HomeMy WebLinkAbout01j_NCS000250 IA Program Overview 2019 9.20.19NORTH CAROLINA
Department of Transportation
77-
ARQI
pli
Industrial Activities Program
September 2019
Agenda
• Permit Requirements
• Program Accomplishments
• Considerations for the Future
2
Program Objectives
• Maintain and implement a Stormwater Pollution
Prevention Plan
(SPPP
or Plan)
for
each facility with an
industrial
activity
that
is
covered
by
this
permit.
• Develop and implement a Plan prior to operation of any
new industrial facilities.
• Evaluate the effectiveness of the industrial SPPP for
each industrial facility.
• Perform required qualitative monitoring at stormwater
discharge points or outfalls identified in SPPPs or during
supplemental inspections for new sources and
discharges as required.
3
Permit Requirements
Maintain and implement a
SPPP for each covered
industrial activity and related
facility.
Perform visual monitoring at
each facility.
NCDOT shall maintain and implement a site specific Stormwater
Pollution Prevention Plan (SPPP) for each covered facility with an
industrial activity. For new activities or facilities, the SPPP shall be
developed and implemented prior to operation. New activities and
facilities shall be identified in the annual report and include a brief
description and location information.
Qualitative monitoring shall be performed at each industrial
stormwater outfall or discharge point twice per year, once in the
spring (April — June) and once in the fall (September — November).
Qualitative monitoring requires an inspection of each stormwater
outfall or discharge point for the following parameters: color, odor,
clarity, floating solids, suspended solids, foam, oil sheen, erosion at
or immediately below the stormwater discharge point or outfall, and
other obvious indicators of stormwater pollution. Qualitative
monitoring is for the purpose of evaluating the effectiveness of the
SPPP. No analytical tests are required. NCDOT will pursue
correction of stormwater quality where qualitative monitoring
indicates degradation of quality in comparison to previous monitoring
events.
SPPP Implementation
9 IA Program has been operational for ~21
years.
• Most program activities focus on
maintaining SPPPs, conducting
inspections, and providing training to keep
employees aware of requirements.
• Note: Contractor -owned activities on NCDOT property (e.g., asphalt
plants) maintain their own SPPPs and/or SPCC Plans for their
operations.
NCDOT Industrial Facilities
Highway and Bridge Maintenance Yards
Equipment Shops
Roadside Environmental Shops
Traffic Services Shops
Material Storage Yards
Fuel Stations
Ferry Terminals
Ferry Maintenance Facility
Rail Maintenance Facility
Equipment Depot
II DIVISION E1GENTER II
Stortnsrater Pollution PreTentian Teamn
Ieam Leader
Counts lfaintenanre Engineer
Team Members
Equipment Shop Supenisor Bridge Maintenance Supenisor
Traffic Senices Supenisor Roadside Emimminental Supenisor
Road Oil Supenisor Additional Ieam liember Specific to
Facilin-
0
Stormwater Pollution Prevention
Plans (Sppps)
• Site -Specific SPPP/SPCC Plans prepared
for facilities
Spill Prevention Control and
Countermeasure (SPCC) Plans
• SPCC Plan requirements integrated into SPPPs
1.
n1_ ,..
GENERAC
POWER SYSTEMS
SPPP/SPCC Plan Updates
• Updates are performed for various facilities due
to facility changes:
— New buildings constructed or modifications to existing
buildings
— New or modifications to existing
storm drainage infrastructure
— New or changes to existing
industrial activities
— New facility staff
E
SPPP/SPCC Plan Template
NDrth cw inn
D¢par+mens orl... 5 D" on
pi ision I Vard
g, in6b Dunn Main[euanre
Reid+sil"Sorlb aroliaa
lix L-npN PFE�Ty��Q ,p 1�
SroR-� sPa,i, PRE i�L-sr r�`
and Ctll tit ES
pc[nber l8TOIb
Figure 1. NCDOT SPPP and SPCC Process Diagram
N DOT Process Diagram for Stormwater Pollution Prevention Plan (SPPP)
& Spill Prevention. Controt and CGuntermcasure Plan (SPCC flan
LnWw,rr WF. R,M.e.q��w
r y �5e,�y,K irern Seeantl`ry
raaara.-,�.,.I s.l.rl,� rawr.wwtr. �,,� a[rw�xxrwnt
riMi M!'SPFP TraID SPFT type .F?P SM Lw .
