HomeMy WebLinkAboutNCG210111_Compliance Inspection Report_20200207 ROY COOPER r
Governor
MICHAEL S.REGAN :
Secretary
BRIAN WRENN
Acting Director
February 7,2020
Blue Ridge Fiberboard, Inc.
Attn: Mike Veihl
250 Celotex Way
Danville,VA 24541
Subject : Compliance Inspection Report:
Permit No.NC 210111
Blue Ridge Fiberboard, Inc.
Caswell County(NC)&City of Danville
Dear Mr. Veihl:
On February 4, 2020, Brandon Wise and Zac Lentz, inspectors with the North Carolina Department of
Environmental Quality(NCDEQ)—Division of Energy, Minerals, and Land Resources, inspected the facility located at
250 Celotex Way in Danville. The purpose of this visit was to conduct a compliance inspection as part of NCDEQ's goal
to inspect all permitted facilities. The inspection consisted of review of the Stormwater Pollution Prevention Plan
(SWPPP)and each of its components, review of the facility outfall,as well as the review of the overall site conditions.
Permit:
This facility has General Stormwater Permit NCG210111 to discharge stormwater from industrial activity
associated with Lumber and Wood Products,Except Furniture [SIC 241 under the National Pollutant Discharge
Elimination System(NPDES). This version of the permit was issued on August 1, 2018 and will expire on July 31, 2023.
The facility has been permitted since March 26, 1993.
Records/Reports:
This facility is required to develop and maintain a SWPPP in accordance with Part II, Section A of the permit.
All qualitative and analytical monitoring records are required to be maintained with the SWPPP for a minimum of five(5)
years. Under this permit, analytical monitoring is required under current operating procedures. The facility records show
sampling is being completed and is kept onsite in the office. Annual updates to the SWPPP are required in accordance
with Part II, Section A, Item 8 of the permit. The SWPPP was well put together and was updated annually with the
current SWPPP being dated March 2019. Overall the SWPPP was well put together and had all required documentation
and very detailed site maps.
Facility Site Review:
This facility operates as a large fiberboard manufacturing facility. Fiberboard is a type of engineered wood
product that is created using wood fibers and pressed into a single sheet of wood. The facility has large amounts of
finished product stockpiles located on the western side of the facility. The final product is typically stored with a cover on
the actual product. This side of the facility discharges to a ditch that runs around the western side of the building and
discharges to an unnamed tributary of Hogans Creek. The newly graveled area where final products is stored flows to two
drop inlets that then discharge to a holding pond before being discharged to the same ditch. On the eastern side of the
facility a large stockpile of wood chips is stored for use in the process. A majority of this stormwater flows north to the
Virginia outfall. In the southeastern corner of the facility there is an area of storage for old materials and waste materials.
This area needs to have better housekeeping due to the size of the debris allowing for it to be moved by the stormwater.
Facility contacts informed NCDEQ that they are currently working on removing leftover materials from the facility,
therefore this area should be cleaned up in the future. The stormwater from this area discharges to a pipe where it then
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road,Suite 3001 Winston-Salem,North Carolina 27105
_00--400D.E 336-776-9800
_ H„w
Compliance Inspection Report
Blue Ridge Fiberboard,Inc.
February 7,2020
Page 2 of 2
flows to a railroad track where the collection point is located. It should be noted that all discharges from the facility have
the ability to be shut with gates on the pipes in order to prevent any unwanted spills from reaching the waterways.
Effluent Receiving Waters:
Effluent from this facility drains into an unnamed tributary of Hogans Creek, class"WS-IV"waters of the
Roanoke River Basin and the Dan River, class"WS-IV"waters of the Roanoke River Basin. Please note these waters are
subject to protections as documented by North Carolina Administrative Code, 15A NCAC 2B .0216.
Self-Monitoring Program:
This facility is required to provide qualitative and analytical monitoring twice annually. The outfall discharge
from the facility is expected to be properly maintained and monitored. At the time of the inspection monitoring was being
completed and records showed regular inspections were being completed as well. Monitoring records showed a single
exceedance during the last sampling period. This exceedance was of total suspended solids and was caused by ground
disturbing activity that has since been addressed.
There are no additional comments or changes to the currently operating permit. Please continue to keep up the
facility and continue to monitor the stormwater outfalls and discharges. If you have any questions or need additional
information,please contact Brandon Wise at(336) 776-9660 or Brandon.wise@ncdenr.gov.
Sincerely,
Brandon Wise
Stormwater Specialist
Land Quality Section
Winston-Salem Regional Office
Enclosure: Inspection Report
Current Certificate of Coverage
CC:NCDEQ—Permit Laserfiche File
Compliance Inspection Report
Permit: NCG210111 Effective: 08/01/18 Expiration: 07/31/23 Owner: Blue Ridge Fiberboard Inc
SOC: Effective: Expiration: Facility: Blue Ridge Fiberboard,Inc.
County:Caswell 250 Celotex Way
Region: Winston-Salem
Danville VA 24541
Contact Person: David Carey Title: Phone: 847-214-2100
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 02/04/2020 Entry Time: 2:OOPM Exit Time: 12:50PM
Primary Inspector: Brandon L Wise �� Phone: 336-776-9660
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
M Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG210111 Owner-Facility:Blue Ridge Fiberboard Inc
Inspection Date: 02/04/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Facility inspected with Zac Lentz. Facility has very well put together SWPPP with all requirements. Monitoring is being
completed, recently had a TSS exceedance due to a newly graded lot discharging to the outfall. Issue was addressed with
new gravel being put down to reduce the amount of sediment reaching the outfall. Some areas of the facility needed
housekeeping improvements,facility contacts informed NCDEQ that they are in the process of removing scrap from previous
owners and this will help with the housekeeping issues.
Page 2 of 3
Permit: NCG210111 Owner-Facility:Blue Ridge Fiberboard Inc
Inspection Date: 02/04/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? N ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? N ❑ ❑ ❑
#Does the Plan include a BMP summary? 0 ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment: SWPPP was well put together and contained all required documentation.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment: Qualitative monitoring being done at two NC outfalls. Third outfall is subject to VA rules.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑
Comment: Analytical sampling being completed at two NC outfalls. Third outfall is subject to VA rules.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑
#Were all outfalls observed during the inspection? N ❑ ❑ ❑
#If the facility has representative outfall status,is it properly documented by the Division? ❑ ❑ 0 ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment: The two outfalls covered by this permit were observed. Third outfall not looked at. Facility did
have some minor houskeeping issues but the facility was in the process of addressing and
removing old scrap.
Page 3 of 3