HomeMy WebLinkAboutNCC200482_ESC Approval Submitted_20200207ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
interim Director
American States Utility Services, Inc.
Attn: Shay Coombs, PE
P.O. Box 73316
Fort Bragg, NC 28307
NORTH CAROLINA
Environmental Quality
January 29, 2020
LETTER OF APPROVAL
Express Option
RE: Project Name: FB-PN 69251 SOF Replace Maze & Tower
Acres Approved: 2
Project ID: CUMBE-2020-100
County: Cumberland, City: Fort Bragg, Address: Lamont Road
River Basin: Cape Fear
Stream Classification: Other
Submitted By: American States Utility Services, Inc.
Date Received by LQS: January 29, 2020
Plan Type: Express
Dear Ms. Coombs:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the j ob site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOT) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the
above named project. The NOT form may be accessed at deq.nc.govINCGOI. Please direct questions about the
NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially,
DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after July 1, 2019, a $100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
North Carolina Department of Environmental Quality i Division of Energy, Mineral and land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NOFiIHCAHOl1NA �
� � \ 910.433.3300
Letter of Approval
American States Utility Services, Inc.
January 29, 2020
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the
jab site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC, once it is received.
3. Records of inspections made during the previous twelve (12) months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan, including the use of equipment and technology owned and operated by the
Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears otherwise
from you, this correspondence serves as your authorization for DEMLR to utilize equipment and / or technology on
your property for inspection purposes.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerel ,
odi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
cc: Isaiah Koonce, American Stages Utility Services, Inc. (electronic copy)
Lee Ward, Water Management Branch (electronic copy)
DEMLR - Fayetteville Regional Office File