basin
■ Emergency Outlet Control Structure
■ Outlet Drainage System
Figure 7-2. Components of a typical infiltration basin
NCDOT SC Inspection and Maintenance Manual 7-3
NCDOT- HSP- 2010- 01
Infiltration Basin
7.3 Inspection and Maintenance
Infiltration basins should be inspected at least annually to determine whether they are
functioning as intended. If an infiltration basin is found to not be functioning properly,
determine the cause and restore to working order as soon as possible. Figures 7-3 and 7-4
illustrate a plan and profile view of the areas that should be inspected and maintained in a typical
infiltration basin configuration.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS) on
NCDOT's Intranet. Photos should be taken to track the status of the stormwater control and
document the maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to
Chapter 4 for additional guidance.
Note that the ability of the soil in the infiltration basin to percolate water is critical to the SC's
function. To minimize compaction, heavy machinery should not be used in the basin (NCDOT,
2008b). Refer to Chapter 3 for additional guidance.
The following sections describe the function of an infiltration basin, and provide inspection and
maintenance guidance for its major components.
TO SWALE PRETREATMENT DEVICE
AND/OR (SHOWN HERE AS A FOREBAY)
FILTER STRIP TOP OF
EMBANKMENT
1019
BASIN BOTTOM LINED — —
INFLOW WITH 4" MIN. OF CLEAN — 8
SAND OR DENSE
oo o o VEGETATION OUTLET
o
FLOW o o PROTECTION
BYPASS
STRUCTURE EMERGENCY OUTLET
- CONTROLSTRUCTURE
(OPTIONAL)
TRANSITION BERM
NOTE: FLOW BYPASS CONFIGURATION
VARIES.
Figure 7-3. Plan view of an infiltration basin and its components
7-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ii�FI��•�n'
St[irrii���rl�
Infiltration Basin
EMBANKMENT
FOREBAY TRASH RACKI OUTLET
F-r--FLOW4. PROTECTION
4" MIN. CLEAN SAND :.
FLOW OR DENSE VEGETATION
BYPASS
STRUCTURE L TRANSITION BERM EMERGENCY OUTLET CONTROL
STRUCTURE (OPTIONAL)
Figure 7-4. Profile view of an infiltration basin and its components
7.3.1 INLET DRAINAGE SYSTEM
Function
The inlet drainage system collects and conveys water to the SC. Inlet drainage systems can
consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the flow bypass structure, pretreatment
device, and infiltration basin. Inspect all ditches, pipes, and/or catch basins draining to the
infiltration basin for trash, sediment and debris. Inspect the ground surface above buried pipes
and structures for depressions and other signs of pipe breakage or separation. If the inlet
drainage system consists of an earthen ditch, inspect the ditch for signs of erosion and
undesirable vegetation. Infiltration basins are particularly susceptible to sedimentation. The area
draining to the basin should be carefully inspected for bare soil.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
7.3.2 FLOW BYPASS SYSTEM
Because the primary outlet is infiltration through the soil, infiltration basins are typically
installed offline. This means that a flow bypass system diverts a predetermined amount of runoff
to the SC while bypassing excess flow so that stormwater does not overtop the banks of the basin
during heavy rainfall. The bypass system generally consists of a flow bypass structure in
conjunction with a swale and/or filter strip. The flow bypass structure directs the now, and the
swale and/or filter strip provides treatment of stormwater that bypasses the infiltration basin.
Refer to Chapter 12 for guidance on swales. Refer to the subsequent sections within this chapter
for guidance on filter strips and flow bypass structures.
NCDOT SC Inspection and Maintenance Manual 7-5
NCDOT- HSP- 2010- 01
Infiltration Basin
7.3.3 FLOW BYPASS STRUCTURE
Function
The flow bypass structure diverts runoff to the infiltration basin under usual circumstances, but
will allow high flow to bypass the basin via a swale and/or filter strip during large storm events.
Inspection
The flow bypass structure uses a weir or other configuration, and must be free of any sediment,
trash, and debris to function properly. Inspect the flow bypass structure for holes and cracks, and
for any erosion that would allow runoff to flow around the structure. If applicable, inspect metal
components for excessive corrosion. Note any undesirable vegetation that might prevent the
flow bypass structure from functioning properly.
Check the basin and swale/filter strip for visual signs that they are receiving flow and have not
been overwhelmed. If the basin does not appear to be receiving flow or if there is evidence of
excessive flow, the flow bypass structure is not functioning properly. Erosion protection
materials may have been installed at the bypass structures' outlet to the swale or filter strip. If
this is the case, inspect to ensure that these materials remain in place and are properly installed.
Maintenance
Remove all undesirable vegetation, sediment, trash, and debris. If the flow bypass structure is
clogged, remove sediment and properly dispose of it off -site. Repair any cracks and holes, and
eroded areas associated with the flow bypass structure. Replace components as necessary.
Replace or repair any materials (e.g., riprap, permanent soil reinforcement matting [PSRM]) used
to protect the outlet of the bypass structure to the filter strip or swale.
7.3.4 FILTER STRIP
Function
Some flow bypass systems use filter strips to treat runoff that has bypassed the infiltration basin.
Filter strips promote infiltration and biological uptake of pollutants, and filter out sediment. The
filter strip should have a minimum length of 50 feet if draining to an SA water (i.e., tidal
saltwater used for commercial shellfishing), or 30 feet for all other areas (NCDOT, 2008b).
Inspection
The filter strip should be vegetated with a uniform, dense cover of desirable vegetation. Inspect
for signs of erosion and channelization. Also, verify that the vegetation is being mowed at the
proper frequency. Ideally, turf grasses should be mowed at a frequency to maintain a maximum
height of 4 inches for warm -season grasses and 6 inches for cool -season grasses. However,
within the NCDOT right-of-way, it is more practical to maintain grass height between 6 and
15 inches. Note any undesirable vegetation growing in the filter strip.
7-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
Infiltration Basin
Maintenance
Remove trash and undesirable vegetation. Remove debris that could cause channelization.
Repair areas affected by erosion or channelization. Mow grass and repair or replace PSRM as
necessary. Ensure that grass remains dense for optimum removal of pollutants. If excessive
sediment has accumulated, remove the sediment and regrade the filter strip. Reestablish
vegetation where necessary (NCDWQ, 2007).
7.3.5 PRETREATMENT CONTROL
Function
Infiltration basins are prone to failure when heavy sediment loads are allowed to enter the basin.
Stormwater that has not been pretreated to remove large solids will quickly clog the first few
inches of soil, reducing the infiltration rate of the basin. Once the basin is clogged, it will begin
to retain water, potentially causing a mosquito hazard and erosion of the emergency spillway
from overuse.
Swales or forebays are often used to pretreat runoff upstream of the infiltration basin. Refer to
Chapter 12 for in-depth guidance on swales. Guidance on forebays follows.
A forebay reduces the runoff velocity of stormwater, which in turn allows solids suspended in
the stormwater to settle before the stormwater enters the infiltration basin. A transition berm is
the component located at the downstream end of the forebay that acts as a weir and releases
runoff to the stormwater control. The presence of a forebay reduces the risk of SC failure.
Inspection (Forebay)
Inspect to ensure that all forebays remain free of trash, debris, and undesirable vegetation.
Inspect to determine whether forebays are structurally sound and that they do not contain
excessive amounts of accumulated sediment. Inspect the transition berm to determine whether it
is structurally sound and shows signs of erosion.
Maintenance (Forebay)
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and properly dispose of it off -site if it appears to occupy more than 50% of the
forebay's storage capacity. Replace erosion protection materials (i.e., riprap) as needed. If
necessary, reestablish vegetation for earthen forebays. Repair the transition berm as necessary,
taking care to maintain the original elevation of the weir. Refer to Chapter 3 for further guidance
on sediment disposal. Consult the North Carolina Department of Transportation Stormwater
Best Management Practices Toolbox if major repairs are required.
7.3.6 BASIN AND SURROUNDING AREA
Function
The main pollutant removal processes occur in the basin. Runoff is detained and allowed to
infiltrate into the soil and eventually into the water table. Infiltration of stormwater into the
NCDOT SC Inspection and Maintenance Manual 7-7
NCDOT- HSP- 2010- 01
Infiltration Basin
basin soil is the primary outlet for this SC. The permeability of the soil beneath the basin
must be maintained or the infiltration basin will fail. Vehicles and construction equipment
should not be operated within the basin (NCDWQ, 2007). Use best professional judgment when
selecting mowing and other landscaping equipment for use in the basin. Avoid the use of riding
lawnmowers and minimize foot traffic on the basin bottom.
Some flow bypass structure configurations require the addition of an emergency outlet in the
form of an emergency outlet control structure or an emergency spillway. Emergency outlet
systems are also installed if failure of the bypass structure is a concern.
Inspection
The bottom of the basin may be vegetated with grass or covered with a layer of sand. If sand
was used, it should form a uniform cover of at least 4 inches. The basin's interior and exterior
side slopes, and all areas surrounding the basin should be stabilized with a uniform cover of
turfgrass. Inspect grass to ensure that it is being mowed at a frequency to maintain a desired
height of 6 to 15 inches.
Inspect the basin for structural integrity. Note any signs of erosion, burrowing animals, or
undesirable vegetation. Inspect the embankment for settling, scouring, cracking, sloughing, and
furrowing, and for shrubs or trees. Also, inspect the downstream toe of the embankment for
seepage (NCDWQ, 2007). Note all trash and debris found in the basin and surrounding areas.
The basin bottom should be relatively flat; standing water can accumulate in localized low areas.
Inspect for evidence that excessive ponding is occurring. Water should drain from the basin
within five days. Cattails and other wetland vegetation are indicators that water is remaining in
the basin longer than intended. If this is the case, try to determine the cause of the standing
water. For example, the soil may no longer be capable of percolating stormwater because of
sedimentation or compaction. A high groundwater table or shallow bedrock can also inhibit
infiltration. NCDOT's Geotechnical Unit may be able to assist in determining the cause of a
malfunctioning infiltration basin.
If the basin appears to be retaining water longer than 5 days, it may need to be pumped out to
correct the problem. If this is the case, the captured runoff must first be visually inspected for
obvious signs of pollutants. Check for an oily sheen or excessive suspended solids. If either of
these is present, do not drain the basin. Call the NCDOT Division Safety Officer or the NCDOT
Roadside Environmental Unit (REU) for guidance.
Maintenance
Remove all undesirable vegetation (using mechanical or herbicidal treatment) and mow grass to
the ideal height. Reestablish turfgrass where erosion has occurred (seed or sod). Refer to
Chapter 3 when considering the use of fertilizer, which may be restricted at some locations.
Replace sand where needed and repair all animal burrows. If there is channelization, reestablish
the proper grade of the basin bottom by removing sediment and filling in, then reestablishing
vegetation if applicable. Sediment should be removed as necessary to minimize clogging
(NCDOT, 2008b). Soil clogged with sediment should be removed and the basin bottom tilled.
7-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higillw an
� 5trirrii���rr�
Infiltration Basin
To minimize compaction, heavy equipment should not be used in the basin. Refer to Chapter 3
for additional information.
7.3.7 EMERGENCY OUTLET CONTROL STRUCTURE (IF PRESENT)
Function
An emergency outlet control structure may have been installed to release excess stormwater
during large storm events. The emergency outlet control structure is composed of a riser and a
discharge pipe. See Section 7.3.9 for information regarding the discharge pipe. The riser is
typically made of concrete for durability. Many risers have an open top with a trash rack over
the opening. Some outlet structures may have sluice gates that enable the basin to be drained for
maintenance purposes. If this is the case and standing water is present, drain the basin and return
the sluice gate to the closed position. Perform inspection and maintenance tasks for components
that were previously inaccessible.
Inspection
Inspect the emergency outlet control structure thoroughly for any sign of damage such as
cracking, holes, or leakage. Inspect to ensure that the outlet box remains covered with a trash
rack and that the trash rack is not excessively corroded. Note the amount of trash and debris
buildup on the trash rack. If a sluice gate is present, open and close it to ensure that it can be
operated through its entire range of motion. Inspect the sluice gate for excessive corrosion.
Verify that there is no sediment or debris below the sluice gate that could prevent it from being
fully closed.
Maintenance
Repair any damaged areas of the emergency outlet control structure, and remove sediment and
debris if it is accessible. Replace metal components if necessary. Lubricate sluice gates with a
marine -type grease. It is recommended that a cover be fabricated to protect the sluice gate's
worm gear from corrosion and increase the visibility of the device. The cover can be made by
placing a cap on one end of a section of PVC pipe (see Figure 7-5). If the sluice gate is damaged
beyond repair, replace it with one that meets the requirement presented in NCDOT Standard
Drawing No. 838.02 (NCDOT, 2006). Perform additional maintenance and repairs as described
in the manufacturer's instructions. If the outlet is clogged or blocked and standing water
prevents access to the structure, hip waders or a small boat may be needed to make the necessary
repairs. Ensure that the proper NCDOT safety procedures are followed when working in or
around standing water.
NCDOT SC Inspection and Maintenance Manual 7-9
NCDOT- HSP- 2010- 01
Infiltration Basin
Figure 7-5. Two large sluice gates with PVC covers
7.3.8 EMERGENCY SPILLWAY (IF PRESENT)
Function
stormwater
An emergency spillway may be present as an alternative to the emergency outlet control
structure. An emergency spillway is an overflow channel, typically constructed in natural
ground.
Inspection
The emergency spillway should remain free of trash and debris at all times. Emergency
spillways are typically covered with grass, but concrete and riprap are also used. For grass
channels, verify that grass is maintained between 6 and 15 inches. Inspect concrete to verify that
it is in good condition, or verify that adequate riprap is present. Note all erosion and undesirable
vegetation.
Maintenance
Emergency spillways must be free of trash, debris, and undesirable vegetation at all times to
function properly. Remove these if present. Grass should be carefully maintained at a height of
6 to 15 inches. If applicable, repair concrete or replace riprap as necessary. Repair areas of
erosion.
7.3.9 OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. The outlet drainage system includes conveyance facilities downstream of the
emergency outlet control structure, the emergency spillway, and/or the flow bypass system.
Inspection
Inspect the inside of pipes (where feasible) to ensure that they are free of sediment and debris.
Inspect the ground surface above buried pipes and structures for depressions and other signs of
7-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higill�� �n
5trirrii\� A
Infiltration Basin
pipe breakage or separation. If the outlet drainage system consists of an earthen ditch, inspect
for signs of erosion and undesirable vegetation. If outlet protection materials are present, verify
that these materials are adequate.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Replace outlet protection materials
(i.e., riprap) as necessary. Refer to Chapter 3 for additional guidance on maintenance
techniques.
7.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
NCDOT SC Inspection and Maintenance Manual 7-11
NCDOT- HSP- 2010- 01
Higl sway
Dry Detention Basin
CHAPTER 8 Dry Detention Basin
G p'
ry
4 rim
Overview
A DRY DETENTION BASIN (DDB) is a stormwater control (SC) that reduces peak stormwater flows,
promotes the settling of suspended pollutants, and minimizes erosive velocities downstream of the
outlet structure.
PURPOSE AND DESCRIPTION
■ Dry detention basins are structural SCs designed to temporarily capture stormwater runoff and
reduce flow velocity.
■ Inflow to the SC is detained and released slowly from a primary outlet control structure over a
period of 48 — 72 hours.
■ Dry detention basins are designed with a drawdown component that keeps the basin dry
between storm events.
INSPECTION
■ Dry detention basins should be dry between storm events; standing water in the basin may
indicate that maintenance is needed.
■ The outlet control structure is critical to the proper function of the dry detention basin and should
be inspected carefully.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Trash and debris should be removed from inlet grates, trash racks, orifices, and forebays.
■ Any structural deficiencies should be repaired or the components replaced.
■ Undesirable vegetation, especially woody vegetation on the embankment, should be removed.
NCDOT SC Inspection and Maintenance Manual 8-1
NCDOT- HSP- 2010- 01
Dry Detention Basin
8.1 Stormwater Control Overview
A Dry Detention Basin (DDB) is a stormwater device whose outlet has been designed to
temporarily detain contaminated runoff and release it slowly over a period of 48-72 hours. It is
during this time that runoff velocities are lowered and physical processes work to remove
pollutants. As stormwater is detained and runoff velocities are lowered, suspended solids and
other associated pollutants settle out and are removed from the runoff before it exits the basin
and enters the nearest stream, river, or lake.
The primary pollutant removal process is sedimentation. Vegetation in the dry detention basin
can also filter out and take up pollutants. Additionally, some water may infiltrate through the
bottom of the basin, which recharges aquifers.
The basin's main outlet is small and is located near the bottom of the basin. This outlet is
referred to as the drawdown orifice, and it allows the basin to temporarily hold water during
storm events and drain completely afterward. One or more additional outlets allow water to
overflow during large storms.
Figure 8-1 illustrates flow entering the basin, being detained, and exiting the basin. The figure
also shows the treatment processes that occur in a typical dry detention basin.
Figure 8-1. Cutaway of a dry detention basin flow diagram and treatment processes
8-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Dry Detention Basin
8.2 Dry Detention Basin Components
Figure 8-2 illustrates the various components of a typical dry detention basin. Note that layouts
vary. Some systems will have additional components, whereas others may lack certain
components. Dry detention basins may include the following:
■ Inlet Drainage System
■ Forebay
■ Basin
■ Outlet Control Structure
■ Drawdown Orifice
■ Outlet Drainage System
■ Emergency Spillway
Figure 8-2. Components of a typical dry detention basin
NCDOT SC Inspection and Maintenance Manual 8-3
NCDOT- HSP- 2010- 01
Dry Detention Basin
8.3 Inspection and Maintenance
Dry detention basins should be inspected at least annually to determine whether they are
functioning as intended. If a dry detention basin is found to not be functioning properly,
determine the cause and restore to working order as soon as possible. Figures 8-3 and 8-4
illustrate a plan and profile view of the areas that should be inspected and maintained in a typical
dry detention basin configuration.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for
further guidance.
The following sections describe the function of a dry detention basin, and provide inspection and
maintenance guidance for its major components.
EMERGENCY SPILLWAY
TOP OF
EMBANKMENT
TRANSITION BERM
8
FOREBAY
OUTFALL o
INFLOW
0
RECEIVING
CHANNEL
OUTLET CONTROL
STRUCTURE
Figure 8-3. Plan view of a dry detention basin and its components
INFLOW
FOREBAY -
TRANSITION
BERM
TRASH RACK
CLEANOUT
UNDERDRAIN
DRAWDOWN
ORIFICE
EMERGENCY
SPILLWAY
EMBANKMENT
\ OUTLET
PROTECTION
OUTLET CONTROL
STRUCTURE
Figure 8-4. Profile view of a dry detention basin and its components
8-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
8.3.1 INLET DRAINAGE SYSTEM
Function
Dry Detention Basin
The inlet drainage system collects and conveys water to the dry detention basin. Inlet drainage
systems can consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect ditches, pipes, and/or
catch basins draining to the dry detention basin for trash, sediment, and debris. Inspect the
ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Desirable vegetation includes grass cover in an open ditch to prevent soil erosion. Undesirable
vegetation includes any woody plants or invasive species that may impede the inlet drainage
system.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
8.3.2 FOREBAY
Function
A forebay is a basin located at the inlet of an SC that pretreats stormwater. Forebays reduce the
runoff velocity of stormwater, which in turn allows sediment in the runoff to settle before the
stormwater enters the dry detention basin. A transition berm is the component located at the
downstream end of the forebay that acts as a weir and releases runoff to the stormwater control.
The presence of a forebay reduces the risk of SC failure.
Inspection
Inspect forebays for trash, debris, and undesirable vegetation. Inspect to determine whether
forebays are structurally sound and that they do not contain excessive amounts of accumulated
sediment. Inspect the embankment and transition berm to determine whether it is structurally
sound and shows signs of erosion. Forebays may have grass -covered embankments and berms,
but they are not designed to support vegetation in the basin. Minimal plant growth is tolerable,
but if it becomes excessive, the storage volume for sediment is reduced and dredging becomes
more difficult. If any invasive species are present, it is generally preferable to remove them
before they become well -established.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Replace erosion protection materials (i.e., riprap) as needed. If the surrounding soil is
disturbed during cleanout of the forebay, or at any other time, reseed any areas of bare soil with
NCDOT SC Inspection and Maintenance Manual 8-5
NCDOT- HSP- 2010- 01
Dry Detention Basin
grass to prevent erosion. Repair the transition berm as necessary, taking care to maintain the
original elevation of the berm. Refer to Chapter 3 for additional guidance on sediment disposal.
Consult the North Carolina Department of Transportation Stormwater Best Management
Practices Toolbox (NCDOT, 2008b) if major repairs or design changes are required.
8.3.3 BASIN AND SURROUNDING AREA
Function
The basin is the component of the dry detention basin that reduces the rate of runoff and allows
suspended solids to settle.
