Loading...
HomeMy WebLinkAbout20001258 Ver 1_COMPLETE FILE_20000920US ARMY CORPS/ENGRS ID:18282714858 SEP 20'00 9:43 No.002 P.01 H US, ARMY CORPS OF ENGINEERS 1.5.1 Parcon Avenue, R om 143 Asheville, Norch (amlina 8801.5006 (828) 2 71-48. Fax: (828) 271.4 58 MX TRANSMISSTON COVER SHEET Dater Tor Division of Water Cis{ fig Fax: 6plyj - Z58-5J30.1 91 Rot PCNawficadon r- Senderr ?,. YOU SHOULD RECEIVE 3o PAGE(,S), INCt L DO NOT'RECEIVE ALL THh PAGES, Remarks; Division Water a ' US Fish a a ached PCN for tcvicw and comment concerning SHPU: We are forwarding the attachad !Action of o O 0 001258 THIS COVER 'WEET. IF YOU W CALL (828) 271.4854 Uq_I h1'K,&-Z' US ARMY CORPS/ENGRS ID:18282714858 LAWGI c-IR oz July 26, 2000 Mr. Steve Chapin U,S. Army Corps of Engineers Regulatory Branch 151 Patton Avenue, Room 143 Asheville, North Carolina 28801-5006 SEP 20'00 B? n Subject: Nationwide Permit No. 12 Pre-Construction Notification Charlotte-Mecklenburg Utilities Long Creek Parallel Sewer Outfall CMTJ Project Nos.: Phase 1 212-90-730; Phase 11 373-91-685 Mecklenburg County, NC LAW Project 30100-8-3661 Dear Mr. Chapin: 9:43 No.002 P.02 On behalf of Charlottc-Mecklenburg Utilities (CMU), ant in cooperation with Woolpert, L'I"P. (WOOLPERT) enclosed pleaso find a completed Joint 1 mn with accompanying figures for a Nationwide Permit (NWP) No. 12 in the above-referenced atter (Attachment A). The approximate 7.8-mile Long Creek Parallel Sewer Outfall project, located in northwest Mecklenburg County, was originally permitted under NWP No. 12 by the U.S. Army rps of Engineers (USACE) on May 27, 1997 (Action 1D No. 199702392) (Attachment R). However, since the issuance of this permit, NWP No. 12 has been reautbori7ed and modifications to the s wer alignment have boon made. An approximate 1,000 linear-foot horizontal realignment is pla While this rualignment will result in no additional impacts stream crossings will be necessary. The proposed utility fir clearing in a forested wetland for a portion of the utility right including the Joint twin and accompanying figures, are # construction notification requirement of NWP No. 12. LAW Engineering surd Environmcnta 2001 Yorkmonl Road, Sulto 100 • Chart Servinq the Uharlalle mroa for over 704.357-Afi00 - Fax: 704.3!)7 4 for one area of the project corridor. wetlands, two additional unavoidable activities will require mechanized land )f--way (R/W). The enclosed materials, itted in compliance with the pre- arviees, Inc. , Nr. 28200 you rf US ARMY CORPS/ENGRS ID:18282714858 LAW ENGINEERING ANb ENVIRONMENTAL SERVICES LAW ENGWEIE;RING AND ENVIRONMENTAL SERVICTS, I: c.. 2801 Yor)unont Road, Suite 100 Date: July 26.20(X) Charlotte NC, 28208 Proicct Name: lal l (704) 357-86(x) FAX (704) 357.1622 Attention: Mr. Steve Rc-. Nationwide Perini i TO; Mr. Steve Chapin U.S. Army Corps of Rngineers Regulatory Branch 151 Patton Avenue, Rm. 143 Asheville, NC 28801-5006 LE7TER ON 7RANSMIIITAL WE ARE SENDING YOU -2?,_Attacllod _ -Under sepal•ate cover via the following items: 11rintS 11131u samples SpcCificaliions Copy of letter i Chogc order other 1F F.NCLOSURFM ARE NnT AS NnTRh Ktnnvr.v'ntnT1RV tte s•r r?wrnr COPIES I DATE I NO. SEP 20'00 9:44 No.002 P.03 Project No.: 301(X)-8-3661 AU G 0 1 2000 PTION 1 7/26/00 1 ( NWP No. 12 Application t)r TRAMMITTE 7 as checksd hclowc copios for approval copies for disllYjbu6on corrected prints -1L-For approval .- Approved as suh?niued _ _ For your qgR ` Approval as nntcd _ _ Av revue?YCd - Rehtrned for wrrmions _ For review and comn?errt R)rMARKS: RESPECTFULLY SUBMME-D, s LAW ENGINEE)UNG AND ENVIRONMENTAL STRVICES, INC. Z?L? Micha .lagnoeco Senior Environmental Sciettat L. J 5 With Permission Copy To File Allen W. Conger, P *.S. Principal Envir tncntal' intlsl. `tly With Permission US ARMY CORPS/ENGRS ID:18282714858 NW1' No.12 PCN- 4ong Creek Parallel Sewer tluljall LAW Project 30100-8-3661 Background SEP 20'00 9:44 No.002 P.04 J91y 16,1000 i The Long Creek Parallel Sewer Outtall will extend approximately 7.8 miles (41,220 linear feet) and roughly parallels i,ong Creek from the existing pump station, located approximately 1,000 feet east of the confluence of Long Crcck and the Catawba River, i''•,cast to Oakdale Itoad. Phase II of the project extends from the existing pump station to Gum B arch and Phase I from Cum Branch to just above Oakdale Road. The proiect vicinity and loc ion of the Long Creek Parallel Sewer Outfall project are presented on Figures 1 and 2 (Attachment C), respectively. The proposed improvements ofthis project include upsizing the existing outfall with a parallel outfall, The existing outfall is comprised of approximately 17,830 linear feet ?lf) of 15-inch pipe and approximately 23,390 if of 21-inch pipe. The proposed outfall consists o` an estimated 6,540 if of 36-inch pipe, 28,860 If of 42-inch pipe, and 5,820 If of 48-inch pip. The northernmost terminus of the approximate 1,000-foot horizontal realignment of 42-inch pipe is located approximately 650 feet southwest of Mount Holly-Huntersville Road (NC: 27) (Fi I$urc 2 - Attachment Q. The proposed sewer realignment accommodates changes requested by exi ing