Loading...
HomeMy WebLinkAbout20191132 Ver 1_WRC Comments_20200204Strickland, Bev From: Wilson, Travis W. Sent: Tuesday, February 4, 2020 2:30 PM To: Leslie, Andrea J; Haupt, Mac; Davis, Erin B; Kim Browning; Steve Kichefski; Tugwell, Todd J CIV USARMY CESAW (US) Subject: East Buffalo Creek Follow Up Flag: Follow up Flag Status: Flagged One point I wanted to add for this project in reference to salvaging any of the current instream habitat and organisms. Because the entirety of the new channel is completely off line it will complicate that process. In a lot of situations where we can salvage bedload or relocate species the new channel crosses over the old and the construction can be done in smaller sections. That allows the construction of a new section with flow and relocating from the next section into the new and bedload from the old abandoned channel can be used in the new ... etc. For this project reusing any bedload material out of the existing stream will require a lot of excavation in a live stream, and relocation of organisms will have to occur all at once when water is diverted. Having not seen the site this might not be that big of an issue, particularly if there is no bedload to salvage. But something to think about. Travis W. Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program NC Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, NC 27522 Phone: 919-707-0370 Fax: 919-528-2524 Travis.Wilsonancwildlife.ora ncwildlife.org a in n m Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.