Inspection
The floor of the basin, its interior and exterior side slopes, and the area surrounding the basin
should be stabilized with at least a cover of turf -type grass. Verify that grass is being mowed at a
frequency to maintain a height of 6 to 15 inches. Inspect the basin for structural integrity. Note
any signs of erosion, burrowing animals, or undesirable vegetation. Inspect the embankment for
settling, scouring, cracking, sloughing, and furrowing, and for invading shrubs and trees. Also,
inspect the downstream toe of the embankment for seepage (NCDWQ, 2007). Note all trash and
debris found in the basin or in surrounding areas. Also, inspect the basin for evidence that water
remains in the basin longer than 5 days. Cattails and other wetland vegetation are good
indicators that water is remaining in the basin longer than intended. If this is the case, try to
determine the cause of the standing water. Possible causes include a high groundwater table,
clogged drawdown orifice(s), and localized low areas.
Some dry detention basins have been planted with certain grasses, trees, shrubs, and herbaceous
plant material to enhance their aesthetic appeal and increase their pollutant removal ability (See
Figure 8-5). If applicable, verify that this plant material remains healthy and uniformly
established. A layer of mulch should be present to help maintain soil moisture, protect against
surface sealing, prevent soil erosion, and provide a suitable microclimate for microorganisms.
The mulch layer should be approximately 3-4 inches thick and relatively level, with no
exaggerated channels cut through as a consequence of concentrated water flow.
It is important to note that dry detention basins with special plant material are not as
common as grassed dry detention basins and can be easily confused with bioretention
basins. However, dry detention basins do not typically have underdrain systems and
cleanouts will not be present. All dry detention basins have a distinct outlet control
structure with a restrictive outlet (drawdown orifice or slightly opened sluice gate) near the
bottom of the basin.
Baffles may have been installed to increase the effective flow length in the basin. If this is the
case, verify that the baffles are undamaged.
8-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ii�F���•�n'
S:ormwaier•
Maintenance
Dry Detention Basin
Figure 8-5. Dry detention basin with planted landscaped vegetation
Remove undesirable vegetation (using a mechanical or herbicidal treatment) and mow grass to
the ideal height. Turfgrass is typically mowed at a frequency to maintain a maximum height of
4 inches for warm -season grasses and 6 inches for cool -season grasses. However, on highway
right-of-way facilities, it is more practical to maintain a grass height between 6 and 15 inches.
If erosion has occurred, reestablish turfgrass (seed or sod) or replace mulch with double -
shredded hardwood bark. Replace dead or unhealthy plant material, and fertilize turfgrass and/or
plant material upon reestablishment. The use of fertilizer may be restricted at some locations.
Refer to Chapter 3 when considering the use of fertilizer. Contact the NCDOT Roadside
Environmental Unit (REU) if guidance is needed in maintaining landscaped dry detention basins.
Repair all animal burrows. If there is channelization, reestablish the proper grade of the basin
bottom by removing sediment and filling in, then reestablishing vegetation. Repair damaged
baffles if applicable. Sediment should be removed if it occupies more than 25% of the basin's
original storage capacity.
8.3.4 UNDERDRAIN SYSTEM (IF PRESENT)
Function
Some large dry detention basins are equipped with underdrain systems to ensure that the basin is
properly drained between storm events. In these systems, the drawdown orifice is still the
primary outlet while the underdrain system is used to prevent small pools from holding water for
periods longer than intended. Underdrain systems are usually constructed using perforated PVC
pipe. The perforated pipe is wrapped in filter fabric to prevent clogging and installed in a
NCDOT SC Inspection and Maintenance Manual 8-7
NCDOT- HSP- 2010- 01
Dry Detention Basin
�
shallow layer (typically 12 inches) of No. 57 stone. To avoid crushing the underdrain system,
heavy equipment should not be driven in the basin. Refer to Chapter 3 for additional
information. Cleanouts are typically visible from the surface if an underdrain system is present.
Inspection
Verify that cleanout caps are in place and undamaged. Damaged or missing caps will allow
stormwater to exit the basin untreated. Remove the caps from the cleanouts and inspect the
inside for sediment or standing water using a flashlight. If water is available, pour water in the
cleanouts using a bucket or hose and observe the outlet control structure or outlet pipe for flow.
If the water does not exit freely, this indicates the underdrain system is clogged. If sediment is
flushed from the underdrain system, it may be an indication that the filter fabric has been
damaged and will need to be excavated and repaired. The basin should be inspected for
depressions that are another indication that soil is entering the underdrain system.
If the basin is holding water longer than 5 days, (NCDWQ, 2007) the under drain system (if
present) can be used to drain the basin via its cleanouts so that any plant or soil material which
may be preventing infiltration can be remediated. Before doing so, the water must first be
visually inspected for obvious signs of pollutants. Check for an oily sheen or excessive
suspended solids. If either of these is present, do not drain the basin. Call the NCDOT Division
Safety Officer or the NCDOT REU for guidance.
Maintenance
A high-pressure hose can be used to flush out underdrain systems by spraying water into
cleanouts. Replace cleanout caps that are missing, cracked, or otherwise damaged. Consider
flushing underdrain systems annually if it appears that they have a tendency to plug. Repair or
replace underdrain systems in accordance with the original design specifications. If additional
guidance is needed, consult the North Carolina Division of Water Quality Stormwater Best
Management Practices Manual (NCDWQ, 2007).
8.3.5 OUTLET CONTROL STRUCTURE (BOX)
Function
The outlet control structure is used to drain the dry detention basin. Outlet control structures can
have several components, including a trash rack, a trash screen, one or more drawdown orifices,
a sluice gate, and an outlet pipe. Inspection and maintenance guidance for these specific
components is provided in subsequent sections of this chapter. Figure 8-6 illustrates the
configuration of a typical outlet control structure. The drawdown orifice(s) is located at the
bottom of the outlet control structure and slowly drains the basin, reducing peak flow and
allowing solids to settle. Typically, the outlet control structure has a second, larger opening that
allows flow from large rainfall events to escape without overtopping the basin. Usually, this is in
the form of an open -top outlet structure with a trash rack. Figure 8-7 offers a photograph of a
typical outlet control structure.
Standing water in the basin may conceal parts of the outlet structure. If access to submerged
components is needed, the basin can be drained or pumped out; however, the water must first be
8-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higll lwaV
i� 5trirrrn��rt�
Dry Detention Basin
visually inspected for obvious signs of pollutants. Check for an oily sheen or excessive
suspended solids. If either of these is present, do not drain the basin. Call the NCDOT Division
Safety Officer or the NCDOT REU for guidance.
Inspection
Treated water should be allowed to flow freely upon entering the outlet control structure. Inspect
the outlet control structure thoroughly for any signs of damage such as cracking, holes, or
leakage. Verify that the outlet box remains covered with a trash rack. See subsequent sections
for guidance on specific components.
Maintenance
Repair any damaged areas of the outlet control structure, and remove sediment and debris if it is
accessible. If the outlet is clogged or blocked and standing water prevents access to the
structure, hip waders or a small boat may be needed to make the necessary repairs. Ensure that
the proper NCDOT safety procedures are followed when working in or around standing water.
PVC WORM
WORM GEAR
i
GEAR COVER
SLUICE
GATE
TRASH RACK
DRAWDOWN
ORIFICE TRASH
SCREEN
L- BASIN
BOTTOM
STEEL PLATE WITH
UTLET DRAWDOWN
PIPE - ORIFICES
000 00 000 0
000 00 000 0
Figure 8-6. Components of an outlet control structure
NCDOT SC Inspection and Maintenance Manual 8-9
NCDOT- HSP- 2010- 01
Dry Detention Basin
Figure 8-7. An outlet control structure
8.3.6 TRASH RACK
Function
Positioned atop the outlet control structure (box), the trash rack protects the overflow of the
outlet structure from becoming clogged with debris.
Inspection
Inspect the trash rack for debris and excessive corrosion.
Maintenance
Remove trash and debris. Replace the trash rack if it is corroded or otherwise damaged. The
replacement trash rack should be consistent with the design specifications for the SC. If
drawings or specifications are not available, contact the NCDOT Hydraulics Unit to obtain
standard trash rack specifications or details.
8.3.7 TRASH SCREEN
Function
Positioned near the base of the outlet control structure, the trash screen helps keep the orifice
from becoming clogged.
8-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Hi�FI��•�n
Dry Detention Basin
Inspection
If it is accessible, inspect the trash screen for accumulated sediment and debris. If the basin is
holding water above the level of the orifice and water is not flowing into the outlet control
structure, this is a good indication that the trash screen may be clogged.
Maintenance
If there is evidence that the trash screen is clogged, open the sluice gate to drain the basin or
pump it out after properly inspecting the water for pollution. Once the basin is drained, remove
any sediment, trash, or debris from the trash screen. Remember to return the sluice gate to its
original position.
8.3.8 DRAWDOWN ORIFICE
Function
Positioned near the base of the outlet control structure, the drawdown orifice is a restricting
device that allows stormwater to slowly enter the outlet box. In most cases, the drawdown
orifice consists of either one or more 2- to 3-inch holes drilled directly into the side of the box or
a predrilled steel plate attached to the side of the outlet control structure covering a manufactured
outlet opening.
Inspection
If the orifice is accessible, verify that stormwater flows freely through it into the outlet structure.
If a steel plate was used to restrict flow, check the plate for excessive corrosion. Standing water
above the level of the orifice is an indication that the orifice may be blocked.
Maintenance
Remove sediment and debris blocking the flow into the orifice. If the water level in the basin is
above the orifice, follow proper precautions before opening the sluice gate or pumping out the
basin. After the basin has been drained, lift the trash screen to gain access to the orifice.
Remember to return the sluice gate to its original position. Replace the steel orifice plate if
necessary.
8.3.9 SLUICE GATE (IF PRESENT)
Function
Sluice gates are typically installed for emergency maintenance needs or to prevent spills from
entering water bodies. In these cases, the sluice gate covers an additional opening that is larger
than the drawdown orifice. The sluice gate can be opened to rapidly drain the basin. In some
instances, sluice gates are used in place of drawdown orifices. If a basin's outlet control
structure is equipped with both an orifice and a sluice gate, the sluice gate should remain
closed at all times. If a sluice gate is used to restrict water flow, it should be left open to
provide a 1-inch opening.
NCDOT SC Inspection and Maintenance Manual 8-11
NCDOT- HSP- 2010- 01
Dry Detention Basin
Inspection
Two types of sluice gates are currently in use: (1) a screw -type gate and (2) a lift -type gate.
Figures 8-8 and 8-9 show a screw -type sluice gate and a lift -type sluice gate, respectively. Open
and close the sluice gate to verify that it is operable through its entire range of motion. Inspect
the sluice gate for excessive corrosion. Verify that there is no sediment or debris below the
sluice gate that could prevent it from being fully closed.
Maintenance
If lubrication is necessary, lubricate with a marine -type grease. It is recommended that a cover
be fabricated to protect the sluice gate's worm gear from corrosion and increase the visibility of
the device. The cover can be made by placing a cap on one end of a section of PVC pipe (see
Figure 8-10). Remove any sediment and debris near the sluice gate. If the sluice gate is
damaged beyond repair, replace it with one that meets the requirements presented in NCDOT
Standard Drawing No. 838.02 (NCDOT, 2006). Perform additional maintenance and repairs as
described in the manufacturer's instructions.
Figure 8-8. An open screw -type sluice gate
8-12 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Dry Detention Basin
Figure 8-9. A lift -type sluice gate
Figure 8-10. Two large sluice gates with PVC covers
8.3.1 O OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system.
Typically, a pipe conveys water from the outlet control structure through the embankment to a
swale or other open channel.
NCDOT SC Inspection and Maintenance Manual 8-13
NCDOT- HSP- 2010- 01
Dry Detention Basin
Inspection
Inspect the inside of the outlet box and pipe(s) for sediment and debris. Inspect the ground
surface above buried pipes and structures for depressions or other signs that might indicate pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Maintenance
Remove any sediment or debris that is accessible. Repair eroded areas and damaged pipes.
Replace outlet protection materials (i.e., riprap) as necessary. Refer to Chapter 3 for additional
guidance on maintenance techniques.
8.3.11 EMERGENCY SPILLWAY (IF PRESENT)
Function
The emergency spillway serves as an overflow structure that is typically constructed as a channel
in natural ground. The emergency spillway is necessary to minimize the potential for
overtopping the basin, which can damage the embankment and lead to SC failure and
downstream flooding.
Inspection
The emergency spillway should remain free of trash and debris. Emergency spillways are
typically covered with grass, but concrete and riprap are also used. For grass channels, verify
that grass is maintained between 6 and 15 inches. Inspect concrete to verify that it is in good
condition, or verify that adequate riprap is present. Note all erosion and undesirable vegetation.
Maintenance
Emergency spillways must be free of trash, debris, and undesirable vegetation to maintain their
functionality. Remove these if present. Grass should be carefully maintained at a height of 6 to
15 inches. If applicable, repair concrete or replace riprap as necessary. Repair areas of erosion.
8.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
8-14 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higl sway
CHAPTER 9
Wet Detention Basin
OVERVIEW
Wet Detention Basin
A WET DETENTION BASIN (WDB) is a stormwater control that maintains a permanent pool of water,
reduces peak stormwater flows, promotes the settling of suspended solids and biological uptake of
pollutants, and reduces erosive velocities downstream of the outlet control structure.
PURPOSE AND DESCRIPTION
■ Wet detention basins improve water quality by allowing sediment to settle and promoting the
growth of wetland plants.
■ The basin has additional capacity to detain and slowly release stormwater from a primary outlet
control structure over a period of time.
INSPECTION
■ The water level should remain near the drawdown device or orifice; low water level or frequent
overflowing indicates that maintenance is necessary.
■ The outlet control structure is critical to the proper function of the wet detention basin and should
be inspected carefully.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Trash and debris should be removed from inlet grates, forebays, orifices, and trash racks.
■ Any structural deficiencies should be repaired or the components replaced.
■ Undesirable vegetation, especially woody vegetation on the embankment, should be removed.
NCDOT SC Inspection and Maintenance Manual 9-1
NCDOT- HSP- 2010- 01
Wet Detention Basin
9.1 Stormwater Control Overview
A Wet Detention Basin (WDB) is a constructed basin with a permanent pool of water that is used
to detain and treat contaminated runoff. During storm events, runoff is directed into the pond
where it is detained until it is displaced by runoff from the next storm. It is during this detention
period that suspended solids and other associated pollutants found in stormwater runoff settle -
out.
Figure 9-1 illustrates flow entering the basin, being detained, and exiting the basin. The figure
also shows the treatment processes that occur in a typical wet detention basin.
Figure 9-1. Cutaway of a wet detention basin flow diagram and treatment processes
9-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Wet Detention Basin
9.2 Wet Detention Pond Components
Figure 9-2 illustrates the various components of a typical wet detention basin. Note that layouts
vary. Some systems will have additional components while others may lack certain components.
Wet detention basins may include the following:
■ Inlet Drainage System
■ Forebay
■ Basin
■ Outlet Control Structure
■ Outlet Drainage System
■ Emergency Spillway
Figure 9-2. Components of a typical wet detention basin
NCDOT SC Inspection and Maintenance Manual 9-3
NCDOT- HSP- 2010- 01
Wet Detention Basin
9.3 Inspection and Maintenance
Wet detention basins should be inspected at least annually to determine whether they are
functioning as intended. If a wet detention basin is found not to be functioning properly,
determine the cause and restore to working order as soon as possible. Figures 9-3 and 9-4
illustrate a plan and profile view of the areas that should be inspected and maintained in a typical
wet detention basin configuration.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A), then entered into the Stormwater Control Management System (SCMS). Photos
should be taken to track the status of the stormwater control (SC) and document the maintenance
activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for further
guidance.
The following sections describe the function of a wet detention basin, and provide inspection and
maintenance guidance for its major components.
TRANSITION BERM
FOREBAY
INFLOW
SPILLWAY
—TOP OF
EMBANKMENT
3
OUTFALL
RECEIVING
CHANNEL
OUTLET CONTROL
STRUCTURE
Figure 9-3. Plan view of a wet detention basin and its components
PERMANENT TRASH RACK
POOL ELEV.
INFLOWa}s,;
FOREBAY �� E
TRANSITION DRAWDOWN
BERM DEVICEIORIFICE
EMERGENCY
SPILLWAY
EMBANKMENT
\ OUTLET
—PROTECTION
OUTLET CONTROL
STRUCTURE
Figure 9-4. Profile view of a wet detention basin and its components
9-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
9.3.1 INLET DRAINAGE SYSTEM
Function
Wet Detention Basin
The inlet drainage system collects and conveys water to the wet detention basin. Inlet drainage
systems can consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect ditches, pipes, and/or
catch basins draining to the wet detention basin for trash, sediment, and debris. Inspect the
ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
9.3.2 FOREBAY
Function
A forebay is a basin located at the inlet of a SC that pretreats stormwater. A forebay reduces the
runoff velocity of stormwater, which in turn allows sediment in the stormwater to settle before
the stormwater enters the wet detention basin. A transition berm is the component located at the
downstream end of the forebay that acts as a weir and releases runoff to the SC. The presence of
a forebay reduces the risk of SC failure.
Inspection
Inspect forebays for trash, debris, and undesirable vegetation. Inspect to determine whether
forebays are structurally sound and that they do not contain excessive amounts of accumulated
sediment. Sediment accumulation should be less than 50% of the forebay's storage capacity.
Inspect the embankment and transition berm for structural integrity and signs of erosion. Inspect
the forebay for undesirable vegetation. Forebays may have grass -covered embankments and
berms, but they are not designed to support vegetation in the basin. Minimal plant growth is
tolerable, but if it becomes excessive, the storage volume for sediment is reduced and dredging
becomes more difficult. If any invasive species are present, it is generally preferable to remove
them before they become well established.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Replace erosion protection materials (i.e., riprap) as needed. If the surrounding soil is
disturbed during cleanout of the forebay, or at any other time, reseed any areas of bare soil with
grass to prevent erosion. Repair the transition berm as necessary, taking care to maintain the
original elevation of the berm. Refer to Chapter 3 for additional guidance on sediment disposal.
NCDOT SC Inspection and Maintenance Manual 9-5
NCDOT- HSP- 2010- 01
Wet Detention Basin
^ Yaliia.1v.m
Consult the NCDOT Stormwater Best Management Practices Toolbox (NCDOT, 2008b) or the
Hydraulics Unit if major repairs are required.
9.3.3 BASIN AND SURROUNDING AREA
Function
The basin is the component of the wet detention basin in which sedimentation and biological
uptake of pollutants occurs. A permanent pool of water is maintained in the basin. The basin is
designed with additional capacity, above the permanent pool, for detaining and slowly releasing
runoff from storm events. The sides of the basin may be covered with grass, riprap, and/or
wetland vegetation.
If sediment removal or access to submerged components is necessary, the basin can be drained or
pumped out; however, the water must first be visually inspected for obvious signs of pollutants.
Check for an oily sheen, any unusual odors, or excessive suspended solids. If any of these are
present, do not drain the basin. Call the Division Safety Officer or the Roadside Environmental
Unit for guidance.
Inspection
Inspect the sides of the basin and the surrounding area for structural integrity, noting any signs of
burrowing animals, erosion, inadequate vegetative cover, or undesirable vegetation. Verify that
grass is being mowed at a frequency to maintain a height of 6 to 15 inches. Inspect the
embankment for settling, scouring, cracking, sloughing, and furrowing, and for invading shrubs
and trees. Also, inspect the downstream toe of the embankment for seepage (NCDWQ, 2007).
Note trash and debris found in the basin or in surrounding areas.
The water level should be at or near the invert of the drawdown device/orifice except after storm
events and during prolonged dry periods. If the water level appears to be too high given recent
weather conditions, one or more components are likely clogged. Follow the inspection
procedures outlined previously before draining or pumping out the basin, then follow the
maintenance guidance given in subsequent sections of this chapter to correct the problem. Low
water levels when there is adequate rainfall indicates that the infiltration rate in the basin is
higher than originally anticipated. If this is an aesthetic problem or causing adverse affects on the
vegetation, a liner can be installed (NCDWQ, 2007). Contact the Hydraulics Unit if there are
chronic problems with low water levels.
Try to determine the depth of sediment that has accumulated in the basin. If levels are
approaching the drawdown orifice, it is likely that sediment needs to be removed before it
impedes the functionality of the basin.
Algae is going to occur in wet detention basins as a result of. 1) nutrient enriched water,
2) shallow water, and 3) intense sun light. When the algal population is controlled, algae provide
nutrient removal. Generally, if the algae mats are not so thick as to provide mosquito refuge, they
should not require removal. However, unhealthy algal growth can occur when poor vegetative
density increases the temperature of the water in the basin or when the basin receives excessive
9-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
� 5trirrii���rr�Higill
Wet Detention Basin
nutrient inputs. If algal growth covers more than 50% of the basin, develop a management plan
to remove and prevent reoccurrence of such growth (NCDWQ, 2007). Physical removal is one
option. Available chemical control options are discussed in the 2009 N.C. Agricultural
Chemicals Manual (NCSU, 2009). Applicators require a commercial pesticide applicators
license with an aquatic endorsement. Contact the Roadside Environmental Unit for guidance.