property owners along this portion of the project corridor. The project will require the acquisition of additional R/W, !paralleling the existing sewer R/W, in order to accommodate the new outfall. Tltc existing sewer is situated within a 30-foot R/W. P Additional R/W, generally 15 feet in width, will be acqui d for the installation of the proposed sewer. The outfall will be installed generally on the outer edge of the existing 30-foot R/W. A temporary construction casement (TC:E) of approximately I feet wide and adjacent to the now or existing R/W will be acquired to facilitate construction. '1'h proposed outfall within the new R/W will closely parallel the existing sewer, being placed as close ' s possible to the existing sewer, within 15 feet center-to-center (12 to 13 feel edge-to-edge) wherev?r possible, and generally to the upland side of the existing outfall. I Portions of the Long Creek Parallel Sewer Outfall are locate within the boundary of Duke Power's Lake Wylie. The portion of the proposed outfall that lies low the 570 foot elevation, extends upstream from the existing Long Greek Pump Station aloe , the existing It/W for a distance of 1,425.19 If. Approximately 732 if of the project occur on Anyone wishing to perform an activity that crosses or is y actually owned by Duke Energy, within the project boundary of any, 2 US ARMY CORPS/ENGRS ID:18282714858 NWPN0.12 PCN- Long Creek POralld Sewer Uuljall L,! W ProJec13 0100-4.9661 Duke Power's reservoirs must obtain a signed from Duke Power's Lake Management office and an Federal Energy Regulatory Commission prior to beginning with CWJ, is completing a Conveyance Application and w concurrently with this PCN. Installation of the portion of t.h falls within Duke Power's jurisdiction will not be perform approved by Duke Power's Lake Management office. Proposed Jurisdictional Impacts need to closely parallel the existing outfall. in aeeo this sewer will not alter pre-construction contours. SEP 20'00 9:45 No.002 F'.05 July 26, 2000 conveying the required property rights er approving the conveyance from the any constriction. LAW, in cooperation Il submit this document to Duke Power Long Creek Parallel Sewer Out.fall that 3 until this Conveyance Application is The proposed 1 l stream crossing locations associated withithe Long Creek Parallel Sewer Outfall, including the two proposed realignment crossings, are depicted on Figures 3A, 3B, and 3C (Attachment C). A typical plan view and profile of a pmje t stream crossing is depicted in Figures 4A and 413, respectively (Attachment Q. With the exception of the two stream crossings necessitated by the 1,000-foot realignment, these stream ?rossings are dictated by the project's backftlled with topsoil from the trench in wetlands areas, will be stabilized immediately upon completion of the utili utility line at each of these crossings will be completely minimum of one foot below the bottom cif the chann with NWP No. 12, the installation of top 6" to 12" of the trench will be ?ny exposed slopes and stream banks line crossing of each waterbody. The ied, with all crossings occurring at. a At each of these crossings, bank stabilization measures will result. in minor riprap p)acers- ;,, the stream channel below ordinary high water, corresponding to the permnnent R/W width. Itiprap placement at the two additional stream crossings will result in approximately 0.06 acre of t11 being placed in these waters of the LJ.S. This impact area was calculated utilizing a co struction corridor width of 40 feet (maximum). All stream crossings have been designed to be as close to perpendicular to the stream as possible, and still provide unencumbered sanitary flows. Existing channel alignments will not be impacted by the project. The existing outfall R/W has been severely eroded in a number of locations by Long Creek floodwaters. These eroded areas 'ill be backftlled and stabilvcd as part of the new outfall construction. The Nationwide Pentit previously issued in this matter authorized temporary impacts to 4.76 acrd of wetlands. 11e majority of wetland impacts will Occur within existing, maintained K/W, consequently, perm nent impacts to wetland areas arc not 3 US ARMY CORPS/ENGRS ID:18282714858 f SEP 20'00 9:45 No.002 P.06 NWP Na!? PCN- Long Creek PanWd Sewer pyjal/ I July 26, 2000 LAW bvfed 30100-&3661 I anticipated. The total impacts associated with the Long ;reek Parallel Sewer Oulfall, including the 1,000-foot realignment, are 4.82 acres of waters of the I? J.S., including 0.33 acre and 4.49 acres of stream and wetlands, respectively. I? I Regulatory Implications The project design complies with the conditions of the Section 401 General Certification (GC) for projects eligible for NWP No. 12, effective June 1, 2000. ritton concurrence from the Division of Water Quality is not required. In accordance to with this Cif;, the edge of the construction corridor shall not be installed parallel to and closer than 10 feet (3 peters) to a stream, except at crossings. Utility lines shall not cross a stream channel at other th n a near-porpendieular direction (i.e., stream channel crossings shall not