MX TRANSMISSTON COVER SHEET
Dater
Tor Division of Water Cis{ fig
Fax: 6plyj - Z58-5J30.1 91
Rot PCNawficadon
r-
Senderr ?,.
YOU SHOULD RECEIVE 3o PAGE(,S), INCt L
DO NOT'RECEIVE ALL THh PAGES,
Remarks; Division Water a ' US Fish a
a ached PCN for tcvicw and comment concerning
SHPU: We are forwarding the attachad
!Action of o O 0
001258
THIS COVER 'WEET. IF YOU
W CALL (828) 271.4854
Uq_I h1'K,&-Z'
US ARMY CORPS/ENGRS ID:18282714858
LAWGI
c-IR oz
July 26, 2000
Mr. Steve Chapin
U,S. Army Corps of Engineers
Regulatory Branch
151 Patton Avenue, Room 143
Asheville, North Carolina 28801-5006
SEP 20'00
B?
n
Subject: Nationwide Permit No. 12 Pre-Construction Notification
Charlotte-Mecklenburg Utilities
Long Creek Parallel Sewer Outfall
CMTJ Project Nos.: Phase 1 212-90-730; Phase 11 373-91-685
Mecklenburg County, NC
LAW Project 30100-8-3661
Dear Mr. Chapin:
9:43 No.002 P.02
On behalf of Charlottc-Mecklenburg Utilities (CMU), ant in cooperation with Woolpert, L'I"P.
(WOOLPERT) enclosed pleaso find a completed Joint 1 mn with accompanying figures for a
Nationwide Permit (NWP) No. 12 in the above-referenced atter (Attachment A). The approximate
7.8-mile Long Creek Parallel Sewer Outfall project, located in northwest Mecklenburg County, was
originally permitted under NWP No. 12 by the U.S. Army rps of Engineers (USACE) on May 27,
1997 (Action 1D No. 199702392) (Attachment R). However, since the issuance of this permit, NWP
No. 12 has been reautbori7ed and modifications to the s wer alignment have boon made. An
approximate 1,000 linear-foot horizontal realignment is pla
While this rualignment will result in no additional impacts
stream crossings will be necessary. The proposed utility fir
clearing in a forested wetland for a portion of the utility right
including the Joint twin and accompanying figures, are #
construction notification requirement of NWP No. 12.
LAW Engineering surd Environmcnta
2001 Yorkmonl Road, Sulto 100 • Chart
Servinq the Uharlalle mroa for over
704.357-Afi00 - Fax: 704.3!)7
4 for one area of the project corridor.
wetlands, two additional unavoidable
activities will require mechanized land
)f--way (R/W). The enclosed materials,
itted in compliance with the pre-
arviees, Inc.
, Nr. 28200
you rf
US ARMY CORPS/ENGRS ID:18282714858
LAW
ENGINEERING ANb ENVIRONMENTAL SERVICES
LAW ENGWEIE;RING AND ENVIRONMENTAL SERVICTS, I: c..
2801 Yor)unont Road, Suite 100 Date: July 26.20(X)
Charlotte NC, 28208 Proicct Name: lal l
(704) 357-86(x) FAX (704) 357.1622 Attention: Mr. Steve
Rc-. Nationwide Perini i
TO; Mr. Steve Chapin
U.S. Army Corps of Rngineers
Regulatory Branch
151 Patton Avenue, Rm. 143
Asheville, NC 28801-5006
LE7TER ON 7RANSMIIITAL
WE ARE SENDING YOU -2?,_Attacllod _ -Under sepal•ate cover via the following items:
11rintS 11131u samples SpcCificaliions
Copy of letter i Chogc order other
1F F.NCLOSURFM ARE NnT AS NnTRh Ktnnvr.v'ntnT1RV tte s•r r?wrnr
COPIES I DATE I NO.
SEP 20'00 9:44 No.002 P.03
Project No.: 301(X)-8-3661
AU G 0 1 2000
PTION
1 7/26/00 1 ( NWP No. 12 Application
t)r TRAMMITTE 7 as checksd hclowc
copios for approval
copies for disllYjbu6on
corrected prints
-1L-For approval .- Approved as suh?niued _
_ For your qgR ` Approval as nntcd _
_ Av revue?YCd - Rehtrned for wrrmions _
For review and comn?errt
R)rMARKS:
RESPECTFULLY SUBMME-D,
s
LAW ENGINEE)UNG AND ENVIRONMENTAL STRVICES, INC. Z?L?
Micha .lagnoeco
Senior Environmental Sciettat L. J 5 With Permission
Copy To File
Allen W. Conger, P *.S.
Principal
Envir tncntal' intlsl.
`tly With Permission
US ARMY CORPS/ENGRS ID:18282714858
NW1' No.12 PCN- 4ong Creek Parallel Sewer tluljall
LAW Project 30100-8-3661
Background
SEP 20'00 9:44 No.002 P.04
J91y 16,1000
i
The Long Creek Parallel Sewer Outtall will extend approximately 7.8 miles (41,220 linear feet) and
roughly parallels i,ong Creek from the existing pump station, located approximately 1,000 feet east
of the confluence of Long Crcck and the Catawba River, i''•,cast to Oakdale Itoad. Phase II of the
project extends from the existing pump station to Gum B arch and Phase I from Cum Branch to
just above Oakdale Road. The proiect vicinity and loc ion of the Long Creek Parallel Sewer
Outfall project are presented on Figures 1 and 2 (Attachment C), respectively. The proposed
improvements ofthis project include upsizing the existing outfall with a parallel outfall, The existing
outfall is comprised of approximately 17,830 linear feet ?lf) of 15-inch pipe and approximately
23,390 if of 21-inch pipe. The proposed outfall consists o` an estimated 6,540 if of 36-inch pipe,
28,860 If of 42-inch pipe, and 5,820 If of 48-inch pip. The northernmost terminus of the
approximate 1,000-foot horizontal realignment of 42-inch pipe is located approximately 650 feet
southwest of Mount Holly-Huntersville Road (NC: 27) (Fi I$urc 2 - Attachment Q. The proposed
sewer realignment accommodates changes requested by exi ing property owners along this portion
of the project corridor.
The project will require the acquisition of additional R/W, !paralleling the existing sewer R/W, in
order to accommodate the new outfall. Tltc existing sewer is situated within a 30-foot R/W.