Some wet detention basins have a vegetated shelf at the perimeter that is planted with wetland
vegetation to increase pollutant removal. Consult the design drawings or landscaping plan to
determine whether the appropriate vegetation is present. Note any undesirable vegetation and
verify that plants remain healthy and uniformly established. Cattails or other invasive plants
should be removed if they cover more than 50% of the basin area (NCDWQ, 2007).
Baffles may have been installed to increase the effective flow length in the basin. If this is the
case, verify that the baffles are undamaged.
Maintenance
Remove undesirable vegetation by hand if possible or by wiping them with pesticide. Use
aquatic herbicides and other appropriate products per label instructions in and around the basin.
Mow grass to the ideal height. Turfgrass is typically mowed at a frequency to maintain a
maximum height of 4 inches for warm -season grasses and 6 inches for cool -season grasses.
However, on highway right-of-way facilities, it is more practical to maintain a grass height
between 6 and 15 inches.
If erosion has occurred, reestablish grass, wetland vegetation, or riprap as appropriate. Replace
dead or unhealthy plant material. Fertilize upon reestablishment only if needed. The use of
fertilizer may be restricted at some locations. Refer to Chapter 3 when considering the use of
fertilizer. Contact the Roadside Environmental Unit if further guidance is necessary to maintain
vegetation in wet detention basins.
Repair all animal burrows. Repair damaged baffles if applicable. Remove sediment if it is
suspected to have exceeded the original design sediment storage depth or if it is impeding the
function of the basin.
9.3.4 OUTLET CONTROL STRUCTURE (BOX)
Function
The outlet control structure regulates the water level and slowly releases stormwater. Outlet
control structures can have several components, including a trash rack, a drawdown device or
orifice, a sluice gate, and an outlet pipe. Inspection and maintenance guidance for these specific
components is provided in subsequent sections of this chapter. Figure 9-5 illustrates the
configuration of a typical outlet control structure. Drawdown devices or orifices are located a
few inches to a few feet below the top of the outlet control structure. The outlet control structure
often has a second, larger opening at the top that allows flow from large rainfall events to escape
without overtopping the basin. Usually, this is in the form of an open -top outlet structure with a
trash rack.
NCDOT SC Inspection and Maintenance Manual 9-7
NCDOT- HSP- 2010- 01
Wet Detention Basin
Inspection
Treated water should be allowed to flow freely upon entering the outlet control structure. Inspect
the outlet control structure thoroughly for any signs of damage such as cracks, holes, or leaks.
Verify that the outlet box remains covered with a trash rack. See subsequent sections for
guidance on specific components.
Maintenance
Repair any damaged areas of the outlet control structure, and remove sediment and debris if it is
accessible. If the outlet is clogged or blocked, hip waders or a small boat may be needed to
make the necessary repairs. Ensure that the proper NCDOT safety procedures are followed
when working in or around standing water.
PVC WORM WORM GEAR
GEAR COVER - -
i
f l TRASH RACK
DRAWDOWN
DEVICE
SLUICE
GATE
f i BASIN
BOTTOM
i
OUTLET
PIPE
C }LjC��C
Figure 9-5. Components of an outlet control structure
9-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:ormwaier•
9.3.5 TRASH RACK
Function
Wet Detention Basin
Figure 9-6. Two views of an outlet control structure
Positioned atop the outlet control structure (box), the trash rack protects the overflow of the
outlet structure from becoming clogged with debris (see Figures 9-5 and 9-6).
Inspection
Inspect the trash rack for debris and excessive corrosion.
Maintenance
Remove trash and debris. Replace the trash rack if it is corroded or otherwise damaged. The
replacement trash rack should be consistent with the design specifications for the SC. If
drawings or specifications are not available, contact the NCDOT Hydraulics Unit to obtain
standard trash rack specifications or details.
9.3.6 DRAWDOWN DEVICE OR ORIFICE
Function
Positioned a few inches below the top of the outlet control structure, the drawdown device or
orifice is a restricting device that allows stormwater to slowly enter the outlet box. Several
configurations exist. The simplest type is one or more orifices in the shape of slots or holes
directly in the side of the outlet control structure.
NCDOT SC Inspection and Maintenance Manual 9-9
NCDOT- HSP- 2010- 01
Wet Detention Basin
Fligl sway
SlUrnzwvaret;
Figure 9-7. Outlet control structures showing two types of drawdown devices,
slotted (left) and PVC elbow (right).
Drawdown devices have been installed on some outlet control structures to protect the orifice
from becoming clogged with floating debris. For example, a small baffle, a wall constructed
around the portion of the riser with the orifice(s), can protect the orifice(s) from floating debris
while allowing runoff to flow under the baffle and out through the orifices. Another type of
drawdown device has a PVC elbow or tee that maintains the entrance to the orifice below the
water level so it does not become clogged with floating debris. Figure 9-5 illustrates this
configuration.
Inspection
If it is accessible, inspect the drawdown device to ensure that stormwater can freely enter the
outlet control structure. If metal components were used to restrict flow or guard against floating
debris, check them for excessive corrosion. If the drawdown device is not visible and is
suspected to be submerged after the 2 — 5 day drawdown period (check design specifications), it
is likely clogged.
Maintenance
Remove sediment and debris blocking the flow into the orifice. If the orifice is submerged,
follow guidance given in Section 9.3.4 before pumping out or draining the basin. Replace
damaged or corroded components.
9.3.7 SLUICE GATE (IF PRESENT)
Function
Sluice gates are installed for emergency maintenance needs. The sluice gate covers an additional
opening at the invert of the basin that is larger than the drawdown orifice. The sluice gate can be
opened to rapidly drain the basin. Figure 9-7 is a photograph of a screw -type sluice gate.
Figure 9-8 shows a lift -type sluice gate.
9-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Figure 9-8. An open screw -type sluice gate
Figure 9-9. A Lift -type sluice gate
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Wet Detention Basin
m
Wet Detention Basin
Inspection
Two types of sluice gates are currently in use: (1) a screw -type gate and (2) a lift -type gate.
Make sure the sluice gate has not frozen shut by slightly testing the functionality, taking care not
to open it, which could allow sediment or debris to escape or get lodged in the outlet. Inspect the
sluice gate for excessive corrosion. Verify that there is no sediment or debris below the sluice
gate that could prevent it from being fully closed.
Maintenance
If lubrication is necessary, lubricate with a marine -type grease. It is recommended that a cover
be fabricated to protect the sluice gate's worm gear on a screw -type gate from corrosion and to
increase the visibility of the device. The cover can be made by placing a cap on one end of a
section of PVC pipe (see Figure 9-9). If accessible, remove any sediment and debris near the
sluice gate. If the sluice gate is damaged beyond repair, replace it with one that meets the
requirements presented in NCDOT Standard Drawing No. 838.02 (NCDOT, 2006). Perform
additional maintenance and repairs as described in the manufacturer's instructions.
Figure 9-10. Two large sluice gates with PVC covers
9.3.8 OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Typically, a pipe conveys water from the outlet control structure through the
embankment to a swale or other open channel.
Inspection
Inspect the inside of structures and pipe(s) to verify that they are free of sediment and debris.
Inspect the ground surface above buried pipes and structures for depressions or other signs that
might indicate pipe breakage or separation. Inspect ditches for signs of erosion and undesirable
vegetation.
9-12 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HiA lwaN,
Wet Detention Basin
Maintenance
Remove any sediment or debris that is accessible. Repair eroded areas and damaged pipes.
Replace outlet protection materials (i.e., riprap) as necessary. Refer to Chapter 3 for additional
guidance on maintenance techniques.
9.3.9 EMERGENCY SPILLWAY (IF PRESENT)
Function
The emergency spillway serves as an overflow structure that is typically constructed as a channel
in natural ground. The emergency spillway is necessary to minimize the potential for
overtopping the basin, which can damage the embankment and lead to SC failure and
downstream flooding.
Inspection
The emergency spillway should remain free of trash and debris. Emergency spillways are
typically covered with grass, but concrete and riprap are also used. For grass channels, verify
that grass is maintained between 6 and 15 inches. Inspect concrete channels to verify that they
are in good condition, or verify that adequate riprap is present. Note all erosion and undesirable
vegetation. Observe the point of discharge to evaluate if erosion protection is adequate.
Maintenance
Emergency spillways must be free of trash, debris, sediment and undesirable vegetation to
maintain proper function. Remove these if present. Grass should be carefully maintained at a
height of 6 to 15 inches. Repair concrete or replace riprap as necessary. Repair areas of erosion.
9.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
NCDOT SC Inspection and Maintenance Manual 9-13
NCDOT- HSP- 2010- 01
Higl sway
CHAPTER 10
Hazardous Spill Basin
Hazardous Spill Basin
• ��.'
'� "
pgyp''-
_ .�.
-•.
"_ - -• '-'s• � � +.x'. -
Jam: . i:' . _ " :.
.
OVERVIEW
A HAZARDOUS SPILL BASIN (HSB) is a stormwater control designed to temporarily detain hazardous
material that has been spilled on roads and parking areas until it can be removed.
PURPOSE AND DESCRIPTION
■ HSBs protect water quality by detaining hazardous materials that have been spilled on roadways
near designated sensitive water supplies, other environmentally sensitive areas, and areas with
concentrated truck parking.
■ Under normal operation, hazardous spill basins do not restrict the free flow of runoff.
INSPECTION
■ The area should first be inspected for any evidence that a spill has occurred. If hazardous
material is present, abandon the inspection, and notify the proper authorities.
■ The outlet should remain unobstructed during normal operation.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Vegetation should be controlled so that the outlet is visible and easily accessible.
■ Sediment and debris should be removed from the device and outlet to retain capacity and to
ensure that the sluice gate or other obstruction method can be properly sealed during a spill.
■ The sluice gate should be exercised and lubricated to prevent corrosion and seizing.
NCDOT SC Inspection and Maintenance Manual 10-1
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
10.1 Stormwater Control Overview
A Hazardous Spill Basin (HSB) is a containment structure installed at stream crossings and rest
area parking lots that aids in the temporary storage and clean up of accidental spills. Under
normal conditions runoff flow is allowed to enter and pass freely through the basin. When a spill
occurs, the basin's drainage outlet structure is closed using a mechanical control valve (sluice
gate). This helps contain the hazardous material and prevents it from reaching and
contaminating the nearest river, lake, or stream.
Before inspecting any hazardous spill basin, the inspector should first check the site for the
presence of a spill. If the basin already contains a spill or a spill has just occurred, the inspection
should be cancelled and rescheduled sometime after `clean-up' has taken place. If it is safe to do
so, the inspector should close the sluice gate, contact the Division's Safety Engineer or
Hazardous Materials Manager, and call 911 and any other proper authorities if this has not
already been done. At no time should an inspector attempt any hazardous material cleanup,
or enter a spill area unless he or she is properly trained.
At a minimum, HSBs should be inspected on an annual basis unless otherwise specified by
environmental permits. Figure 10-1 illustrates the function of an HSB.
Figure 10-1. Function of a hazardous spill basin
10-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
10.2 Hazardous Spill Basin Components
Figure 10-2 illustrates the various components of a typical HSB. Note that layouts vary. The
outlet structure shown is one of several configurations. Also, many HSBs are lined with riprap.
HSBs may include the following:
■ Inlet Drainage System
■ Erosion Protection at the Inlet
■ Basin
■ Outlet Structure
■ Sluice Gate or Obstruction Materials
■ Outlet Drainage System
Figure 10-2. Components of a typical hazardous spill basin
NCDOT SC Inspection and Maintenance Manual 10-3
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
10.3 Inspection and Maintenance
HSBs are sometimes difficult to locate due to their low elevation or overgrown vegetation. If
this is the case, the sluice gate's worm gear is often visible from the road, even through thick
vegetation. Refer to Section 10.3.5 for photos and additional information.
Before inspecting any HSB, the inspector should first check the site for the presence of a spill. If
the basin already contains a spill, the inspection should be cancelled and rescheduled for a later
date. If a spill has just occurred and it is safe to do so, the inspector should close the sluice gate,
and call 911 and the Division's Safety Engineer or Hazardous Materials Manager. At no time
should an inspector attempt any hazardous material cleanup.
If there is no evidence of a spill, the inspection can continue. HSBs should be inspected at least
annually to determine whether they are functioning as intended. Most importantly, it should be
verified that the outlet structure and sluice gate or obstruction materials can adequately block the
flow should a spill occur. If an HSB is found to be functioning improperly, determine the cause
and restore to working order as soon as possible. Figures 10-3 and 10-4 illustrate a plan and
profile view of the areas that should be inspected and maintained for a typical HSB. Figure 10-3
also illustrates the flow path under normal conditions.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for
further guidance.
The following sections describe the function of a hazardous spill basin, and provide inspection
and maintenance guidance for its major components.
;TORE
(CONFIGURATION
VARIES)
Figure 10-3. Plan view of a hazardous spill basin and its components
10-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Smriiwaier
Hazardous Spill Basin
OUTLET STRUCTURE
(CONFIGURATION
VARIES)
2:1 OR FLATTER 1
D — RIPRAP r 'YYY
GRADE TO DRAINQUTFLOW
IIVFZOW 11
MIN. SLOPE OF 0.3% — r
�^ 4d
NOTES:
DURING NORMAL OPERATION, OUTLET STRUCTURE DOES
NO OHS T'RUCI FREE FLOW OF RUNOFF
Figure 10-4. Profile view of a hazardous spill basin and its components
10.3.1 INLET DRAINAGE SYSTEM
Function
The inlet drainage system collects and conveys water to the SC. Inlet drainage systems can
consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect all ditches, pipes,
and/or catch basins draining to the hazardous spill basin for trash, sediment, and debris. Inspect
the ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
10.3.2 EROSION PROTECTION AT THE INLET
Function
Erosion protection materials (i.e., riprap and filter fabric) may have been placed at the inlet to the
HSB to protect this area from erosion. For some HSBs, the entire basin is lined with riprap. If
this is the case, refer to Section 10.3.3.
Inspection
Verify that the erosion protection measures are undamaged, remain in place, and are adequate to
protect the inlet of the basin. Figure 10-3 shows the basic dimensions for erosion protection at
the basin inlet. Refer to NCDOT Standard Drawing No. 876.02 for additional guidance
(NCDOT, 2006). Inspect the riprap for sediment, trash, debris, and undesirable vegetation.
NCDOT SC Inspection and Maintenance Manual 10-5
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
Maintenance
Remove sediment, trash, debris, and undesirable vegetation and properly dispose of it off -site.
Replace riprap as needed.
10.3.3 BASIN AND SURROUNDING AREA
Function
The basin is the component of the HSB that stores contaminants in the event of a spill.
Normally, runoff flows freely through the basin.
Inspection
The floor of the basin, its interior and exterior side slopes, and all areas surrounding the basin
should be stabilized with a uniform cover of turfgrass or adequate erosion protection materials,
such as riprap. Inspect grass to ensure that it is being mowed at a frequency to maintain a height
of 6 to 15 inches.
Inspect the basin for structural integrity. Note any signs of erosion, burrowing animals, or
undesirable vegetation. Inspect the embankment for settling, scouring, cracking, sloughing, and
furrowing, and for shrubs and trees. Also, inspect the downstream toe of the embankment for
seepage (NCDWQ, 2007). Note all trash and debris found in the basin or in surrounding areas.
Some hazardous spill basins may be lined with riprap to slow flow and protect against erosion.
Note whether the riprap is heavily stained or covered with sediment buildup. The source of the
sediment should be identified and corrected if possible.
Inspect the basin for standing water. If standing water is present, determine whether the cause is
(1) a clogged outlet structure, (2) the elevation at the bottom of the basin is below the invert of
the outlet structure, or (3) slow flowing water due to a constant upstream source. No
maintenance is required if there is a constant stream of water. However, vegetative growth will
have to be monitored more closely if there is a constant supply of water, such as a spring.
Maintenance
Remove all undesirable vegetation (using a mechanical or herbicidal treatment) and mow grass
to the ideal height. Turfgrass is typically mowed at a frequency to maintain a maximum height
of 4 inches for warm -season grasses and 6 inches for cool -season grasses. However, within the
NCDOT right-of-way, it is more practical to maintain a grass height between 6 and 15 inches. If
erosion has occurred, reestablish turfgrass (seed or sod), replace riprap, and fertilize turfgrass
upon reestablishment. The use of fertilizer may be restricted at some locations. Refer to
Chapter 3 when considering the use of fertilizer. Repair animal burrows. If there is
channelization or standing water, reestablish the proper grade of the basin bottom by removing
sediment and filling in, then reestablishing vegetation. Sediment should be removed as
necessary to minimize outlet clogging. Remove and replace riprap as necessary.
10-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higillw an
5trirrii��att
10.3.4 OUTLET STRUCTURE
Hazardous Spill Basin
The most typical outlet configuration is a sluice gate fixed to a concrete headwall that blocks the
outlet pipe when closed, as shown in Figure 10-4. Obstruction materials, such as sand bags, are
another means of blocking the outlet pipe. Inspection and maintenance guidance for these two
options follows. Refer to Section 10.3.6 on Obstruction Materials. If an alternative design was
used, follow the general guidance given in this chapter and in Chapters 2 and 3 to inspect the
outlet and maintain its function.
Figure 10-4. Components of an outlet structure
The outlet must be clearly visible and easy to access. Remove undesirable vegetation as
necessary to increase visibility and ease of access. Figure 10-5 is an example of an overgrown
hazardous spill basin.
Figure 10-5. A sluice gate barely visible due to overgrown vegetation
NCDOT SC Inspection and Maintenance Manual 10-7
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
10.3.5 SLUICE GATE
Function
In HSBs, sluice gates are used to block the flow and contain pollutants during a spill. Two types
of sluice gates are currently in use: (1) a lift -type gate and (2) a screw -type gate. Figures 10-6
and 10-7 show a lift -type sluice gate and a, screw -type sluice gate respectively. Under normal
conditions, the sluice gate should be left in the open position. The sluice gate is also a good
means for locating an HSB. The sluice gate's worm gear is often visible through overgrown
vegetation. In addition, many sluice gate worm gears have been fitted with a capped section of
white PVC pipe to increase visibility and protect against corrosion. The sluice gates in
Figure 10-7 have worm gear covers. Sluice gates may also be mounted on the downstream end
of the outlet pipe (see Figure 10-8).
Figure 10-6. Lift -type sluice gate
Figure 10-7. Large, screw -type sluice gates with PVC cover and cap over worm gear
10-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:ormwaier•
Hazardous Spill Basin
Figure 10-8. A sluice gate mounted on the downstream end of the outlet pipe
Inspection
Open and close the sluice gate to ensure that it is operable through its entire range of motion.
Inspect the sluice gate for excessive corrosion. Verify that there is no sediment or debris below
the sluice gate that could prevent it from being fully closed.
Maintenance
Lubricate the sluice gate worm gear with a marine -type grease. Remove any sediment and debris
near the sluice gate. It is recommended that a cover be fabricated to protect the sluice gate's
worm gear from corrosion and increase the visibility of the device. The cover can be made by
placing a cap on one end of a section of PVC pipe. If the sluice gate is damaged beyond repair,
replace it with one that meets the requirement presented in NCDOT Standard Drawing
No. 838.02 (NCDOT, 2006). Perform additional maintenance and repairs as described in the
manufacturer's instructions.
10.3.6 OBSTRUCTION MATERIALS
Function
Obstruction materials are sometimes used as a means to block the outlet during a spill. These
materials are stored on site and should be ready to use at all times. The mini -hazardous spill
basin (driveway type) barrier with sandbags and sandbags (alone) in open ditches are two
alternative hazardous spill types of barriers used along with the regular type of hazardous spill
basin. These two new types of hazardous spill barriers were first installed along the US-1 Vass
Bypass in Moore and Lee Counties during 2007. (See Figures 10-9 and 10-10).
NCDOT SC Inspection and Maintenance Manual 10-9
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
Figure 10-9. Driveway -type mini -hazardous spill basin
Figure 10-10. Open -ditch hazardous spill basin with sandbags
i [)riiFPr
10-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Hi�FI��•�n�
�� 5trirrrn��rt�
Inspection
Hazardous Spill Basin
If a sluice gate or similar method is not used, verify that obstruction materials are present.
Obstruction materials should be easy to find and easy to physically place inside or in front of the
outlet of the hazardous spill basin. Verify that obstruction materials are undamaged and
sufficient to block the outlet. Be sure the outlet pipe or ditch is free of debris and heavy
vegetation buildup.
Maintenance
Replace damaged or inadequate obstruction materials. Sandbag materials should be resistant to
sunlight damage (i.e., black carbon fiber bags). Relocate materials if they are not clearly visible
or easy to access and move into place. Clean out outlet pipe or ditch that is blocked with debris
and heavy vegetation buildup.
10.3.7 OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Components of this system can include channels, pipes, catch basins, manholes,
culverts, and other structures. Headwalls are also a common component of the outlet drainage
system.