be at an angle of less th n 75 degrees or more than 105 degrees to the stream bank). No-seam piping will be installed wit in the footprint of a stream channel or within two feet of the stream batiks. Measures shall be ken to prevent livo or flesh concrete from coming into contact with waters of the L).S. until be 2 ken has hardened. Placement of riprap will be restricted to the stream bottom and banks dittotly impacted by the placement of the utility line (i.e., below the normal high water level). Th stream berm must be restored to the original contour after construction. Placement of riprap o other materials shall not result in dc. stabilization of the stream bed or banks upstream of downstream of the crossing. Appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" hichever is more appropriate shall be in full compliance with all specifications governing the pr per design, installation and operation and maintenance of such Best Management Practices in (order to assure compliance with the appropriate turbidity water quality standard. All sediment Ind erosion control treasures placed in wetlands or waters shall be removed and the natural grad restored within two months after the Division of Land Resources has released the project. An ual species suitable for wet locations shall be planted and established within jurisdictional wetlands for soil and erosion control. Perennials such as fescue will not he planted. Fertilizer 1vI11 not be applied within 10 feet (3 meters) of streams. The construction corridor (includi? g access roads and stockpiling of materials) will be limited to 40 feet (12.2 meters) in width i4 wetlands and across stream channels and will be minimized to the maximum extent practicable. 4 US ARMY CORPS/ENGRS ID:18282714858 SEP 20'00 9:46 No.002 P.07 NWPNv.12 PC/V - Long Owk Par0d Sewer Oatfall f Jay 26, 2000 L!W Protect 90100•d-9661 Permanent, maintained access corridors in jurisdictional areas will be restricted to the minimum width practicable and will not exceed 10 feet (3 mctcrs) i width except at manhole locations. A 10 feet (3 meters) by 10 feet (3 meters) perpendicular vehicle turnaround will be spaced at least 500 feet (152.4 meters) apart, An anti-seep collar shall b placed at the downstream (utility line gradient) wetland boundary and every ISO feet (45.7 metet') up the gradient until the utility exits the wetiand for buried utility lines. Permanent changes in I pre-construction elevation contours in waters or wetlands or stream dimension, pattern or proftl will not be permitted and any excess material will be removed to a high ground disposal area. Pri-construction wetland contours will be restored in accordance with CMU's construction documents. I Possible sedimentation of the stream during and immediati'ly following the construction phase of this project will be minimized by strict implementation of State-approved sediment and erosion control plan. This plan will employ a network of sedimonl traps, check dams, and silt fencing to control the export of sediment from the project site to atii...?.it undisturbed areas. All erosion and sediment control devices will be inspected for compliance with the construction contract documents during and after construction, as well as foliong any major storm event, to identify any needed repair, maintenance, or redesign. Activities o the subject site involving impacts to waters of the U.S. will be required to follow the General onditions of the Nationwide Permits (Federal Register, Vol. 65, No. 47; March 9, 2000) a d State Consistency Conditions, as applicable. All nationwide and regional Conditions for NW No. 12 will be met by CMU's design and adhered to by CMU's contractors. Please be advised that the Long Creek Parallel Sewer qutfall project is subject to the State Environmental Policy Act (SEPA) as a major activity under the NCDENR's Departmental Rules for implementation of the Act (T15A:O] C.0504). An Environmental Assessment (EA) was completed by WOOLPERT in August 1991 and circulated pursuant o the requirements of the Act (State Clearinghouse # 92-E4300-0201). The SEPA process con luded with the NCDENR Division of Environmental Management's (DTM's) issuance of a Find' a of No Significant Impact (FONSI) dated October 31, 1991 (Attachment D). In a letter dated Ma 9"000, the Division of Water Quality stated that the proposed approximate 1,000 linear-foot hor ontal realignment of the Long Creek Parallel Sewer Outfall project will not require a revised EA additional SEPA review (Attachment E). An archaeological survey of the project area was comp eted in July 1992 by Coastal Carolina j 5 L US ARMY CORPS/ENGRS ID:18282714858 i SEP 20'00 9:46 No.002 P.08 I NWP No, 12 PCN - Long ctiwk ParMid Sewer Ou yall I July 26, 2000 L4W Project 301004.3661 1 Research, Inc. (CCR) of Tarboro, North Carolina, under thoisupervision of Loretta Lautzenheiser. A I COPY of the subsequent correspondence from the State Histpric Preservation Officer (SHPO), dated August 25, 1992 is attached (Attachment F). The project, as currently designed by WOOLPERT, will rc ult in unavoidable temporary impacts to 4.82 acres of water of