P
Additional R/W, generally 15 feet in width, will be acqui d for the installation of the proposed
sewer. The outfall will be installed generally on the outer edge of the existing 30-foot R/W. A
temporary construction casement (TC:E) of approximately I feet wide and adjacent to the now or
existing R/W will be acquired to facilitate construction. '1'h proposed outfall within the new R/W
will closely parallel the existing sewer, being placed as close ' s possible to the existing sewer, within
15 feet center-to-center (12 to 13 feel edge-to-edge) wherev?r possible, and generally to the upland
side of the existing outfall. I
Portions of the Long Creek Parallel Sewer Outfall are locate within the boundary of Duke Power's
Lake Wylie. The portion of the proposed outfall that lies low the 570 foot elevation, extends
upstream from the existing Long Greek Pump Station aloe , the existing It/W for a distance of
1,425.19 If. Approximately 732 if of the project occur on
Anyone wishing to perform an activity that crosses or is
y actually owned by Duke Energy,
within the project boundary of any,
2
US ARMY CORPS/ENGRS ID:18282714858
NWPN0.12 PCN- Long Creek POralld Sewer Uuljall
L,! W ProJec13 0100-4.9661
Duke Power's reservoirs must obtain a signed
from Duke Power's Lake Management office and an
Federal Energy Regulatory Commission prior to beginning
with CWJ, is completing a Conveyance Application and w
concurrently with this PCN. Installation of the portion of t.h
falls within Duke Power's jurisdiction will not be perform
approved by Duke Power's Lake Management office.
Proposed Jurisdictional Impacts
need to closely parallel the existing outfall. in aeeo
this sewer will not alter pre-construction contours.
SEP 20'00 9:45 No.002 F'.05
July 26, 2000
conveying the required property rights
er approving the conveyance from the
any constriction. LAW, in cooperation
Il submit this document to Duke Power
Long Creek Parallel Sewer Out.fall that
3 until this Conveyance Application is
The proposed 1 l stream crossing locations associated withithe Long Creek Parallel Sewer Outfall,
including the two proposed realignment crossings, are depicted on Figures 3A, 3B, and 3C
(Attachment C). A typical plan view and profile of a pmje t stream crossing is depicted in Figures
4A and 413, respectively (Attachment Q. With the exception of the two stream crossings
necessitated by the 1,000-foot realignment, these stream ?rossings are dictated by the project's
backftlled with topsoil from the trench in wetlands areas,
will be stabilized immediately upon completion of the utili
utility line at each of these crossings will be completely
minimum of one foot below the bottom cif the chann
with NWP No. 12, the installation of
top 6" to 12" of the trench will be
?ny exposed slopes and stream banks
line crossing of each waterbody. The
ied, with all crossings occurring at. a
At each of these crossings, bank
stabilization measures will result. in minor riprap p)acers- ;,, the stream channel below ordinary
high water, corresponding to the permnnent R/W width. Itiprap placement at the two additional
stream crossings will result in approximately 0.06 acre of t11 being placed in these waters of the
LJ.S. This impact area was calculated utilizing a co struction corridor width of 40 feet
(maximum). All stream crossings have been designed to be as close to perpendicular to the stream
as possible, and still provide unencumbered sanitary flows. Existing channel alignments will not
be impacted by the project. The existing outfall R/W has been severely eroded in a number of
locations by Long Creek floodwaters. These eroded areas 'ill be backftlled and stabilvcd as part
of the new outfall construction. The Nationwide Pentit previously issued in this matter
authorized temporary impacts to 4.76 acrd of wetlands. 11e majority of wetland impacts will
Occur within existing, maintained K/W, consequently, perm nent impacts to wetland areas arc not
3
US ARMY CORPS/ENGRS ID:18282714858 f SEP 20'00 9:45 No.002 P.06
NWP Na!? PCN- Long Creek PanWd Sewer pyjal/ I July 26, 2000
LAW bvfed 30100-&3661
I
anticipated. The total impacts associated with the Long ;reek Parallel Sewer Oulfall, including
the 1,000-foot realignment, are 4.82 acres of waters of the I? J.S., including 0.33 acre and 4.49 acres
of stream and wetlands, respectively. I?
I
Regulatory Implications
The project design complies with the conditions of the Section 401 General Certification (GC) for
projects eligible for NWP No. 12, effective June 1, 2000. ritton concurrence from the Division of
Water Quality is not required. In accordance to with this Cif;, the edge of the construction corridor
shall not be installed parallel to and closer than 10 feet (3 peters) to a stream, except at crossings.
Utility lines shall not cross a stream channel at other th n a near-porpendieular direction (i.e.,
stream channel crossings shall not be at an angle of less th n 75 degrees or more than 105 degrees
to the stream bank). No-seam piping will be installed wit in the footprint of a stream channel or
within two feet of the stream batiks. Measures shall be ken to prevent livo or flesh concrete
from coming into contact with waters of the L).S. until be 2 ken
has hardened. Placement of
riprap will be restricted to the stream bottom and banks dittotly impacted by the placement of the
utility line (i.e., below the normal high water level). Th stream berm must be restored to the
original contour after construction. Placement of riprap o other materials shall not result in dc.
stabilization of the stream bed or banks upstream of downstream of the crossing.
Appropriate sediment and erosion control practices which equal or exceed those outlined in the
most recent version of the "North Carolina Sediment and Erosion Control Planning and Design
Manual" or the "North Carolina Surface Mining Manual" hichever is more appropriate shall be
in full compliance with all specifications governing the pr per design, installation and operation
and maintenance of such Best Management Practices in (order to assure compliance with the
appropriate turbidity water quality standard. All sediment Ind erosion control treasures placed in
wetlands or waters shall be removed and the natural grad restored within two months after the
Division of Land Resources has released the project. An ual species suitable for wet locations
shall be planted and established within jurisdictional wetlands for soil and erosion control.
Perennials such as fescue will not he planted. Fertilizer 1vI11 not be applied within 10 feet (3
meters) of streams. The construction corridor (includi? g access roads and stockpiling of
materials) will be limited to 40 feet (12.2 meters) in width i4 wetlands and across stream channels
and will be minimized to the maximum extent practicable.
4
US ARMY CORPS/ENGRS ID:18282714858
SEP 20'00 9:46 No.002 P.07
NWPNv.12 PC/V - Long Owk Par0d Sewer Oatfall f Jay 26, 2000
L!W Protect 90100•d-9661
Permanent, maintained access corridors in jurisdictional areas will be restricted to the minimum
width practicable and will not exceed 10 feet (3 mctcrs) i width except at manhole locations. A
10 feet (3 meters) by 10 feet (3 meters) perpendicular vehicle turnaround will be spaced at least
500 feet (152.4 meters) apart, An anti-seep collar shall b placed at the downstream (utility line
gradient) wetland boundary and every ISO feet (45.7 metet') up the gradient until the utility exits
the wetiand for buried utility lines. Permanent changes in I pre-construction elevation contours in
waters or wetlands or stream dimension, pattern or proftl will not be permitted and any excess
material will be removed to a high ground disposal area. Pri-construction wetland contours will be
restored in accordance with CMU's construction documents.