Inspection
Inspect the headwall, pipes, and drainage structures for cracks or leaks. Inspect the ground
surface above buried pipes and structures for depressions or other signs that might indicate pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation. If outlet
protection materials such as riprap are present, verify that these materials are adequate and in
good shape.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair all eroded areas and damaged pipes. Replace outlet protection materials
(i.e., riprap) as necessary. Refer to Chapter 3 for additional guidance on maintenance techniques.
10.3.8 SIGNAGE (IF PRESENT)
Many hazardous spill basins have signage that describes the actions necessary to contain a spill.
Note any damage to the sign as well as obstructions that hide the sign or make it difficult to read
(i.e., overgrown vegetation). Make repairs and remove obstructions to the sign as necessary.
Figure 10-11 shows some examples of signage associated with HSBs.
NCDOT SC Inspection and Maintenance Manual 10-11
NCDOT- HSP- 2010- 01
Hazardous Spill Basin
Figure 10-11. Signage associated with hazardous spill basins
10.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
If a hazardous spill basin already contains a spill, the inspection should be cancelled and
rescheduled for a later date. If a spill has just occurred and it is safe to do so, the inspector
should close the sluice gate, and call 911 and the NCDOT Division's Safety Engineer or
Hazardous Materials Manager. At no time should an inspector attempt any hazardous
material cleanup.
10-12 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
lE¢;Il�h•�ll•
Swriii�vat�r.
Stormwater Wetland
CHAPTER 11 Stormwater Wetland
OVERVIEW
A STORMwATER WETLAND (SW) is an engineered marsh or swamp with dense wetland vegetation
designed to remove stormwater pollutants primarily through biological processes.
PURPOSE AND DESCRIPTION
■ Stormwater wetlands, as opposed to naturally occurring wetlands, have distinct inlet and outlet
structures.
■ Vegetation grows throughout the wetland.
■ Pools of standing water are usually present, although some wetlands are designed to treat runoff
below ground.
INSPECTION
■ The density and diversity of vegetation is critical to the success of the stormwater wetland.
During inspection, vegetation should be compared to the landscaping plan.
■ The water level should remain near the drawdown device, except under drought conditions.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Trash and debris should be removed from inlet grates, forebays, orifices, and trash racks.
■ Undesirable vegetation should be removed, and diseased or dying vegetation should be
replanted.
■ If an algae bloom is present, an action plan should be developed and followed.
Note: This is a specialized device and if any major maintenance is needed, contact the Hydraulics
or Roadside Environment Units in Raleigh for guidance.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Stormwater Wetland
11.1 Stormwater Control Overview
Stormwater Wetlands (SW) are constructed stormwater controls that mimic natural wetlands, and
are designed with multiple treatment zones of different water depths. Each treatment zone
supports a diverse aquatic ecosystem. The primary treatment zones are deep pools, shallow
water, and shallow land. Deep pools (18-36 inches deep) dissipate flow energy, trap sediment,
remove nitrogen, and promote infiltration. Deep pools are also important for mosquito control
by providing habitat for fish. The shallow water zone (2-4 inches) provides habitat for diverse
wetland plants that provide additional nitrogen and phosphorus removal. The shallow land zone
(also referred to as the temporary inundation zone) is submerged only for a short period of time
as a result of storm events. Otherwise this area is dry and should be 0-12 inches above the
normal pool elevation. This area supports a wide variety of vegetation that grows in wet or dry
conditions and increases the diversity of the wetland.
A constant supply of water, generally provided by groundwater in addition to stormwater, is
needed to maintain a shallow water level. Therefore, most stormwater wetlands are located in
low-lying, typically wet areas. Figure 11-1 illustrates the treatment processes that occur in a
typical stormwater wetland.
Figure 11-1. Cutaway of a stormwater wetland flow diagram and treatment processes
11-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ii�FI��•�n'
5trirrii���rt�
Stormwater Wetland
11.2 Stormwater Wetland Components
Stormwater wetlands include, but are not limited to, the following components:
■ Inlet Drainage System
■ Forebay(s)
■ Basin
■ Outlet Control Structure
■ Outlet Drainage System
■ Emergency Spillway
A typical stormwater wetland layout and its components are shown in Figure 11-2.
Figure 11-2. Components of a typical stormwater wetland
As runoff enters the stormwater wetland forebay, the runoff velocity is quickly reduced allowing
large trash, debris, and solids to be removed. After runoff leaves the forebay, runoff moves
slowly through the wetland vegetation in the shallow water zone. Contact with vegetation allows
for biological treatment of metals and nutrients primarily through microbial processes (NCHRP,
2006). As runoff continues through the wetland, it enters the deep pools. Because the deep
NCDOT SC Inspection and Maintenance Manual 11-3
NCDOT- HSP- 2010- 01
Stormwater Wetland
pools tend to be stagnant, they provide oxygen -free environments for additional nutrient removal
by anaerobic microbes (Hunt et al., 2007).
As opposed to natural systems, stormwater wetlands have distinct inlet and outlet control
systems to manage the shallow water elevation. The outlet control structure is typically a riser
structure composed of low -flow and high -flow options. A low -flow orifice maintains the
shallow water level in the wetland. High -flow options (e.g., an open -throat riser, broad -crested
weir) detain and slowly release stormwater from large storm events over a period of 2-5 days.
This reduces the runoff velocity of the discharge, and allows additional physical and chemical
processes to remove pollutants while the water is detained in the stormwater wetland.
11.3 Inspection and Maintenance
Stormwater wetlands should be inspected at least annually to determine whether they are
functioning as intended. Most important, it should be verified that the outlet control structure is
functioning properly and that the shallow water level is being maintained. If a stormwater
wetland is found not to be functioning properly, determine the cause and restore to working order
as soon as possible. Figures 11-3 and 11-4 illustrate a plan and profile view of the areas that
should be inspected and maintained in a typical stormwater wetland configuration.
All inspection findings and maintenance activities must be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, should be uploaded to SCMS. Refer to Chapter 4
for further guidance.
The following sections describe the function of a stormwater wetland, and provide inspection
and maintenance guidance for its major components.
EMERGENCY SPILLWAY
SHALLOW WATER
TOP OF
EMBANKMENT'
TRANSITION
BERM
FOREBAY
}
OUTFALL
Y
INFLOW
Y�
1
�i
RECEIVING
ENERGY
DISSIPATOR
�.}�� a
CHANNEL
OUTLETCONTROL
LOW FLOW CHANNEL
STRUCTURE
SHALLOW
LAND
DEEP POOL
Figure 11-3. Plan view of a stormwater wetland and its components
11-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ii�F���•�n'
S:orliwaier
Stormwater Wetland
TRASH RACK
SHALLOW -EMBANKMENT
FOREBAv LAND
SHALLOW WATER
INFLOW LEVEL
� EMERGENCY
SPILLWAY
f ENERGY
ENERGY DI55IPATUR i ❑155IPATOR
OUTLET CONTROL
DEEP POOL STPUCTURE
AN7IFLOTATION MATERIALS
Figure 11-4. Profile view of a stormwater wetland and its components
11.3.1 INLET DRAINAGE SYSTEM
Function
The inlet drainage system collects and conveys water to the stormwater wetland. Inlet drainage
systems can consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the basin. Inspect ditches, pipes, and/or
catch basins draining to the stormwater wetland for trash, sediment, and debris. Inspect the
ground surface above buried pipes and structures for depressions and other signs of pipe
breakage or separation. Inspect ditches for signs of erosion and undesirable vegetation.
Desirable vegetation includes grass cover in an open ditch to prevent soil erosion. Undesirable
vegetation includes any woody plants or invasive species that may impede the inlet drainage
system.
Maintenance
Remove and properly dispose of debris, undesirable vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
11.3.2 FoREBAY
Function
A forebay is a basin located at the inlet of a SC that pretreats stormwater. A forebay reduces the
velocity of stormwater, which in turn allows sediment in the runoff to settle before the
stormwater enters the stormwater wetland. A transition berm is the component located at the
downstream end of the forebay that acts as a weir and releases runoff to the SC. The presence of
a forebay reduces the risk of SC failure.
NCDOT SC Inspection and Maintenance Manual 11-5
NCDOT- HSP- 2010- 01
Stormwater Wetland
Inspection
Inspect forebays for trash and debris. Inspect to determine whether forebays are structurally
sound and that they do not contain excessive amounts of accumulated sediment. Inspect the
embankment and transition berm for structural integrity and signs of erosion. Inspect the forebay
for undesirable vegetation. Forebays may have grass -covered embankments and berms, but they
are not designed to support vegetation in the basin. Minimal plant growth is tolerable, but if it
becomes excessive, the storage volume for sediment is reduced and dredging becomes more
difficult. If any invasive species are present, it is generally preferable to remove them before
they become well established.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Replace erosion protection materials (i.e., riprap) as needed. If the surrounding soil is
disturbed during cleanout of the forebay, or at any other time, reseed any areas of bare soil with a
turf -type grass to prevent erosion. Repair the transition berm as necessary, taking care to
maintain the original elevation of the berm. Refer to Chapter 3 for additional guidance on
sediment disposal. Consult the NCDOT Stormwater Best Management Practices Toolbox
(NCDOT, 2008b) or the Hydraulics Unit if major repairs are required.
11.3.3 BASIN AND SURROUNDING AREA
Function
The basin is the component of the stormwater wetland in which wetland plants and aquatic
organisms remove nutrients and other pollutants. Generally, the wetland supports a shallow
water elevation interspersed with deep pools. The wetland is also designed with additional
capacity, above the shallow water elevation, for detaining and slowly releasing runoff from
storm events. The interior and side slopes of the stormwater wetland are covered with very
specific wetland and nonwetland vegetation, depending on the water level in that area of the SC.
If access to submerged components is necessary, the stormwater wetland can be drained or
pumped out; however, the water must first be visually inspected for obvious signs of pollutants.
Check for an oily sheen, any unusual odors, or an excessive amount of suspended solids. If any
of these are present, do not drain the basin. Call the Division Safety Officer or the Roadside
Environmental Unit for guidance.
Inspection
Inspection of the stormwater wetland basin should focus particularly on the health, density, and
diversity of wetland vegetation. The design planting plan should be obtained and referenced
during the inspection. The plants in the planting plan are chosen to provide one or more specific
functions such as pollutant uptake, shade, or mosquito control. If over 30% of the wetland
vegetation appears to be dead or dying, determine the source of the problem (i.e., inadequate
water supply, disease) and record it on the inspection form (Appendix A). Ideal vegetation
density should be greater than 90% in planted areas (NCDWQ, 2007). If the vegetation density
11-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Hi�FI��•�n
Stormwater Wetland
is clearly reduced from the intended design, provide a note on the inspection form, including the
general location within the stormwater wetland.
Aquatic weeds and other invasive species can be detrimental to a stormwater wetland because
they will very quickly take over the desirable wetland plants. Once established, it can be
impossible to remove the invasive species without also harming the native plants. Therefore,
early intervention is important. Invasive or aggressive species should be removed as soon as
they are noticed, because by the following year they will be much more difficult to kill.
Examples of exotic invasive species that can be problems for stormwater wetlands include
hydrilla, phragmites, and purple loosestrife. Cattails can also be a problem species. Although
they are native and provide some pollutant removal, cattails multiply quickly and can reduce the
device's storage capacity, crowd out other desirable species, and create a breeding habitat for
mosquitoes (Hunt et al., 2007).
Many stormwater wetlands contain some algae. Algae is going to occur in stormwater wetlands
as a result of. 1) nutrient enriched water, 2) shallow water, and 3) intense sun light. When the
algal population is controlled, algae provide nutrient removal. Generally, if the algae mats are
not so thick as to provide mosquito refuge, they should not require removal. However, unhealthy
algal growth can occur when poor vegetative density increases the temperature of the water in
the wetland or when the wetland receives excessive nutrient inputs. If algal growth covers more
than 50% of the stormwater wetland, develop a management plan to remove and prevent
reoccurrence of such growth (NCDWQ, 2007). Physical removal is one option. Approved
chemical control options are discussed in the N.C. Agricultural Chemicals Manual (NCSU,
2009). Applicators are required to have a commercial pesticide applicators license with an
aquatic endorsement. Contact the Roadside Environmental Unit for guidance.
Inspect the sides of the stormwater wetland and the surrounding area for structural integrity,
noting any signs of burrowing animals, erosion, or inadequate cover. If areas around the
stormwater wetland are grassed, verify that grass is being mowed at a frequency to maintain a
height of 6 to 15 inches. Inspect the embankment for settling, scouring, cracking, sloughing, and
furrowing, and for invasive shrubs and trees. Also, inspect the downstream toe of the
embankment for seepage (NCDWQ, 2007). Note trash and debris found in the stormwater
wetland or in surrounding areas.
The water level should be at or near the invert of the drawdown device/orifice except after storm
events and during prolonged dry periods. Generally, the deep pools of the wetland should not
dry out during prolonged dry periods, except for significant droughts. If the deep pools are dry
and the region is not undergoing an extreme drought, the stormwater wetland may be
experiencing excessive infiltration. Make a note of the condition on the inspection form. The
underlying soils may need to be tamped down or a clay soil supplement added to the wetland
(Hunt et al., 2007).
Maintenance
Avoid spraying nonaquatic chemicals in and around the basin. Remove undesirable
vegetation by hand if possible or by wiping plants with pesticide. It is important to dispose
of vegetative cuttings off -site so they do not contribute additional nutrients to the
stormwater wetland.
NCDOT SC Inspection and Maintenance Manual 11-7
NCDOT- HSP- 2010- 01
Stormwater Wetland
Mow grass to the ideal height around the wetland and on the embankment. Turfgrass is typically
mowed at a frequency to maintain a maximum height of 4 inches for warm -season grasses and
6 inches for cool -season grasses. However, on highway right-of-way facilities, it is more
practical to maintain a grass height between 6 and 15 inches.
If inadequate plant density is noted in the inspection, replace vegetation according to the planting
plan. Fertilize upon establishment, following best practices to avoid excessive input of nutrients
into the wetland. The use of fertilizer may be restricted at some locations. Refer to Chapter 3
when considering the use of fertilizer. If inadequate wetland vegetation is a widespread problem
throughout the SC or if the wetland is dry during nondrought periods, contact the Division
Environmental Officer or the Roadside Environmental Unit for guidance. In this event, it may
be necessary to perform soil amendments or to regrade the basin.
If excessive algae is noted during the inspection, refer to the information under "Inspection" of
this section and/or follow any appropriate actions in the algae management plan for the SC.
Repair animal burrows.
Unlike most other stormwater controls, solids that have settled in the stormwater wetland cannot
be removed by dredging. Any dredging of the wetland risks negatively impacting the vegetative
cover. Solids should be removed from the stormwater wetland only if it is deemed critical to the
functioning of the stormwater wetland. The top layer of dredged material should be replaced
over the wetland to reestablish vegetation (NCDWQ, 2007). Proper maintenance of the forebay
should prevent more costly dredging of the stormwater wetland basin.
11.3.4 OUTLET CONTROL STRUCTURE (BOX)
Function
The outlet control structure maintains the shallow water level in the wetland and regulates the
slow release of stormwater. Outlet control structures can have several components, including a
trash rack, a drawdown device or orifice, a sluice gate, and an outlet pipe. Inspection and
maintenance guidance for these specific components is provided in subsequent sections of this
chapter. Figure 11-5 illustrates the configuration of a typical outlet control structure.
Figure 11-6 illustrates the configuration of a flashboard riser, sometimes used on stormwater
wetlands to provide more flexibility with water levels. Generally, a drawdown device, such as
an orifice installed directly into the riser or an inverted pipe, controls the elevation of the shallow
pool. The outlet control structure often has a second, larger opening at the top that allows flow
from large rainfall events to escape without overtopping the basin. Usually, this is in the form of
an open -top outlet structure with a trash rack. Flashboard risers consist of a riser with one wall
or edge composed of movable boards to create adjustable water levels. With this type of riser,
the shallow water level and large rainfall elevations may be adjusted in a variety of ways to
handle maintenance needs. Figure 11-7 shows photos of the two outlet control structures.
11-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
l� S:orillwaier
Inspection
Stormwater Wetland
Treated water should be allowed to flow freely upon entering the outlet control structure. Inspect
the outlet control structure thoroughly for any signs of damage such as cracks, holes, or leaks.
Verify that the outlet box remains covered with a trash rack. See subsequent sections for
guidance on specific components. For flashboard riser structures, check the connection between
boards for any signs of leaks or seepage.
Maintenance
Repair any damaged areas of the outlet control structure, and remove sediment and debris if it is
accessible. If the outlet is clogged or blocked, hip waders or a small boat may be needed to
make the necessary repairs. Ensure that the proper NCDOT safety procedures are followed
when working in or around standing water.
Figure 11-5. Components of a typical outlet control structure for a stormwater wetland
NCDOT SC Inspection and Maintenance Manual 11-9
NCDOT- HSP- 2010- 01
Highwa
Stormwater Wetland
TRASH RACK
FLASHBOARD
INSERT
OUTLET PIPE
SHALLOW WATER
LEVEL ORIFICE
CROSS BRACE
FLASHBOARD INSERTS WITH
ORIFICES FOR ADJUSTABLE
WATER LEVEL
SHALLOW WATER
LEVEL
Figure 11-6. Components of a flashboard riser outlet control structure
for a stormwater wetland
I
Figure 11-7. Two examples of outlet control structures: a standard riser (left)
and a flashboard riser (right)
11.3.5 TRASH RACK
Function
Positioned atop the outlet control structure, the trash rack protects the overflow of the outlet
control structure from becoming clogged with debris (see Figures 11-5 and 11-6).
11-10 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Stormwater Wetland
Inspection
Inspect the trash rack for debris and excessive corrosion.
Maintenance
Remove trash and debris. Replace the trash rack if it is corroded or otherwise damaged. The
replacement trash rack should be consistent with the design specifications for the SC. If
drawings or specifications are not available, contact the NCDOT Hydraulics Unit to obtain
standard trash rack specifications or details.
11.3.6 DRAWDOWN DEVICE OR ORIFICE
Function
The drawdown device or orifice is a restricting device that allows stormwater to slowly enter the
outlet box. Several configurations exist. The simplest type is one or more orifices in the shape
of slots or holes directly in the side of the outlet control structure. Another type of drawdown
device has a PVC elbow or tee that maintains the invert to the outlet control structure below the
water level so it does not become clogged with floating debris.
Inspection
If it is accessible, inspect the drawdown device to ensure that stormwater can freely enter the
outlet control structure. If metal components were used to restrict flow or guard against floating
debris, check them for excessive corrosion. If the drawdown device is not visible, it is likely
submerged due to being clogged.
Maintenance
Remove sediment and debris blocking the flow into the orifice. If the water level in the basin is
above the orifice, open the sluice gate and drain the basin until the drawdown device/orifice is
accessible, then clean it out. Replace damaged or corroded components.
11.3.7 SLUICE GATE (IF PRESENT)
Function
Sluice gates are installed for emergency maintenance needs. The sluice gate covers an additional
opening at the invert of the basin that is larger than the drawdown orifice. The sluice gate can be
opened to rapidly drain the basin. Figure 11-8 is a photograph of a screw -type sluice gate.
Figure 11-9 shows a lift -type sluice gate.
Inspection
Two types of sluice gates are currently in use: (1) a screw -type gate and (2) a lift -type gate.
Make sure the valve has not frozen shut by slightly testing the functionality, taking care not to
open it, which could allow sediment or debris to escape or get lodged in the outlet. Inspect the
sluice gate for excessive corrosion. Verify that there is no sediment or debris below the sluice
gate that could prevent it from being fully closed.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Highway
Stormwater Wetland
11-12
Figure 11-8. An open screw -type sluice gate
Figure 11-9. A lift -type sluice gate
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
I� Si[]n nwaier
Maintenance
Stormwater Wetland
If lubrication is necessary, lubricate with a marine -type grease. It is recommended that a cover
be fabricated to protect the sluice gate's worm gear from corrosion and to increase the visibility
of the device. The cover can be made by placing a cap on one end of a section of PVC pipe
(see Figure 11-10). Remove any sediment and debris near the sluice gate. If the sluice gate is
damaged beyond repair, replace it with one that meets the requirements presented in NCDOT
Standard Drawing No. 838.02 (NCDOT, 2006). Perform additional maintenance and repairs as
described in the manufacturer's instructions.
Figure 11-10. Two large sluice gates with PVC covers
11.3.8 OUTLET DRAINAGE SYSTEM
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Typically, a pipe conveys water from the outlet control structure through the
embankment to a swale or other open channel.
Inspection
Inspect the inside of structures and pipe(s) to verify that they are free of sediment and debris.
Inspect the ground surface above buried pipes and structures for depressions or other signs that
might indicate pipe breakage or separation. Inspect ditches for signs of erosion and undesirable
vegetation.
Maintenance
Remove any sediment or debris that is accessible. Repair eroded areas and damaged pipes.
Replace outlet protection materials (i.e., riprap) as necessary. Refer to Chapter 3 for additional
guidance on maintenance techniques.