the U.S., including approximately .33 acre and 4.49 acres of stream and wetlands, respectively. It is our understanding that this pro cot qualifies for Nationwide Permit No. 12. On behalf of CMU, we are hereby requesting written ?pproval from the USACE Wilmington District to proceed with the above-described activities. Thank you for your attention to this inatter. Please don't hesitate to call Mike Ingnoeco at (704) 357- 8600, extension 5543, if you have any questions. i Sincerely, L?;,IIOINEE G AND ENVIRONMENTAL SERVIC 'S, INC. Lisa J, Bee Michael A. Iagnocco Project Environmental Scientist , Senior Environmental Scientist : W. 6VA Allen W. Conger, P.W.S. Principal Environmental Scientist LJB/MAllAWCajb P VYIM PWOMMON CC. Dennis Gwaltney, P.E., CMU Ron Geiger, P.E., WOOLPRRT Attachment A - Joint Form i Attachment D - NWP No. 12 - dated May 27, 1997 Attachment C - Figures Attachment D - FONSI, dated October 31, 1991 Attachment C - DWQ Correspondence, dated May 9, 2000 Attachment F - SHPO Correspondence, dated August 25, l y 6 S WN FWMN " US ARMY CORPS/ENGRS ID:18282(14858 5EF 2u'uu y:4( NO.uuz r.uy 001258 DEM ID: CORPS ACTION ID: NATIONWIDE. PERMIT REQUESTED ()ROVIDF. NATIO? WIDE PERMI PRE-CONSTRUCTION NOTIFICATION APPLICATION I'OR NATIONWIDE P[sRMI'I'S 'I'IaAT REQIIIRTs: ALIG d 1 2000 1) NOTIFICA11ON TO THE CORPS t .?, ENGINEERS PES ,r? WwGa-RA 2) AI l LICATION) OR SECTION A01 .I RI'll'IC ATiO 3) COORDINATION WIT11 THE N.C. 1VISION OF COASTAL MANAGEMENT" SEND THE ORIGINAL AND (1) COPY Or THIS COMPI,F? D FORM TO'T'HE APPROPRIATi? FIELD OFFICE OF 1'HE CORPS OF ENGINEERS (SET! AGENCY"" DDRESSES SHRE'1). SEVEN (7) COPTRS SHOULD RE SENT TO THE N.C. DIVISION OF WATER VUALITY (SEE AGENCY ADDRESSES SHEET), PLEASE PRINT, 1 1. OWNERS NAME: City of Charlotte, Charlotte-Meckj nburg Utilities MAILING ADDRESS: 5IOU Brookshire Ugulevard I SUBDIVISION NAME: CITY: Sharlotte STATE: NC 7.11 CODE: 2,8216 PROJECT LOCATION ADDRESS, INCLUDING SlDIVISION NAME (1F DIFFERENT FROM MAILING ADDRESS ABOVE): The approximate 7.,8-mile sewer proicctrou 1 Parallels Lon¢ POC:Mr. Dennis Gwaltney 3. TELEPHONE NUMBER (I IOM E): N/A (W RK): (704)391 -508Q 4. IF APPLICABLE: AGENT'S NAME OR "SPONSI LE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: LAW Enuineerina and F:nvironm ntal Services. Inc. POC: Mr._Michael; A, lagoocco. Senior Environmental Scientist 4a. TFT EPHONE NUMBER (WORK): (704) 357-860043 (FAX): (704) 357-1622 5. LOCATION OF WORK (PROVIDE A MAI', REFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): (See Figures I and 2 - Attachment C) COUNTY: Mcchlellburp- NEARES'1+? TOWN OR CITY: Mount Holly US ARMY CORPS/ENGRS ID:18282714858 6. SEP 20'00 9:4( No.UU2 r.iu I SPECIFIC LOCATION (INCLUDE ROAD NUMB) I 7,8-mile Droieet routthiv parallels Long Crock from th RS, LANDMARKS, ETC.): 211 approximate t existing pump station, 12cated approximate) 1,000 cast of the conflucncc pf Long Crock and the_ '' 1.0 Q-foot resligun)ggj pion of the proiecj is localct tawba River, porthcast to Oakdale Road. 'j'oie approximately 1,000 fm soutliwest!Rf Mount Ill Road NC; 27). Ma'or roads that nt rs c ewer corridor de Bclmjg6 Road SR 1606). Mount H&Y-11untorsvillo a Bra k h' Rgulevard C 16 and Oakdalo d (SR-2042), i IMPACTED OR NEAREST STRRAM/RIVER: Lon Crcck iu jam Dt%al . %.atawuu 7a. IS PROJECT LOCATED NEAR WATER CLASSIF16 AS TROUT, TIDAL SALTWATER (SA), HIGH QUALI'T'Y WATERS (IIQW), OUTSTANDINi i RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-11)7 YES ? NO 0 IF Yr. l FXPI..AIN: 7b. IS THE, PROJECT LOCATED WITHIN A NORTH tCFRN ROLTNA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL C (AEC:)? YES ?NO Z 7c. IF THE PROJECT IS LOCATED WITHIN A COAS' AL COUNTY (SET; PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT' IS THE LAND 1]S PLAN (LUP) DESIGNATION? N/A I 8a. HAVE ANY SECTION 404 PERMITS BEEN PRVNI ' USLY REQUESTED FOR USE ON TIIiS PROPERTY? YI;S ®NO ?IF YES, PROVIDE A 'TION I.D. NUMBER OF PREVIOUS PFRMI'1' AND ANY ADDITIONAL INFORMATION (INCLi )F: PHOTOCOPY OF 401 CERTIFICATION): County. was originally pgmitted undcr NWP No. 12 bw the U.S. Army CgMs of Enaineera (USACE on i 8b. ARr ADDI'r1ONAL PERMIT REQUES'T'S EXPEC?D FOR THIS PROPERTY IN THE FUTURE? YES ?NO (R1F YES, DESC)UBE ANTICIPATE WORK: 2 US ARMY CORPS/ENGRS ID:18282714858 SEP 20'00 9:48 No.UU2 F'.11 9a. FSTIM.ATED TOTAL. NUMBER OF ACRES IN TMCT OF LAND: N/A Linear Sanitary Sewer Pro'ec 91). ES'I1MATED TOTAL NUMBER OF ACRES OF W?TLANDS LOCATED ON PROJECT SITE: N/A Linear Sanitary Sewer Proiect j i i 10a. NUMBER OF ACRES OF WETLANDS 1MPACTEO BY THE PROPOSED PROJECT BY: FILLING: EXCAVA'11ON: FLOODING: OT11ER: DRAINAGE: TOTAL ACRES TOIIRE IMPACTED: I Ob. (1) STREAM CHANNEL TO BE IMPACTED $Y TI IE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BF vV AND AFTER RELOCATION: i LENGTH BEFORE.: LINEAR FT. AFTER: LINEAR FT. WIDTH BEFORE (based on normal high watct cont?lit$): FT. WIDTH AFTER: FT. AVERAGE DEPTH BEFORE: FT. AFTER: FT. (2) STREAM 'TS li. a RE, FROM: (CHECK ALT, THAT APPLY) OPEN CHANNEL RELOCATION: [] f PLACEMENT OF PIPE IN Cl IANNEL:E] CHANNEL EXCAVATION: M CO?4STRUCTION OF A DAM/FLOODING: ? OTHER: 0.33 acre -, minor sanitary sewer installation, ] ] . IF CONSTRUCTION OF A POND IS PROPOSED, THAT IS THE SIZE OF TI IE WATERSHED DRAINING TO THE POND? N/A WHAT is THE EXPECTED POND SURFACE 12. DESCRIPTION OF PROPOSED WORK INCLU EQUIPMENT TO BE USED (ATTACH PLANS: G DISCUSSION OF'TYPE OF MECHANICAL, 'X I I" DRAWINGS ONLY): used Rcm consUrj6ga activities. US ARMY CORPS/ENGRS ID:18282714858 ' SEP 20'00 9:49 No.002 P.12 I 13. 