Loading...
HomeMy WebLinkAbout01f_NCS000250_Toolbox_AuditPresentation_2019-9-23_BSLNORTH CAROLI NA Department of Transportation r Y � VFW yr. Lti CAROL � w I G/ NCDOT's BMP Toolbox for Post -Construction Runoff September 23, 2019 Brian Lipscomb, PE 9 Highway Stormwater Program Co -managed by the Hydraulics Unit and the Roadside Environmental Unit Comply with the NPDES Permit (NCS000250) 4t" Term (10/1/2015 - 9/30/2020) • NPDES Permit Sections, Part II Section A - IDDEP Section B - Post -Construction Controls — B.1 — SSIPP — B.2 - BMP Retrofits — B.3 — BMP Toolbox — B.4 - BMP I&M Program — B.5 — PCSP — B.6 — Vegetation Management Section C - Construction Section D - Industrial Facilities Section E - Education and Involvement — E.1 —Internal — E.2 — External Section F — Research and Program Assessment NORTH CAROLINA OEPARTHIERT OE TRAWORTATIOH STORWHAT ER PEST IIQMAGENE NT PRACTICES Twi ISOX k_ V-- L AW. N;: NCDOT Hi hwa g Y Stormwater low, PROGRAM I WIRmerem2 111#i13►1*111 3. BMP Toolbox for Post -Construction Stormwater Program a. Objectives i. Maintain and update as necessary a BMP Toolbox to aid in the siting, design, and construction of Stormwater quality BMPs with guidance on the suitability of each for NCDOT applications. ii. Evaluate BMPs for applicability to a linear highway system. b. Management Measures The NCDOT shall implement the following management measures to meet the objectives of the BMP Toolbox for Post -Construction Stormwater Program (PCSP). Vie; -Management Measures Measurable Goals (a) Maintain a BMP Maintain a stormwater BMP Toolbox to provide design guidance Toolbox. for post -construction stormwater control measures. The BMP Toolbox will include appropriate uses/anticipated applications and design criteria. Proprietary BMPs will be evaluated in keeping with DEMLR requirements for permitting new stormwater technologies. (b) Update the toolbox as As necessary, evaluate new BMP types or design components for necessary potential updates to the BMP Toolbox. If applicable to NCDOT applications, the BMP Toolbox will be updated to include this new information. (c) Submit proposed New guidance on proposed BMPs will be submitted for DEMLR BMP Toolbox approval prior to implementation. revisions to DEMLR for approval. 3 Post -Construction Stormwater Guidance NORTH CAROLINA DEPARTMENT OF TRANSPORTATION GUIDELINES FOR DRAINAGE STUDIES AND HYDRAULIC DESIGN DAVID S. CHANG, PhD., P.H. STATF HYDRAUR.TCS TNGE4FER NGVEhiR 21, 2016 H Istormwater Management Plan NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICES TOOLBOX Uepo�mwnt ITranspvratwn lhr iw Z Apni 2014 T Where Find the BMP Toolbox Connect NCDOT connect.ncdot.gov ------------- Imo( r https://connect.ncdot.gov/resources/hydro/Pages/HSPProgramPages.aspx?PGM=BMPT Or Google NCDOT BMP Toolbox Toolbox Chapters • Chapter 1 —Introduction • Chapter 2 — NCDOT Stormwater BMPs • Chapter 3 - Level Spreader • Chapter — Preformed Scour Hole • Chapter 5 — Dry Detention Basin • Chapter - Swale • Chapter 7 - Forebay • Chapter 8 - Hazardous Spill Basin • Chapter 9 — Bridge BMPs • Chapter 10 — Infiltration Basin • Chapter 11 — Media Filters • Chapter 12 — Wet Detention Basin • Chapter 13 — Stormwater Wetland • Chapter 14 — Filter Strip • Appendices 6 Potential Toolbox Chapters • Permeable Pavement • Bio-Embankment • Bio-Filtration Conveyance • Bio-Swale • Living Shoreline • Open Graded Friction Course • Soil Amendments • Disconnected Impervious Surface Documentation Stormwater BMP Toolbox NoRm CAROLINA DEPARTMENT OF TRANSPORTATION STORWNATFR BEST MANAGE MFNT PRACTICES TDOLBOx 51 1 � Nffi Caepkr 4 -. f bepdireKrx d hainpgninom Stormwater Management Plan I li+I I+ rsonn G msna OePanment of i rsmPana em tinii i>»+, ni r XgTway 5lermwa[er Program STORM VAT ERMANAGENENTPLAN ww wa mu) TF NO: a General Prpect ItlPrmasm Y 5Elem L TIPN—Wl, P -T Cam: Wp TC.b Centraclml trsi R rAddless: AMmss: Plare Plrere Emai: Final: R�ere �rs Rirer Rasi s GMA Ca YAetland'wiMn Pre 1LmW P trsc ■ Prdecl fin mies atek', SvmuNnP Land Ose'. Pr osetl Pr "M Euti Siro M 'aU Bui[L Ales ac. -_ TYo� Croft Secdon Dexrotiro� Anrw I Avg My F. ft(.M#da): Cks rvF�vre. - Exrst Yeas Pi-General X... ption d Yidmitairm d Wmr ern Try ImP�I Smla>Waer S_ p6 H W DVIR NCWR Stream htlea Ne- NCDWR SudauWaror Classificationrorw. e.* PAma Classifiutgrc Sip km Mal dassificamrt Ourr Strewn CcssYraemr H aimerts: A �mIi TBE a CC(mITY', TR Stream lR 9srtw Wsesln ESRd Preset HWdes 6rdGeSundnPWMEbdv? trri Orafns dsdmroe 6nr RuNefP D'esipYu Pads PrwtlMin RrHeYt trek Orans Disahar O.xr Water (eYeA povtleNFdwaro mono l5pspal letl Nawara!) PIYee, desn�e n sAe cSera•al ProisG rtanatree, irro./Anssnue GeneraiProject Namafw) rositle nfPauen erne Ga�vN -ep Ngraase Considerations • More web -based — Chapter by Chapter downloads T;NORTH ban I C-LNA ■ - ?Em -.1 Q¢—ilty Stormwater Design Manual oa,gn rwamal Rcwnlauaeun meulnlmurn oa,gi emena �Mx) ua[aremerim it , Prugamwll pelb]Malry �yrt-'Rue Alanu p � g �m ig awmxalaiula,. Forms ro- - _jaa�miA) 5[M [retlitina ,11/IR016J: lM16utamenl Ik,s i 9,Y1 a�16 R9 ne ndlud!conpa�nax wregulaeeammulK.nSapertmm L9wrer ._O5 Sbmmral� an0 lonpoi llSw y=Nnn'Fg pyml�c. Stonnw U, Design Manual Table of Contents _n Part C: Minimum Design Criteria and Recommendations for Stormwater Control Measures G0. MDC for all SCMs _ (1/312017) C-1. Infiltration System_ (61312019) G2. Bioretention Cell_ (111912018) C-3. Wet Pond_ (711812019) 0 Other Tools / Resources Field Guide For Post -Construction Stormwater BMPs https://connect.ncdot.gov/resources/hydro/Pages/HSPProductPages.aspx?PROD=FGPCS 7>rr. W, f;.,,ubmr ❑eoa,rrm r of Thonwmdafrun FIEL❑ GUIDE FOR POST -CONSTRUCTION STORMWATER BEST MANAGEMENT r[rrly 70rb EDMON SECTf . , WET DETENTION BASIN A Wet Detention Basin is a basin or pond that is designed to maintain a permanent pod of water. reduce stormwater runoff, promote sedimentation of dill and debris, and reduce velocity of flow downstream. Wet Detention Basins are generally comprised of. ✓ Foreraay, - Dissipates energy and captures sediment from inflow See Section 6. J Basin - Impoundment area for storage or runoff. ✓ Vegetated Shelf - Perimeter of the basin planted with wetland vegetation. Outlet Control Structure - Concrete box with drawdown device and trash rack Drowdown Device - Set at the permanent pool elevation for controlled release of now. Embankment - Earthen berm used to form basin. ✓ Emergency Spillway - Releases large storm events to prevent embankment overtopping and erosion. WtI DIE: I t N I IUN ran SIN L, 7msh rock stwtQ open ft-dy mO Wf w9efference ham aaael MAW Stnretum ayptwKroems AN cmredr to the cr.Qrel s&bicfwe bor below the fxxmvl peof elevafro mrrs! be Wirer" NCDOT Questions way tormwat PROGRAM 3rw' n'""aniC0".1