NCDOT SC Inspection and Maintenance Manual 11-13
NCDOT- HSP- 2010- 01
Stormwater Wetland
11.3.9 EMERGENCY SPILLWAY (IF PRESENT)
Function
The emergency spillway serves as an overflow structure that is typically constructed as a channel
in natural ground. The emergency spillway is necessary to minimize the potential for
overtopping the basin, which can damage the embankment and lead to SC failure and
downstream flooding.
Inspection
The emergency spillway should remain free of trash and debris. Emergency spillways are
typically covered with grass, but concrete and riprap are also used. For grass channels, verify
that grass is maintained between 6 and 15 inches. Inspect concrete channels to verify that they
are in good condition, or verify that adequate riprap is present. Note all erosion and undesirable
vegetation.
Maintenance
Emergency spillways must be free of trash, debris, and undesirable vegetation to maintain their
functionality. Remove these if present. Grass should be carefully maintained at a height of 6 to
15 inches. Repair concrete or replace riprap as necessary. Repair areas of erosion.
11.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
11-14 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higl sway
CHAPTER 12 Swale
OVERVIEW
Swale
A SWALE (S) is a vegetated channel that treats and conveys runoff from small drainage areas.
PURPOSE AND DESCRIPTION
■ Swales are broad and shallow so that water will flow slowly.
■ Swales remove suspended solids, metals, and nutrients through sedimentation, vegetated
filtration, infiltration, and biological uptake.
INSPECTION
■ Swales should be carefully monitored for erosion so they do not contribute sediment to receiving
waters.
■ Swales should be inspected periodically to verify that the ideal vegetation type is maintained at
the proper density and height.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Sediment and debris should be removed before it negatively impacts vegetation growth or inhibits
infiltration.
■ Mowing should be done at a frequency that maintains aesthetics and prevents the growth of
undesirable vegetation.
■ Eroded areas in and around the Swale should be repaired as needed.
NCDOT SC Inspection and Maintenance Manual 12-1
NCDOT- HSP- 2010- 01
Swale
12.1 Stormwater Control Overview
Swales (S) convey and treat peak runoff from small drainage areas. Swales decrease runoff
velocity to promote infiltration and physical filtration. Swales also increase contact time
between runoff and vegetation to promote biological uptake of pollutants.
Swales are similar to roadside ditches in appearance and function. During storm events, swales
collect water from roadways and transport it downstream. The main difference between a swale
and a roadside ditch is that swales are especially broad and shallow. The broad and shallow
design and the vegetation in the swale help to slow the speed of the runoff.
The reduction in speed enhances both the pollutant filtering and runoff infiltration processes.
Suspended solids and other associated pollutants can be filtered and settle -out, contact with
vegetation allows for biological treatment of metals and nutrients through primarily microbial
processes, and the potential for downgrade erosion is greatly reduced. Figure 12-1 illustrates the
treatment processes and flow paths in two different swale configurations.
Figure 12-1. Swale treatment processes and flow paths
12-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Highway
C-- bLgg1-k "aW" Swale
12.2 Swale Components
Figure 12-2 illustrates the various components of a typical swale. Note that layouts vary. Some
systems will have additional components while others may lack certain components. Swale
systems may include the following:
■ Inlet Drainage System
■ Forebay, Preformed Scour Hole, or Splash Pad
■ Swale
■ Check Dams (not illustrated in Figure 12-2)
■ Outlet Drainage System
Figure 12-2. Components of a typical swale system
NCDOT SC Inspection and Maintenance Manual 12-3
NCDOT- HSP- 2010- 01
Swale ,..w
12.3 Inspection and Maintenance
Swales and the drainage structures associated with them should be inspected at least annually to
determine whether they are functioning as intended. If the system is found to not be functioning
properly, determine the cause and restore to working order as soon as possible.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS) on
NCDOT's Intranet. Photos should be taken to track the status of the stormwater control (SC)
and document the maintenance activities conducted. These, too, can be uploaded to SCMS.
Refer to Chapter 4 for further guidance.
The following sections describe the function of a swale, and provide inspection and maintenance
guidance for its major components.
12.3.1 INLET DRAINAGE SYSTEM (IF PRESENT)
Function
The inlet drainage system collects and conveys water to the SC. Inlet drainage systems can
consist of open channels, pipes, curb and gutter, and catch basins. An inlet drainage system may
not be present if the swale receives runoff directly from the source via overland flow.
While swales sometimes include a forebay at the inlet, riprap and filter fabric are often used for
erosion protection.
Inspection
Stormwater runoff should be allowed to flow freely into the swale. Inspect ditches, pipes, and/or
catch basins draining to the swale for trash, sediment, and debris. Inspect the ground surface
above buried pipes and structures for depressions and other signs of pipe breakage or separation.
Inspect ditches for signs of erosion and undesirable vegetation.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. If riprap has been placed at the inlet,
inspect for undercutting or erosion. Refer to Chapter 3 for additional guidance on maintenance
techniques.
12.3.2 FOREBAY, PREFORMED SCOUR HOLE, OR SPLASH PAD (IF PRESENT)
Function
Forebays, splash pads, and/or preformed scour holes (PSHs) are energy dissipaters that may all
be used at the inlet(s) of a swale to pretreat stormwater and protect against erosion. A forebay
reduces the flow velocity, which in turn allows suspended solids in the stormwater to settle
before the stormwater enters the swale. Forebays facilitate maintenance by collecting sediment
in one area where it can be removed easily, increasing the life of the swale. Splash pads simply
protect against erosion where runoff exits a pipe, in this case, at the inlet to the swale. Preformed
12-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
it S:oril waier
Swale
scour holes resemble forebays, but are designed to dissipate flow as it exits the PSH, similar to a
level spreader. PSI -Is are square or round in shape, and use riprap and permanent soil
reinforcement matting to protect against erosion. Figure 12-3 gives a side -by -side comparison of
a forebay and a PSH. Guidance for forebays and splash pads follows.
Inspection
Inspect forebays and splash pads for trash, debris, and undesirable vegetation. Inspect to
determine whether these facilities are structurally sound and that they do not contain excessive
amounts of accumulated sediment. Splash pads are not typically designed to store sediment;
however, any sediment accumulations that have the potential to wash downstream or cause
problems in the swale should be removed.
Maintenance
Remove sediment, trash, debris, and undesirable vegetation and properly dispose of it off -site.
Sediment should be removed from a forebay when it exceeds 50% of a forebay's storage
capacity. Correct any structural deficiencies and replace erosion protection materials (i.e.,
riprap) as needed. If necessary, reestablish vegetation for earthen forebays. Refer to Chapter 3
for further guidance on sediment disposal.
Figure 12-3. A well maintained forebay (left) and
a newly constructed preformed scour hole (right)
12.3.3 SWALE
Function
A swale decreases runoff velocity to promote infiltration and filtration of stormwater runoff. By
slowing runoff, suspended solids and associated pollutants settle out of stormwater before being
conveyed downstream. Typically, swales work best on relatively flat grades. However, check
dams (see section 12.3.4) may be installed in areas with steep slopes to help slow the flow.
Swales often drain directly into receiving waters and other stormwater controls. For this reason,
it is important that swales are carefully inspected and maintained to prevent excessive pollutants
from being conveyed downstream. Figure 12-4 shows two photos of typical swales in a highway
setting.
NCDOT SC Inspection and Maintenance Manual 12-5
NCDOT- HSP- 2010- 01
Swale
Inspection
The base of the swale, its interior and exterior side slopes, and areas surrounding the swale
should be stabilized with a dense cover of turf -type grass. Inspect the swale and surrounding
areas for erosion. Inspect for undercutting of swale side slopes, which can cause the slopes to
become steeper than 3:1, the maximum allowed. Steep side slopes can cause excessive
channelization and an increase in flow velocity, which decreases the effectiveness of the swale.
Figure 12-4. Linear highway applications of swales
Verify that grass is being mowed at a frequency to maintain the desired height. Ideally, turf
grasses should be mowed at a frequency to maintain a maximum height of 4 inches for warm -
season grasses and 6 inches for cool -season grasses. However, within the NCDOT right-of-way,
it is more practical to maintain grass height between 6 and 15 inches.
Inspect the swale and surrounding areas for bare soil, sediment deposition, trash, debris, and
undesirable vegetation.
Maintenance
Trash, debris, and undesirable vegetation should be removed from the swale. Excessive
accumulations of sediment should be removed when typical flow is altered or grass can no
longer be seen. Stabilize any eroding surfaces in or around the swale, and repair undercut slopes
by restoring the proper grade and reseeding. Refer to Chapter 3 for further guidance.
12.3.4 CHECK DAMS (IF PRESENT)
Function
Checks dams are small riprap dams constructed to enhance the water quality benefits of swales.
Checks dams, are installed in swales to create storage volume or to slow flow in areas with steep
slopes. Figure 12-5 shows an example of check dams implemented in a swale. Check dams are
permanent riprap dams constructed to enhance water quality and should not be confused with a
sediment and erosion control temporary device used during roadway construction.
12-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higll lwaV
JL
5trirrii���rt
Inspection
Swale
Inspect check dams for trash, debris, undesirable vegetation, excessive sediment, and erosion
around the sides of the rock check. Verify that check dams retain the proper dimensions. Check
dams should be approximately one foot high along the base and sides of the swale and
approximately 4.5 feet in width (in the direction of flow). The main structure of the check dam
should be composed of Class B riprap. A 12-inch (approximate) layer of No. 57 stone should be
located on the upstream side of the check dam to capture sediment. Figure 12-6 shows the basic
configuration of a check dam.
Figure 12-5. Swale with check dams
Figure 12-6. Check dam
NCDOT SC Inspection and Maintenance Manual 12-7
NCDOT- HSP- 2010- 01
Swale
Maintenance
If possible, maintenance on the permanent check dam should be performed when the swale is dry
so as not to allow accumulated sediment to wash downstream. Remove and properly dispose of
trash, debris, undesirable vegetation, and sediment. Replace riprap and No. 57 stone, repair
erosion, and rebuild or reshape check dams as necessary. When mowing swales, be sure not to
damage the check dam's structure. Handheld equipment should be used when mowing around
check dams.
12.3.5 OUTLET DRAINAGE SYSTEM (IF PRESENT)
Function
The outlet drainage system conveys water from the SC to the downstream drainage system or
receiving water. Components of this system can include channels, pipes, catch basins, manholes,
culverts, and other structures. Swales often end at a grassy, open area or forested buffer. An
outlet drainage system will not be present in these situations.
Inspection
Inspect pipes and drainage structures for cracks or leaks. Inspect the ground surface above
buried pipes and structures for depressions or other signs of pipe breakage or separation. Inspect
ditches for signs of erosion and undesirable vegetation. If outlet protection materials are present,
verify that these materials are adequate.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Replace outlet protection materials
(i.e., riprap) as necessary. Refer to Chapter 3 for additional guidance on maintenance
techniques.
12.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
12-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Higl sway
Level Spreader
CHAPTER 13 Level Spreader
OVERVIEW
A LEVEL SPREADER (LS) is a structural stormwater control that redistributes concentrated stormwater
flow into sheet flow.
PURPOSE AND DESCRIPTION
■ A level spreader provides a nonerosive outlet for concentrated runoff by diffusing the water
uniformly across a stable slope.
■ A level spreader consists of a trough with a level, nonerosive lip.
INSPECTION
■ Level spreaders are designed to convert concentrated flow to sheet flow before it enters a buffer
or filter strip; erosion within the buffer or filter strip is an indication that the level spreader is not
functioning properly.
■ The level spreader lip must be level to promote uniform, diffuse flow along its entire length.
■ Inspections should occur annually, unless otherwise required by environmental permits or more
frequent inspections are deemed necessary.
TYPICAL MAINTENANCE
■ Sediment, trash, and debris should be removed from the level spreader trough and other
components as applicable.
■ Any structural deficiencies, especially pertaining to the level spreader lip, should be repaired or
the components replaced.
■ Repair eroded areas within the buffer or filter strip after determining the root cause of the erosion.
NCDOT SC Inspection and Maintenance Manual 13-1
NCDOT- HSP- 2010- 01
Level Spreader
13.1 Stormwater Control Overview
A Level Spreader (LS) is a stormwater device used to slow runoff velocities, trap sediment and
promote infiltration. It works by dispersing concentrated runoff uniformly over the ground's
surface. During storm events concentrated runoff from parking lots, roadways, or ditches is
directed into the level spreader where it is spread out and released as sheet flow over a vegetated
area (filter strip). The resultant sheet flow helps reduce the erosion potential and enhances the
pollutant filtering and runoff infiltration processes. Suspended solids and other associated
pollutants are filtered and settle -out, while dissolved metals and nutrients are taken -up by the soil
and plant roots. Figure 13-1 illustrates concentrated water flow entering a level spreader and
sheet water flow exiting a level spreader.
Figure 13-1. Water flow through a level spreader
Figure 13-2 illustrates the treatment processes that occur in a typical level spreader system.
13-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Smrmwaier
Level Spreader
Figure 13-2. Level spreader treatment processes
13.2 Level Spreader Components
Figure 13-3 illustrates the various components of a typical level spreader system. Currently,
level spreaders are designed to include a flow bypass structure (NCDOT, 2008b). For these
systems, runoff enters the level spreader via a flow bypass structure, which is designed to divert
a set amount of runoff to the trough of the level spreader. Excess flow bypasses the level
spreader and is conveyed by ditch or pipe directly downstream. Level spreaders constructed
before the flow bypass system requirement was in place may not include a flow bypass system.
For these level spreaders, all runoff will enter the level spreader regardless of the flow rate.
Level spreader systems may include, but are not limited to, the following components:
■ Inlet Drainage System
■ Flow Bypass Structure/System
■ Level Spreader Trough and Lip
■ Filter Strip and/or Buffer
■ Bypass Swale/Pipe or Outlet Ditch
NCDOT SC Inspection and Maintenance Manual 13-3
NCDOT- HSP- 2010- 01
Level Spreader
50' BUFFER ZONE
VEGETATED FORESTED
FROM INLET
BUFFER BUFFER
DRAINAGE
ZONE ZONE
SYSTEM
FLOW
BYPASS ¢
STRUCTURE
LIP
VEGETATED
OR CONCRETE
TROUGH
BYPASS
SWALE OR
PIPE
V.
44
///
OPTIONAL
PERMANENT SOIL
REINFORCEMENT MATTING
DRAWDOWN
DEVICE
RECEIVING WATER
BODY
Figure 13-3. Components of a typical level spreader system
(not all components may be present)
13.3 Inspection and Maintenance
Level spreaders should be inspected periodically to determine whether they are functioning as
intended. Most importantly, it should be verified that the level spreader is distributing flow
evenly. If a level spreader is found not to be functioning properly, determine the cause and
restore to working order as soon as possible.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for
further guidance.
The following sections describe the function of a level spreader, and provide inspection and
maintenance guidance for its major components.
13-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
S:onnwaier•
13.3.1 INLET DRAINAGE SYSTEM
Function
Level Spreader
The inlet drainage system collects and conveys water to the SC. Inlet drainage systems can
consist of open channels, pipes, curb and gutter, and catch basins.
Inspection
Stormwater runoff should be allowed to flow freely into the level spreader or flow bypass
structure. Inspect ditches, pipes, and/or catch basins draining to the level spreader for trash,
sediment, and debris. Inspect the ground surface above buried pipes and structures for
depressions and other signs of pipe breakage or separation. Inspect ditches for signs of erosion
and undesirable vegetation.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Refer to Chapter 3 for additional
guidance on maintenance techniques.
13.3.2 FOREBAY (IF PRESENT)
Function
A forebay is a basin located at the inlet of a SC that pretreats stormwater. A forebay reduces the
runoff velocity of stormwater, which in turn allows suspended particles in the stormwater to
settle before the stormwater enters the level spreader. The presence of a forebay reduces the risk
of SC failure due to clogging of the filter strip and sediment accumulation in the trough.
Inspection
Inspect the forebay for trash, debris, and undesirable vegetation. Inspect to determine whether
forebays are structurally sound and that they do not contain excessive amounts of accumulated
sediment.
Maintenance
Remove trash, debris, and undesirable vegetation and properly dispose of it off -site. Remove
sediment and dispose of it off -site if it appears to occupy more than 50% of the forebay's storage
capacity. Reestablish vegetation in earthen forebays. Refer to Chapter 3 for further guidance.
13.3.3 FLOW BYPASS STRUCTURE (IF PRESENT)
Function
Level spreaders can easily become overwhelmed during large rainfall events. If flow in excess
of the design amount is allowed to pass through the level spreader, it will likely reconcentrate
and erode areas of the filter strip or buffer. Flow bypass structures allow excess flows from large
storm events to bypass the level spreader via a bypass swale or pipe and discharge directly to the
receiving stream.
NCDOT SC Inspection and Maintenance Manual 13-5
NCDOT- HSP- 2010- 01
Level Spreader
Inspection
The flow bypass structure should be free of any sediment, trash, and debris. Inspect the flow
bypass structure for holes and cracks, and for any erosion that would allow runoff to flow around
the structure. Note any undesirable vegetation that might prevent the flow bypass structure from
performing its function. If applicable, inspect metal components for excessive corrosion. Check
the level spreader and buffer/filter strip for visual signs that it is receiving flow and has not been
overwhelmed. If the level spreader does not appear to be receiving flow or if there is evidence of
excessive flow, the flow bypass structure is not functioning properly.
Maintenance
Remove undesirable vegetation, sediment, trash, and debris. If the flow bypass structure
becomes clogged, remove sediment and dispose of it off -site. Repair any cracks and holes, and
eroded areas associated with the flow bypass structure. Replace components as necessary.
13.3.4 LEVEL SPREADER TROUGH AND LIP
Function
The level spreader trough collects stormwater runoff, and the nonerosive lip evenly distributes
the runoff to downgrade areas as diffuse flow. The trough may be vegetated or concrete. The lip
may be constructed of various materials. The level spreader may also be equipped with a
drawdown system (e.g., weep holes leading to a drainage system) if prolonged periods of
standing water are not desired.
Inspection
The level spreader trough and lip should be level and remain relatively free of sediment and
debris or the level spreader will quickly become overwhelmed and lose its effectiveness. Inspect
the lip for erosion, undesirable vegetation, and other impairments that could render it uneven or
otherwise ineffective. Verify that the area immediately downstream of the level spreader lip is
free of woody vegetation, which can cause reconcentration of flows and reduce flow across the
filter strip. If a drawdown system is present, check to make sure it is not clogged with sediment
or debris. Pervious bags filled with stone may have been placed over the drawdown system's
inlets to keep sediment from entering. If sand bags are present, inspect them for damage.
Maintenance
Repair any areas of the level spreader trough that are damaged or, in the case of vegetated
troughs, eroded. If there is erosion around the ends of the level spreader, regrade the soil, build a
berm that is higher than the lip, and stabilize the area with vegetation (NCDWQ, 2007).
Sediment should be removed before it interferes with the level spreader's ability to distribute
flow evenly. Repair the lip if it has eroded or has become cracked or otherwise damaged.
Remove any vegetation growing over the lip or any woody vegetation that could channelize
flow. If there is a drawdown system and it has become clogged, remove any sediment and
debris. Replace damaged pervious rock bags. See Figure 13-4 for examples of level spreaders
with typical maintenance needs.
13-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Smrmwaier
Level Spreader
Figure 13-4. Typical maintenance concerns: erosion at the level spreader lip and
channelization in the filter strip (left), and woody debris in need of removal (right)
13.3.5 FILTER STRIP AND BUFFER
Function
Stormwater treatment processes occur in the filter strip and buffer. Filter strips and buffers
promote infiltration and biological uptake of pollutants, and filter out sediment. Permanent soil
reinforcement matting (PSRM) may have been installed just downstream of the level spreader lip
to prevent erosion. An example of a level spreader and filter strip is shown in Figure 13-5. This
level spreader was designed with a drawdown device consisting of weep holes. The placement
of pervious bags of stone prevents sediment from clogging the weep holes.
Inspection
The filter strip should be vegetated with a uniform, dense cover of desirable vegetation. Inspect
for signs of erosion and channelization. Also, verify that the vegetation is being mowed at the
proper frequency. Ideally, turfgrasses should be mowed at a frequency to maintain a maximum
height of 4 inches for warm -season grasses and 6 inches for cool -season grasses. However, on
highway right-of-way facilities, it is more practical to maintain grass height between 6 and
15 inches. Note any undesirable vegetation growing in the filter strip.
Buffers may be used instead of a grassed filter strip. Buffer areas, which are typically forested,
are particularly susceptible to channelized flow and erosion. Carefully inspect the buffer for
evidence of these processes, which indicates that the level spreader is not functioning properly.
Also, verify that sediment has not accumulated in the filter strip or buffer to the degree that
vegetation is dying (NCDWQ, 2007). If PSRM has been installed, inspect it for damage and
verify that it is properly toed in and anchored.
Maintenance
Remove trash and undesirable vegetation. Remove debris that could cause channelization.