14 STATE. REASONS WHY IT iS B ErL1EVED THAT 7'IIIS ACTIVITY MUST BE CARRTED OUT EN WETLANDS. (INCLIJDE ANY ME=ASURES TAKNN TO MiN1MIZE WETLAND IMPACTS): sMer R/W rdor to acoommodate iew ouffidl.jIm cxi§ting ewer is situat 3 - Hf'niateftc nnnrl f., ..l..e..1....?...11..1 ?1,? ......?...... ,...rc n Ih•L.. t.__._n_.t__ --c.t-'- _-- -?, _. _ ?. pie-2onstruction contours, The top " of the, eh will be b c fill with to2sgil from the trench da Any uxpgaod slu es and stream banks will bo. stabiliod ti Lion of the utility line o . ing of each w 'li line at each of theat crossings will be i 1 blifled. one foot bolovy-the o t nel. Ate .. dl s urring at a minimum of li of these cr k stabMI iZation measures will rosult in, minor ripran placement in th - nne ardin= h water, a 1 PURPOSE OF PROPOSED WORK; gip. Long Creek Parallel Sewer Ou 11 will hole Ewer. YRnin t *) rest center-to-center (17 10 13 test ed a-to-wise) wherever i sodble and ucnorallx e upland side of the existing outfall,, US ARMY CORPS/ENGRS ID:18282714858 SEP 20'00 9:49 No.002 F'.16 I I orrespondinst t nt R/ width. Rinr in 21w. mont at t} o additional stream CrOSSIngs will t in a oximatel 0.06 arze of f 11 ibeing placed in these waters, of thp, -1),S. jj)is ' t area was calculated utjjjz'n a constru ion corridor width of 40 fM (maxj iu?m) All stream crossings v .lI@ve,I}si ?Lpyd Ip he as clo#e in ye[pPndjctQ1 to ream as possible. 15. YOU ARE REQUIRED TO CONTACT THE U.S, F. H AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FI SI IERTFS SERV CT's (NMFS) (SEE AGENCY ADDRT?SSES SHEET) REGARDING THE PRMSENCE OF ANY 1JDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR TI IREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT ARBA THAT MAY 13E AFFECTED BY THE PROPOSED PROJECT. DATE. CONTACTED: Contacted as part of the EA Scoping; FA complet in 1991 pursuant to SEPA. 16. YOU ART: REQUIRED TO CONTAC T TI IR STA-1- HISTORIC PRESERVATION OFFICER (SIIPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPP.)VIIES IN THE PERMIT AREA WHICH M RE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: Contacted as part of the EA Scoping; EA complet I in 1991 pursuant to SEPA. Archaeological survey performed in July 1992 by oastal Carolina Research (Attachment F), 17. DOES THE PROJECT INVOLVE AN EXPMNDITU E OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES ® NO ? (IF NO, GO TO 1$) a. IF YES, DOES THE PROJECT REQUIRE AEPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE RT?QUI 'MENTS OF TITP NORTH CAROLINA ENVIRONMENTAL POLICY AC'17 YES NO ? Note*: EA com leled by Woolpert in August 1991 for the original 7,8-mile alignment 5 I L occur within cxistinft, maintained W) y. permanent impgcts to wetland areas arc aero_and 4.49 acres of stream and wetlands rgsnectiy(L US ARMY CORPS/ENGRS ID:18282714858 I SEP 20'00 9:50 No.002 P.14 I r I i b. IF YES, HAS TI III DOCUMI?NT BE iN Rr?VIFWED THROUGH THE NOJVFH CAROLINA DEPARTMENT OF ADMINISTRATION S T'ATE CLEARINGHOUSE7 YES ® NO (] Note*: Cott pletcd EA was circulated/reviewed through the State Clearnghouse (#i91-0891). The NCEPA process concluded ith DEM's Issuance of a Finding of No SIgnificnnt Impact (FONSI) on Octobor 31,1991 (Attachme D), Inn letter dated May 9, 2000, the Division of Water Q ality stated that the proposed approximate 1,000 linea toot horizontal realignment of the Long Creek Parallel Se er Outfall project will not require a revised EA or addition SFPA review (Attachment E). IF ANSWER TO 17b 1S YPS, 'I'I-IEN SUHMIT APP' OPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF LNYIRONMENTAL MANAGEMF,NT REGARDING COMPLIANCE WITH THE NORTH'CAROL.INA ENVIRONMENTAL POLICY ACT. I i QUESTIONS REGARDING THE STATF. C:LEAR11401OUSE REVIEW PROCESS ST40ULD BE DIRECTED TO MS. CHRYS BAGGE17, DIR.EC:'IC?R STATE CLEARINGHOUSE. NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WESTJONES STREET, RALEIGH, NORTH CAROLTNA 27603-8003, TEI P.PHONE (t19) 733-6369. 18. THE FOLLOWING ITEMS SITOULD BE INC:LUD ? D WITH TI ITS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISC14ARGE OF FX '.AVATI:D OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING LL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (T OR NATION DE I)L'RMIT NUMi3ERS 14, 18, 21, 26, 29 AND 38). ALL STREAMS (INTPRM1T-I'ENT NI) PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAY' SCAT ES SHOULD BE 1 INCH EQUALS 5017EET OR 1 INCII EQUALS 100 FEET OR THEIR Eq JIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTO RAPH OF WETLANDS TO BE IMPACTED BY PROJPCT. c. IF DELINEATION WAS PERFORMED BY A NSULTANT, INCLUDE ALL DATA SHEETS MLEVANT TO THE, PLACEMENT OF THT: D 'LINi?ATION LTNF... d. ATTACH A COPY OF THE STORM WA'T'ER ANAGEMENT PLAN IF REQUIRED. o. WI TAT IS LAND USE OF