INSPECTION RECORD FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCGO10000
SELF -INSPECTION RECORD FOR LAND DISTURBING ACTIVITIES PER § 113A-54.1
RESPONSE FOR EROSION CONTROL FORM 1675
PROJECT LOCATION TIP/WBS#
LEVEL II SUPERVISOR COUNTY
CONTRACTOR
All erosion and sedimentation control measures and stormwater discharge outfalls must be inspected once per seven calendar days AND
within 24 hours of a rainfall of 1.0 inch or greater per 24-hour period. Permittee must keep a record of inspections. If using on site rain
gage, complete daily rainfall measurement. If using Multi Precipitation Estimator (MPE), attach rainfall data for weekly period.
Day
Date
Rain
FAitnt in
Notes
000
TT
00
W
Th
F
Sat
00
Sun
00
Phase of Grading
Place a check in the box of the current projectphase)
Installation of perimeter erosion and sediment control measures
Clearing and grubbing of existing ground cover
Completion of any phase of grading of slopes or fills
Installation of storm drainage facilities
Completion of construction or development
Establishment of permanent ground cover sufficient to restrain erosion
Has all land disturbing activity been completed? (Y/N)
Has the final permanent ground cover been completed and established? (Y/N)
By this signature, I certify (in accordance with Part IV, Section B, 6(d) of the NCGO10000 permit)
that this report is accurate and complete to the best of my knowledge:
Cert. Level II Supervisor
NCDOT Cert. Level II Representative
Cert. #
Cert. #
Exceptions to standard monitoring requirements
Idle projects: Idle projects must be inspected once every 14
calendar days and after 1.0" of rain in a 24-hour period. Idle
projects are projects that have not been completed but where no
construction activity occurs for 21 calendar days or more AND
the entire project has been adequately stabilized with temporary
vegetation pursuant to DEMLR guidelines.
Completed projects: Completed projects are those projects
where work has been completed and you're waiting for the
permanent vegetation to establish (i.e. waiting for the grass to
grow). Completed projects must be inspected once every 30
calendar days AND within 24 hours of a rain event 1.0 inch or
greater in 24 hours. The reduced monitoring can begin once
construction has been completed, and erodible slopes have been
sufficiently stabilized to restrain erosion by application of
permanent ground cover varieties and installation of temporary
ground cover to include appropriate erosion control matting
and/or other approved mulch materials.
Form should not be signed until the week is complete and ALL
corrective actions have been completed in the 24 hour and/or 5
day time periods.
04/2019 SPPPFORM30
Stormwater Discharge Outfalls (SDO) Visible Sedimentation and Stream
(Required to list each SDO for each inspection) Turbidity
Inspection Station Number Corrective Actions Needed Priority* Date other sediment stream
Date Corrected Pollutants** Deposited*** Clarity****
* R=Routine, needs
**Is there evidence of other pollutants discharging from
***Is there visible sediment deposited in a stream,
****Is there visible
attention within 5
site such as oil sheen, discoloration, cement wastes,
wetland, buffer or adjacent property? (Y/N) Contact
decrease in stream clarity
days; U=Urgent,
sanitary waste, fertilizers, or fuel or chemical storage
DWR within 24 hours if visible sediment greater than a 5
(increase turbidity -cloudy)
needs attention
leakage? (Y/N) **If Other Pollutants is marked Yes,
gallon bucket is deposited in surface waters or wetlands,
because of a discharge?
within 24 hrs.
describe extent of discharge and list the corrective actions
and DEMLR if greater than 5 gallon bucket lost off site.
(Y/N)
taken. Report potential illicit discharges to NCDOT for
NOTE: Any erosion control device that is damaged that has the potential to lose sediment and/or pollutants offsite and/or into surface waters should be treated as "URGENT".
04/2019 SPPPFORM30
Erosion & Sedimentation Control Devices
(Required to list all devices that need maintenance)
Inspection Station Number Corrective Actions Needed Priority* Date
Date Corrected
*R=Routine, needs attention within 5 days; U=Ur ent, needs attention within 24 hours.
NOTE: Any erosion control device that is damaged that has the potential to lose sediment and/or pollutants offsite and/or into surface waters should be treated as "URGENT".
04/2019 SPPPFORM30
RESPONSE FOR EROSION CONTROL - INSPECTOR'S DAILY REPORT
SUBSTITUE FORM 1675
Pay Item
Standard/Metric Unit
Quantity
Comments
Temporary Silt Fence
LF M
Special Sediment Control Fence
TN/MTN LF/M
Temporary Mulching
AC HA
Seed - Temporary Seeding
LB KG
Fertilizer - Temporary Seeding
TN MTN
Matting for Erosion Control
SY M2
Coir Fiber Mat
SY M2
Coir Fiber Baffles
LF M
Perm. Soil Reinforcement Mat
SY M2
Seeding and Mulching
AC HA
Seed - Repair Seeding
LB KG
Fertilizer - Repair Seeding
TN MTN
Seed for Supplemental Seeding
LB KG
Fertilizer Topdressing
TN MTN
Response for Erosion Control
EA EA
Safety/Highly Visible Fencing
LF M
We agree that this is the work to be performed.
We agree that this work was performed.
NCDOT Representative:
NCDOT Representative:
Prime Representative:
Prime Representative:
Date
Date