Agenda
• Permit Requirements
• Program Accomplishments
• Considerations for the Future
2
Program Objectives
• Continue to control development activities disturbing one or more acres of
land surface including activities by NCDOT contractors.
• Require construction site operators to implement appropriate erosion and
sediment control (ESC) practices.
• Require site inspection and enforcement of control measures.
• Establish requirements for construction site operators to control waste that
may cause adverse impacts to water quality such as discarded building
materials, concrete truck washout, chemicals, litter, and sanitary waste at
the construction site.
• Continue to implement ESC measures and reclamation plans on all borrow
pit and waste site projects, including activities at Ferry Terminals associated
with dredging activities and contractor owned or leased borrow pits
associated with NCDOT projects in keeping with the ESC program
delegated by North Carolina Sedimentation Control Commission.
3
Permit Requirements
..
Maintain theme
Implementation of NCDEQ DEMLR ESC Program delegated to NCDOT by
delegation agreement
Sedimentation Control Commission (SCC) in February, 1991... for NCDOT
with NCDEQ DEMLR
construction projects and implementation of the applicable requirements of
ESC Program on an
General Permit NCG010000 effectively meets the objectives above by
annual basis.
permitting and controlling development activities disturbing one or more
acres of land surface and those activities less than one acre that are part of a
larger common plan of development. This program is authorized under the
Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of NCAC.
This program includes procedures for public input, sanctions to ensure
compliance, requirements for construction site operators to implement
appropriate E&SC practices, review of site plans which incorporates
consideration of potential water quality impacts, and procedures for site
inspection and enforcement of control measures. This program has been
delegated to and implemented by NCDOT.
Maintain compliance
NCDOT shall incorporate the applicable requirements of NCG010000... into
with the applicable
its delegated ESC Program, pursuant to "NCDOT Applicable Requirements
requirements of the
from NPDES General Permit No. NCG010000 for Construction Activities and
General Permit
Guidance for Complying with Those Applicable Requirements" in the
NCG010000.
memorandum dated June 9, 2014 or as updated.
Permit Requirements
Implement ESC measures on NCDOT shall implement ESC measures on all non-commercial
all non-commercial borrow
pits/waste sites.
Implement approved
reclamation plans on all non-
commercial borrow pits/waste
sites.
borrow pit and waste site projects. The measures utilized shall be in
keeping with the ESC program established by the North Carolina
Sedimentation Control Commission.
NCDOT shall implement the approved reclamation plan on all non-
commercial borrow pit/waste site projects. The reclamation
measures utilized shall be in keeping with the reclamation program
established by the North Carolina Mining and Energy Commission.
Borrow Pit Discharge NCDOT in coordination with DEMLR will implement the Borrow Pit
Management Program Discharge Management Program. This process will consist of the
following tasks:
• Implement appropriate management measures to treat borrow
pit wastewater for given conditions.
• Implement an inspection and maintenance program.
• Maintain training material and instruct field personnel overseeing
borrow pit operations.
• Evaluate and implement appropriate new/innovative
technologies.
Construction Program Overview
• NCDOT's Construction Program controls
potential impacts to water quality from land
disturbance at construction sites and from
borrow pit and waste site activities.
• NCDOT implements the ESC Program,
which incorporates NCGO10000
requirements on construction projects.
6
Delegation Agreement
• Allows NCDOT to review and approve ESC plans
based on compliance with SPCA, water quality
regulations, and permit conditions for each project.
• Authorizes NCDOT to perform inspections for land
disturbing activities associated with Highway
construction.
• Did not grant enforcement authority, so policies
and procedures were developed to correct
compliance issues with NCDOT construction
projects.
Delegation Annual Review
Annual Reviews are
presented at the
Sedimentation
Control Commission
Meeting each year
Daily Project Inspection
• Project personnel inspects and monitors the construction
of a project daily and records daily activities and rainfall
amounts.
• Responsible for NCG01 record keeping.
• If a compliance issue develops, project personnel in
conjunction with the contractor will address the issue and
corrective actions are made.