SURROUNDING)' PERTY? Residontial/UndeycIpRed f. IF APPLICABLE, WI IAT IS PROPOSED ME?TI OD OF SEWAGE DISPOSAL? Conveyed n m Station an el t McAlpine Qmh WTP 8. SIGNED AND DA'Z'ED AGENTAUTI40RILAT N I.ET'I'ER, IF APPLICABLE. G US ARMY --ORPS/ENGRS tll la?a?r 140JV NOTE: WETLANDS OR WATERS OF THE U.S. Y NOT RE IMPACTED PRIOR TO: I) ISSUANCE OF A Sr CT10N 404 C RPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (W ER QUALITY) CERTIFICA'11ON, AND 3) (IN THE TWF•.NTY COASTAL CO NTTFS ONLY), A LETTER FROM THE NORTI I CAROLINA TIVISION OF COA cT' h ? MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT *ITH TIIE NORTH CAROLINA COASTAL A GE NT PROGRAM. ?'J? OG?O - I ? ,Z•!o ? OWNER'S/AGENT'S SICKTURE D '1'E vm wm?m (AGENT'S SIGNATURE VALID ONLY IF AVTHORIZATION LE'T'TER FROM THE OWNER IS PROVIDED (180.)) ? 7 US ARMY CORPS/ENGRS ID : 18282714858 S;EF 2U "w y . Jl IVu. vvc r . iv i AGENT CERTIFICATION OF A11THORIZATION i l ?CnNil Clt/?hty represcnting Charlotte-Mecklenburg Utilities, hereby certify that I have authorized Michael A. lagnocco of LAW Engineering and Environmental Services, Inc. to act on my behalf and take all actions necessary to the processing, issuance, and acceptance of this permit and any and all standard and special conditions attached. We hereby certify that the above information submitted in this application is true and accurate to the best of our knowledge. i Applicant's signature AAD 1 ;S-L)& it. Daic Agent's s"U61 ----1- I !r Tate i Completion of this form will allow the agent to sign all fIture application correspondence. US ARMY CORPSiENGRS ID:18282714858 IS ARMY CORPSiENGRS ID:18282714858 S5Er 2u , uu y ; J I NO . UUL r . If MAY 04'00 9:5( Nu.UU1 N.U1 May 27, 1997 11 1 Regulatory Branch AcLi.on ID No. 199702392 and Nationwide and Bedding) Permit 10. 12 (Utility Line Baekfijl Mr. Dennis Gwaltney charlotte-Mecklenburg utility neF,arLmenL y SiOO Brookshire Boulevard Charlotte, North Carolina 28216 i Dear Mr. Gwaltney: 1 Reference your application received Februar 7E, 1991, for Department of the Army (DA) authorization to impact a total v 4.76 acres of waters and wetlands adjacent to Long Creek, Gum Dranch, Gu ter Branch and unnamed tributaries to construct the 7.G-mile Long crna varallol sewer outfall from south of Belmeade Road to Oakdale Road nvrthwco of Charlotte. Mecklenburg County, North Carolina. For the purposes of the corps of Fnginctera XegulaLory Prowram, the "December 13, 1996 Federal RV9101-C07, Final. Nvti3v of Issuance, Reissuance, and Modification of Nationwide Permitw (61. FR 65674)" listed nationwide permits. Authorization, purauanL to SfuLivel 404 of the Clean Water Act, wait provided for the discharge of dredged or fill material a soeiated with excavation, backlill or bedding for utility linco, includinj outfall and intake structures, provided there io no change in preednarruetion contours. This nationwide permit does not authorize aaeeaa rna e;, temporary or permanent, or foundations atsoCiated with overhead uLS,lit.y 1ieoeH. Your work is authorized by this, nationwide permit provided it is accomplished in strict accordance wit.h %.Il a ens!) bed c:vnditivtta ar?d provided you receive a Section 401 w&Ld? quality cextifi ation from the North Carolina Aivivion of water Quality (NCDWQ). You should contact Mr. %7ohn Dorney, telephone (919) 733-1766, rcgarding water qunl:t(y certification. This nationwide permit does not relieve you of this rdaponeeibility to obtain other required State or local approval. This verification will be valid for a pori d of two years Ixoin the date of this letter or until the nationwide pEermil. i modified, reissued or revoked. It is incumbent upon you Lo remain in ormed of changes to the nationwide permits, which will be announced by ublie notice whan they occur. It you commence, or are under contract to comma ro, this activity before the date the nationwide parml,L 1.1i Modified or revoked, you will have twelve months from the date of Lhe modification or revocation'to complete the activity under the present Lerms and conditions of this natioi+de permit. i i Mnv MA of-iMM 1fT: n 18282914858 PAGE.02 US ARMY CORPS/ENGRS J MKI'IY LUKrS/L14UK? ID:18282r14?3?05 ?t.r zV Vv JL ,? . . •? Ill 12fLiSL(14tf5? NHY 04'UU yO;00 IVu.UUi r.UJ i i .Z. I I We have evaluated potential. impacts of your activity, and we have determined that your proposal will not affner. any endangered species. When you have completed your work and any required mitigation, please sign and return the enelo4ed ccrtifiraacien form Questions or comments may be addressed to Mr. Steven Lund in our Asheville Rugulatory Field office, telephone (704) 271•-4057. Sincerely. FILENAME: cmudl2.05a/nw CL SAW- CO- RA/J,vu?d CESAW-CO-RA/Johnson/a Xw?, rtAxL Robert W. Johnson, CESAW-CO-RA/file Office Manager Asheville kagulato7y Field Office Enclosures Coplea Furnished (without enclosures): Mr. John Dorney Aivieion of Walter Quality North Carolina Department of Environment, Health and Natural Resources 4401 Reedy Croak Road p Raleigh, North Carolina 27607 E MAY A4 POOP 18:41 Ie282714858 PAGE.03 US ARMY CORPS/ENGRS lll 1?1??rl?+u?u ?` -°- -- L WI ?J Mr r• ?y?` A C 1•Ir ,1•uttlVy Lf• L y ?'