Loading...
HomeMy WebLinkAbout20001047 Ver 1_COMPLETE FILE_20000809 CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants DWQ CALCULATIONS FOR CAPITAL PLAZA Wake Forest, NC tn? i p ,S? 1 rlJ , ??1 •i , ? November 13, 2000 Project No. 06013 :!!TA Prepared For Wake Forest/Granite, L.L.C. P.O. Box 1928 Mount Airy, NC 27030 k 3622 Lyckan Parkway Suite 3003 . Durham, N.C. 27707 919-490-1645 Phone ¦ 919-403-0336 Fax civilengr@aol.com CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 CHECKED BY joB_L. 4P! 7"A L ?LAZA SHEET NO. OF Z CALCULATED BY ?! \ DATE DATE Q = c"' / 2 7 - 3 04F A crS (:Z/o - ':? 3 = 37 19 cw z /-/ -??z ?9 3 Z 7 w VXOMT 2W 1 is?ois No) Ml (ftMj ®. uc . siocn. Mm 01471 N Dl* PHD E T0U FA& 14WY154M CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 DATE ?loii/E" cPf?41? 5-fA- Quo ?- SS ? 3S 9 C?S_ S40 ?r Lt/?RO?rr?v 741/0 ?T ??l./? OUT,?.4LL ©/ pup ?.VTc°11 ? Gc???S CZ/ Z -7, G. CFS Q=__?wLNi2 1-71 5 10 [ rz'' D 0 SIr1AIE'- kJ?1R v -Alp CHECKED BY. joB_?P/Tq G. A44 4 /f SHEET NO. Z OF CALCULATED BY_ <C/ IA? DATE PRODUCT 204 1 ;Srg%SNft) 251;vwaaa ®. int. Grown. Wss 01471 To ONa PNDNE TOLL FREE 14M M4,W Y CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants GA `, DWQ CALCULATIONS FOR CAPITAL PLAZA Wake Forest, NC November 13, 2000 Project No. 06013 Prepared For Wake Forest/Granite, L.L.C. P.O. Box 1928 Mount Airy, NC 27030 ` ry 3622 Lyckan Parkway Suite 3003 . Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax . civilengr@aol.com CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 CHECKED BY. SCARF JOBL?API -rA L P 'L14 Z4 SHEET NO. I OF 2 CALCULATED BY ty?,/ / \ DATE DATE Q-i?gt/ ; l?>scl1,4,zc,-? 7o Z-:5- o ? ? 3 = 3? 9 c<-s '9- ??Z7p? .?!Z '-5 ................ PROOUDi 247 ("AN) 2051 IPIM) O* bt., Grobn. MW 01471. To Oraw PNDW MU FREE 14M23 633 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB-S.-4*0/7r4?- Y SHEET NO. G OF G CALCULATED BY DATE CHECKED BY DATE RrAI F 90 Q? G SS = 3$ 9 ?S_ CF.? Wit. 5 ?? ?TsEr?, L,?.,v = 7o X ?¢ 5 S90 ?T LVC.4 rro?rD?l? ? 70 ?T Ot/T?,4LZ- 64-XpuZ74-hC ' ?PU7" OUT,?,4LL. ©?" •9.up lIV7257 G. CFS Q - Gk, L y ?2 =D,S 2 7Y O s1Q? ?ZAI,P c . 1 PRODUCT 204 1130911$INN) MI (PaM) ®. Wt. WW. Mm 01471 To ONM DRONE TOLL FREE I-WG 254M CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants DWQ CALCULATIONS FOR CAPITAL PLAZA Wake Forest, NC November 13, 2000 Project No. 06013 Prepared For Wake Forest/Granite, L.L.C. P.O. Box 1928 Mount Airy, NC 27030 CIO % 3622 Lyckan Parkway Suite 3003 . Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax civilengr@aol.com CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 jOB L ;4PI -rA L AL A ZA SHEET NO. OF CALCULATED BY (:f p1le DATE G?HE?k6g8Y [ DATE ,1r JVi.? Q = GwLN?2 G 3 ?32? 6-1 vE/V : 2:2, 5?1<f RCS'. 7; L5 ite- 2 <io G ':? 3 - 37 9 cis 7 9 C07?),? Z y_ d, 0, ? 17 3 , VICo, i3-XZ?a? - /. / PRODUCT 204 1 $rpy SNM) 2051 ,NaMl1 . Wt GMWb Wn 01471 %D W W01[ TOLL FREE 1400.2254M CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 CHECKED BY JOB- C ?/Tq 4r Y Get' /J SHEET NO. Z OF ?i CALCULATED BY DATE DATE 5TATC I.MP1 ElJA45- 7D -_/Op iO C G'ivil! % Qa ??D = ZT C?5 <F, 90 Qro ?- SS ? 3S 9 C.FS PER _6T?T2, Llt lw = 72%'< ¢ $ 5"40 ?T L?VC?'? ?RO ?/DFf, ? ??O ?'T ?T21lC?v,??? 7-e S?I?IJ w Z -7, y G, C><S a = ?w L ,y !23 ?7/3 , 3Cs?G???Z D .:51t?,E-' I?1f?R vl;zAlp PRODUCT 204 1 $npY SMU12W I ?Pjml ®. k. WW. Mm 01471. To per PIM TOLL FREE 140D-234W State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Certified Mail Return Recent Requested Mr. James L. Horton JLH Hydro, Inc. 1800 Statesville Blvd. Salisbury, NC 28144 Dear Mr. Horton: A ?? NCDENR October 23, 2000 Re: FERC Project No. 2585 Idols Hydroelectric Project Davie/Forsyth County DWQ # 991181 The Division of Water Quality has reviewed your submittal for a 401 Water Quality Certification for the subject FERC project made on October 25, 1999. This Office sent correspondence to you on November 11, 1999 that stated that your application was not complete since you did not provide information that shows that you have title to the subject property or have been authorized by the owner to apply for certification (15A NCAC 2H .0502(t). At that time we placed the application on hold to allow you an opportunity to provide the necessary information. 