I
Possible sedimentation of the stream during and immediati'ly following the construction phase of
this project will be minimized by strict implementation of State-approved sediment and erosion
control plan. This plan will employ a network of sedimonl traps, check dams, and silt fencing to
control the export of sediment from the project site to atii...?.it undisturbed areas. All erosion and
sediment control devices will be inspected for compliance with the construction contract
documents during and after construction, as well as foliong any major storm event, to identify
any needed repair, maintenance, or redesign. Activities o the subject site involving impacts to
waters of the U.S. will be required to follow the General onditions of the Nationwide Permits
(Federal Register, Vol. 65, No. 47; March 9, 2000) a d State Consistency Conditions, as
applicable. All nationwide and regional Conditions for NW No. 12 will be met by CMU's design
and adhered to by CMU's contractors.
Please be advised that the Long Creek Parallel Sewer qutfall project is subject to the State
Environmental Policy Act (SEPA) as a major activity under the NCDENR's Departmental Rules for
implementation of the Act (T15A:O] C.0504). An Environmental Assessment (EA) was completed
by WOOLPERT in August 1991 and circulated pursuant o the requirements of the Act (State
Clearinghouse # 92-E4300-0201). The SEPA process con luded with the NCDENR Division of
Environmental Management's (DTM's) issuance of a Find' a of No Significant Impact (FONSI)
dated October 31, 1991 (Attachment D). In a letter dated Ma 9"000, the Division of Water Quality
stated that the proposed approximate 1,000 linear-foot hor ontal realignment of the Long Creek
Parallel Sewer Outfall project will not require a revised EA additional SEPA review (Attachment
E). An archaeological survey of the project area was comp eted in July 1992 by Coastal Carolina
j 5
L
US ARMY CORPS/ENGRS ID:18282714858 i SEP 20'00 9:46 No.002 P.08
I
NWP No, 12 PCN - Long ctiwk ParMid Sewer Ou yall I July 26, 2000
L4W Project 301004.3661 1
Research, Inc. (CCR) of Tarboro, North Carolina, under thoisupervision of Loretta Lautzenheiser. A
I
COPY of the subsequent correspondence from the State Histpric Preservation Officer (SHPO), dated
August 25, 1992 is attached (Attachment F).
The project, as currently designed by WOOLPERT, will rc ult in unavoidable temporary impacts to
4.82 acres of water of the U.S., including approximately .33 acre and 4.49 acres of stream and
wetlands, respectively. It is our understanding that this pro cot qualifies for Nationwide Permit No.
12. On behalf of CMU, we are hereby requesting written ?pproval from the USACE Wilmington
District to proceed with the above-described activities.
Thank you for your attention to this inatter. Please don't hesitate to call Mike Ingnoeco at (704) 357-
8600, extension 5543, if you have any questions. i
Sincerely,
L?;,IIOINEE
G
AND ENVIRONMENTAL SERVIC 'S, INC.
Lisa J, Bee Michael A. Iagnocco
Project Environmental Scientist , Senior Environmental Scientist
: W. 6VA
Allen W. Conger, P.W.S.
Principal
Environmental Scientist
LJB/MAllAWCajb P VYIM PWOMMON
CC. Dennis Gwaltney, P.E., CMU
Ron Geiger, P.E., WOOLPRRT
Attachment A - Joint Form i
Attachment D - NWP No. 12 - dated May 27, 1997
Attachment C - Figures
Attachment D - FONSI, dated October 31, 1991
Attachment C - DWQ Correspondence, dated May 9, 2000
Attachment F - SHPO Correspondence, dated August 25, l y
6
S WN FWMN "
US ARMY CORPS/ENGRS ID:18282(14858
5EF 2u'uu y:4( NO.uuz r.uy
001258
DEM ID: CORPS ACTION ID:
NATIONWIDE. PERMIT REQUESTED ()ROVIDF. NATIO? WIDE PERMI
PRE-CONSTRUCTION NOTIFICATION APPLICATION
I'OR NATIONWIDE P[sRMI'I'S 'I'IaAT REQIIIRTs: ALIG d 1 2000
1) NOTIFICA11ON TO THE CORPS t .?, ENGINEERS PES
,r? WwGa-RA
2) AI l LICATION) OR SECTION A01 .I RI'll'IC ATiO
3) COORDINATION WIT11 THE N.C. 1VISION OF COASTAL MANAGEMENT"
SEND THE ORIGINAL AND (1) COPY Or THIS COMPI,F? D FORM TO'T'HE APPROPRIATi? FIELD
OFFICE OF 1'HE CORPS OF ENGINEERS (SET! AGENCY"" DDRESSES SHRE'1). SEVEN (7) COPTRS
SHOULD RE SENT TO THE N.C. DIVISION OF WATER VUALITY (SEE AGENCY ADDRESSES
SHEET), PLEASE PRINT, 1
1. OWNERS NAME: City of Charlotte, Charlotte-Meckj nburg Utilities
MAILING ADDRESS: 5IOU Brookshire Ugulevard I
SUBDIVISION NAME:
CITY: Sharlotte STATE: NC 7.11 CODE: 2,8216
PROJECT LOCATION ADDRESS, INCLUDING SlDIVISION NAME (1F DIFFERENT FROM
MAILING ADDRESS ABOVE): The approximate 7.,8-mile sewer proicctrou 1 Parallels Lon¢
POC:Mr. Dennis Gwaltney
3. TELEPHONE NUMBER (I IOM E): N/A (W RK): (704)391 -508Q
4. IF APPLICABLE: AGENT'S NAME OR "SPONSI LE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER: LAW Enuineerina and F:nvironm ntal Services. Inc.
POC: Mr._Michael; A, lagoocco. Senior Environmental Scientist
4a. TFT EPHONE NUMBER (WORK): (704) 357-860043 (FAX): (704) 357-1622
5. LOCATION OF WORK (PROVIDE A MAI', REFERABLY A COPY OF USGS
TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): (See Figures I and 2 -
Attachment C)
COUNTY: Mcchlellburp- NEARES'1+? TOWN OR CITY: Mount Holly
US ARMY CORPS/ENGRS ID:18282714858
6.