Repair areas affected by erosion or channelization. Mow grass to the appropriate height. Repair
or replace PSRM as necessary. Note that PSRM may not be visible and should not be disturbed
NCDOT SC Inspection and Maintenance Manual 13-7
NCDOT- HSP- 2010- 01
Level Spreader
if vegetation is well established and adequate to protect against erosion. Ensure that grass
remains dense and thick for optimum removal of pollutants. If excessive sediment has
accumulated, remove the sediment, reestablish vegetation, and regrade if necessary (NCDWQ,
2007).
Figure 13-5. Example of a level spreader and filter strip with
a drawdown device consisting of weep holes with rock bags
13.3.6 BYPASS SWALE /PIPE OR OUTLET DITCH
Function
A level spreader equipped with a flow bypass system has a swale or pipe that conveys runoff
from the flow bypass structure to the receiving stream during large rainfall events. Conversely, a
level spreader with a filter strip, but no bypass system, will discharge flow into an outlet ditch. If
the ditch or pipe empties directly into a stream, it should do so in a manner that does not degrade
the stream channel or banks. Typically, this requires the use of riprap or another type of
protection/energy dissipation.
Inspection
Stormwater should be allowed to flow freely from the flow bypass structure or filter strip. All
conveyances should be inspected for trash, sediment, and debris. For vegetated, open channels,
inspect the area for erosion and undesirable vegetation. Also, note the mowing frequency, as
mentioned previously. For other open channels, verify that the channel is properly protected
from erosion. If a pipe is used, inspect the surface above the buried pipe for signs of pipe
breakage or separation. When applicable, inspect the area where the bypass swale or pipe
discharges to the stream.
13-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
HigIl lwav
I� 5t[iriii���rrctl°l�
Maintenance
Level Spreader
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas and damaged pipes. Replace or repair any material
(i.e., riprap) or structure used to prevent the discharge to the stream from causing erosion. Refer
to Chapter 3 for additional guidance on maintenance techniques.
13.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection emergency maintenance needs are identified (i.e., a sluice gate frozen in
the open position), the inspector should either correct the problem at that time or contact the
party(s) responsible for emergency maintenance repairs. If emergency maintenance needs are
not corrected at the time of the inspection, a follow-up inspection should be conducted to verify
that the responsible party(s) has taken action and all needs have been addressed. Observations
made during the follow-up inspection must be documented on the appropriate SC inspection
report form and entered into SCMS.
NCDOT SC Inspection and Maintenance Manual 13-9
NCDOT- HSP- 2010- 01
Higl:iway
Permeable Pavement
CHAPTER 14 Permeable Pavement
OVERVIEW
PERMEABLE PAVEMENT is an alternative to conventional concrete and asphalt paving materials that
allows for infiltration of stormwater into a storage area, with void spaces that provide temporary
detention (NCDENR, 2012)
PURPOSE AND DESCRIPTION
■ Permeable pavement is a Best Management Practice (BMP) that promotes the infiltration of
stormwater into void spaces that filters pollutants, decreases runoff rate, and reduces pollutant
loads (NCDENR, 2012 and ICPI, 2008).
INSPECTION
■ Inspection should occur annually unless otherwise more frequent inspections are deemed
necessary. Monitor the permeable pavers in parking lots and driveway areas periodically for
accumulation of sediment or debris;
■ Monitor planted areas adjacent to pavement and areas upstream of pavement for erosion;
■ Do not allow construction staging or soil mulch storage on unprotected pavement; and
■ Do not pull weeds that grow in permeable pavement as this could damage the joint/opening filler
material. A licensed pesticide applicator should spray weeds.
TYPICAL MAINTENANCE
■ The most prevalent maintenance concern is the potential clogging of the pervious pavement
pores (EPA, 2014).
■ Vacuum permeable pavement surface in parking lot and driveway areas1 to 2 times per year. Do
not vacuum the sidewalks that receive routine maintenance.
NCDOT SC Inspection and Maintenance Manual 14-1
NCDOT- HSP- 2014- 02
Permeable Pavement x. w
■ Maintain permanent stable surface cover adjacent to the pavement.
■ Immediately remove any soil or debris deposited on the pavement.
14.1 Stormwater Control Overview
Permeable interlocking concrete pavement (PICP) consists of manufactured concrete units that
reduce stormwater runoff volume, rate, and pollutants. The concrete has small openings between
permeable joints that typically comprise 5% to 15% of the paver surface area and are filled with
highly permeable, small -sized aggregates (EPA, 2014). The joints allow stormwater to enter a
bedding course of highly permeable open -graded aggregate. The pavers and bedding layer are
placed over an open -graded base and subbase which creates a reservoir for stormwater storage
and increases infiltration. PICP's ability to reduce or eliminate stormwater runoff, even in
intense rain events, also reduces pollution (ICPI, 2014). PICPs are highly aesthetic, durable,
easily repaired, require low maintenance, and can withstand heavy vehicle loads (EPA, 2014).
Figure 14.1 below shows a typical NCDOT PICP installation at a non -roadway facility.
Figure 14.1 - Typical NCDOT PICP sidewalk installation at a Rest Area.
PICP is typically intended for sidewalks (Figure 14.1), parking lots and driveway areas. Figure
14.2 shows a cross-section of a typical PICP installation.
14-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2014- 02
li�;ltwtt�•
Stnr�zn����tr•r
Permeable Pavement
Edge restraint
Overflow system
Geotextile or impermeable liner
Figure 14-2. - A cross-section of a permeable interlocking concrete paver installation.
14.2 PICP Components
A previous NCDOT project included a PICP sidewalk that was designed to include 3 1/8 in.
thick pavers with permeable joints over an open -graded bedding course (1 '/2 to 2 in. thick #8
stone), open -graded base course (minimum 4 in. thick #57 stone), and open -graded subbase
(minimum 6 in. thick #2 stone) on non -compacted soil subgrade. For these systems, perforated
pipes (4 in. minimum) inside socks will serve as underdrains (as required) that are spaced and
sloped to drain all stormwater. Excess flow turns into surface runoff that enters overflow
structures (as equipped).
PICP systems may include, but are not limited to, the following components:
■ Concrete Pavers
■ Subbase, Base, Bedding, and Jointing Aggregates
■ Underdrain/Observation Wells
■ Geotextile Liner or Impermeable Liner
■ Drainage Swales or Storm Sewer Inlets for Emergency Overflow
■ Overflow System
NCDOT SC Inspection and Maintenance Manual 14-3
NCDOT- HSP- 2014- 02
Permeable Pavement
14.3 Inspection and Maintenance
PICP should be inspected periodically to determine whether it is functioning as intended. Parking
lot and driveway surfaces should be vacuumed I to 2 times annually (typically spring/fall)
Vacuuming schedule should be adjusted as needed to prevent clogging. If PICP is found not to
be functioning properly, determine the cause and restore to working order as soon as possible.
All inspection findings and maintenance activities should be noted on the inspection form (see
Appendix A) and then entered into the Stormwater Control Management System (SCMS).
Photos should be taken to track the status of the stormwater control (SC) and document the
maintenance activities conducted. These, too, can be uploaded to SCMS. Refer to Chapter 4 for
further guidance.
The following sections describe the function of PICP, and provide inspection and maintenance
guidance for its major components.
Figure 14-3. — Plan view of permeable interlocking concrete pavers.
14.3.1 CONCRETE PAVERS
Function
Provide permeability to a paved surface and provide stability for traffic (vehicles, machinery,
pedestrians, bicyclists, etc.).
Inspection
Inspect paver surface for deformities exceeding 1/2 in., cracks, offsets more than 1/4 in.
above/below adjacent units or curbs, inlets, etc. Look for staining due to oil and grease
drips/spills.
Edge restraints keep the pavers in place. Inspect edge restraints for cracks or other damage.
14-4 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2014- 02
rv.l' 4ae'.�'
Maintenance
Permeable Pavement
Replace deformed or cracked pavers. Correct any paver offsets greater than 1/4 inch above/below
adjacent units or curbs, inlets, etc. To remove oil and grease, add stain remover, let it soak and
then rinse. During the winter, remove snow with standard plow/snow blowing equipment and
monitor salt use for treating icy conditions. Do not apply sand or gravel on or around permeable
pavement for winter maintenance. Instead use jointing material for traction. Do not store piles of
snow or soil on pavement. Repair/replace edge restraint as necessary.
14.3.2 SUBBASE, BASE, BEDDING, AND JOINTING AGGREGATES
Function
The subbase, base, bedding, and jointing aggregates provide subsurface structure and pore space
(permeability) within PICP. Reduces runoff volume, decreases runoff rate, filters storm water,
and reduces pollutant loads.
Inspection
Stormwater runoff should be allowed to flow freely through the PICP. Inspect paver joints for
trash, sediment, debris, and oil and grease. Examine the pavement surface for sagging or
depressions, as this can indicate failure of the subbase and require corrective action. Inspect the
vegetation around PICP perimeter for cover and soil stability repairing/replanting as necessary.
Monitor areas upstream of the PICP for evidence of erosion and/or construction activities. Do
not allow construction staging or mulch storage on unprotected PICP. Aggregate depth below
chamfer bottoms on paver surfaces should be measured after vacuuming. If the permeable
pavement is suspected to be sufficiently clogged, then an infiltration rate test should be
performed using an industry standard practice, such as ASTM C1701 or ASTM D3385.
Maintenance
Permeable pavement in sidewalk applications (e.g., at rest areas) receive a higher level of routine
maintenance, which includes sweeping, blowing, and litter removal. Furthermore, maintenance
practices such as vacuuming sidewalk areas may cause the lightly compacted aggregate in the
voids to be removed. Thus, the maintenance recommendations in this section are intended for
parking lots and driveway areas where higher traffic volume occurs resulting in higher
compaction and potential pollutants.
Vacuum surface I to 2 times annually (typically spring/fall) using a regenerative air vacuum
sweeper to remove trash, sediment, and debris and properly dispose of it off -site. Use a true
vacuum sweeper for restoring highly clogged surfaces. Do not use pressure washing to unclog
surface joints. Replenish aggregate in joints when more than'/2 in. from chamfer bottoms on
paver surfaces exists. Do not pull up unwanted vegetation! Use an approved systematic
herbicide, such as Glyphosate, and then return within the week to remove them by hand.
NCDOT SC Inspection and Maintenance Manual 14-5
NCDOT- HSP- 2014- 02
xy
Permeable Pavement .x.w
14.3.3 UNDERDRAIN/OBSERVATION WELLS (IF PRESENT)
Function
Underdrains prevent saturation of aggregate layers over lower -infiltration soils and convey
stormwater to downstream swale, stream, or outlet structure. Observation wells allow the
inspection of water level within the aggregate area.
Inspection
The underdrain outfalls should be free of any sediment, trash, and debris. Inspect the underdrain
outfalls for free flow and the observation wells for outflow following storm events. Check outfall
areas for erosion and undercutting. Inspect the surface above the buried pipe for signs of pipe
breakage or separation. When applicable, inspect the area where the pipe discharges to the
stream.
Maintenance
Remove sediment, trash, and debris around underdrain outfalls. Use a bucket or hose to pour
water into the underdrain cleanout and observe the outlet structure for flow. If the underdrain
becomes clogged, remove sediment and dispose of it off -site. A high-pressure hose can be used
to flush out the underdrain system by spraying directly into the cleanouts. Repair or replace
underdrain system in accordance with the original design specifications. Consider flushing the
underdrain system annually if it appears it has a tendency to plug.
Replace/repair broken or separated pipes and missing or damaged well caps. Fill-in and re -
stabilize outfall areas if erosion and undercutting occur.
14.3.4 GEOTEXTILE LINER (IF PRESENT)
Function
A geotextile liner prevents the lateral migration of soil into the base/subbase aggregates when
soil is restraining the sides of the base/subbase at the PICP perimeter.
Inspection
The soil around the perimeter of the PICP should retain the aggregate layers in place. Inspect the
geotextile liner for tears, holes, and wrinkles. Check for erosion and signs of loose aggregates on
the embankments around the perimeter of the PICP.
Maintenance
Replace/repair geotextile liner as needed. Replace aggregates, backfill soil embankment,
stabilize with matting, and seed with grass as needed following geotextile failures.
14-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2014- 02
Si[�rzln��il[•r'
14.3.5 IMPERMEABLE LINER (IF PRESENT)
Function
Permeable Pavement
Prevents toxic pollutants from leaching into the underlying soil layer and subsequently
contaminating the groundwater at sites where there is higher risk of spills and contamination.
Inspection
The impermeable liner forces water to leave the system through the porous underdrain pipe.
Inspect to ensure that there is flow from the underdrain outlet during storm events.
Maintenance
Replace impermeable liner as necessary.
14.3.6 DRAINAGE SWALES OR STORM SEWER INLETS FOR EMERGENCY OVERFLOW (IF
PRESENT
Function
PICP that has underlying soil with a moderate to low infiltration rate can be equipped with a
swale that conveys surface runoff to the receiving stream during large rainfall events.
Conversely, PICP with a storm sewer inlet will discharge surface runoff into the municipal storm
sewer system. If the swale empties directly into a stream, it should do so in a manner that does
not degrade the stream channel or banks. Typically, this requires the use of riprap or another
type of protection/energy dissipation.
Inspection
All conveyances should be inspected for trash, sediment, and debris. For vegetated swales,
inspect the area for erosion and undesirable vegetation. Also, note the mowing frequency to
ensure that the proper vegetation height is maintained. For non -vegetated swales, verify that the
channel is properly protected from erosion. If a storm sewer inlet is used, inspect the grates for
debris, sediment, and trash build-up. When applicable, inspect the area where the swale
discharges to the stream.
Maintenance
Remove and properly dispose of debris, unwanted vegetation, and major sediment
accumulations. Repair eroded areas. Replace or repair any damaged material (i.e., riprap) or
structure used to prevent erosion at the outfall.
14.3.7 OVERFLOW SYSTEM
Function
Prevents system flooding during larger storm events and may provide detention during smaller
storm events.
NCDOT SC Inspection and Maintenance Manual 14-7
NCDOT- HSP- 2014- 02
Permeable Pavement
Inspection
Overflow systems should be inspected for sediment and debris. Check for the presence of
standing water several days after a large storm event, which could indicate plugging in the outlet
pipe. Inspect the outlet area for signs of erosion. Check for damaged or corroded pipes or other
structural components.
Maintenance
Remove and properly dispose of debris and sediment accumulations. Repair or replace damaged
components. Repair eroded areas at outlet pipe. Replace or repair any material (i.e., riprap) or
structure used to prevent the erosion at the outfall.
14.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into SCMS. Observations recorded would include a
general description of the SC and those maintenance needs identified such as the removal of
accessible trash, sediment, and unwanted vegetation.
If during an inspection, emergency maintenance needs are identified (i.e., failure of the
stormwater control system), the inspector should either correct the problem at that time or
contact the party(s) responsible for emergency maintenance repairs. If emergency maintenance
needs are not corrected at the time of the inspection, a follow-up inspection should be conducted
to verify that the responsible party(s) has taken action and all needs have been addressed.
Observations made during the follow-up inspection must be documented on the appropriate SC
inspection report form and entered into SCMS.
14-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2014- 02
Higl.iway
Preformed Scour Holes
CHAPTER 15 Preformed Scour Holes
OVERVIEW
A PREFORMED SCOUR HOLE (PSH) is a structural stormwater control designed to dissipate energy
and promote diffuse flow.
PURPOSE AND DESCRIPTION
■ Preformed scour holes are riprap depressions constructed at the outlet of a point discharge.
■ By providing a stable impact point for peak flows, a preformed scour hole dissipates energy and
diffuses flow for specific applications.
INSPECTION
■ Preformed scour holes are inspected by the Division Roadside Environmental Engineers
(DREEs) for downstream erosion, improper construction, and structural damage 1 year after
project acceptance by NCDOT.
■ If the preformed scour hole is considered functional during the inspection, no further inspection or
maintenance activities are performed.
■ If the preformed scour hole is considered non-functional at the inspection, repairs are made, and
the scour hole is reinspected 1 year after the repair.
■ If the preformed scour hole is considered functional at the second inspection, no further
inspection and maintenance activities are performed.
NCDOT SC Inspection and Maintenance Manual 15-1
NCDOT- HSP- 2015- 05
Preformed Scour Holes
TYPICAL MAINTENANCE
Highway I" "
■ Most PSH locations are difficult to access. For any maintenance work where heavy equipment is
needed, minimize tracking, excavation, and re -grading, which may create an increased potential
of erosion.
■ The most prevalent maintenance concern with PSH is the potential of downgrade erosion.
Reseed and/or replant downgrade vegetation to minimize erosion, if necessary.
■ Verify that the riprap consists of a well -graded mixture of stone. Replace and/or reset riprap to
maintain designed structural components for dissipating energy and promoting diffuse flow. The
top of the scour hole is required to be level such that even diffuse flow is leaving the device.
■ Clear the scour hole of any unwanted debris or trash. .
■ Repair or replace filter fabric and permanent soil reinforcement matting to minimize downstream
erosion.
15.1 Stormwater Control Overview
Preformed scour holes are preshaped, riprap plated areas located directly downgrade of a
discharge point. The man-made structure mimics the natural scour hole that would otherwise
form at the conveyance outlet if no energy dissipation were provided. The basin is stabilized
with filter fabric and riprap to absorb the impact of the discharge and to prevent additional
erosion. Once runoff has filled the shallow basin, it overtops the preformed scour hole and is
redistributed as diffuse flow to the surrounding area.
Figure 15-1. Standard Preformed Scour Hole Installation
15-2 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2015- 05
xy
.x.w Preformed Scour Holes
To prevent erosion immediately downgrade of the preformed scour hole, an apron of permanent
soil reinforcement mat (PSRM) is required around and downgrade of the BMP. Preformed scour
holes absorb the impact of high velocities and reduce the potential for downgrade erosion from
point discharges by reducing flow velocities. When preformed scour holes are implemented
under small peak flow conditions and installed on level ground, they redistribute concentrated
inflow as diffuse outflow to adjacent land. The top of the scour hole is required to be level
such that even diffuse flow is leaving the device. Figure 15.1 shows a typical Preformed Scour
Hole installation. Preformed scour holes provide a water quality benefit by dispersing flow,
which achieves the following:
■ Prevents scour at the pipe discharge,
■ Promotes runoff infiltration, and
■ Reduces soil erosion.
Preformed scour holes are typically intended for small drainage areas receiving flows from 15 to
18-inch diameter pipes. The maximum allowable discharge is 6 ft3/s and 10 ft3/s for a 15-inch
and 18-inch pipe, respectively.
15.2 Preformed Scour Hole Components
Preformed scour holes must be installed in a flat area and should be stabilized with filter fabric
and riprap to absorb the impact of the discharge and to prevent additional erosion. The base of
the preformed scour hole is square. The base width is calculated as 3 times the discharge pipe
size. The minimum design depth of the scour hole is 1 foot and the maximum design depth is
3 feet. Side slope for all four sides of the scour hole is 2H:IV. Class B riprap (d50 of 8 inches)
should be used on top of the filter fabric to line the preformed scour hole. The minimum and
maximum stone sizes for Class B riprap are 5 inches and 12 inches, respectively.
To prevent erosion immediately downgrade, an apron of PSRM is required downgrade of the
preformed scour hole. The minimum width of the PSRM apron is the standard roll width. PSRM
must be buried a minimum of 1 foot underneath the filter fabric and natural ground around the
perimeter of the scour hole. Ensure that the apron is flush with natural ground. The elevation of
the top of the preformed scour hole should be the same as the elevation of the PSRM.
Figures 15.2 and 15.3 show a typical layout and cross-section of a preformed scour hole
installation.
Preformed scour holes may include, but are not limited to, the following components:
■ Scour Hole
■ Filter fabric
■ Riprap
■ PSRM
NCDOT SC Inspection and Maintenance Manual 15-3
NCDOT- HSP- 2015- 05
inlet Riprap
Drainage
System
Inlet Pipe . -
Basin
Permanent Sail
Reinforcement Matting
�1
Riprap
Inlet Pipev;r
Basin
Filter Fabric
r
Permanent Soil
Reinforcement Matting
xy
.x.w Preformed Scour Holes
15.3 Inspection and Maintenance
Preformed Scour Holes are inspected 1 year after project acceptance to determine their
functionality and overall condition. If the PSH receives a Level of Service (LOS) rating of C or
better, the device is considered to be functional and no further inspection or maintenance is
required for the device. If during the 1-year inspection, PSH receives a LOS rating of D or F, the
device is considered nonfunctional and corrective maintenance and/or repair is required. Once
the maintenance and repair is completed, a follow-up inspection is conducted after 1 year and if
the device is considered functional (rating C or better), then no further inspection or maintenance
is conducted.
A PIPE
l (d=15' OR 18')
SQUARE PREFORMED -
SCOUR HOLE (PFSH)
(RIPRAP IN BASIN NOT
SHOWN FOR CLARITY)
w A
(STANDARD.
ROLL 'MOTH)
PERMANENT SOIL
REINFORCEMENT MATTING
(PSRM). PSRM SHALL BE
SEEDED WITH VEGETATION
AT INSTALLATION.