• If the corrections are deemed severe by the project
engineer, then operations on the project are suspended
until the compliance issue is rectified.
9
Monthly Project Inspections
• There are 7 REU
Field Operations offices,
each covering 2
of the 14
highway divisions
in the State. Each office
has at least two
engineers
per office.
• REU Field Operations staff performs monthly site reviews on all DOT
land disturbing projects to determine if the ESC plans and permits are
implemented accordingly, and that the necessary maintenance is
occurring.
• NCG01 documentation is reviewed and any deficiencies are identified.
• Each project is evaluated on a scale of 1-10 for installation of
measures, maintenance of measures, effectiveness of measures, plan
implementation and overall project evaluation.
• If the site review identifies a situation that is not being corrected, then
an Immediate Corrective Action (ICA) notice can be issued. An overall
score of 6 or less results in the issuance of an ICA report.
10
Immediate Corrective Action
• Issued when project is
out of compliance with
SPCA/NCG01
• ICA alerts NCDOT
Management of an
issue that needs
immediate attention.
• Establishes corrective
action timeframe
• Notifies DEMLR and/or
DW R of project status
North Carolina Department of Transportation
Roadside Environmental Unit
Erosion & Sedimentation ! Stormwater Report
!CA
Immediate Corrective Action
This project does not comply with the North Carolina Erosion and Sedimentation Con Voi laws. In mediale Gorr Vve Action is needed
to resolve the situation to tuff compliance with the Law: JIM: 04B. 0000).
Project Information
Inspection Date: 0810212016
Evaluator:
Phil Suggs
Project #: 34839.3.GVS4
TIP #:
U-2579B
Division #: 9
County:
Forsyth
Project Type: Contract
Engineer:
Winston Salem Res. (Cragmore)
Project Length: 4.00
Disturbed Acres:
100
River Basin: Yadkin
HQW Zone:
Na Trout Zone: NO
Location Winston Salem
Northern Beltway Eastern section US 158 to Bus 421 and 140
Description:
Project Evaluation
Report Type: ❑Routine
✓❑ICA ❑ICAExlst
❑ICAEx2nd ❑CICA-SWD
❑PCN
❑ECPAR
Installation Maintenance
Effectiveness Plan Overall Project
Length Section
of BMIPs of BMPs
of BMPs Implementation Evaluation
0.1 Sile10 and 2,
6 6
6 6 6
approaching slopes
3.9 Remainder of Project
8 8
a a 8
Grading S-f, 0 - 8 = Immediate C—dive Action Pi qurred, 7 = Fair, 8 =
Good, 9 = VrJy Good, 10 = E—Nenf
11
ICA Terms
• ICA Ex = Immediate Corrective Action
Extension
• Continuing ICA
• CICA-SWO = Continuing ICA Suspension
of Work Operations
• PCN = Permit Consultation Needed
• ECPAR = Erosion Control Plan Audit
Request
Field Operations Site Reviews
July 1, 2018—June 30, 2019
Project Types
Contract Construction Projects
Maintenance Projects
Vertical Construction Projects
Bridge Maintenance Projects
Resurfacing Projects
Site Reviews
47763
194
27
844
AN
13
Reclamation Process
• NCDOT operates under its exemption
from the Mining Act for borrow sites
provided all materials are used "in
connection with the construction, repair,
and maintenance" of our road system.
• Reclamation sites follow all requirements
for ESC and fall under NCDOT's
delegated program based on the Mining
Act and SPCA
14
Reclamation Process
• NCDOT requires reclamation plans for all
waste/borrow sites that exceed project limits
regardless of size
• Environmental Evaluations are conducted on all sites
before approved for use to confirm that sites do not
impact any jurisdictional areas or federally protected
species.
• An EC plan is designed and implemented at each site
• Final inspections are conducted on all waste/borrow
sites or prior to project completion if property owners
elect to take responsibility of the site.
15
Reclamation Process
• Reclamation sites that require dewatering
operations will require an evaluation to
determine setbacks to minimize the risk of
impacts to adjacent jurisdictional areas.