15A NCAC 2H .0502(f) states that an application "shall be considered valid only if the application bears the signature of a responsible officer of the company, municipal official, partner or property owner." As of this date this Office has no evidence in the subject file that the above information has been provided. As such, this Office is returning your application (enclosed) because it cannot be considered valid. By copy of this letter, the Division is notifying the Federal Regulatory Commission that the subject 401 Water Quality Certification could not be considered valid and is, hereby, being returned to the applicant. You may apply for a 401 Water Quality Certification at a later date if the above information can be provided. I can be reached at 919-733-1786 if you have any questions. Sincerely, J ?f Joh/R. Dorney Water Quality Certification Program Enclosures cc: Winston-Salem DWQ Regional Office Secretary, Federal Energy Regulatory Commission, Dockets-Room A, 888 First Street NE, Washington, DC 20426 Todd St. John File 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1896 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper At n NCDENR DIVISION OF WATER QUALITY November 17, 2000 Memorandum To: Bob Zarzecki From: Todd St. John Subject: Capital Plaza Wake County D W Q# 001047 I have reviewed the stormwater plan for the subject property and have determined that the applicant has provided a design on the site plans dated November 13, 2000 that will achieve diffuse flow to the maximum extent practicable. The applicant will use dry detention basins for shaving peak flows followed by swales or rock berms designed to provide diffuse flow. The applicant has consolidated all of their impacts under NW 39 and is below the threshold impacts for notification. As such, they are only required to meet NBR stormwater requirements. The above design provides more than 70 feet of diffuse flow per 10 cis in a 10 year storm according to Phil Koch of Civil Consultants. Page 2 of 2 Diffuse flow of all stormwater at non-erosive velocities shall be achieved prior to the stormwater entering the protected stream buffers as identified within 15A NCAC 213 .0233(5). Stormwater controls described within the November 13, 2000 revisions reviewed by Mr. Todd St. John shall be put in place to ensure the diffuse flow requirement of the rules. Deed notifications or similar mechanisms shall be placed on remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the State in order to assure compliance for future wetland, buffer and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter. If you do not accept any of the conditions of this certification. you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings. P.O. Box 27447, Raleigh. N.C. 27611- 7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality "No Practical Alternatives" determination under 15A NCAC 2B .0233(8). If you have any questions. please telephone Bob Zarzecki at 919-733-9726. Sincerely. Stevens Attachment Cc: Steve Mitchell / DWQ Raleigh Regional Office File Copy Central Files Phil Koch, Civil Consultants, Inc. Non-Discharge Branch Wetlands/401 Unit 1621 Mail Service Center FAX # 7 Raleigh, 9 North Carolina 27669-1621 Telephone 919-733-1786 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper IF State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Zra h WA IT 00 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 27, 2000 DWQ # 001047 Wake County Page 1 of 2 Mr. Craig Hunter, Manager Wake Forest/Granite LLC PO Box 1928 Mount Airy. NC 27030 Re: Neuse River Buffer Authorization Capital Plaza Wake County, NC APPROVAL of Neuse River Buffer Rules CERTIFICATE OF AUTHORIZATION And 401 Water Quality Certification Dear Mr. Hunter. You have our approval, in accordance with the attached conditions, to impact 147 linear feet of streams, .092 acres of wetlands, and the protected riparian buffers for the purpose of construction of a road crossing in a jurisdictional stream that is subject to the Neuse Buffer Rules and the development of the Capital Plaza project. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification number 3289 or 3287, for Nationwide permits numbers 14 or 39, respectively. The stream crossing shall not impact over 150 feet of stream length, including any stabilization, without unless you first provide a modified application and obtain written approval to use General Water Quality Certification No. 3287. The stream crossing and associated stormwater controls shall be constructed as described within your application and the proposed construction plans dated November 13, 2000. In addition, you should get any other required federal, state or local permits before you proceed with your project. This approval is only valid for the purpose and design that you described in your application including the November 13, 2000 revisions. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization and approval letter and is thereby responsible for complying with all conditions. For this approval to be valid, you must follow the conditions listed below as well as any other conditions identified within 15A NCAC 213 .0233. The stream crossing shall not impact over 150 feet of stream length, including any stabilization. The stream crossing and associated stormwater controls shall be constructed as described within your application and the proposed construction plans dated November 13, 2000. Non-Discharge Branch Wetlands/401 Unit 1621 Mail Service Center FAX # 7 Raleigh, 9 North Carolina 27669-1 62 1 Telephone 919-733-1786 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper `qte of North Carolina apartment of Environment And Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director NCDENR Division of Water Quality October 10. 2000 C. Phil Koch, P.E. Civil Consultants 3622 Lyckan Parkway, Suite 3003 Durham, NC 27707 Subject: Capital Center DWQ Project No. 001047 Wake County Dear Mr. Koch: The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional information is as follows: 1. Pond Worksheet 1 Please complete the enclosed worksheet for each pond in order to minimize review time. Forested Filter Strips Forested filter strips, specified in condition no. 13 of General Water Quality Certification No. 3287, are required to be 100 feet wide (perpendicular to flow) per acre tributary to them. They also must be at least 50 feet long (in the direction of the flow, see page 78 of the NC DENR Stormwater Best Management Practices Manual, April 1999). However the width of the strips can be reduced, in this instance, as determined using the following equation: W,=Qd*WiodQPCiA (where Wr= the required width, Qd= the peak discharge associated with a 10 year event after it has been routed through the detention or retention pond. W100= the width of the forested filter strip based on 100 feet per acre tributary, QPCiA= the peak discharge from the 10 year event as it enters the detention/retention pond). Please provide calculations to show that the above has been met. Operation and Maintenance Agreement An operation and maintenance agreement is required. Typical requirements for an operation and maintenance plan include the following: • Vegetation management/mowing schedule • Semi-annual inspections • Debris check after every storm event • Benchmark for sediment removal (specific elevations listed) • Designation of a responsible party 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper The operation and maintenance agreement must also be signed by the responsible party and notarized. Please see the following for the link to an example agreement: http://h2o.enr.state.nc.us/su/PDF_Files/State_SW_program_forms/SWU 102_Wet_Pond_Supplemen t.pdf Division wetlands unit staff will strive to complete a final technical review within 10 working days of receipt of the requested information. Completing the enclosed worksheet will greatly decrease the staff review time. If you have any questions or would like to discuss this project, please contact me at (919) 733-9584. Also, please note that the NCDENR Stonnwater