SEP 20'00 9:4( No.UU2 r.iu
I
SPECIFIC LOCATION (INCLUDE ROAD NUMB) I
7,8-mile Droieet routthiv parallels Long Crock from th
RS, LANDMARKS, ETC.): 211 approximate
t existing pump station, 12cated approximate)
1,000 cast of the conflucncc pf Long Crock and the_ ''
1.0 Q-foot resligun)ggj pion of the proiecj is localct tawba River, porthcast to Oakdale Road. 'j'oie
approximately 1,000 fm soutliwest!Rf Mount
Ill Road NC; 27). Ma'or roads that nt rs c ewer corridor de Bclmjg6
Road SR 1606). Mount H&Y-11untorsvillo a Bra k h' Rgulevard C 16 and Oakdalo d
(SR-2042), i
IMPACTED OR NEAREST STRRAM/RIVER: Lon Crcck
iu jam Dt%al . %.atawuu
7a. IS PROJECT LOCATED NEAR WATER CLASSIF16 AS TROUT, TIDAL SALTWATER (SA),
HIGH QUALI'T'Y WATERS (IIQW), OUTSTANDINi i RESOURCE WATERS (ORW), WATER
SUPPLY (WS-I OR WS-11)7 YES ? NO 0 IF Yr. l FXPI..AIN:
7b. IS THE, PROJECT LOCATED WITHIN A NORTH tCFRN ROLTNA DIVISION OF COASTAL
MANAGEMENT AREA OF ENVIRONMENTAL C (AEC:)? YES ?NO Z
7c. IF THE PROJECT IS LOCATED WITHIN A COAS' AL COUNTY (SET; PAGE 7 FOR LIST OF
COASTAL COUNTIES), WHAT' IS THE LAND 1]S PLAN (LUP) DESIGNATION?
N/A I
8a. HAVE ANY SECTION 404 PERMITS BEEN PRVNI ' USLY REQUESTED FOR USE ON TIIiS
PROPERTY? YI;S ®NO ?IF YES, PROVIDE A 'TION I.D. NUMBER OF PREVIOUS PFRMI'1'
AND ANY ADDITIONAL INFORMATION (INCLi )F: PHOTOCOPY OF 401 CERTIFICATION):
County. was originally pgmitted undcr NWP No. 12 bw the U.S. Army CgMs of Enaineera (USACE on
i
8b. ARr ADDI'r1ONAL PERMIT REQUES'T'S EXPEC?D FOR THIS PROPERTY IN THE FUTURE?
YES ?NO (R1F YES, DESC)UBE ANTICIPATE WORK:
2
US ARMY CORPS/ENGRS ID:18282714858
SEP 20'00 9:48 No.UU2 F'.11
9a. FSTIM.ATED TOTAL. NUMBER OF ACRES IN TMCT OF LAND: N/A Linear Sanitary Sewer
Pro'ec
91). ES'I1MATED TOTAL NUMBER OF ACRES OF W?TLANDS LOCATED ON PROJECT SITE:
N/A Linear Sanitary Sewer Proiect j
i
i
10a. NUMBER OF ACRES OF WETLANDS 1MPACTEO BY THE PROPOSED PROJECT BY:
FILLING: EXCAVA'11ON:
FLOODING: OT11ER:
DRAINAGE: TOTAL ACRES TOIIRE IMPACTED:
I Ob. (1) STREAM CHANNEL TO BE IMPACTED $Y TI IE PROPOSED PROJECT (IF
RELOCATED, PROVIDE DISTANCE BOTH BF vV AND AFTER RELOCATION:
i
LENGTH BEFORE.: LINEAR FT. AFTER: LINEAR FT.
WIDTH BEFORE (based on normal high watct cont?lit$): FT.
WIDTH AFTER: FT.
AVERAGE DEPTH BEFORE: FT. AFTER: FT.
(2) STREAM 'TS li. a RE, FROM: (CHECK ALT, THAT APPLY)
OPEN CHANNEL RELOCATION: [] f PLACEMENT OF PIPE IN Cl IANNEL:E]
CHANNEL EXCAVATION: M CO?4STRUCTION OF A DAM/FLOODING: ?
OTHER: 0.33 acre -, minor
sanitary sewer installation,
] ] . IF CONSTRUCTION OF A POND IS PROPOSED, THAT IS THE SIZE OF TI IE WATERSHED
DRAINING TO THE POND? N/A WHAT is THE EXPECTED POND SURFACE
12. DESCRIPTION OF PROPOSED WORK INCLU
EQUIPMENT TO BE USED (ATTACH PLANS:
G DISCUSSION OF'TYPE OF MECHANICAL,
'X I I" DRAWINGS ONLY):
used Rcm consUrj6ga activities.
US ARMY CORPS/ENGRS ID:18282714858 ' SEP 20'00 9:49 No.002 P.12
I
13.
14
STATE. REASONS WHY IT iS B ErL1EVED THAT 7'IIIS ACTIVITY MUST BE CARRTED OUT EN
WETLANDS. (INCLIJDE ANY ME=ASURES TAKNN TO MiN1MIZE WETLAND IMPACTS):
sMer R/W rdor to acoommodate iew ouffidl.jIm cxi§ting ewer is situat 3 -
Hf'niateftc nnnrl f., ..l..e..1....?...11..1 ?1,? ......?...... ,...rc n Ih•L.. t.__._n_.t__ --c.t-'- _-- -?, _. _ ?.
pie-2onstruction contours, The top " of the, eh will be b c fill with to2sgil from
the trench da Any uxpgaod slu es and stream banks will bo. stabiliod
ti Lion of the utility line o . ing of each w 'li line at
each of theat crossings will be i 1 blifled.
one foot bolovy-the o t nel. Ate .. dl s urring at a minimum of
li of these cr k stabMI
iZation
measures will rosult in, minor ripran placement in th -
nne ardin= h water,
a 1
PURPOSE OF PROPOSED WORK; gip. Long Creek Parallel Sewer Ou 11 will hole
Ewer. YRnin t *) rest center-to-center (17 10 13 test ed a-to-wise) wherever i sodble and ucnorallx
e upland side of the existing outfall,,
US ARMY CORPS/ENGRS ID:18282714858 SEP 20'00 9:49 No.002 F'.16
I
I
orrespondinst t nt R/ width. Rinr in 21w. mont at t} o additional stream
CrOSSIngs will t in a oximatel 0.06 arze of f 11 ibeing placed in these waters, of thp, -1),S.
jj)is ' t area was calculated utjjjz'n a constru ion corridor width of 40 fM (maxj iu?m)
All stream crossings v
.lI@ve,I}si
?Lpyd Ip he as clo#e in ye[pPndjctQ1 to ream as possible.