•? ylr r, ,? 11N ? i IY1 ddd •,W1..- •Y?J illl'? •" 1 I/ll L/1y?' J11lLL .nl W •? . J r .I ?S v ./ ' '~ JNI IW , ? t N.•/ PROJECT AREA `4 "" ??? X 3 s• ?I MOWMA1N mulib brRt • . yq 1?• Y ' ;? Iw N LM w 1 J 1 LLL 0 t je 1I `?.I ?V' _ ?? i CH RLOTTE-?MECKLENBVRG ' NarN??Rn?G bzvzsloN IiLO'rTE, NORTI? CAROLINA ?' P11RALil1. SE1NlR OUTFAU. PHASE 1 ? 1 ?? . ,?, 1••os PROJECT VICINITY , I ' ILIT'Y •DEPAR'?'MFN'x' US ARMY CORPS/ENGRS ID:18282r14?3505 t' •` Y cO? (r••? 1 t r , IPA -Zi V ? (? 'i 1. O r L ;- ,,, .... ? i• ;14 ?, :fit M ?:t?-•r,????:??. +„ c" t N { APPROXIMATE LOCATION'' OF 1, 00-FOOT REALIONMENT .r'I'? /r.• ? ?? .y ? •144...:. ?. 1 O •? ?.Nw?t ? ? 1?J O` ., PROJECT LIMIT r•,?, l+ rs4 w• -" `. s L R ? ? S/v ? ? A ... ''• Ile % fl XISTING PUMP; TATION C • ? I ? f O, ? ? • ? ! r r. • K, DNG 1 h US ARMY CORPS/ENGRS ID:18282r14t35?; w O + v win, .,`111, \ ... - ?? r:" ?; • • ? a , 'r? PHASE I 1 ? ? L?,j•?;rr `?4r ja7 L Jtr zv vv • J'1 ire .....< . l PROJECT LIMIT; PH S? .x`47 ?. ! CH RLOTTE--MECKLENBURC • ' i UTILITY DEPARTMENT 1 S `` ENZ;INNERING DIVISION C RLOTTE, NORTH CAROLINA LONG CREEK • PARALLEL SEWER OUTFALL ? PHASE I A M ec?I a Pane w. 1'±290 PROJECT LOCATION 2 . 1 ?? x • r US ARMY CORPS/ENGRS ID:18282r14858 MATCH LINE FIG. 38. Y W f O k1% i PSS 1 (1,525 LIj) PFO1 (2,300 LF) I I cl ?? PROP. SANITARY! I • SEWER TRUNK TOT I PF01 (2,500 LF) c j BEGIN ROJECT PHASE II (EXIST IN PUMP STATION) zotr Lv vv Z7 • 19V LEGEND WETLANDS INVOLVEMENT WETLANDS POCKET INVOLVEMENT 4- WATERCOURSE INVOLVEMENT (50 LF) LINEAR FEET OF WETLAND INVOLVEMENT V APPROXIMATE LOCATION' OF TWO ADDITIONAL STREAM CROSSINGS APPROXIMATE LOCATION OF PROPOSED REALIGNMENT (1,000 LF) PROJECT WETLANDS INVOLVEMENT: 4.76 ACRE CHARLOTTE-MEC aJWBUltG UTILITY DEPARTMENT ENGINEERING DIVISION CHmwTTE, NORTH CAROLINA LONG CF( PARALLd •8W! A OWALL SOAL9 PROJECT tAYOUT I IMa PHA I TFILW "WlM sA US ARMY CORPS/ENGRS ID:18282714858 ' Str 1V"VU { ERRY RD. y - 'r IVU.VVL 1 .Z-v LEGEND WETLANDS INVOLVEMENT 0 WETLANDS POCKET INVOLVEMENT --- WATERCOURSE INVOLVEMENT (50 LF) LINEAR FEET OF WETLAND INVOLVEMENT Y TOT L PROJECT WETLANDS INVOLVEMENT. 4.76 ACRE CHARLOTTE- M»ECIaZNBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLUTA PARAWL Wei OMAIL hltAAt 1 ? 1 EI A 1 r TFAA?I nL PHASE I CC SEWIR 38 MATCH LINE FIG. 2A US ARMY CORPS/ENGRS LEGEND `1YW WETLANDS INVOLVEMENT i WETLANDS POCKET INVOLVEMENT ?r ID:18282714858 SEP 20'00 9:57 No.002 P.24 -0- WATERCOURSE INVOLVEMENT (50 LF) LINEAR FEET OF WETLAND INVOLVEMENT OJECT WETLANDS INVOLVEMENT: 4.76 ACRE CFURIATTE- MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA LONG Olaf vAPuua OMM oMMu PKW,.. PAMCT LAYOUT 1R PHASE 1 & I TrAW Sr*IM zc MATCH LINE FIG. 2B JS ARMY CORPS/ENGRS ID:18282714858 NOTE: EASEMENT LINE ALSO DENOTES LIMITS OF DISTURBANCE SE 11 1 E nG (}F BANK r., r FESMUTT-75-, J I? i I- SEF 20'00 9:b( NO.uuz r.zz> PH- EIP i0 EC STD 6.60 VOL. s 300 cf { v WEIR a 5.0' TBM # 39 NAIL IN 30" GUM Elsw 635.25 REMOVE EXISTING SEWED LI PLUG & REBUILD INVERT. ""'" ?-,.? STA. 231 +83.56 PHASE 11 G El S S& 0+00.DO PHASE I ?P W1 OUTSIDE DROP PROPOSED T UTILITY DEPARTMENT STREAM CROSSING ENGINEERING DIVISION 301, CMP CHARLOTTE, NORTH CAROLINA STD. DTL EC NO. 1 J MAN ?wMUa sEwen an,?Au. ?IILi MAN I a I LONd a?eac ,?}? TYMCAL sTREMA CR088N0 ? f+?40r PLAN VIEW 4A ? PLOP. MANHOLE X78 PHASE I/ ` PLOP. MANHOLE # f PHASE I ' ? STD. 07'L N0.6 V NTED (STD D TL ? 10) N s ? •s7'44" ? S LID LID & SEALED 9?.s7' SEE FlGtlRE a g FOR CORRESPONDING PROFILE EM PO RARY cHARLOTTE-MECKLEN$URG US ARMY CORPS/ENGRS ID:18282714858 SEN 2U'UU y:W3 NO.UVZ r.zo J. =,r ;.G 1U 231 -f-00 2334-00 SEE FIGURE 4 A FOR CORRESPONDING PLAN VIEW CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA 232-4-00 PARAU LONG CFUK E TYPICAL STREAM CROMM FM f-40 "OR PROFILE !B US ARMY CORPS/ENGRS James G. Martin, Governor ID:18282714858 SEP 20'00 9:59 No.UU1 r.zr 1 North Carolina Department of aAdmi istration October 31, 1991 James S. Lofton, Secretary Mr. Alan Clark N.C. Department of Environment, Health, and Natural Resources I Division of Environmental Management Archdale Building I Raleigh, North Carolina 27611 I Dear Mr. Clarks Re: SCH File #92--E--4300-0201; Environmental Assessment and Finding of No Significant Impart for the Proposed Long Creek Parallel Sewer Outf.all Phasand II by the Charlotte-Mecklenburg Utility Department The above referenced environmental imps information has been reviewed through the State Clearinghous under the provisions of the North Carolina Environmental Policy pct. Attached to this letter are continents made by state/local agencies in the course of this review. Because of the nature of the''comments, it has been determined that no further state Clearinghouse review action on your partt,, is needed for compliance with the North Carolina Environmental Policy Act. The attached comments should be taken into consideration in project development. Best regards. JSL:jt Attachments S ' rely, OL_ i ,1 ' e S. o ton ..:..:. CC: Region F 116 West Jones Street • Raleigh, Nurth Cawlina 27603$003 • Telephone 919.733.7232 State G.wrier 51.01.00 i An Equal Opp,rrwmrv I AflirmariveAcriiEmpkWr ?i 1 US ARMY CORPS/ENGRS ID:18282714858 VIV IAHIER WUHLIIY Fax:9197155637 'tV SEP 20'00 9:59 No.002 P.28 May 9 '00 15:21 P.02 NORTH CAROLINA DEPARTMEN'T' Ole ENVIR NMENT AND NATURAL RESOURCES DlvlstoN of WAruR QUALITY 4 May 2000 Michael A. Iaonocco i Law Engineering and Environmental Servicts, Inc. 2801 Yorkmont Road, Suite 100 Charlotte, North Carolina 28202 Pte: Long Creek Parallel Sewer Outfall, Fit ji-k Alterations I Dear Mr. Iagnocco: This letter is to clarify that, based on the inf rmaiion provided to the Division of Water ation provided to the Division of Water o Quality (Division) regarding changes in the ng Creek Parallel Sewer project in Mecklenburg County, neither a revised Env on mental Assessment (EA) nor an additional SEPA review of the proposed ch ges are needed. It is our understanding, from your letter to me dated March 29, 200 , that the proposed changes involve alterations in the vertical profile/ increases i pipe sixes, and a modification in horizontal aligno=t of approximately 1,000 linear fee . The realignment will require two additional crossings of Long CTeCk, and ace, rding to follow-up information you provided on April 17. 2000. will not affect cultural resources. Your March 29, 2000 letter also identified that all other project impacts will remain virtually dl t same as identified In the October 31. 1991 EA prepated for the proposai. Based on the above information, additional tcview of the project through the SEPA process is not needed. However, I would like to em hasize that where the outfall impacts wetlands and streams, the project must be in complia cc with conditions in the Division's 401 Water Quality Certification for sewer lines (see at hed). If the project will not be in compliance with these conditions, application must be ade to the Division's Wetlands/401 Unit for a written certification. For more information n making an application, please see the following website: hap://h2o.onrstate.nc 1i rNnbranch/wetland/regeert.html. If you have any questions. please contact m4 at 919-733-5083 ext. 567. sincerely, Gloria F. Pumarn Environmental Specialist X 919 ?- Orck"C9 4MCN7rR, RALII*M, NORTH CARObtNA a7099.1417 wsblltC' n20 nrAtste.ne.us PWONR 910+7aI.•SO68 FAX !1!•7»•!!11 AN CAUAL OPPORTUMITV / AFP1RuA11,vf. A -h CM?LOrt• - 50% RgCyCLL9/10% Posri4On96YMQR PAPOR 1 I k4 y . i?xi US ARMY CORPS/ENGRS ID:18282714858 I . ?? wwr SEP 20'00 10:00 No.002 P.29 North Carolina Department of Clltural Resources fames G. Martin, Governor Division of Archives and History Patric Dorsey, Secretary William S. Price, Jr., Director August 25, 1992 Michael A. lagnocco Senior Environmental Planner i Woolpart Consultants 8731 Red Oak Boulevard Charlotte, NC 28217-3958 a Re: Long Creek Sewer EA, Mecklenburg County CH 91-E-0000-0890, ER 93-7175 Dear Mr. lagnocco: j Thank you for your letter of July 31, 1992, conce ning the above project. Based on our review of the archaeological report, lus recent telephone conversations with Loretta Lautzenhelser, we offeq the following comments. 0 In general the report meets our office's guidelines nd those of the Secretary of the Interior. The following five properties were determined not eligible for listing in the National Register of Historic Places: i 31 MK611 - 31 MK615 Secause no sites listed in or eligible for the National Register are present in the project's area of potential effect, no additional archaeological investigations need to be conducted and the project can proceed as Fined. We would like to note that the study conducted d monstrates the potential major Impacts to areas that could contain significant archaeological sites, While no sites were discovered within the project corridor, the s bsurface tests documented the widespread disturbance of floodplain soils associiiginal ed with pipeline construction activities. The disturbances associated with the Long Creek sewer lines clearly exceed the idealized construction limits depicted in Figure 6 of the report, According to Ms. Lautzenhelser, the -profiles shov?J in Figure 7 depict construction- related deposits of spoil and pipeline wench fill rat er than stress deposits. These observations underscore problems of relying exclusively on engineering drawings of projected construction limits to gauge potential impacts to archaeological resources. The above comments are made pursuant to Section 106 of the National Historic Prq*servation Act of 1966 and the Advisory Coun I on Historic Preservation's Regulations for Compliance with Section 106, cogified at 36 CFR Part 800. 109 East ones Street 9 Raleigh, North Carolina 27601-7807 US ARMY CORPS/ENGRS ID:18282714858 SEP 20100 10:01 No.002 P.30 Michael A. lagnocco August 25, 1992, Page-2 Thank you for your cooperation and consideration. ! If you have questions concerning the above comment, please contact Renee Gledhill-Barley, environmental review coordinator, at 919/733-476$. Sir?cerely, Davld BrooG k?` Deputy State Historic Preservation Officer DB:siw cc: Tom Vandeventer, Charlotte-Mecklenburg Utilities Department Alan Clark, Division of Environmental Management Loretta Lautzenhelser, Coastal Carolina Reseorch