Best Management Practices Manual, April 1999, and other documents and information can be downloaded from the Wetlands Unit web site at http://h2o.ehnr.state.nc.us/ncwetIands/. Sincerely, Todd St. John, P Environmental Engineer Attachments cc: John Dorney, Wetlands/401 Unit Raleigh Regional Office File CIVIL CONSULTANTS INC. Civil Engineers band Development Consultants TO: NCDENR-DWQ 4401 Reedy Creek Road Raleigh, NC 27607 DATE: 09/26/00 JOB NO: 6013 ATTN: John Dorney RE: Capital Plaza Wake Forest, NC WE ARE SENDING YOU THE FOLLOWING ITEMS VIA Airborne Express COPIES DATE NO. DESCRIPTION 1 09/26/00 Letter addressing comments 3 09/26/00 1-7 Supplemental Stormwater Management Calculations (Level Spreader Design) 3 09/25/00 C4 Grading Plan 3 109/25/00 D5 Stormwater Detention/Retention Ponds Plans and Details THESE ARE TRANSMITTED AS CHECKED BELOW: F I FOR APPROVAL ? AS REQUESTED FOR REVIEW AND COMMENT F-1 FOR YOUR USE F] _; I Wi ? FOR SIGNATURE ? AS DISCUSSED REMARKS: COPY TO: File SIGNED: C. Phil Koch, P.E. LETTER OF TRANSMITTAL 3622 Lyckan Parkway Suite 3003 n Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax civilengr@aol.com CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants September 26, 2000 Project No: 6013 NCDENR, Division of Water Quality Non-Discharge Branch 401 /Wetlands Unit 1621 Mail Service Center Raleigh, NC 27699 Attn: Mr. John Dorney Ref: Capital Plaza DWQ Project No. 001047 Dear Mr. Dorney: In response to your letter of review, please find the enclosed revised drawings and calculations referencing the modified outlets to the ponds. These revisions address the following concerns stated in your letter: 1. Provide a method demonstrating sheet flow of outlet water Each pond outlet has now been redesigned to provide a level spreader device to convert the concentrated flow to uniform flow at non-erosive velocities of less than 2 fps. The design used is similar in nature to the spreader detail provided in the state handbook. Given this design, the high velocity (10 fps or more) at the FES is reduced to 2.5-3.5 fps at the end of the rip rap and then further reduced to less than 2 fps by the spreader. Additionally, since the height of the spreader weir is above the elevation of the water surface at the end of the apron, some pooling will occur to further decrease the velocity and provide some additional settling on the upstream side of the weir. The combination of the pooling and weir length provide for uniform flow over the outlet weir at velocities below the 2 fps onto the grassed areas below the outlet. As designed, these devices provide the least invasive method of providing uniform flow. Other than the protective, biodegradable liners required for grass establishment, these devices do not introduce any foreign materials to the area in question; they are constructed solely through standard grading and seeding methods. Additionally, the devices have been located in and above well-vegetated areas of uniform slope draining to the wooded areas above the stream; thus, re-concentration of the runoff is not likely. 362.2 Lyckan Parkway Suite 3003 . Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax civilengr(a)aol.com 2. Move outlet of Pond #4 Also, per your request, the outlet at Pond #4 has been moved to the south side of the pond. I anticipate that this information will be sufficient to address these items. However, should you have any additional questions or concerns, please contact Tony Whitaker or me at 919-490-1645. Sincerel urs, Phil Koch, PE Enclosures CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants SUPPLEMENTAL STORMWATER MANAGEMENT CALCULATIONS (Level Spreader Design) for CAPITAL PLAZA Wake Forest, North Carolina September 26, 2000 Project No. 06013 Prepared for: Wake Forest/Granite, LLC P.O. Box 1928 Mount Airy, NC 27030 3622 Lyckan Parkwnv Suite 3003 Durham, N.C. 27707 919-490-1645 Pfinn,: 919-403-0336 Far civilengr@aol.com 1 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 Job L> / ??RF4T?lGC2 - A-plT,4L_ SHEET NO OF CALCULATED BY DATE CHECKED BY DATE SCALE LEv E L _ J P REAM=1? ?4t.. ?., PC-; _DLiCl , LEuE1 SPTPe,4QrZ:R, 71-vlCEz ; A R.C . TFECZ4 l R V RF-I?;'4X-E FZC w ?a M 7-14E (:5L4 -r r--ALI .!5 --Ta lJ loll FOP-M F-LnLO _@ _ _Na? - I:F?,OS.t VE _ VClrx.,L-tl ES_. ?P RE?IIJ EIS I i? D I CA.TE Tt-f.4.T ?i-tE 1??.1 ?. ?