15. YOU ARE REQUIRED TO CONTACT THE U.S, F. H AND WILDLIFE SERVICE (USFWS)
AND/OR NATIONAL MARINE FI SI IERTFS SERV CT's (NMFS) (SEE AGENCY ADDRT?SSES
SHEET) REGARDING THE PRMSENCE OF ANY 1JDERALLY LISTED OR PROPOSED FOR
LISTING ENDANGERED OR TI IREATENED SPECIES OR CRITICAL HABITAT IN THE
PERMIT ARBA THAT MAY 13E AFFECTED BY THE PROPOSED PROJECT. DATE.
CONTACTED:
Contacted as part of the EA Scoping; FA complet in 1991 pursuant to SEPA.
16. YOU ART: REQUIRED TO CONTAC T TI IR STA-1- HISTORIC PRESERVATION OFFICER
(SIIPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC
PROPP.)VIIES IN THE PERMIT AREA WHICH M RE AFFECTED BY THE PROPOSED
PROJECT. DATE CONTACTED:
Contacted as part of the EA Scoping; EA complet I in 1991 pursuant to SEPA.
Archaeological survey performed in July 1992 by oastal Carolina Research (Attachment F),
17. DOES THE PROJECT INVOLVE AN EXPMNDITU E OF PUBLIC FUNDS OR THE USE OF
PUBLIC (STATE) LAND?
YES ® NO ? (IF NO, GO TO 1$)
a. IF YES, DOES THE PROJECT REQUIRE AEPARATION OF AN ENVIRONMENTAL
DOCUMENT PURSUANT TO THE RT?QUI 'MENTS OF TITP NORTH CAROLINA
ENVIRONMENTAL POLICY AC'17
YES NO ? Note*: EA com leled by Woolpert in August 1991 for the
original 7,8-mile alignment
5 I
L
occur within cxistinft, maintained W) y. permanent impgcts to wetland areas arc
aero_and 4.49 acres of stream and wetlands rgsnectiy(L
US ARMY CORPS/ENGRS ID:18282714858 I SEP 20'00 9:50 No.002 P.14
I
r
I
i
b. IF YES, HAS TI III DOCUMI?NT BE iN Rr?VIFWED THROUGH THE NOJVFH CAROLINA
DEPARTMENT OF ADMINISTRATION S T'ATE CLEARINGHOUSE7
YES ® NO (] Note*: Cott pletcd EA was circulated/reviewed through the
State Clearnghouse (#i91-0891). The NCEPA process
concluded ith DEM's Issuance of a Finding of No
SIgnificnnt Impact (FONSI) on Octobor 31,1991
(Attachme D), Inn letter dated May 9, 2000, the Division
of Water Q ality stated that the proposed approximate
1,000 linea toot horizontal realignment of the Long Creek
Parallel Se er Outfall project will not require a revised EA
or addition SFPA review (Attachment E).
IF ANSWER TO 17b 1S YPS, 'I'I-IEN SUHMIT APP' OPRIATE DOCUMENTATION FROM THE
STATE CLEARINGHOUSE TO DIVISION OF LNYIRONMENTAL MANAGEMF,NT
REGARDING COMPLIANCE WITH THE NORTH'CAROL.INA ENVIRONMENTAL POLICY
ACT. I
i
QUESTIONS REGARDING THE STATF. C:LEAR11401OUSE REVIEW PROCESS ST40ULD BE
DIRECTED TO MS. CHRYS BAGGE17, DIR.EC:'IC?R STATE CLEARINGHOUSE. NORTH
CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WESTJONES STREET, RALEIGH,
NORTH CAROLTNA 27603-8003, TEI P.PHONE (t19) 733-6369.
18. THE FOLLOWING ITEMS SITOULD BE INC:LUD ? D WITH TI ITS APPLICATION IF PROPOSED
ACTIVITY INVOLVES THE DISC14ARGE OF FX '.AVATI:D OR FILL MATERIAL INTO
WETLANDS:
a. WETLAND DELINEATION MAP SHOWING LL WETLANDS, STREAMS, LAKES AND
PONDS ON THE PROPERTY (T OR NATION DE I)L'RMIT NUMi3ERS 14, 18, 21, 26, 29
AND 38). ALL STREAMS (INTPRM1T-I'ENT NI) PERMANENT) ON THE PROPERTY
MUST BE SHOWN ON THE MAP. MAY' SCAT ES SHOULD BE 1 INCH EQUALS 5017EET
OR 1 INCII EQUALS 100 FEET OR THEIR Eq JIVALENT.
b. IF AVAILABLE, REPRESENTATIVE PHOTO RAPH OF WETLANDS TO BE IMPACTED
BY PROJPCT.
c. IF DELINEATION WAS PERFORMED BY A NSULTANT, INCLUDE ALL DATA SHEETS
MLEVANT TO THE, PLACEMENT OF THT: D 'LINi?ATION LTNF...
d. ATTACH A COPY OF THE STORM WA'T'ER ANAGEMENT PLAN IF REQUIRED.
o. WI TAT IS LAND USE OF SURROUNDING)' PERTY? Residontial/UndeycIpRed
f. IF APPLICABLE, WI IAT IS PROPOSED ME?TI OD OF SEWAGE DISPOSAL?
Conveyed n m Station an el t McAlpine Qmh WTP
8. SIGNED AND DA'Z'ED AGENTAUTI40RILAT N I.ET'I'ER, IF APPLICABLE.
G
US ARMY --ORPS/ENGRS tll la?a?r 140JV
NOTE: WETLANDS OR WATERS OF THE U.S. Y NOT RE IMPACTED PRIOR TO:
I) ISSUANCE OF A Sr CT10N 404 C RPS OF ENGINEERS PERMIT,
2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF
ENVIRONMENTAL MANAGEMENT (W ER QUALITY) CERTIFICA'11ON, AND
3) (IN THE TWF•.NTY COASTAL CO NTTFS ONLY), A LETTER FROM THE
NORTI I CAROLINA TIVISION OF COA cT' h ? MANAGEMENT STATING THE
PROPOSED ACTIVITY IS CONSISTENT *ITH TIIE NORTH CAROLINA COASTAL
A GE NT PROGRAM.