T+PPI D�F L]P �
Irlree.r: eDn _
Nnc.v»< .y�N 6PPr LFY, Yf� &[�M iBLlkr#! {4{••••�
��fmTtirY 5Y11 A'Y/.}Er 1M�4
Dos b-I } CbcFw h
r& s,&..T_ SPPP
LtCantinuvus
[ Sudn�e F,xm.b � PMwi/.�
Hysa.r.�liWe N4[Vfeatlra'
fi'P,+a'+:LDr ry,y,ldw■oa 19ePn11 + iE+IGpwl
PmrrE+yw s.� I ne„M a.m I
WT
SPPP Annual Cycle, ;n •� Cam,
�.,e io FaT■ireV
{Jul1t=�layj
a Po`Li`rartl Cervluol LnL cblx$KC PIS R`nk[ SPCC
IKa Iuh.e III
[Jp■■Oe aPA I 4 Heern elwerwF Iln� dkM
Tu/M Prw L70 TV" Pew NP► •.,,�--,� r,no�
SV—
a..arWrt {,eS,,.W
srP'I �.rar. 7 Wmiuci ■ b.-vn.a.■� r—;MiW io--r#la2�l
P■eftrrnf� rw�,�lL � �+ r f
fa��167�s1� FreIMe L4Ypf[IIBM1 [
$P{_{�Pl911
nr`a�: Lae ri■.rD.r:aaP
wTULr �r
pvr Lrr.
k.oantau#1tx d
er.a,.r EerALer
awe.rw r.n,...l
'.F�P.3� L Sw Ml�aw�iM�wIF nFL,Iwr4rAw
ry. P4 Few ?5
10
Tasks
Tasks Overview
❑Completion Status
BMPS
❑Annual Cyde BMPs
BM P Funding (Faei I ity)
BMP Funding (Division)
Site Specific BMPs
Incomplete BMPs
Completed 6MPs
Division Status
Documents
IRMA Guidance Manual
Administration
Site Administration
Us er Admi n i strati o n
❑ SPCC Report
❑ Logoft
SPPP/SPCC Website
djoconnorl I Help
5tormwater Program 3R Program
Dw: e V Poc: rkmurphv
Fac: WA TL: WA
Year: I 1a t81112015 to 513112D1 V
Facilities
Bladen County Maintenance Yard
Columbus County Maintenance Yard
Cumberland Countv Division Maintenance Yard
Robeson County Maintenance Yard
Harnett County Maintenance Yard
Cumberland County Salt Storage Yard
Harnett County Storage Yard
Elwell FerrvTerminal
Harnett County (Spout Springs) Materials Storage
Yard
Form 1 Tasks
1 2 3 4 5 6 7 S 9 16 11 12 13 14 15 16 17 13
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
The North Carolina
Department of Transportation
11
Task Overview
• SPPP/SPCC implementation tracked on website
Tasks
❑ Tasks auervi ew
❑ Completion Status
BMPs
❑ Annual Cycle BMPs
❑ BM P Funding (Facility)
❑ BMP Funding (Division)
Site Specific BMPs
In complete DM Ps
Completed 6MPs
Division Status
Plan Documents
❑ SPPPISPCC Template
❑ Appen di ces A- C
❑ Apen dix ❑ - AI I Forms
❑ Certificab on(s)
❑ Electronic Mapping
Training
Train in g RepDrt
Documents
IRMA Guidance Manual
Administration
G Site Administration
❑ Us er Admi n i strati on
SPCC Report
Logofr
Div: 7 V
J:— Rodkingham County Maintenanm Yard V
Year_ 18 t&112015 to 51311-11) V
H--Il.....r,-4. � —f",M—Ir..—M AADT,. 1.,o.rt,i—q—it.r—
Task Task to be Performed
1 Read the SPPPISPCC Plan
2 Ensure SPPP Certification is completed
3 Ensure Management Certification and PE Certification is completed
4 Ensu re Th e Certification of th a Applicability of th a Su bstantial H arm
Criteria Certification is completed
S Complete Spill Response and Notification Form
6 Complete SPCC Monthly Site Inspection
7 Appoint the SPPT members
S Train the SPPT members and personel Dn SPPPISPCC
9 Complete Annual Cycle 6MPs and update Site -Specific 6MPs
10 Perform tat biannual wet weather visual observation of SDOs
11 Cnndu ct site inspections
12 Perform 2nd biannual wet weather visual observation of SDOs
13 Conduct Comprehensive Facility Compliance Inspection
14 Complete SPCC Annual Site Inspection
15 Complete NDn-Stormw ater Disch arge Assesment
16 obtain Non-Stormw ater Discharge Certification[Requ ire% PO C to review
Form 5]
17 Review the SPPPISPCC Plan
13 Make necessary revisions to SPPPISPCC Plan
Release accumulated rainwater from exposed secondary containment
Complete Significant Spill Report