• Effluent from dewatering operations will be
monitored and the appropriate
management procedures will be used to
make sure NCDOT is in compliance with
the applicable regulations.
16
Training
• NCDOT ESC/Stormwater Certification
Program conducted through NCSU's BAE
and Soil Science Department
• NCDOT REU Field Operations staff
performs specialized training sessions for
DOT/contractors/consultants as needed.
9 Field Ops conducts on site calibrations
with regulatory agencies to ensure
consistency
17
NCDOT ESC/Stormwater
Certification Prog.ram
• NCSU's Biological & Agricultural Engineering and Soil Science Departments
have partnered with NCDOT to offer ESC/Stormwater Certification Program
to ensure personnel are trained to comply with ESC/stormwater provisions
on NCDOT projects.
• NCDOT requires all contractors and NCDOT personnel to have a certified
Level II supervisor and foreman to oversee operations on NCDOT projects.
• Certification must be renewed every three years.
• Must be Level II certified to perform NCG01 site inspections and record
keeping
Certification Levels
Level Description # Persons Currently
Certified
ESC/SW Inspector/Installer 1183
II ESC/SW Site Management 5102
III Designers of ESC Plans 868
New Technology
• Researching UAV
technologies for site
inspections and monitoring.
REU has purchased its own
UAV.
• Research and field trials are
beneficial with evaluating
new technologies and
determining how well it
performs under real world
conditions.
ncdot-gov
Program Accomplishments
AWLWAW� MrAft
AN
SHOW
.4
.. w
Research Projects
Research projects performed by Dr. Richard A. McLaughlin at NCSU as
part of NCDOT's Construction Program:
Recently Completed Projects
• Performance Standards for Straw Mulch Binding Agents
• Evaluation of Flocculants: Optimizing Characteristics and Screening
Methods
• Comparing Low -Cost Methods to Stabilize Temporary Diversions and
Ditches
• Erosion, Sediment, and Turbidity Control and Monitoring Research to
Meet Water Quality Goals
Active Projects
• Reducing the Environmental Impact of Road Construction
• Improved Approaches to Environmental Compliance during Highway
Construction
21
Performance Standards for Straw Mulch
Binding Agents
• Determine viable straw tackifier
options to replace emulsied
asphalt
• Tackifiers were tested using a
wind tunnel
• Results concluded that there
are several options that can
withstand steady winds while
not prohibiting vegetation
germination
22
Evaluation of Flocculants
• Collected 22 different soil
samples from across the state
• Evaluated effectiveness of
current flocculants available
• PAM performance is strongly
dependent on the soil type
• Even with PAM, fine particles
can be difficult to flocculate
23
Comparing Low Cost Methods to Stabilize
Temporary Diversions and Ditches
• Field lab tested and project
tested several different liners
and mattings in ditches
• Liners greatly reduced erosion
in areas of concentrated flow
r
_Y 8
24
Erosion,
Sediment
and Turbidity Control
and
Monitoring
Research
to
Meet
Water Quality
Goals
• Tested four different surface
skimmer devices
• Constructed a rainfall simulator
for erosion testing _
• Two flocculant dosers were
constructed and tested
• PAM toxicity testing on =
freshwater mussels
Considerations for the Future
• NCDOT will continue to maintain
the ESC Program's existing policies
and procedures for inspections,
reclamation process, training, and
research
• NCDOT will continue to develop
new ESC BMP details as needed to
address unique needs.
• NCDOT continues to evaluate the
program's internal processes to
identify any new opportunities for
improvement.
26
Ongoing Accomplishments
• New product inventory
database
• Update the Level III
Certification
• Update the NCDOT Best
Management Practices
for Construction and
Maintenance Activities
Manual
BEST MANAGEMENT PRACTICES
FOR
CONSTRUCTION
AND
MAINTENANCE
ACTIVITIES
NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION
August2003
27
ncdvt.gvv
DVP.YVIF.
61IM11r1[!11[0
F
r-
Construction Program Summary
• L A
ncdvt.gvv
Construction Program Summary
0