Loading...
HomeMy WebLinkAboutNCC200455_NOI Application_20200206Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/4/2020 10:51:27 AM (NCG01 NOI Submission) Approve by Morman, Alaina 2/5/2020 10:58:49 AM (Review- Construction NOI 21488) • The task was assigned to Morman, Alaina by round robin distribution 2/4/2020 10:52 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 6, 2020 5:00 PM. The priority is: High 2/4/2020 10:52 AM Submit by McCoy, Suzanne 2/6/2020 10:44:25 AM (Payment Verification for NCC200455) * Alicia De Palma • McCoy, Suzanne assigned the task to McCoy, Suzanne 2/6/2020 10:43 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 18, 2020 5:00 PM. The priority is: High 2/5/2020 10:59 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * PING Line 328 Relocation A 2. County* Forsyth 3. Highway or Street White Rock Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Winston-Salem 5. State * NC 6. Zip Code * 27105 7. Latitude * Enter the latitude in decimal degrees 36.1785 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.2157 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/06/2020 Estirrated Construction Project Start Cate 10. Date to End* 04/30/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Other (0000) Standard Industrial Classification for Ceveloprrent 12. Acres to be 8.60 disturbed* (including off -site borrow and waste areas) 13. Total site area 8.60 (acres) * 14. Post- 0.02 construction (Estirrated) impervious area (acres) * NCC Project NCC-FORSY-2020-PNG Line 328 Relocation A Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Mill Creek Wate rbody* Barre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 12-94-7 Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Piedmont Natural Gas Name * 2. First Name* Sanu If Corporation, enter Pbegistered Agent First Barre 3. Last Name* Odugbesan If Corporation, enter Faegistered Agent Last %rre 3b. Title Project Manager 4. Permitee E-mail sanu.odugbesan@duke-energy.com Address * 5. Permittee 704-731-4246 Telephone No.* 6. Permittee Mailing Street Address Address* 4720 Piedmont Row Drive Address Line 2 city State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Frovince / Fbgion Charlotte NC Fbstal / Zip Code Country 28210 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Dennis Contact - First Name * 2. Primary Site Robertson Contact - Last Name * 3. Title Implementation Superintendent 4. Site Contact E- dennis.robertson@duke-energy.com mail Address* 5. Site Contact 803-917-6577 Telephone No. 6. Organization Name 7. Site Contact Street Address Mailing Address* 4720 Piedmont Row Drive Address Line 2 City Charlotte Fbstal / Zip Code 28210 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 12/04/2019 Approved * 2. E&SC Plan Project FORSY-2020-013 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Permit Approval DOC120419-12042019111711.pdf 11.07MB Approval Wst be FDFfornat letter/documentation Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. 6. NOI Certification NOI form signed.pdf 49.73KB Form Mast be RDFforrrat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Sanu Odugbesan Title Project Manager Organization Piedmont Natural Gas Date * 02/04/2020 F. Tracking and COC Info NOI Tracking No. 21488 NC Reference No. NCG01-2020-0455 Uses 'count number' variable (incremrented by SP) Certificate of NCC200455 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 455 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)