?'J? OG?O - I ? ,Z•!o ?
OWNER'S/AGENT'S SICKTURE D '1'E
vm wm?m
(AGENT'S SIGNATURE VALID ONLY
IF AVTHORIZATION LE'T'TER FROM
THE OWNER IS PROVIDED (180.)) ?
7
US ARMY CORPS/ENGRS ID : 18282714858 S;EF 2U "w y . Jl IVu. vvc r . iv
i
AGENT CERTIFICATION OF A11THORIZATION
i
l ?CnNil Clt/?hty represcnting Charlotte-Mecklenburg Utilities,
hereby certify that I have authorized Michael A. lagnocco of LAW Engineering and
Environmental Services, Inc. to act on my behalf and take all actions necessary to the processing,
issuance, and acceptance of this permit and any and all standard and special conditions attached.
We hereby certify that the above information submitted in this application is true and accurate to
the best of our knowledge.
i
Applicant's signature
AAD 1
;S-L)& it.
Daic
Agent's s"U61
----1- I !r
Tate
i
Completion of this form will allow the agent to sign all fIture application correspondence.
US ARMY CORPSiENGRS ID:18282714858
IS ARMY CORPSiENGRS ID:18282714858
S5Er 2u , uu y ; J I NO . UUL r . If
MAY 04'00 9:5( Nu.UU1 N.U1
May 27, 1997
11 1
Regulatory Branch
AcLi.on ID No. 199702392 and Nationwide
and Bedding)
Permit 10. 12 (Utility Line Baekfijl
Mr. Dennis Gwaltney
charlotte-Mecklenburg utility neF,arLmenL y
SiOO Brookshire Boulevard
Charlotte, North Carolina 28216 i
Dear Mr. Gwaltney: 1
Reference your application received Februar 7E, 1991, for Department of
the Army (DA) authorization to impact a total v 4.76 acres of waters and
wetlands adjacent to Long Creek, Gum Dranch, Gu ter Branch and unnamed
tributaries to construct the 7.G-mile Long crna varallol sewer outfall from
south of Belmeade Road to Oakdale Road nvrthwco of Charlotte.
Mecklenburg County, North Carolina.
For the purposes of the corps of Fnginctera XegulaLory Prowram, the
"December 13, 1996 Federal RV9101-C07, Final. Nvti3v of Issuance, Reissuance, and
Modification of Nationwide Permitw (61. FR 65674)" listed nationwide permits.
Authorization, purauanL to SfuLivel 404 of the Clean Water Act, wait provided
for the discharge of dredged or fill material a soeiated with excavation,
backlill or bedding for utility linco, includinj outfall and intake
structures, provided there io no change in preednarruetion contours. This
nationwide permit does not authorize aaeeaa rna e;, temporary or permanent, or
foundations atsoCiated with overhead uLS,lit.y 1ieoeH.
Your work is authorized by this, nationwide permit provided it is
accomplished in strict accordance wit.h %.Il a ens!) bed c:vnditivtta ar?d provided
you receive a Section 401 w&Ld? quality cextifi ation from the North Carolina
Aivivion of water Quality (NCDWQ). You should contact Mr. %7ohn Dorney,
telephone (919) 733-1766, rcgarding water qunl:t(y certification. This
nationwide permit does not relieve you of this rdaponeeibility to obtain other
required State or local approval.
This verification will be valid for a pori d of two years Ixoin the date
of this letter or until the nationwide pEermil. i modified, reissued or
revoked. It is incumbent upon you Lo remain in ormed of changes to the
nationwide permits, which will be announced by ublie notice whan they occur.
It you commence, or are under contract to comma ro, this activity before the
date the nationwide parml,L 1.1i Modified or revoked, you will have twelve months
from the date of Lhe modification or revocation'to complete the activity under
the present Lerms and conditions of this natioi+de permit.
i
i
Mnv MA of-iMM 1fT: n 18282914858 PAGE.02
US ARMY CORPS/ENGRS
J MKI'IY LUKrS/L14UK?
ID:18282r14?3?05 ?t.r zV Vv JL ,? . . •?
Ill 12fLiSL(14tf5? NHY 04'UU yO;00 IVu.UUi r.UJ
i
i
.Z. I
I
We have evaluated potential. impacts of your activity, and we have
determined that your proposal will not affner. any endangered species.
When you have completed your work and any required mitigation, please
sign and return the enelo4ed ccrtifiraacien form
Questions or comments may be addressed to Mr. Steven Lund in our
Asheville Rugulatory Field office, telephone (704) 271•-4057.
Sincerely.
FILENAME: cmudl2.05a/nw
CL SAW- CO- RA/J,vu?d
CESAW-CO-RA/Johnson/a Xw?,
rtAxL
Robert W. Johnson, CESAW-CO-RA/file
Office Manager
Asheville kagulato7y Field Office
Enclosures
Coplea Furnished (without enclosures):
Mr. John Dorney
Aivieion of Walter Quality
North Carolina Department of
Environment, Health and
Natural Resources
4401 Reedy Croak Road p
Raleigh, North Carolina 27607
E
MAY A4 POOP 18:41 Ie282714858 PAGE.03
US ARMY CORPS/ENGRS lll 1?1??rl?+u?u ?` -°- --
L WI ?J Mr r• ?y?` A C
1•Ir
,1•uttlVy Lf• L y ?'•? ylr r,
,? 11N ? i IY1 ddd
•,W1..- •Y?J illl'? •" 1 I/ll L/1y?' J11lLL .nl W •? . J
r
.I
?S v ./
' '~
JNI
IW , ?
t N.•/
PROJECT AREA `4 "" ???
X
3
s•
?I
MOWMA1N
mulib
brRt • . yq
1?•
Y '
;? Iw
N LM
w
1
J 1
LLL
0
t je 1I `?.I ?V' _ ?? i
CH RLOTTE-?MECKLENBVRG
' NarN??Rn?G bzvzsloN
IiLO'rTE, NORTI? CAROLINA
?' P11RALil1. SE1NlR OUTFAU.
PHASE 1 ? 1 ??
. ,?,
1••os PROJECT VICINITY
,
I '
ILIT'Y •DEPAR'?'MFN'x'
US ARMY CORPS/ENGRS ID:18282r14?3505
t'
•` Y
cO? (r••? 1 t r ,
IPA
-Zi
V ? (? 'i 1. O r L
;-
,,, .... ? i• ;14 ?, :fit M ?:t?-•r,????:??. +„
c" t N { APPROXIMATE LOCATION'' OF 1, 00-FOOT REALIONMENT
.r'I'? /r.• ? ?? .y ? •144...:. ?.