Figure 15-4. Plan view of Preformed Scour Holes
PIPE
(d=15" OR IS")
DEPTH OF SCOUR HOLE
(1` MIN. - 3` MAX.)
PSRM
INSTALL LEVEL AND
FLUSH WITH NATURAL
GROUND
--NATURAL
GROUND
LINER: CLASS B RIPRAP
WITH TYPE 2 FILTER FABRIC MIN. I' TUCK
DEPTH OF RIPRAP (I')
BASE
WITH
Figure 15-5. Profile view of Preformed Scour Holes
NCDOT SC Inspection and Maintenance Manual 15-5
NCDOT- HSP- 2015- 05
Preformed Scour Holes
The following sections describe the function of preformed scour holes and provide inspection
and maintenance guidance for its major components.
15.3.1 SCOUR HOLE
Function
The scour hole is the principal structural component of the device that provides energy
dissipation for peak runoff flows. The scour hole basin is lined with filter fabric and riprap
(discussed in the following sections), and is representative of a natural scour hole that would
develop at the pipe outlet in absence of an energy dissipater.
Inspection
Stormwater runoff should be able to flow in and out of the scour hole. Verify that there is a
depression within the scour hole and it is not filled with unwanted trash or debris. Inspect the
riprap for a well -graded mixture.
Maintenance
Typically, the device should need minimal maintenance. However, if any unwanted trash or
debris is noted, it should be removed promptly. Refer to the riprap section if it requires
maintenance.
15.3.2 FILTER FABRIC
Function
The filter fabric is an erosion protection and stabilization material, which may be made of woven
or nonwoven monofilament yarns. It is used to line the stone plated basin for absorbing the
impact of the discharge and preventing erosion. The filter fabric also prevents soil movement
into or through the riprap.
Inspection
Verify that the filter fabric is undamaged, remains in place as installed, and appears adequate to
protect the area from erosion. Check to ensure that the filter fabric is buried below ground and if
any wire staples or anchor pins have been removed causing the edges to be exposed.
Maintenance
If there is damage to the filter fabric and erosion is visible underneath the riprap plated portion of
the scour hole, restore the compacted fill and repair filter fabric. Any damage to the filter fabric
should be repaired by removing the riprap and placing another piece of filter cloth over the
damaged area and securing it using wire staples or anchor pins. Once repair is completed,
replace the riprap. If the wire staples or anchor pins are missing exposing the edges, pull the
edge of the filter fabric underground and place new wire staples or anchor pins to provide
stability.
15-6 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2015- 05
1[]1"111\1j11['f
15.3.3 RIPRAP
Function
Preformed Scour Holes
Riprap is a layer of stone designed to protect and stabilize areas that are subject to erosion.
Riprap is a highly erosion -resistant material which is effective in many locations to dissipate
energy and reduce flow velocity of the runoff water. The riprap may be field stone or rough
quarry stone and should be hard, angular, highly weather resistant, and well -graded. Larger
stones predominate and smaller size stones fill the voids between larger stone.
Inspection
During the scheduled inspections, examine riprap plating to see if any erosion has occurred
around or below the riprap or if stones appear to be dislodged. Verify that the riprap consists of
well -graded mixture of large and small size stone.
Maintenance
For routine maintenance items, remove any debris from the scour hole and check the exit areas
for any potential obstructions that could hinder diffuse flow. If the stone gradation seems
inadequate use the smaller -sized stones to fill voids. If the riprap appear moved or erosion is
visible, schedule maintenance to make repairs and prevent further damage.
15.3.4 PERMANENT SOIL REINFORCEMENT MATTING
Function
The Permanent Soil Reinforcement Matting is installed to prevent soil erosion from flows and
assist the vegetation
to grow and establish in the areas receiving diffuse flows from the scour hole. The matting is
installed flush with natural ground and buried below the filter fabric immediately downgrade of
the scour hole.
Inspection
If there are signs of erosion and/or poor vegetation growth downgrade of the scour hole, look for
nearby vegetation to determine if it is blocking sunlight and vegetation establishment. Verify
that the PSRM is buried firmly below ground, overlain by the filter fabric, and the edges are not
exposed.
Maintenance
Reseed areas with erosion or poor vegetation downgrade of the scour hole if the PSH had been
installed recently and is in the establishment phase. If the PSRM edges are unburied and
exposed, use wire staples to provide stability. If adjacent dense vegetation is causing impaired
growth, consider minimal pruning to allow sunlight penetration.
Note: In addition to these major components discussed above, the area surrounding the
preformed scour hole, especially downgrade, should also be inspected for signs of sparse
NCDOT SC Inspection and Maintenance Manual 15-7
NCDOT- HSP- 2015- 05
Preformed Scour Holes
vegetation and erosion, since this is the most common maintenance issue in PSHs. Repair
eroded areas by resodding or reseeding, if the erosion warrants intervention. If the practice is
new and in the establishment phase, consider delaying the repair until the next inspection cycle.
15.4 Inspection and Maintenance Summary
Observations made while inspecting stormwater controls must be documented on the appropriate
SC inspection report form and entered into the SCMS database system. Observations recorded
would include a general description of the SC, its location, and the maintenance needs identified.
Maintenance needs can be routine or non -routine. Removal of accessible unwanted trash and
debris, which the crews may be able to perform during the same day are examples of routine
maintenance activities. Any maintenance activities performed should be recorded on the
maintenance report form. Non -routine maintenance needs often require specialized equipment
and trained personnel. If during an inspection, non -routine maintenance needs are identified
(i.e., failure of the stormwater control system), the inspector should either correct the problem at
that time or contact the party(s) responsible to schedule non -routine maintenance repairs.
If non -routine maintenance needs are not corrected at the time of the inspection, a follow-up
inspection should be conducted to verify that the responsible party(s) has taken action and all
maintenance needs have been addressed. Observations made during the follow-up inspection
must be documented on the appropriate SC maintenance report form and entered into SCMS.
15-8 NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2015- 05
xry
.x. w References
References
ARC. 2001. Georgia Stormwater Management Manual. Atlanta Regional Commission. Aug.
2001. <http://www.georgiastormwater.com/> (accessed 6 Aug. 2008).
Code of Federal Regulations, Title 29, Labor, Part 1910, Occupational Safety and Health
Standards, Subpart J, General Environmental Controls, 146, Permit -Required Confined
Spaces.
EPA. 2014. Permeable Interlocking Concrete Pavement. United States Environmental Protection
Agency. <http://water.epa.gov/polwaste/npdes/swbmp/Permeable-Interlocking-Concrete-
Pavement.cfm> (accessed 15 August 2014).
FEMA, 2005. Dam Owner's Guide to Plant Impact on Earthen Dams. FEMA L-263. Sept.
2005. <http://www.damsafety.org/media/Documents/PDF/fema-1263.pdf> (accessed
19 January 2009).
Hunt, W.F., Burchell, M.R., Wright, J.D., and Bass, K.L.. 2007. Stormwater Wetland Design
Update: Zones, Vegetation, Soil and Outlet Guidance. NC Cooperative Extension, Raleigh,
NC.
ICPI.2011. Sustainability Ecological solutions with concrete pavers.
<http://www.icpi.org/sites/default/files/factsheet sustainability_pdf> (accessed 27 August
2014).
ICPI.2013. Tech Spec Number 18 Construction of Permeable Interlocking Concrete Pavement
Systems. <http://www.icpi.oriz/sites/default/files/Tech_ Spec _18_web.pdf> (accessed 27
August 2014).
ICPI. 2014a. Inspector's Guide for PICP Installation & Maintenance.
<http://www.icpi.org/sites/default/files/picp inspection _checklist.pdf> (accessed 27 August
2014).
ICPI. 2014b. ICPI Design: Permeable Interlocking Concrete Pavement.
<http://www.icpi.org/design> (accessed 27 August 2014).
NCAC. 2007. Title 15A, Environment and Natural Resources, Chapter 02, Environmental
Management. NCDWQ "Redbook. " Surface Waters and Wetlands Standards. North
Carolina Administrative Code, effective May 1, 2007.
NCDENR. 2009. Erosion and Sediment Control Planning and Design Manual. Developed as
cooperative effort between the North Carolina Sedimentation Control Commission, the North
Carolina Department of Environment and Natural Resources, and the North Carolina
Agricultural Extension Service.
NCDENR. 2012. Permeable Pavement Systems Subchapter 3.10 of BMP Manual. North
Carolina Department of Environment and Natural Resources. October 16, 2012.
NCDOT. 1998. Vegetation Management Manual. North Carolina Department of
Transportation, Roadside Environmental Unit, Raleigh, NC.
NCDOT. 2004. Workplace Safety Manual. By Karen H. Goodall. North Carolina Department
of Transportation, Transportation Mobility and Safety Division, Raleigh, NC.
NCDOT SC Inspection and Maintenance Manual R-1
NCDOT-HSP-2010-01
References
Litoriam-mer
NCDOT. 2006. Roadway Standard Drawings. North Carolina Department of Transportation,
Raleigh, NC.
NCDOT. 2008a. Invasive Exotic Plants of North Carolina. By Cherri Smith. North Carolina
Department of Transportation, Raleigh, NC.
NCDOT. 2008b. Stormwater Best Management Practices Toolbox. North Carolina Department
of Transportation, Hydraulics Unit, Raleigh, NC.
NCDOT. 2011. Inspection and Maintenance Guidelines for Preformed Scour Holes. North
Carolina Department of Transportation, Raleigh, NC.
NCDOT. 2012a. McDowell County Permeable Paver Specifications. North Carolina Department
of Transportation, Raleigh, NC. Perm Paver Specs McDowell Co RA.pdf
NCDOT. 2012b. Standard Specifications for Roads and Structures. North Carolina Department
of Transportation, Raleigh, NC.
NCDOT. 2013. Preformed Scour Holes Follow -Up Investigation. North Carolina Department of
Transportation, Highway Stormwater Program, Roadside Environmental Unit, Raleigh, NC.
NCDWQ. 2007. Stormwater Best Management Practices Manual. North Carolina Department
of Environment and Natural Resources. Division of Water Quality. 27 Sept. 2007.
<http://h2o.enr.state.nc.us/su/bmp_fonns.htm> (accessed 6 Aug. 2008).
NCHRP. 2006. Evaluation of Best Management Practices and Low Impact Development for
Highway Runoff Control. User's Guide for BMP/LID Selection. National Cooperative
Highway Research Program, Transportation Research Board, Washington, DC.
NCSU. 2009. 2009 North Carolina Agricultural Chemicals Manual. North Carolina State
University. College of Agriculture and Life Sciences. November, 2009.
<http://ipm.ncsu.edu/agchem/8-toc.pdf> (accessed 6 Apr. 2009).
NCSU. 2012. Maintaining Permeable Pavement Presentation. North Carolina State University.
Biological and Agricultural Engineering Department. May, 2012.
USDA. 2009. USDA-NRCS Plants Database Image Gallery.
<http://plants.usda.gov/gallery.html> (accessed 20 June 2009).
NCCES. 1998. Horticulture Information Leaflet 647 (Yellow Nutsedge photograph). By Joseph
C. Neal. North Carolina State University, North Carolina Cooperative Extension Service.
December, 1998.
Virginia Cooperative Extension. 2009 (accessed). Virginia Tech Weed Identification Guide.
(Centipedegrass photograph) <http://www.ppws.vt.edu/scott/weed_id/ereop.htm> (accessed
30 June 2009).
U.S. Fish and Wildlife Service. 2007. (Yaupon Holly photograph).
<http://en.wikipedia.org/wiki/File:Ilex_vomitoria_fws.jpg> (accessed 30 June 2009).
Winston, R. 2014. Rethinking Pavement: Why not Pervious, Porous, or Permeable? March 27,
2014 LID Summit Presentation. North Carolina State University, Raleigh, NC.
R-2 NCDOT SC Inspection and Maintenance Manual
NCDOT-HSP-2010-01
Highway
Appendix A
APPENDIX A Inspection Checklists
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
LOS RANKING:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y
N
BIORETENTION BASIN
Inspector(s):
Inspection Date:
Structural Components
Inlet/outlet drainage systems are structurally sound and functional.
Forebay and transition berm are structurally sound and functional.
Basin, embankment, and emergency spillway are structurally sound and functional.
(Sediment must be removed from the basin when it exceeds 50% or more of the
forebay's storage capacity.)
Filter media and underdrain, including cleanouts, appear to be structurally sound and
functional.
Outlet control structure and components are structurally sound and functional.
Areas of Maintenance
Inlet and outlet ditches/pipes are free of sediment, leaves, trash, and other debris.
Forebay is clean and free of sediment, leaves, trash, and other debris. (Sediment must
be removed when it exceeds 50% or more of the forebay's storage capacity.)
Grass has been mowed and undesirable vegetation removed.
Plants are healthy and mulch layer is adequate (at least 3 inches).
Basin is free of standing water.
Areas of erosion have been repaired.
Trash rack is unobstructed and free of sediment, leaves, trash, and other debris.
❑ ❑ Are structural repairs needed at this site? (If yes, describe in Comments.)
❑ ❑ Is any maintenance necessary at this site? (If yes, describe in Comments.)
❑ ❑ Were maintenance activities conducted at the time of inspection?
(If yes, describe in Comments.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the
device has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y N
❑ ❑
❑ ❑
❑ ❑
DRY DETENTION BASIN
inspector(s):
Inspection Date:
Structural Components
Inlet drainage system is structurally sound and functional.
Sluice gate is in place, structurally sound, and functional.
Drawdown orifice plate is in place, structurally sound, and functional.
Trash rack is in place, structurally sound, and functional.
Trash screen is in place, structurally sound, and functional.
Forebay and transition berm are structurally sound and functional.
Basin, embankment, and emergency spillway are structurally sound and
functional. (Sediment must be removed when it reduces the design depth by 50%)
Outlet control structure is in place, structurally sound, and functional.
Areas of Maintenance
Trash rack is unobstructed and free of sediment, leaves, trash, and other debris.
Openings in the drawdown orifice plate are unobstructed and free of sediment,
leaves, trash, and other debris.
Trash screen is unobstructed and free of sediment, leaves, trash, and other debris.
Sluice gate is unobstructed and free of sediment, leaves, trash, and other debris.
Forebay is clean and free of sediment, leaves, trash, and other debris. (Sediment
must be removed when 50% or more of the capacity is reduced.)
Inlet and outlet ditches/pipes are free of sediment, leaves, trash, and other debris.
Grass has been mowed and undesirable vegetation removed
Do any components at this site need structural repairs? (If yes, describe below:)
Is any maintenance necessary at this site (i.e., areas of erosion, unwanted
vegetation)? (If yes, describe in Comments section.)
Were maintenance activities conducted during the time of inspection? (If yes,
describe in Comments section.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Y N
❑ ❑
❑ ❑
❑ ❑
FILTRATION BASIN
inspector(s):
Inspection Date:
Structural Components
Inlet/outlet drainage systems are structurally sound and functional.
Forebay and transition berm are structurally sound and functional.
Basin, embankment, and emergency spillway are structurally sound and
functional. (Sediment must be removed from the basin when it exceeds 50% or
more of the forebay's storage capacity.)
Filter media and underdrain appear to be structurally sound and functional.
Outlet control structure and components are structurally sound and functional.
Areas of Maintenance
Inlet and outlet ditches/pipes are free of sediment, leaves, trash, and other debris.
Forebay is clean and free of sediment, leaves, trash, and other debris. (Sediment
must be removed when it exceeds 50% or more of the forebay's storage capacity.)
Grass has been mowed and undesirable vegetation removed.
Basin is free of standing water.
Trash rack is unobstructed and free of sediment, leaves, trash, and other debris.
Are structural repairs needed at this site? (If yes, describe in Comments.)
Is any maintenance necessary at this site? (If yes, describe in Comments.)
Were maintenance activities conducted at the time of inspection?
(If yes, describe in Comments.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
HAZARDOUS SPILL BASIN
Inspector(s):
Inspection Date:
Structural Comuonents
Y
N
N/A
❑
❑
❑
Inlet and outlet drainage systems are structurally sound and functional.
❑
❑
❑
Sluice gate is in place, structurally sound, and functional.
❑
❑
❑
Concrete headwall/outlet structure is in place, structurally sound, and functional.
❑
❑
❑
Basin and side slopes are structurally sound and functional.
❑
❑
❑
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Inlet and outlet pipe(s) are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Basin is free of sediment, leaves, trash, and other debris.
❑
❑
❑
Grass has been mowed and undesirable vegetation removed as needed.
❑
❑
❑
Sluice gate opening is unobstructed and free of sediment, leaves, trash, and other
debris.
❑
❑
❑
Outlet is accessible and free of sediment, leaves, trash, and other debris.
❑
❑
❑
Signage is undamaged, clear, and visible.
Y N
❑ ❑ Are structural repairs needed at this site? (If yes, describe in Comments section.)
❑ ❑ Are there maintenance needs at this site? (If yes, describe in Comments section.)
❑ ❑ Does the basin pond water for excessive periods of time? (If yes, describe in
Comments section.)
❑ ❑ Are odors being emitted from the basin? (If yes, describe in Comments section.)
❑ ❑ Were maintenance activities conducted at the time of inspection?
(If yes, describe in Comments section.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
Y
N
N/A
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
INFILTRATION BASIN
Inspector(s):
Inspection Date:
Structural Components
Inlet and outlet drainage systems and flow bypass structure are structurally sound
and functional.
Pretreatment BMP and filter strip/swale are structurally sound and functional.
Basin, embankment, and emergency spillway (if present) are structurally sound
and functional.
Emergency outlet control structure, sluice gate, and trash rack are structurally
sound and functional if present.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
All components are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Sediment was removed from forebay if capacity was reduced to 50% or less.
❑
❑
❑
Basin sidewalls and surrounding areas are stabilized with a dense cover of turf
grass maintained at a height of 6-15 inches.
❑
❑
❑
Basin bottom has adequate cover (4" of sand or dense turf grass 6-15" in height).
❑
❑
❑
Sediment was removed from basin if soil media appeared to be clogged.
❑
❑
❑
Areas of erosion have been repaired.
Y N
❑ ❑ Are there structural repairs needed at this site? (If yes, describe in Comments
section.)
❑ ❑ Are there maintenance needs at this site? (If yes, describe in Comments section.)
❑ ❑ Were maintenance activities conducted at the time of inspection?
(If yes, describe in Comments section.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
LEVELSPREADER
Inspector(s):
Inspection Date:
Structural Comuonents
Y
N
N/A
❑
❑
❑
Inlet pipe grate is in place, structurally sound, and functional.
❑
❑
❑
Sediment forebay is structurally sound and functional.
❑
❑
❑
Inlet and outlet ditches are structurally sound and functional.
❑
❑
❑
Inlet pipe or flow bypass system is in place, structurally sound and functional.
❑
❑
❑
Level spreader trough is in place, structurally sound, and functional.
❑
❑
❑
Level spreader lip is in place, structurally sound, and functional.
❑
❑
❑
Filter strip is structurally sound, and functional.
❑
❑
❑
Bypass swale or pipe is structurally sound and functional.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Sediment forebay is clean, free of sediment, leaves, trash, and other debris.
❑
❑
❑
Inlet and outlet ditches are clean, free of sediment, leaves, trash, and other debris.
❑
❑
❑
Flow Bypass Structure is clean and free of sediment.
❑
❑
❑
Inlet drainage system is unobstructed, free of leaves, trash, and other debris.
❑
❑
❑
Weep holes are unobstructed, free of sediment, leaves, trash, and other debris.
❑
❑
❑
Rock filter bags protecting weep holes are not damaged or in need of replacing.
❑
❑
❑
Filter strip has a good stand of grassed vegetation. No erosion noted.
❑
❑
❑
Grass has been mowed and undesirable vegetation removed as needed.
❑
❑
❑
Bypass swale is well vegetated and free of sediment, leaves, trash, and other
debris.
Y N
❑ ❑ Are structural repairs needed at this site? (If yes, describe in Comments section.)
❑ ❑ Are there maintenance needs at this site? (If yes, describe in Comments section.)
❑ ❑ Were maintenance activities conducted at the time of inspection?
(If yes, describe under Comments.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
PERMEABLE PAVEMENT
Inspector(s):
Latitude:
Longitude:
Inspection Date:
Structural Components
Y
N
N/A
❑
❑
❑
Concrete pavers are structurally sound and functional.
❑
❑
❑
Subbase, base, bedding, and joint aggregates are structurally sound and
functional.
❑
❑
❑
Underdrain/ observation wells are structurally sound and functional.
❑
❑
❑
Geotextile or impermeable liner is structurally sound and functional.
❑
❑
❑
Drainage swales or storm sewer inlets for emergency overflow are structurally
sound and functional.
❑
❑
❑
Overflow system is structurally sound and functional.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Concrete pavers are free of sediment, leaves, trash, and other debris.
Subbase, base, bedding, and jointing aggregates are free of sediment, leaves, trash,
❑
❑
❑
and other debris. (Joints should be refilled with jointing aggregate when more
than'/z inch from chamfer bottom on paver surfaces exists).