Complete Permit Non-compliance Report
Complete Discharge Report to EPA Regional Administrator
Required
Target
Completion
Documentation
Status
Date
Date
None
6MM015 COMPLETE
6I26I2015
Form 20
&W0 2015 COMPLETE
612612015
Form 21
6rW2015 COMPLETE
6I26I2015
Form22
61W2015 COMPLETE
6I26I2015
Form 25
6rW2015 COMPLETE
6I26I2015
Form 23
10I312016 COMPLETE
6I3I2016
Form
7I312015 COMPLETE
6I26I2015
Form 3
7I31C015 COMPLETE
6I26I2015
Annual Cycle 6MP
751 C015 COMPLETE
12122I2015
1st Form 17
9I302015 COMPLETE
1212212015
1st Form 19
12I302015 COMPLETE
211I2016
2nd Form 17
4I302016 COMPLETE
502016
Form 4 & 2nd Form 19
4I302016 COMPLETE
502016
FDrm 24
5I302016 COMPLETE
6I3I2016
Form5
5I302016 COMPLETE
6I212016
Form
SI302016 COMPLETE
6I2I2016
Form?
5502016 COMPLETE
6I24I2016
Forma
5I302016 COMPLETE
612412016
Form 18
As Needed On -Going
Form
As Needed On -Going
Form 10
As Needed On -Going
Form 26
As Needed On -Going
12
Qualitative Monitoring
Qualitative monitoring tracked on website
Tasks
Tasks Ove-mew
Outtall Number:
County:
Completion Status
BMpS
Facility Name:
Date:
Inspector:
Phone:
Receiving Stream:
Annual Cycle BMPs
BM Funding (Facility)
SMP Funding (Division)
Site Specific BM Ps
Incomplete BM Ps
GutfalI Type:
Completed BMPs
Division Status
Industrial Activities in Drainage Area:
Flow Observation:
Documents
color:
IRIVIA Guidance Manual
Od or:
Administration
Clarity:
Floating Solids:
Suspended Solids:
Foam:
Site Administration
User Administration
'SPCC Report
LDgoff
Oil Sheen:
Erosion:
Obvious Indicators of
Stormwater Pollution:
NRIDE S Permit No:
Form 17: Year 18, Fall
3
Cumberland
Cumberland County Division MaintenanceYard
9f24i20152:15:00 PM
W. R. Hammond
9104861421
Blounts Creek
24inch pipe
Parking area for Highway Equipment and Traffic Services Facility.
FIDw
None
None
1
1
2
Fa Ise
Fa Ise
ND
ND Evidence
NCS000250
13
Best Management Practices
• BMPs tracked on website
BMPs
uMnual Cycle BMPs
❑ EMIR Funding (Fact I ity)
BMPFunding (Division)
Incomplete BMPs
completed BMPs
Division Status
❑ SPPPfSPCC Template
Appen di ces A- C
Apendix D - A I Forms
❑Certification(s)
❑ Electronic Mapping
„ .. ,y
Training Report
Admmutration
TABLE 1: An n ua l Cycle BM Ps
To be funded by Standing Maintenance Fund
BMP No. Required Baseline Best Management Practice
9-7 Co-nductdaily visual observations of equipment for drips and leaks
01 CDnductstormwaterPollution preventiDntraining
12 Reduce use Df hazardous materials -select non -toxic and recycled products where feasible
12-1 Minimizeexposureo-fscrapmetalto-precipitation(a.g.,removefromsite)
13 Remove unneeded HAZMATs from Facility (excess inventDry and* expired shelf life)
14 Remove hazardous wastes from site promptly - dispose properly — do not exceed assigned generatorstatus
17 Manage runoffto reduce pollutants
02 ConductGood HousekeepingProgram
03 Conduct Preventative Maintenance Program
18-1 Conduct daily visual observations of tanker for drips and leaks
04 Conduct Spill Prevention and Response Program
05 InfDrm Dn ate contractors of NPDES Permit and SPPP compliance issues- ensure pollution preventiDn by all wDrkers
06 Minimize industrial actively expDsureto precipitation and run-Dn
07 Conductdaiyvisualobservationso-fvehiclesfo-rdripsandleaks
03 CDnduct daily visual observations of equipment for drips and leaks
2&1 Minimize exposure tires to precipitation (e.g., provide cover, relocate indoors)