>= ?EC'7? OIF SP?EAI7E(? ?Cf7L..?C,?' ? ?/Ei-4aG!"?`c? Tc? L- TH?>`i 8A!6 EV ON - 3 L k L = h/??? LE?,lc?Tl-c, C? _ Nlax CFS? Pcrlp ! ?sivEtit ?., = ?8?? IFS 4,7 I ?3 L_ 240 (8° x ,. 99) F"o L- LO I d I N G T t E- SA t- ( tE- 1" E1-1-A 0 70 LO &Y/, ?1- L ?o u v 1 5'8.7 8d' "7 40, 3 i0 S,o " 1, 9 f-P:S 3 21,E 30' 4, '7 , 1, 9 cps 32 4 o l 51,011 1, 9 -FPS AL.- Afcr- Lo,A-mv I.t w EL-L- vEr7E-r,? t AjzEAs . 1 d- Z oL rL-F---T' AeovE A G--RASSED, SEWE?F- E?S?N"l -T` L©c1?-f?P A8pt1;E:: `r4c Wo6 PS SI M l L4 F2.l-Y. A R cA A C JACEN-T- T_-T_4.? TAE .?•T? I. ,q L ?c.!-r? L.L PRODUCT 204 1ISNo SWs?05 l p3M.1 Pond 1 - Conditions at end of Apron Worksheet for Trapezoidal Channel Project Description Project File Worksheet Flow Element Method Solve For c:\haestad\academic\fmw16013-lev.fm2 Pond 1 - Outlet conditions @ apron Trapezoidal Channel Manning's Formula Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 58.70 cfs Results Depth 0.90 ft Flow Area 18.58 ft2 Wetted Perimeter 23.68 ft Top Width 23.39 ft Critical Depth 0.67 ft Critical Slope 0.027928 ft/ft Velocity 3.16 ft/s Velocity Head 0.16 ft Specific Energy 1.05 ft Froude Number 0.63 Flow is subcritical. o9i2sioo 09:13:36 AM Academic Edition FIOWMaster v5.17 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 75555-16W Page 1 of 1 Pond 2 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 2 - Outlet conditions at Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 fttft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 40.30 cfs Results Depth 0.72 ft Flow Area 14.54 ftZ Wetted Perimeter 22.56 ft Top Width 22.33 ft Critical Depth 0.52 ft Critical Slope 0.030024 ft/ft Velocity 2,77 ft/s Velocity Head 0.12 ft Specific Energy 0.84 ft Froude Number 0.61 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:17:05 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 C,? Pond 3 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 3 - Outlet Conditions c@ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 21.70 cfs Results Depth 0.50 ft Flow Area 9.78 ft2 Wetted Perimeter 21.17 ft Top Width 21.01 ft Critical Depth 0.35 ft Critical Slope 0.033959 ft/ft Velocity 2,22 ft/s Velocity Head 0.08 ft Specific Energy 0.58 ft Froude Number 0.57 Flow is subcritical. 09/26100 Academic Edition FlowMaster v5.17 09:19:39 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 t'" Pond 4 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 4 - Outlet Conditions @ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 32.00 cfs Results Depth 0.59 ft Flow Area 12.92 ft2 Wetted Perimeter 23.75 ft Top Width 23.56 ft Critical Depth 0.42 ft Critical Slope 0.031969 ft/ft Velocity 2.48 ft/s Velocity Head 0.10 ft Specific Energy 0.69 ft Froude Number 0.59 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:22:01 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 (n CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 joe SyMRZ e,47-Ai//7' I T, SHEET NO. OF C1?K CALCULATED BY DATE CHECKED BY DATE -SCALE JuMMA2Y O?_ 1/E.LdCl?Y_ _ I??1iG1C?iOLV /?? 2 ro, ? _ _ Z.s ?, /7 7 w C)a.?-?w 7?547 6151NG Q - A _w ?NUUM) M 115"0511Msi 205 1 iPaWM r M CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants SUPPLEMENTAL STORMWATER MANAGEMENT CALCULATIONS (Level Spreader Design) for CAPITAL PLAZA Wake Forest, North Carolina September 26, 2000 Project No. 06013 Prepared for: Wake Forest/Granite, LLC P.O. Box 1928 Mount Airy, NC 27030 3622 Lyckan Parkwav Suite 3003 Durham, N.C. 27707 919-490-1645 Prone 919-403-0336 Fax civilengr@aol.com J CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOBLMM'I ??RF tT?Ctz - APIT t SHEET NO. OF_ CALCULATED BY DATE CHECKED BY DATE SCALE PaNp I Cs?vt~? 5'8, 7 cFS 00 L. = SO 4,7 -lr ?3 L 24O ?Sox?3 1, 9 GPs 1:5c'L LO ?'-fi N G 7-k E, S? -t ETA o PO L4 ?rl? ?1- , L you D 1 5-8.7 8d' 4 , 7 A/ ,? P5 Z 40.3 5?' S,o "' 1, 9 3 2l,? 30' 4,-7/1 3? 4o pf AL t_ AF-,c LocA-cp la wEa- vEr?