❑
❑
❑
Underdrain/ observation wells are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Geotextile or impermeable liner has been replaced.
❑
❑
❑
Drainage swales or storm sewer inlets for emergency overflow are free of
sediment, leaves, trash, unwanted vegetation, and other debris.
❑
❑
❑
Overflow system is free of sediment, leaves, trash, and other debris.
Y
N
❑
❑
Are structural repairs needed at this site? (If yes, describe in Comments section.)
❑
❑
Are there maintenance needs at this site? (If yes, describe in Comments section.)
Comments/Recommendations/Actions
Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning properly.
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
STORMWATER BMP: PREFORMED SCOUR HOLE
SCMS ID#:
DIVISION:
CITY & COUNTY
LOCATION:
❑ Highway Right -of -Way
❑ Rest Area ❑ County
Maintenance Yard (CMY)
❑ DOH Offices ❑ Ferry
❑DMV
❑Municipal (City/Town)
❑ Other
LOS Ranking:
Inspector(s):
Latitude:
(Decimal Degrees)
Longitude:
(Decimal Degrees)
Inspection Date:
Detailed Location:
Scour Hole and Rip Rap
Y N N/A
❑ ❑ ❑ Scour Hole is free of sediment, leaves, trash, and other debris and the depression is
maintained.
❑ ❑ ❑ Riprap has a gradation (varied sizes) of different stone size.
Filter Fabric and Permanent Soil Reinforcement Matting (PSRM)
Y N N/A
❑ ❑ ❑ Filter Fabric is structurally sound and functional as lining of the scour hole.
❑ ❑ ❑ PSRM is structurally sound and functional, as installed below the filter fabric around the
perimeter of scour hole.
❑ ❑ ❑ The filter fabric and PSRM edges are buried below ground and anchored as installed.
Inlet and Outlet Structures
Y
N
N/A
❑
❑
❑
Drainage swale or inlet pipe into the Preformed Scour Hole is structurally sound and
functional.
❑
❑
❑
Drainage swale or inlet pipe into the Preformed Scour Hole is free of sediment, leaves, trash,
and debris.
❑
❑
❑
Outlet area is free of sediment, leaves, trash, unwanted vegetation, and debris.
❑
❑
❑
Surrounding vegetation is well established with no signs of erosion or bare areas.
Maintenance Needs
Check One
❑ None Needed
❑ Routine/ Normal
❑ Immediate Attention Required
Comments/Recommendations/Actions Taken:
Date
Inspection Description
Initial Ins ection
Maintenance Conducted (if needed)
Follow-up Inspection
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance
needs were found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the
device has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of
the device has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance
needs were found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major
structural component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
STORMWATER WETLAND
Inspector(s):
Inspection Date:
Structural Comuonents
Y
N
N/A
❑
❑
❑
Inlet/outlet drainage systems are structurally sound and functional.
❑
❑
❑
Forebay and transition berm are structurally sound and functional.
❑
❑
❑
Basin, embankment, and spillway are structurally sound and functional.
❑
❑
❑
Drawdown device/orifice is in place, structurally sound, and functional.
❑
❑
❑
Outlet control structure and components are structurally sound and functional.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Inlet and outlet ditches/pipes are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Forebay is clean and free of sediment, leaves, trash, and other debris. (Sediment
must be removed when it exceeds 50% or more of the forebay's storage capacity.)
❑
❑
❑
Pools are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Algal growth covers less than 50% of the stormwater wetland.
❑
❑
❑
Wetland is well vegetated with the intended species; undesirable vegetation has
been removed.
❑
❑
❑
Water level is at or near the elevation of the orifice.
❑
❑
❑
Drawdown device/orifice and trash rack are unobstructed and free of sediment,
leaves, trash, and other debris.
Y
N
❑
❑
Are there structural repairs needed at this site? (If yes, describe in Comments.)
❑
❑
Are there maintenance needs at this site? (If yes, describe in Comments.)
❑
❑
Were maintenance activities conducted during the time of inspection?
(If yes, describe in Comments.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
SWALE
Inspector(s):
Inspection Date:
Structural Comuonents
Y
N
N/A
❑
❑
❑
Forebay is structurally sound and functional.
❑
❑
❑
Inlet and outlet drainage systems are structurally sound and functional.
❑
❑
❑
Side slopes and bottom of swale are structurally sound and functional.
❑
❑
❑
Water quality rock checks are structurally sound and functional if present.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Forebay is clean, free of sediment, leaves, trash, and other debris.
❑
❑
❑
Inlet and outlet ditches/pipes are clean, free of sediment, leaves, trash, and other
debris.
❑
❑
❑
Is erosion occurring within the swale? (If yes, describe in Comments section.)
❑
❑
❑
Swale is clean, free of sediment, leaves, trash, and other debris.
❑
❑
❑
Swale has an established stand of turf grass.
❑
❑
❑
Swale has been mowed and undesirable vegetation removed.
❑
❑
❑
If present, rock checks retain dimensions and have adequate riprap and No. 57
stone.
Y N
❑ ❑ Are structural repairs needed at this site? (If yes, describe in Comments section.)
❑ ❑ Are there maintenance needs at this site? (If yes, describe in Comments section.)
❑ ❑ Were maintenance activities conducted at the time of inspection?
(If yes, describe in Comments section.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred, but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found, but function of the device
has not been affected.
C
Moderate structural deterioration and/or maintenance needs were found, but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device is no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
LOS Ranking:
STORMWATER BMP:
BMP ID#:
DIVISION:
COUNTY:
DATE INSTALLED:
LOCATION:
WET DETENTION BASIN
inspector(s):
Inspection Date:
Structural Components
Y
N
N/A
❑
❑
❑
Inlet/outlet drainage systems are structurally sound and functional.
❑
❑
❑
Forebay and transition berm are structurally sound and functional.
❑
❑
❑
Basin, embankment, and emergency spillway are structurally sound and
functional.
❑
❑
❑
Drawdown device/orifice is in place, structurally sound, and functional
❑
❑
❑
Outlet control structure and components are structurally sound and functional.
Areas of Maintenance
Y
N
N/A
❑
❑
❑
Inlet and outlet ditches/pipes are free of sediment, leaves, trash, and other debris.
❑
❑
❑
Forebay is clean and free of sediment, leaves, trash, and other debris. (Sediment
must be removed when it exceeds 50% or more of the forebay's storage capacity.)
❑
❑
❑
Grass has been mowed and undesirable vegetation removed, and eroded areas
repaired.
❑
❑
❑
Water level is at or near the invert of the orifice.
❑
❑
❑
Permanent pool does not contain excessive (covers more than 50% of permanent
pool surface area) algae or invasive plants (i.e., cattails).
❑
❑
❑
Sediment accumulation is not impeding the function of the basin.
❑
❑
❑
Drawdown device/orifice and trash rack are unobstructed and free of sediment,
leaves, trash, and other debris.
Y
N
❑
❑
Are there structural repairs needed at this site? (If yes, describe in Comments.)
❑
❑
Are there maintenance needs at this site? (If yes, describe in Comments.)
❑
❑
Were maintenance activities conducted during the me of inspection?
(If yes, describe in Comments.)
Comments/Recommendations/Actions Taken:
LOS Category
LOS Description
A
Some aging and wear has occurred but no structural deterioration or maintenance needs were
found. Device is functioning ro erl .
B
Minor structural deterioration and/or maintenance needs were found but function of the device has
not been affected.
C
Moderate structural deterioration and/or maintenance needs were found but function of the device
has not been significantly affected.
D
Serious deterioration in at least one structural component and/or major maintenance needs were
found. Function of the device is inadequate.
F
Device no longer functional due to the general or complete failure of a major structural
component and/or the lack of adequate maintenance.
Highway
Appendix B
APPENDIX B NCDOT Stormwater Control Naming
Convention
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
VA " � r
Highway NCDOT Stormwater Control Naming Convention
STORMWATER TERMS
Basin: This term signifies any depression that has a wider width than depth. According to this definition,
all ponds are basins. Basins may be circular, oval, or channel -shaped. However, all basins are designed
to detain the water quality volume before discharging that volume to surface water or groundwater. Any
stormwater control that is designed based on a target stormwater volume will be referred to as a basin.
Best Management Practice (BMP): EPA defines a BMP as a nonstructural (technique, or measure ) or
structural control (engineered grass swale, dry detention basin, filtration basin, etc.) that is used for a
given set of conditions to manage the quantity and improve the quality of storm water runoff in the most
cost-effective manner (EPA-821-R-99-012 August 1999).
Detention: Many stormwater manuals use the term detention basin to mean a basin that temporarily
holds stormwater then slowly releases it to the receiving stream. In contrast, retention basins, sometimes
called wet ponds, can refer to basins that maintain a permanent pool of water. For simplicity, NCDOT will
use the term wet detention basin to describe a basin with a permanent pool of water and dry detention
basin to refer to a basin that is dry between storm events.
Filters: Some non-HSP references distinguish between stormwater controls that remove gross solids
(screens) and those that remove suspended and settleable solids (filters). However, this naming
convention is based on the relative size of the material being filtered, not on the actual physical
separation process. The preferred term for the physical separation of water and solids using a porous
media is filtration, and the structure is a filter, regardless of the porosity of the media.
Stormwater Control: Stormwater control is preferred over best management practice to refer to
nonstructural and structural controls because it is a more accurate and precise descriptor of stormwater
treatment practices.
Stormwater Control System: One or more stormwater controls implemented together is a system. The
stormwater controls selected target different practices or pollutants to provide comprehensive stormwater
treatment.
Stormwater Wetlands: The preferred term in the HSP for a stormwater treatment wetland is stormwater
wetland. The term constructed wetland has been used by other agencies to mean a mitigation wetland
that has been restored as compensation for unavoidable aquatic impacts and/or wetlands constructed to
treat stormwater. This dual meaning can be confusing. Therefore, stormwater wetland will be used to
denote wetlands designed for stormwater treatment as required by National Pollutant Discharge
Elimination System (NPDES) permits. Constructed wetland will signify a mitigation wetland required for
Clean Water Act Section 401 and Section 404 permits.
Swale: This term refers to a shallow, vegetated trough that conveys stormwater. Swales are designed
based on a target flow rate for various design storms. Swales can be further classified by their vegetation
type. For example, different types of swales include grass swales, landscaped swales, and wetland
swales. The term vegetative or vegetated swale is too broad and will not be used by the HSP as an
official stormwater control name. In addition, stormwater controls that are designed based on the water
quality volume are basins and will not be referred to as swales. Swale signifies stormwater conveyance
and rate -based design, not basin geometry.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
VA " i r
Highway NCDOT Stormwater Control Naming 9 Convention
Page 2 of 8
STRUCTURAL STORMWATER CONTROL FIELD GUIDE
This field guide is intended to assist the user in identifying different types of post -construction stormwater
controls used by NCDOT. Post -construction stormwater controls treat stormwater runoff from roadway
surfaces and other NCDOT facilities. The photos and descriptions provided represent typical examples of
NCDOT structural controls and their identifying characteristics. However, each structural control will vary
depending on site -specific conditions.
Filtration Basin
A SHALLOW BASIN WITH ENGINEERED OR AMENDED SOIL AND
AN UNDERDRAIN SYSTEM
Filtration basins function by detaining stormwater in the
basin. As stormwater infiltrates through the amended
soil, sand, or engineered media, pollutants are filtered
and adsorbed onto soil particles. Treated stormwater is
directed to the receiving stream via the underdrain
system.
■ Filtration basins may be shaped like ponds or
channels.
�-
■ To improve pollutant removal, the basin may be
covered with grass, wetland species, or landscaped
vegetation (see Bioretention Basin).
�- _ ,..,:_...:....••
■ Sand filters are considered filtration basins.
-
Filtration basins may have outlet control structures
-
and emergency spillways. However, all filtration
basins have underdrain systems.
Bioretention Basin
A TYPE OF FILTRATION BASIN WITH ENGINEERED MEDIA, AN
UNDERDRAIN SYSTEM, AND LANDSCAPED VEGETATION
Bioretention basins use a landscaped mix of water -
tolerant plants to improve pollutant removal. The
. •'' ,, *�
vegetation is selected for its ability to physically filter and
f
uptake stormwater pollutants. As with all filtration basins,
:;•...: -{
stormwater is infiltrated through amended soil or an
engineered media before it enters the underdrain system.
■ Selected vegetation simulates various ecosystems
. • •, .
such as forests, meadows, and hedgerows
`
-= '�a-fn,.•
Bioretention basins are suited to drainage areas less
than 1 acre.
■ Bioretention basins may include outlet control
structures and emergency spillways, but they will
always have underdrain systems.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
MN
Highway NCDOT Stormwater Control Naming 9 Convention
Page 3 of 8
Dry Detention Basin
A SHALLOW, DRY BASIN WITH AN OUTLET PIPE OR ORIFICE AT
THE INVERT OF THE BASIN
Dry detention basins attenuate peak discharges and
temporarily detain runoff to promote sedimentation of
solids and infiltration. Runoff is slowly released from an
outlet control structure at a steady flow rate to increase
detention time.
Dry detention basins may be shaped like ponds or
channels.
The primary outlet control structure is located at the
invert of the basin, allowing stormwater to drain slowly
and completely between storm events.
■ Dry detention basins are identified by the presence of
an outlet control structure and an emergency spillway.
Wet Detention Basin
A SHALLOW BASIN THAT MAINTAINS A PERMANENT POOL OF
WATER BY USING AN ELEVATED OUTLET CONTROL STRUCTURE
_
Wet detention basins treat stormwater through
sedimentation and biological uptake of pollutants by
_"-
plants, algae, and bacteria. Stormwater runoff in excess
of the permanent pool is slowly released from the basin
to prevent downstream erosion.
■ Wet detention basins may be shaped like ponds or
channels.
■ The outlet control structure is elevated above the
_
invert of the basin, allowing pollutant -laden solids to
settle to the bottom and cleaner surface water to exit.
■ The wet detention basin may have additional capacity
for detaining and slowly releasing volumes greater
�,.
than the permanent pool volume.
■ Wet detention basins contain an emergency spillway
to convey large events.
■ Vegetation growing around the perimeter of the basin
provides for biological uptake of nutrients from the
water.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
MN
Highway NCDOT Stormwater Control Naming 9 Convention
Page 4 of 8
Infiltration Basin
A SHALLOW BASIN IN PERMEABLE SOILS THAT DETAINS AND
INFILTRATES STORMWATER RUNOFF
Infiltration basins use porous soils to infiltrate stormwater.
During infiltration, pollutants are physically filtered and
adsorbed by the native soil. Infiltration basins provide
_
total runoff volume control for all runoff equivalent to and
smaller than the design storm and help to recharge
groundwater.
-
■ Infiltration basins may be shaped like ponds or
channels.
■ Infiltration basins may have outlet control structures
and emergency spillways.
■ Infiltration basins rarely have underdrain systems.
- -
The purpose of the underdrain system in an infiltration
basin is to facilitate maintenance.
Hazardous Spill Basin
A SHALLOW BASIN WITH AN OUTLET CONTROL STRUCTURE
THAT CAN BLOCK THE ENTIRE CROSS -SECTIONAL AREA OF
_
FLOW
Hazardous spill basins (HSBs) are designed to contain
hazardous materials in the event of an accidental spill.
During normal operation, stormwater runoff flows
unimpeded through the basin. In the event of a spill, the
outlet control structure is manually activated, preventing
discharge from the basin.
■ HSBs may be shaped like a pond or a channel.
■ Sluice gates or sand bags are typically used to block
0:..
the basin outlet.
• Some HSBs are marked by a sign with instructions to
personnel on how to contain a spill.
-. •.
The HSB outlet control structure may be designed to
T
provide detention in some applications.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
Ml
Highway NCDOT Stormwater Control Naming 9 Convention
I'l iln{I UV[
Page 5 of 8
Stormwater Wetland
AN ENGINEERED MARSH OR SWAMP WITH DENSE WETLAND
VEGETATION
Stormwater wetlands mimic the water treatment ability of
natural wetlands. Stormwater wetlands remove a variety
of pollutants, primarily through biological uptake via
-
plants and microorganisms.
.
Stormwater wetlands, as opposed to naturally
occurring wetlands, have distinct inlet and outlet
structures.
■ Vegetation grows throughout the wetland.
Y'r
Shallow pools of standing water are usually present,
•• • -
although some wetlands are designed for subsurface
flow.
■ Thick vegetative growth around the edges of the
wetland aids in the biological uptake of pollutants.
Swale
A BROAD AND SHALLOW CHANNEL WITH DENSE VEGETATION
r•
Swales convey and treat peak runoff from small drainage
areas. Swales decrease runoff velocity to promote
infiltration and physical filtration. Swales also increase
contact time between runoff and vegetation to promote
biological uptake of pollutants.
■ Swales are shaped like channels and are designed
based on target flow rates.
■ Swales require nearly flat longitudinal slopes to
k+
function. Some applications use water quality rock
checks to reduce the effective slope.
Swales do not incorporate underdrain systems.
-:
Channel -shaped stormwater controls that use
underdrain systems are filtration basins, not swales.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
mm
Highway NCDOT Stormwater Control Naming Convention
Page 6 of 8
Level Spreader
A TROUGH AND LEVEL LIP USED TO REDISTRIBUTE
CONCENTRATED STORMWATER AS DIFFUSE FLOW
Level,Spreader
Level spreaders provide a nonerosive outlet for
concentrated runoff by diffusing the water uniformly
across a stable slope.
■ Level spreaders are implemented upstream of buffers,
swales, and basins to improve infiltration and
biological uptake.
• Level spreaders are implemented downstream of
stormwater controls to prevent stormwater from
reconcentrating.
■ Level spreaders are implemented on nearly flat
SpreadLevel
grades to prevent reconcentration of runoff.
The length of the level spreader trough will vary,
depending on the stormwater discharge rate.
Filter Strip (component)
",.
A LINEAR SECTION OF LAND, EITHER GRASSED OR FORESTED,
THAT PHYSICALLY FILTERS AND INFILTRATES STORMWATER.
Filter strips intercept perpendicular, diffuse flow, much the
same way a buffer does. As runoff enters the filter strip,
dense foliage and thick root mats physically filter out
solids while reducing the peak flow rate.
Runoff must be in the form of diffuse flow for filter
't.
strips to function. Filter strips are often located
downstream of level spreaders and preformed scour
holes.
N
■ Filter strips may consist of tree stands, shrubs, grass,
or a combination thereof.
Filter strips may be located along the perimeter of a
water bodies as well as nonriparian areas.
Unlike buffers, filter strips are regularly managed
through mowing, trimming, and replanting.
1 ..
1 -
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
MN
Highway NCDOT Stormwater Control Naming 9 Convention
Page 7 of 8
Buffer (component)
a k:,
A SECTION OF DENSE WOODY OR GRASSY VEGETATION
'd.
ALONG THE RIPARIAN CORRIDOR OF A WATER BODY
Buffers are constructed or natural strips of
vegetation located along the banks of a water body.
Buffers perform many of the same functions as filter
strips. The buffer vegetation acts as a filter to
remove pollutants from runoff and shallow
groundwater.
• Thin buffers provide bank stabilization, whereas
wider buffers remove solids and uptake dissolved
pollutants.
• Unlike filter strips, buffers should require little or
no management.
■ Buffers may be configured according to the two -
zone or three -zone model. In these models, the
%
areas closest to the stream bank are undisturbed
t +�, - ,
forest. Landward areas are made up of shrubs or
grass.
■ In some watersheds, riparian buffers are subject
to Riparian Area Protection Rules (i.e., buffer
Bottom Photo: North Carolina Department of the
rules) that restrict development.
Environment and Natural Resources (NCDENR)
Preformed Scour Hole (component)
A RIPRAP-LINED BASIN FORMED AT THE OUTLET OF A
POINT DISCHARGE
�.
By providing a stable impact point for peak flows, a
scour hole (PFSH) dissipates energy and
preformed
diffuses flow. PFSHs prevent downgrade erosion
and promote infiltration.
The basins are reinforced with riprap to prevent
erosion and scour.
• PFSH are used with pipe diameters of 18 inches
or less.
■ An apron of permanent soil reinforcement matting
y�
(PSRM) is required downgrade of PFSH to
prevent scour.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01
MN
Highway torNCDOT Stormwater Control NamingConvention
�:mvu,`a,�
Page 8 of 8
Forebay (component)
A SMALL BASIN LOCATED UPSTREAM OF ANOTHER
,, --
STORMWATERCONTROL
Forebays are pretreatment devices designed to remove
_,.
large stormwater particles. Forebays are important
.�k
components of stormwater control systems because they
improve the pollutant removal efficiency and extend the
r
life of downstream controls.
■ Forebays are always located upstream of other
-
stormwater controls, generally controls in the basin
family.
■ Stormwater usually transitions from the forebay to the
x-•*W_
downstream control via a weir.
_
Forebays are typically lined with riprap and filter
fabric.
)Forem.
NCDOT SC Inspection and Maintenance Manual
NCDOT- HSP- 2010- 01