1 O •? ?.Nw?t ? ? 1?J O`
., PROJECT LIMIT r•,?,
l+ rs4 w• -" `.
s L R ? ? S/v ? ? A ...
''• Ile % fl XISTING PUMP;
TATION
C • ? I ? f O, ? ?
• ? ! r r. •
K,
DNG 1
h
US ARMY CORPS/ENGRS ID:18282r14t35?;
w O + v
win,
.,`111, \ ... - ?? r:" ?; • • ? a , 'r?
PHASE I
1 ?
? L?,j•?;rr
`?4r ja7
L
Jtr zv vv • J'1 ire .....<
. l
PROJECT LIMIT;
PH S?
.x`47
?. ! CH RLOTTE--MECKLENBURC
• ' i UTILITY DEPARTMENT
1 S `` ENZ;INNERING DIVISION
C RLOTTE, NORTH CAROLINA
LONG CREEK •
PARALLEL SEWER OUTFALL ?
PHASE I A M
ec?I a Pane w.
1'±290 PROJECT LOCATION 2
.
1 ?? x
• r
US ARMY CORPS/ENGRS ID:18282r14858
MATCH LINE FIG. 38.
Y
W f
O
k1%
i
PSS 1 (1,525 LIj)
PFO1 (2,300 LF)
I I cl ??
PROP. SANITARY!
I • SEWER TRUNK
TOT
I PF01 (2,500 LF)
c
j BEGIN ROJECT PHASE II
(EXIST IN PUMP STATION)
zotr Lv vv Z7 • 19V
LEGEND
WETLANDS INVOLVEMENT
WETLANDS POCKET INVOLVEMENT
4- WATERCOURSE INVOLVEMENT
(50 LF) LINEAR FEET OF WETLAND
INVOLVEMENT
V APPROXIMATE LOCATION' OF TWO
ADDITIONAL STREAM CROSSINGS
APPROXIMATE LOCATION OF
PROPOSED REALIGNMENT
(1,000 LF)
PROJECT WETLANDS INVOLVEMENT: 4.76 ACRE
CHARLOTTE-MEC aJWBUltG
UTILITY DEPARTMENT
ENGINEERING DIVISION
CHmwTTE, NORTH CAROLINA
LONG CF(
PARALLd •8W! A OWALL
SOAL9 PROJECT tAYOUT
I IMa PHA I TFILW "WlM sA
US ARMY CORPS/ENGRS
ID:18282714858
' Str 1V"VU
{
ERRY RD.
y - 'r IVU.VVL 1 .Z-v
LEGEND
WETLANDS INVOLVEMENT
0 WETLANDS POCKET INVOLVEMENT
--- WATERCOURSE INVOLVEMENT
(50 LF) LINEAR FEET OF WETLAND
INVOLVEMENT
Y
TOT L PROJECT WETLANDS INVOLVEMENT. 4.76 ACRE
CHARLOTTE- M»ECIaZNBURG
UTILITY DEPARTMENT
ENGINEERING DIVISION
CHARLOTTE, NORTH CAROLUTA
PARAWL Wei OMAIL
hltAAt 1 ? 1
EI A 1 r TFAA?I nL
PHASE I CC SEWIR 38
MATCH LINE FIG. 2A
US ARMY CORPS/ENGRS
LEGEND
`1YW WETLANDS INVOLVEMENT
i WETLANDS POCKET INVOLVEMENT
?r
ID:18282714858
SEP 20'00 9:57 No.002 P.24
-0- WATERCOURSE INVOLVEMENT
(50 LF) LINEAR FEET OF WETLAND
INVOLVEMENT
OJECT WETLANDS INVOLVEMENT: 4.76 ACRE
CFURIATTE- MECKLENBURG
UTILITY DEPARTMENT
ENGINEERING DIVISION
CHARLOTTE, NORTH CAROLINA
LONG Olaf
vAPuua OMM oMMu
PKW,..
PAMCT LAYOUT 1R
PHASE 1 & I TrAW Sr*IM zc
MATCH LINE FIG. 2B
JS ARMY CORPS/ENGRS ID:18282714858
NOTE: EASEMENT LINE ALSO
DENOTES LIMITS OF
DISTURBANCE
SE 11
1
E
nG (}F BANK r.,
r
FESMUTT-75-,
J
I?
i
I-
SEF 20'00 9:b( NO.uuz r.zz>
PH-
EIP
i0
EC STD 6.60
VOL. s 300 cf {
v WEIR a 5.0'
TBM # 39
NAIL IN 30" GUM
Elsw 635.25
REMOVE EXISTING SEWED LI
PLUG & REBUILD INVERT.
""'" ?-,.? STA. 231 +83.56 PHASE 11
G
El S
S& 0+00.DO PHASE I
?P
W1 OUTSIDE DROP
PROPOSED T UTILITY DEPARTMENT
STREAM CROSSING ENGINEERING DIVISION
301, CMP CHARLOTTE, NORTH CAROLINA
STD. DTL EC NO. 1
J
MAN ?wMUa sEwen an,?Au. ?IILi
MAN I a I
LONd a?eac ,?}?
TYMCAL sTREMA CR088N0 ?
f+?40r PLAN VIEW 4A
? PLOP. MANHOLE X78 PHASE I/
` PLOP. MANHOLE # f PHASE I
' ? STD. 07'L N0.6
V NTED (STD D TL ? 10)
N s ? •s7'44" ? S LID LID & SEALED
9?.s7'
SEE FlGtlRE a g FOR CORRESPONDING PROFILE
EM PO RARY cHARLOTTE-MECKLEN$URG
US ARMY CORPS/ENGRS ID:18282714858
SEN 2U'UU y:W3 NO.UVZ r.zo
J.
=,r
;.G
1U
231 -f-00
2334-00
SEE FIGURE 4 A FOR CORRESPONDING PLAN VIEW
CHARLOTTE- MECKLENBURG
UTILITY DEPARTMENT
ENGINEERING DIVISION
CHARLOTTE, NORTH CAROLINA
232-4-00 PARAU LONG CFUK
E TYPICAL STREAM CROMM FM
f-40 "OR PROFILE !B
US ARMY CORPS/ENGRS
James G. Martin, Governor
ID:18282714858
SEP 20'00 9:59 No.UU1 r.zr
1
North Carolina
Department of aAdmi istration
October 31, 1991
James S. Lofton, Secretary
Mr. Alan Clark
N.C. Department of Environment, Health,
and Natural Resources I
Division of Environmental Management
Archdale Building I
Raleigh, North Carolina 27611
I
Dear Mr. Clarks
Re: SCH File #92--E--4300-0201; Environmental Assessment and
Finding of No Significant Impart for the Proposed Long
Creek Parallel Sewer Outf.all Phasand II by the
Charlotte-Mecklenburg Utility Department
The above referenced environmental imps information has been
reviewed through the State Clearinghous under the provisions of
the North Carolina Environmental Policy pct.