- T,?IT P AR?45. l Z 6L rL.F--T- Aso\/E-: A G A 55Ej7.3 5E:W U;z E-N,SE.NZ E RT L-6cA71z v Ascvcc 7-4c klcx:tp5 RD.J Ac'-* r:- 7r- To 7-N, Ic- 'St Nt t LAR,L' Y AREA A w,4cZEN-r-- -t,-Z, - K'> ?. ? ?TCzE?? 1. ALL O- G- FA u::s PRODUCT 204 1 IS.VO SWsi 205 1 PM Pond 1 - Conditions at end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 1 - Outlet conditions c@ apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 58.70 cfs Results Depth 0.90 ft Flow Area 18.58 ft2 Wetted Perimeter 23.68 ft Top Width 23.39 ft Critical Depth 0.67 ft Critical Slope 0.027928 ft/ft Velocity 3.16 ft/s Velocity Head 0.16 ft Specific Energy 1.05 ft Froude Number 0.63 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:13:36 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Pond 2 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 2 - Outlet conditions at Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 40.30 cfs Results Depth 0.72 ft Flow Area 14.54 ftz Wetted Perimeter 22.56 ft Top Width 22.33 ft Critical Depth 0.52 ft Critical Slope 0.030024 ft/ft Velocity 2.77 ft/s Velocity Head 0.12 ft Specific Energy 0.84 ft Froude Number 0.61 Flow is subcritical. 09126/00 Academic Edition FlowMaster v5.17 09:17:05 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 t. Pond 3 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:lhaestadlacademiclfmw16013-lev.fm2 Worksheet Pond 3 - Outlet Conditions @ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 21.70 cfs Results Depth 0.50 ft Flow Area 9,78 ft2 Wetted Perimeter 21.17 ft Top Width 21.01 ft Critical Depth 0.35 ft Critical Slope 0.033959 ft/ft Velocity 2,22 ft/s Velocity Head 0.08 ft Specific Energy 0.58 ft Froude Number 0.57 Flow is subcritical. 0926/00 Academic Edition 09:19:39 AM FlowMaster v5.17 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 page 1 of I of ell Pond 4 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:lhaestadlacademiclfmw16013-lev.fm2 Worksheet Pond 4 - Outlet Conditions @ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 fttft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 32.00 cfs Results Depth 0.59 ft Flow Area 12.92 ftz Wetted Perimeter 23.75 ft Top Width 23.56 ft Critical Depth 0.42 ft Critical Slope 0.031969 ft/ft Velocity 2.48 ft/s Velocity Head 0.10 ft Specific Energy 0.69 ft Froude Number 0.59 Flow is subcritical. 09126/00 Academic Edition FlowMaster v5.17 09:22:01 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 DATE SCALE -_?uMM,Q?Y ©F' _ 1??.?ClTY_ J??PPI..I?TpN Low 4i11 _ FES Cam' , 4p olv 3 ,/7,' Z•2 l,9. /D, ?aM1»G/7E5P A V SHEET OF CALCULATED BY ?, ` DATE CHECKED BY. Cg000CT 204 1 iS?ngk SneelsIn I IPa0Ae0i CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants SUPPLEMENTAL STORMWATER MANAGEMENT CALCULATIONS (Level Spreader Design) for CAPITAL PLAZA Wake Forest, North Carolina September 26, 2000 Project No. 06013 Prepared for: Wake Forest/Granite, LLC P.O. Box 1928 Mount Airy, NC 27030 3622 Lyckan Parkway Suite 3003 Durham, N.C. 27707 919-490-1645 Pra-. 919-403-0336 Fax civdengr(-z,)aol.com CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB LEVL'L `PE5APE-R - C F'l t SHEET NO. CALCULATED BY CHECKED BY_ SCALF OF DATE DATE LEV F-L.._ S PREADF-t, CALX,, REao r R.Ev__ . Tc& RF.pucz .Ri o w Pi-in" 7-1-1 E t14?. Y"r A t . "To d m I t=oR-r -L F-L n o (e_ N opt E: F?o-s 1 VF- \/Gt 'L-Yl r ..... ........... RC,VIE-L 0F: Tipp j-raTE. _OtSIr? N r.R _L.EwEL.J ?'PRE.?1JE? -_ I nld_IcATt= -_Tt-fA? Tk>r. _ 1?/?.I c? E>="F'E<."?"' aF Sp?cr?c.C-/I-C,tT ............. At5 €-P O N 3 LH4/2 j L = h/5i R LcN cs-rl-r, C? _ l?l, C FS PaNy? I Cs v ru Q = 8, - cFS L - 8O 3 L 24-0 (<Q?3 Fo t-L_o?,t NG 77(AE_ SSA" E NIE??o p0 Lo C?1?? Q L. V Po u D I 5-8.7 r , `? ?p5 Z 40-S so' S 1.9 f 3 21,E 30' 4, r, `? GPs 32 4o' 151°11 1,9 -PFI!S APt7ITlcNALJ-Y, ALj- -6 FRC ;7f R. AKE L o ATEl7 ?a wFem. P AizEA5. I :?. Z oLcT-LZ-r` AQovE--- A GvzA-55ET7, 5E:WEK EASE.t?(EKr Lock-m-p AS©vE -T-4-E- W66ps Rp-jAc_r:-m-r- To 7`i-1? . ?arc'4 ,?w C. 5t M z?Y S 4--4 cuTL-cr -t-.n Asc,vE rTi-}? ?ntoCS Q RE;A Acz-. ACFN-r" 7"-o- --r?:, -fRE?? ?. A LL AID lacaTc-?7 -7;?; Luc - D6wN-57P?EokN( CC?N" c T?'A`?