HomeMy WebLinkAboutNCC200485_ESC Approval Submitted_20200207ROY COOPER
Governor
MICHAEL S. REGAN
Secrefdiry � - .
S. DAMEL SMITH
Director
NORTH CAROLINA
Environmental Quality
December 31, 2019
LETTER OF APPROVAL
Taylor Morrison of Carolinas, Inc.
Attention: Alan Kerley, VP of Land Development
11405 North Community House, Suite 150
Charlotte, North Carolina 28277
RE: Project Name: Holcomb Woods Phase 2 Lots: 153, 197-210, 285-294
Acres Approved: 8.44
Project ID: CABAR-2020-036
County: Cabarrus
City: Harrisburg
Address: Paper Birch Drive
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Taylor Morrison of Carolinas, Inc.
Date Received by LQS: December 10, 2019
Plan Type: New
Dear Mr_ Morrison:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site, This plan approval shall expire three (3) years following the date of approval,
if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all -new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form. MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.ne.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@nedenr.gov or Paul Clark at Paul.clark@ncdcnr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee
will be charged'annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept
on file at the job site:
D 1;; North Carolina Department of E6yJsonment,9 Quality I Division of Energy, Mineral and Land Resources —�
Mooresville Regional Offlee 1 610 East Center Avenue, SultcWl I Mooresville, North Carolina 281115
'Od 704.6683699
Letter of Approval
Taylor Morrison of Carolinas, Inc,
December 31, 2019
Page 2 of 2
L The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act,
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
S' ly,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
c: R. Joe Harris & Associates
Attention: Patrick L. Murphy, PE
1698 West highway-160, Suite 130
Fort Mill, South Carolina 29708
Inspection Department