Attached to this letter are continents made by state/local
agencies in the course of this review. Because of the nature of
the''comments, it has been determined that no further state
Clearinghouse review action on your partt,, is needed for
compliance with the North Carolina Environmental Policy Act.
The attached comments should be taken into consideration in
project development.
Best regards.
JSL:jt
Attachments
S ' rely, OL_
i
,1 ' e S. o ton
..:..:. CC: Region F
116 West Jones Street • Raleigh, Nurth Cawlina 27603$003 • Telephone 919.733.7232
State G.wrier 51.01.00 i
An Equal Opp,rrwmrv I AflirmariveAcriiEmpkWr
?i
1
US ARMY CORPS/ENGRS ID:18282714858
VIV IAHIER WUHLIIY Fax:9197155637
'tV
SEP 20'00 9:59 No.002 P.28
May 9 '00 15:21 P.02
NORTH CAROLINA DEPARTMEN'T' Ole
ENVIR NMENT AND NATURAL RESOURCES
DlvlstoN of WAruR QUALITY
4
May 2000
Michael A. Iaonocco i
Law Engineering and Environmental Servicts, Inc.
2801 Yorkmont Road, Suite 100
Charlotte, North Carolina 28202
Pte: Long Creek Parallel Sewer Outfall, Fit ji-k Alterations
I
Dear Mr. Iagnocco:
This letter is to clarify that, based on the inf rmaiion provided to the Division of Water
ation provided to the Division of Water
o
Quality (Division) regarding changes in the ng Creek Parallel Sewer project in
Mecklenburg County, neither a revised Env on mental Assessment (EA) nor an
additional SEPA review of the proposed ch ges are needed. It is our understanding,
from your letter to me dated March 29, 200 , that the proposed changes involve
alterations in the vertical profile/ increases i pipe sixes, and a modification in horizontal
aligno=t of approximately 1,000 linear fee . The realignment will require two
additional crossings of Long CTeCk, and ace, rding to follow-up information you
provided on April 17. 2000. will not affect cultural resources. Your March 29, 2000
letter also identified that all other project impacts will remain virtually dl t same as
identified In the October 31. 1991 EA prepated for the proposai.
Based on the above information, additional tcview of the project through the SEPA process
is not needed. However, I would like to em hasize that where the outfall impacts wetlands
and streams, the project must be in complia cc with conditions in the Division's 401 Water
Quality Certification for sewer lines (see at hed). If the project will not be in compliance
with these conditions, application must be ade to the Division's Wetlands/401 Unit for a
written certification. For more information n making an application, please see the
following website: hap://h2o.onrstate.nc 1i rNnbranch/wetland/regeert.html.
If you have any questions. please contact m4 at 919-733-5083 ext. 567.
sincerely,
Gloria F. Pumarn
Environmental Specialist
X 919 ?- Orck"C9 4MCN7rR, RALII*M, NORTH CARObtNA a7099.1417
wsblltC' n20 nrAtste.ne.us PWONR 910+7aI.•SO68 FAX !1!•7»•!!11
AN CAUAL OPPORTUMITV / AFP1RuA11,vf. A -h CM?LOrt• - 50% RgCyCLL9/10% Posri4On96YMQR PAPOR
1
I k4 y .
i?xi
US ARMY CORPS/ENGRS
ID:18282714858
I
.
?? wwr
SEP 20'00 10:00 No.002 P.29
North Carolina Department of Clltural Resources
fames G. Martin, Governor Division of Archives and History
Patric Dorsey, Secretary William S. Price, Jr., Director
August 25, 1992
Michael A. lagnocco
Senior Environmental Planner i
Woolpart Consultants
8731 Red Oak Boulevard
Charlotte, NC 28217-3958 a
Re: Long Creek Sewer EA, Mecklenburg County CH
91-E-0000-0890, ER 93-7175
Dear Mr. lagnocco: j
Thank you for your letter of July 31, 1992, conce ning the above project.
Based on our review of the archaeological report, lus recent telephone
conversations with Loretta Lautzenhelser, we offeq the following comments.
0
In general the report meets our office's guidelines nd those of the Secretary of
the Interior. The following five properties were determined not eligible for listing in
the National Register of Historic Places:
i
31 MK611 - 31 MK615
Secause no sites listed in or eligible for the National Register are present in the
project's area of potential effect, no additional archaeological investigations need
to be conducted and the project can proceed as Fined.
We would like to note that the study conducted d monstrates the potential major
Impacts to areas that could contain significant archaeological sites, While no sites
were discovered within the project corridor, the s bsurface tests documented the
widespread disturbance of floodplain soils associiiginal ed with pipeline construction
activities. The disturbances associated with the Long Creek sewer lines
clearly exceed the idealized construction limits depicted in Figure 6 of the report,
According to Ms. Lautzenhelser, the -profiles shov?J in Figure 7 depict construction-
related deposits of spoil and pipeline wench fill rat er than stress deposits. These
observations underscore problems of relying exclusively on engineering drawings
of projected construction limits to gauge potential impacts to archaeological
resources.
The above comments are made pursuant to Section 106 of the National Historic
Prq*servation Act of 1966 and the Advisory Coun I on Historic Preservation's
Regulations for Compliance with Section 106, cogified at 36 CFR Part 800.
109 East ones Street 9 Raleigh, North Carolina 27601-7807
US ARMY CORPS/ENGRS ID:18282714858 SEP 20100 10:01 No.002 P.30
Michael A. lagnocco
August 25, 1992, Page-2
Thank you for your cooperation and consideration. ! If you have questions
concerning the above comment, please contact Renee Gledhill-Barley,
environmental review coordinator, at 919/733-476$.
Sir?cerely,
Davld BrooG k?`
Deputy State Historic Preservation Officer
DB:siw
cc: Tom Vandeventer, Charlotte-Mecklenburg
Utilities Department
Alan Clark, Division of Environmental
Management
Loretta Lautzenhelser, Coastal Carolina Reseorch