©N Off' k?u:? ^,r ? '. 1I0DUCT 7UW 1 ?S"o Shwv 205 1 i PM W - Pond 1 - Conditions at end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw16013-lev.fm2 Worksheet Pond 1 - Outlet conditions c@ apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 58.70 cfs Results Depth 0.90 ft Flow Area 18.58 ftz Wetted Perimeter 23.68 ft Top Width 23.39 ft Critical Depth 0.67 ft Critical Slope 0.027928 ft/ft Velocity 3.16 ft/s Velocity Head 0.16 ft Specific Energy 1.05 ft Froude Number 0.63 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:13:36 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Pond 2 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:lhaestad\academic\fmw16013-lev.fm2 Worksheet Pond 2 - Outlet conditions at Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 40.30 cfs Results Depth 0.72 ft Flow Area 14.54 ftz Wetted Perimeter 22.56 ft Top Width 22.33 ft Critical Depth 0.52 ft Critical Slope 0.030024 ft/ft Velocity 2,77 ft/s Velocity Head 0.12 ft Specific Energy 0.84 ft Froude Number 0.61 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:17:05 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 l Pond 3 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw\6013-lev.fm2 Worksheet Pond 3 - Outlet Conditions c@ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 18.00 ft Discharge 21.70 cfs Results Depth 0.50 ft Flow Area 9.78 ft2 Wetted Perimeter 21.17 ft Top Width 21.01 ft Critical Depth 0.35 ft Critical Slope 0.033959 ft1ft Velocity 2,22 ft/s Velocity Head 0.08 ft Specific Energy 0.58 ft Froude Number 0.57 Flow is subcritical. 09/26/00 Academic Edition 09:19:39 AM FlowMaster v5.17 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203 755-1666 Page 1 of 1 Pond 4 - Conditions @ end of Apron Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\academic\fmw16013-lev.fm2 Worksheet Pond 4 - Outlet Conditions @ Apron Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.040 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 32.00 cfs Results Depth 0.59 ft Flow Area 12.92 ftz Wetted Perimeter 23.75 ft Top Width 23.56 ft Critical Depth 0.42 ft Critical Slope 0.031969 fttft Velocity 2.48 ft/s Velocity Head 0.10 ft Specific Energy 0.69 ft Froude Number 0.59 Flow is subcritical. 09/26/00 Academic Edition FlowMaster v5.17 09:22:01 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490.1645 FAX (919) 403-0336 SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE c`?ul?%/MAIZY ©F-_. VQ CC-17Y R6j7c1CT,D/V 064 -ow- 14 ell- Z,8 3 7, 7 Z.2_ l,9 A 1/ State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director ILF!WAA NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES September 20, 2000 Wake County DWQ Project No. 001047 Craig Hunter Wake Forest/Granite, LLC P.O. Box 1928 Mount Airy, NC, 27030 Dear Mr. Hunter: On August 9, 2000, the NC Division of Water Quality received your application for a 401 Water Quality Certification to impact .092 acre of wetlands, including 147 linear feet of streams for the proposed Capital Center project in Wake County. Mr. Todd St. John of the DWQ Central Office and Mr. Steve Mitchell of the DWQ Raleigh Regional Office have reviewed your proposal. Although DWQ does not have fundamental objections to the project, we have determined that the proposed ponds alone will not be sufficient to treat stormwater. Before we can proceed with issuance of the 401 Certification, we need you to demonstrate how sheet flow at the outlet of the ponds can be achieved. For example, forested filter strips at the pond outlets may achieve sheet flow. Also, the outlet at Pond #4 should be moved from the north side of the pond to the south side. Please revise the plans accordingly and forward them to this office. Until this information is received, I will request (by copy of this letter) that the Corps of Engineers place this project on hold. Also, this project will be placed on hold for our processing due to incomplete information (15A NCAC 2H.0507(h)). I can be reached at (919) 733-1786. Dorney cc: Corps of Engineers Raleigh Field Office Raleigh DWQ Regional Office File Copy Central Files 001047 Division of Water