22-1 Conductdaiyvisualobservationso-fdistributorsfo-rdripsandleaks
25-7 Instruct personnel regarding OWS limits at Facility (e.g., do- not introduce detergents, solvents, acids, or miscible products into OWS)
BMPRef. Completed
3.2.7c ❑r
3.2.1 ❑,/
3.2.9a Q
3.2.6f ❑r
3.2.9c Q
3.2.9b Q
3.2.12a 0
3.2.2a ❑r
3.2.3a Q
3.2.7c 0
3.2.4a 0
3.2.5b ❑,/
3.2.6b Q
3.2.7c ❑r
3.2.7c Q
3.2.6f 0
3.2.7b Q
3.3.4a Q-1
14
Training
• NCDOT's emphasizes employee training
to meet SPPP requirements
• NCDOT utilizes many unique approaches
to train Division personnel on stormwater
pollution prevention, good housekeeping,
and spill prevention.
ILA
Example of Training
Approaches
• SPPP and SPCC video modules for
initial or annual refresher training
• Individual or group training sessions
• Posters and handouts for program
reminders
• NCDOT Industrial &Roadway
Maintenance Activities (IRMA) BMP
Guidance Manual for training
briefings
INlPEtT TO PROTECT...
lTORMWATER!
❑O YOUR PARTto hedj�prevent Stormwater Pollution.
Visually inspect and orooerly maintain erosion and
16
Example of Training Materials
Permanent constructed roof
provides cover for salt and
sand/salt mixture stockpiles
,. �___V'_-_
Cl
Tarpaulin protects stockpile by keeping
d-blown precipitation out of building
Covered canopy
7 keeps precipitation
out of containment
area (sloped roof
directs rainfall awav)
Sal,
bri_i
Straw bales provide
containment for stockpile
Paved loading area
(allows personnel to sweep spilled
'd a back into building)
Salt residue spilled during
loading operations should be
swept into building or cleaned
up after each storm event
Stormwater runoff
diverted away from salt
storage and loading areas
Tarpaulin used to cover
temporary salt delivered
mid -season until material can be
loaded into building
Impervious surface
and sealed cracks
provides positive
containment
17
Training
• NCDOT utilizes strain-the-trainer
approach
• SPPP/SPCC Plan Implementation
Workshops conducted for Division
personnel:
— Level I — Introductory Review for new
personnel
— Level I I —Advanced Training for Team
Leaders/ select Team Members
IN
Ongoing Internal Maintenance
Yard Reviews
SPPP/SPCC Plan evaluation
Review of documentation of completed tasks
Interviews with SPPP Team Leader and discussion of
site -specific changes or needs at facility
In-depth site inspection
BMP recommendations provided
verbally during inspection and
written recommendations
provided later
Dual purpose:
— Opportunity to update site plans,
— One-on-one training
19
rr� -rrr.: r • �.-ry�rr.r •rrrrrr • •r -r • •r-rrr.,-:-rrrr� • rrr,�: err: r.rr::�r.r.-Frr.,':-rrr.r.�r
Considerations for the Future
• NCDOT will continue to maintain and implement site -specific SPPPs
at its industrial facilities and develop new SPPPs for new facilities.
• NCDOT REU staff will continue to assist Division personnel by:
— Conducting training workshops,
— Providing guidance on SPPP BMPs at industrial facilities,
— Performing site reviews, and
— Supporting divisions with other aspects of the IA Program as
needed.
• NCDOT continues to evaluate the program's internal processes to
identify any new opportunities for improvement (e.g., new training
videos).
20
Overview of DEQ
Industrial Site Reviews
• Reviews were performed
by DEQ atNCDOT
industrial facilities:
— McDowell CMY
— Wake County (Trenton) MSY
— Cumberland CMY
— Castle Hayne CMY
— Forsyth CMY
— Union CMY
IV-
21
ncdvt.gov
0
activities Proom
-&M® -_
wpm
L