Loading...
HomeMy WebLinkAboutNCC200443_NOI Signed Certification_20200206NCG01 Notice of Intent (NOI) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOL Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6`h Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE Per NC General Statute 143-215.6B (i), any person who knowingly makes any false statement representation, or certification in any application, record, report plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that (check all boxes to indicate your agreement): P� I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. 0 The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. P" I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. C � I hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharges) and is enforceable in the same manner as an individual permit. / Name of Project: kl lv- 4r/4 ,. ��'r �'�1���, G� Z � Legally Responsible Organizational Entity: (-� /44114e (a-7'1 Legally Responsible Person: TT' jo-4v Title of Legally Responsible Person: L) L J �0-74, *Signature: �� l� Date: *Print Name and Title of Signed if Authorized ' Individual Differs from Permittee: Phone Number: 1 1 h _ <q_3 7;' j * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 permit. For more information on signatory requirements, see Part IV, Section B, Item (5) of the NCGO10000 permit. NORTH CAROLINA Environmental Quality Construction Storrnwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System (NPDES) application for coverage under North Carolina's General Permit NCG010000: STORMWATER DISCHARGES associated with construction activities (or NCG250000) A. Project Information Part A. Preje: t Lncation and Information 1. Project Name* Arbor Ridge 2. County* Mecklenburg 3. Highway or 15797 Statesville Rd Street Address * Street name only is acceptable if no address number assigned yet 4. City or Huntersville Township* 5. State* NC 6. Zip Code* 28078 7. Latitude* Enter the latitude In decimal degrees 35A290 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -80.8640 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/05/2020 10. Date to End * 02/28/2021 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial Classification for Development 12. Acres to be 8.74 disturbed * (including off -site borrow and waste areas) 13. Total site area 18.90 (acres) * 14. Post- 3.88 construction (Estimated) impervious area (acres)* Project Tracking ID NCC-MECKL-2020-Arbor Ridge Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Torrence Creek Waterbody* dame of waterbody into which stormwater runoff will discharge 15b. Waterbody 11-115-4 Index No.* NC Waterbody Index Number Stormwater Ili No discharges will l- I Yes flow to additional waters * 16a. Is this project 4 Yes subject to the NC r , No, not subject to NC SPCA Sediment Pollution Control Act?* Note: Stormwater discharges from construction activities associated with oil and gas exploration, production, processing, treatment, or transmission facilities are eligible for the exemption from NPDES permit coverage except in very limited instances. Do not proceed with this application before consulting this EPA fact sheet and verifying a permit applies. B. Permittee Information Permittee Information - Legally Responsible Entity and Individual Important. The person who signs the N01 Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit, For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Name* 2. First Name` 3. Last Name* 3b. Title* 4. Permitee E-mail Address* 5. Perm ittee Telephone No.* 6. Permittee Mailing Address Arbor Ridge at Huntersville LLC Matt If Corporation, enter Registered Agent First Name Sobota If Corporation, enter Registered Agent Last Name Director of Development msobota@ridgecare.com 336-993-7555 Street Address 983 Old Winston Road, Suite 118 Address Line 2 City Kernersville Postal I Zip Code 27284-6640 Check box if the Il Yes street address the same as mailing address State f Province I Region NC Country us 7. Permittee Street Street Address Address` 983 Old Winston Road, Suite 118 Address Line 2 City State / Province 1 Region Kernersvilie NC Postal / Zip Code Country 27284-6640 us 8. Type of Non -Government Ownership` C. Site Contact information Part C. Projoct Site Contact Information 1. Primary Site Matt Contact - First Name * 2. Primary Site Sobota Contact - Last Name * 3. Title Director of Development 4. Site Contact E- msobota@ridgecare.com mail Address* This person will be copied on all correspondence. S. Site Contact 336-993-7555 Telephone No.* 6. Organization Arbor Ridge at Huntersville LLC Name 9. Site Contact Street Address Mailing Address* 983 Old Winston Road, Suite 118 Address Line 2 City State ! Province I Region Kernersville NC Postal I Zip Cody; Country 27284-6640 us 10. Consultant (Optional) Name Jay Henson First and Last name 11. Consultant E- jay@hensonfoley.com mail This person will be copied on all correspondence. 12. Consultant 704-875-1615 Telephone No. D. E&SC Plan Part D. Erosion & Sediment Contrai (E&SC) Plan Approval Information 1. Date E&SC Plan 01/30/2020 Approved * 2. E&SC Plan 393467 Project Assigned by agency or local program Number/ID* 3. E&SC Plan ! State DEQ Office Approved by* Local Program 4. Local Program` Town of Huntersville Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan 2020-01-10_ Arbor _Ridge_Civil_Plans_Feed... 51.43MB Approval must be PDF format letterldocumentation * Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. 6. NOI Certification NOI cert form.pdf 343.27KB Form * Must be PDF format YOU MUST MAIL THE ORIGINAL SIGNED NOI CERTIFICATION FORM (click on this link) to The Stormwater Program at the address on the form for the application to fulfill federal application requirements. The Certification Form must be signed by the person listed in Section B (Permittee Information) or by an authorized responsible person within the same organization. NOTE: The person who signs the paper form must be the same person to electronically certify and sign the eNOL This is an Express E $ No Review Project* F` Yes E. Certification North Carolina General Statute 143-215.6B (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsities, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I"�l I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, * tl I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * jai If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part it (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * tv] I hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you The Responsible Person named on this Notice of Intent are: * Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature's Type Name* Matt Sobota Title* Director of Development Organization* Arbor Ridge at Huntersville Date * 02/03/2020