Loading...
HomeMy WebLinkAbout20190289 Ver 1_Approval Letter_20200206ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Publix Super Markets Inc Attn: Randy Barber 501 North Galloway Rd Lakeland, FL 33815 NCDOT, Environmental Analysis Unit Attn: Phillip Harris III, P.E., C.P.M. 1598 Mail Service Center Raleigh NC 27699-1598 NORTH CAROLINA Environmental Quality February 6, 2020 DWR # 20190289 correction Guilford County Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions Publix Distribution Center USACE Action ID. No. SAW-2018-00240 Dear Sirs: Attached hereto is a copy of Certification No. WQC004211 issued to Randy Barber and Publix Super Markets Inc., and Phillip Harris III and NCDOT, dated February 6, 2020. This Certification is being issued to modify the mitigation condition and replaces in full the Certification issued on January 22, 2020. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at htto://www.ncoah.comZ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). D_EQ� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 2 of 9 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Mac Haupt, Acting Supervisor 401 & Buffer Permitting Branch Enclosures: Final Decision Granting Variance with Conditions (DWR Project #20190289 v2) cc: Brian Breissinger, Timmons Group (via email) Michael Turchy, NCDOT (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) Olivia Munzer, NCWRC (via email) Todd Bowers, EPA, (via email) DWR WSRO401 file DWR 401 & Buffer Permitting Branch file Filename: 20190289Publix(Gu ilford)_401_IC_reissua nce.docx Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 3 of 9 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004211 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500, to Randy Barber and Publix Super Markets Inc., and Phillip Harris III and NCDOT, who have authorization for the impacts listed below, as described within your modified mitigation information received by the N.C. Division of Water Resources (Division) on January 24, 2020, and the original application received on March 5, 2019 and subsequent information on May 5, 2019, August 16, 2019, October 7, 2019, December 9, 2019 and December 12, 2019, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on February 28, 2019. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Development Impacts Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream S1-A* 290 (linear feet) 0 (linear feet) SI-B 687 (linear feet) 0 (linear feet) Si-C 28 (linear feet) 0 (linear feet) S2 318 (linear feet) 0 (linear feet) S3* 204 (linear feet) 0 (linear feet) S3.2* 163 (linear feet) 0 (linear feet) S4 283 (linear feet) 0 (linear feet) S5 56 (linear feet) 0 (linear feet) S6 373 (linear feet) 0 (linear feet) S7-A* 1479 (linear feet) 0 (linear feet) S7-B 708 (linear feet) 0 (linear feet) S7-C 54 (linear feet) 0 (linear feet) S10.2 89 (linear feet) 0 (linear feet) 404/401 Wetlands W1 142 (square feet) 0 (square feet) W2 743 (square feet) 0 (square feet) W2.2 21(square feet) 0 (square feet) W3-A 1 87 (square feet) 0 (square feet) W3-13 1 5035 (square feet) 0 (square feet) Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 4 of 9 W3-C 1297 (square feet) 0 (square feet) W4 1468 (square feet) 0 (square feet) WS-B 4169 (square feet) 0 (square feet) W6-A 911 (square feet) 0 (square feet) W6-13 1370 (square feet) 0 (square feet) W8 255 (square feet) 0 (square feet) W9 976 (square feet) 0 (square feet) W10 285 (square feet) 0 (square feet) W10.2 85 (square feet) 0 (square feet) Wll 519 (square feet) 0 (square feet) W12-A 608 (square feet) 0 (square feet) W12-B 340 (square feet) 0 (square feet) W13 5895 (square feet) 0 (square feet) W14 7167 (square feet) 0 (square feet) W15 132 (square feet) 0 (square feet) W16 67 (square feet) 0 (square feet) W17 87 (square feet) 0 (square feet) W18-A 280 (square feet) 0 (square feet) W18-B 203 (square feet) 0 (square feet) W18-C 164 (square feet) 0 (square feet) W18-D 822 (square feet) 0 (square feet) W18-E 1308 (square feet) 0 (square feet) W19 4935 (square feet) 0 (square feet) W19.2 3461 (square feet) 0 (square feet) W39.3 5113 (square feet) 0 (square feet) Open Waters W5-A 62719 (square feet) 0 (square feet) W7 142 (square feet) 0 (square feet) * indicates perennial stream requiring mitigation Roadway Improvement Impacts Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Sl 10 (linear feet) 19 (linear feet) S2 6 (linear feet) 10 (linear feet) S3 13 (linear feet) 13 (linear feet) S5 251 (linear feet) 33 (linear feet) S6 20 (linear feet) 15 (linear feet) 404/401 Wetlands W2 0.02 (acres) 0.01(acres) W4 0.05 (acres) 0.03 (acres) W5 0..01 (acres) 0 (acres) Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 5 of 9 Buffers —Zone 1 131 1201 (square feet) 0 (square feet) B2* 11763 (square feet) 0 (square feet) B3 1635 (square feet) 0 (square feet) Buffers — Zone 2 B2* 4355 (square feet) 0 (square feet) B3 896 (square feet) 1 0 (square feet) * indicates impacts requiring mitigation 2. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502] 3. Mitigation must be provided for the proposed development impacts as specified in the table below. The Division has received acceptance letters from the NC Division of Mitigation Services (DMS) to meet the stream and buffer mitigation requirements and from the Restoration Systems LLC Mitigation Bank - Benton Branch Site to meet the wetland mitigation requirement. Until the DMS and Restoration Systems receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation Required River and Sub -basin Number Stream 2,136 (feet) Cape Fear (03030002) Wetland 1.10 (acres) Cape Fear (03030002) Buffers Zone 1: 35,289 (square feet) Zone 2: 6,532.5 (square feet) Cape Fear (03030002) Haw River 4. Publix Super Markets Inc shall secure an approved Stormwater Management Plan (SMP) from Guilford County before any development impacts authorized in this certification occur. If the approved SMP, or any future modification of the SMP, causes the outlet structures of Stormwater Pond A and Stormwater Pond D to be different from what was submitted to the Division on December 9, 2019 then the modified SMP shall also be submitted to the Division prior to the commencement of the modifications [15A NCAC 02B..0506(b)(5)] S. Publix Super Markets Inc shall implement the Stream Hydrology Monitoring Plan prepared by Timmons Group and dated November 27, 2019 with the following modification: Publix Super Markets Inc shall collect data continuously for a minimum period of three (3) years which will begin when the erosion control permit is formally closed by the appropriate local or state agency which will indicate that the site is considered stable and in a "post -construction" stormwater condition. Publix Super Markets Inc will notify the Division within 30 days of start of continuous monitoring. Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 6 of 9 6. Full Compliance with Final Decision Granting Variance with Conditions (DWR Project #20190289 v2), issued by the Environmental Management Commission on August 9, 2019 is required. [15A NCAC 02H .0506(b)(3)] 7. All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 8. Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent, and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506 (4)] 9. The proposed project development project must comply with the Guilford County local water supply ordinance approved by the N.C. Environmental Management Commission (EMC) as required under the Jordan Lake Water Supply Watershed: Protection and Maintenance of Riparian Areas (Jordan Buffer Rule) [15A NCAC 02B .0267] 10. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification. [15A NCAC 02H .0501 and .0502] No removal of vegetation or other impacts of any kind shall occur to state regulated riparian buffers beyond the footprint of impacts approved in a Buffer Authorization or Variance or as listed as an exempt activity in the applicable riparian buffer rules. [15A NCAC 02B .0200] 11. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). 12. Sediment and erosion control measures shall not be placed in wetlands or waters except within the footprint of temporary or permanent impacts authorized under this Certification. [15A NCAC 02H .0501 and .0502] 13. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. [15A NCAC 02B .0201] 14. An NPDES Construction Stormwater Permit (NCGO10000) is required for construction projects that disturb one (1) or more acres of land. The NCGO10000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If the project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506(b)(5) and (c)(5)] The North Carolina Department of Transportation (NCDOT) shall be required to be in full compliance with the conditions related to the construction activities within the most recent version of their individual NPDES (NCS000250) stormwater permit. [15A NCAC 02H .0506(b)(5) and (c)(5)] Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 7 of 9 15. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)] 16. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. [15A NCAC 02B .0200 and 15A NCAC 02B .0231] 17. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. [15A NCAC 02B .0200] 18. No temporary impacts are allowed beyond those included in this Certification. All temporary fill and culverts shall be removed and the impacted area shall be returned to natural conditions within 60 calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed profile. All temporarily impacted sites shall be restored and stabilized with native vegetation. [15A NCAC 02H .0506(b)(2) and (c)(2)] 19. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this Certification. [15A NCAC 02H .0506(b)(2) and (c)(2)] 20. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 21. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to prevent movement by wave, current action, or stream flows and shall consist of clean rock or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)] 22. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 8 of 9 23. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shall not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuels and oils. [15A NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211 (12)] 24. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance. [15A NCAC 02H .0506(b)(3) and (c)(3)] 25. In accordance with 143-215.85(b), the permittee shall report to the Winston Salem Regional Office at (336) 776-9800 (after hours and on weekends call 800-858-0368) any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. 26. Randy Barber and Publix Super Markets Inc., and Phillip Harris III and NCDOT shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B .0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Randy Barber and Publix Super Markets Inc., and Phillip Harris III and NCDOT and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Randy Barber and Publix Super Markets Inc., and Phillip Harris III and NCDOT in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 27. Upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return a certificate of completion (available on the DWR website https://edocs.deg.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0502(f)] 28. If the property or project is sold or transferred, the new Permittee shall be given a copy of this Certification (and written authorization if applicable) and is responsible for complying with all conditions. [15A NCAC 02H .0501 and .0502] 29. This Certification neither grants nor affirms any property right, license, or privilege in any waters, or any right of use in any waters. This Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Certification does not create any prescriptive right or any right of priority regarding any usage of water. This Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Certification to possess any prescriptive or other right of priority with respect to any other consumptive user Publix Distribution Center DWR Project #20190289 Individual Certification #WQC004211 Page 9 of 9 regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. 30. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [35A NCAC 02H .0502(e)] 31. Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. 32. The permittee shall report to the Winston Salem Regional Office at (336) 776-9800 any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200) including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200). Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506] This the 6"' day of February 2020 Mac Haupt, Acting Supervisor 401 & Buffer Permitting Branch SLH WQC004211