Quality • Non-Discharge Branch 401 /Wetlands Unit, 1621 Mail Service Center, Raleigh, NC 27699 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants STORMWATER MANAGEMENT CALCULATIONS for CAPITAL PLAZA Wake Forest, North Carolina June 13, 2000 Revised July 3, 2000 Revised July 14, 2000 Revised July 24, 2000 Project No. 06013 Prepared for: Wake Forest/Granite, LLC P.O. Box 1928 Mount Airy, NC 27030 ' ?ti) yCY ????'ii!dt:?lSt 3622 Lyckan Parkway Suite 3003 Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax civilengr a aol.com i DRAINAGE AREA ANALYSIS PRE-AND POST-DEVELOPMENT A rho ORAINAOE AREA 1A - 1,696,730 SF COMMERCIAL - SHOPPING CENTER DRAINAGE AREA 2A - 1,660,992 SF RESIDENTIAL/0MG ERCNAL DRAINAGE AREA 18 - SEE BREAKOUT COMMERCIAL - VANN DOGE AINAGE AREA - 851,699 SF RESIDENTIAL (1/5 AC LOTS), DRAINAGE AREA /4 - 4,016,127 SF RESIDENTIAL (1/5 TO 1/3 AC) DRAINAGE AREA /7 - 3,469,605 SF WOODS - 316,427 SF REMAINDER - RESIDENTIAL. (1/2 AC) PREDEVELOPMENT CONDITIONS DRAINAGE AREA ROADWAY DRAINAGE TO OFFSITE DRAINAGE AREA 3 - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) DRAINAGE AREA S - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) DRAINAGE AREA 6 - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) 000e 8j:Lb:7i £Z Jew nUl 6Mp•jj-ajd-ep\£1:09\rOad\NSOS\:0 2 aw?w ? 0 O \ 0 ®? 0 ? ? o OC 00 op 0 ?0 0 62 \ CO 6 ?J r 1A AREA U • IA96.M45 L POW . I02.71L67 2. PARRWfi • 743,12161 3. ROAD • 125.931A9 l OIAKL • 639.7 S VMDS • 67AI92 L MUSH • 76,77739 7. ROOKS • 1.132.59 8. RISC D TWMUS 229.61 9. COOMLAL AREA 718,997.71 3 IB 1,261,736.79 99,440 WAIG" .12 ?Q 136,017.83 • 3,084.33 • 179,410.45 13,860.20 3,19634 PERVIOUS • 6,91&17 'AMM. = &0, 490 4t, 0008 5b :L0 :5j £Z JeW nUl 9MO' ea-eaJd\U09\rOdd\NSOS\ :O 5 A4t 3 A 3 938,6:1.38 ODF 13,092.44 'ARKING - t4,500.7 ;DAD - 23293,4 RAVEL - 36,00023 /DUDS - 359,53319 (RUSH - 14,79922 DCKS - 2,901.86 IISC. IMPERVIOUS - 230.48 6 A4t' 0 u n ?u? ?vo .sNc?S?ui?6isNo? 000e 66 EZ :OL £Z JeNj nUl 6Ma u---5-eaiv,,\E609\rodd\NSOS\ :O At', ?IIIiIIG 6 AREA 6 • LA02,74021 L ROOF - 324.33 2. PARON • 0 3. ROAD • 61,SS3.37 ?• GRAM • 1606570 S. Yom Q%91.77 6. 7RUSM • 1M9713 7. ROCKS • 0 1. MSSC. "ERVIOUS - 0 8 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 12-Aor-00 DRAINAGE AREA #: 1A/1B AREA 1A (SF) 1696750 DESCRIPTION AREA 1A: COMMERC IAL / SHOPPING CENTER AREA 1 B (SF) 1261757 DESCRIPTION AREA 113: COMMERC IAL/ WINN DIXIE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 67.92 REMOTE ELEVATION 398 HYDRAULIC LENGTH: 4750 OUTFALL ELEVATION 292 BASIN SLOPE: 0.022 ELEVATIONAL DIFFERENCE: 106 TIME OF CONC.: 22.89 LAND USE/COVER AREA AREA % OF RATIONAL DELTA CU RVE DELTA (SF) (AC) TOTAL C ' C CN CN AREA 1A - SHOPPING CENTER IMPERVIOUS AREA ROOF 182317 4.19 0.06 0.95 0.06 98 6 PARKING LOT 543125 12.47 0.18 0.95 0.17 98 18 ROADWAY 125934 2.89 0.04 0.95 0.04 98 4 GRAVEL 660 0.02 0.00 0.80 0.00 85 0 ROCKS 1433 0.03 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 230 0.01 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 318998 7.32 0.11 0.85 0.09 92 10 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67118 1.54 0.02 0.20 0.00 55 1 WOODS, POOR COVER 56377 1.29 0.02 0.25 0.00 66 1 LAWN/PASTURE, GOOD 400558 9.20 0.14 0.30 0.04 61 8 AREA 1B - WINN DIXIE IMPERVIOUS AREA ROOF 99440 2.28 0.03 0.95 0.03 98 3 ROADWAY 156018 3.58 0.05 0.95 0.05 98 5 PARKING LOT 278528 6.39 0.09 0.95 0.09 98 9 GRAVEUDIRT ROAD 5084 0.12 0.00 0.80 0.00 85 0 ROCKS 3196 0.07 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 6918 0.16 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 60480 1.39 0.02 0.85 0.02 92 2 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 179410 4.12 0.06 0.20 0.01 55 3 WOODS, POOR COVER 15860 0.36 0.01 0.25 0.00 66 0 LAWN/PASTURE, GOOD 456823 10.49 0.15 0.30 0.05 61 9 EIGHTED C/CN 1.00 0.67 82 Page 1 of 5 9 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 12-Aar-00 DRAINAGE AREA #: 2A/2B AREA 1A (SF) 1660992 DESCRIPTION AREA 1A: COMMERCIAL AND RESIDENTIAL AREA 1 B (SF) 851699 DESCRIPTION AREA 213: RESIDENTIAL (1/5 AC RE LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 57.68 REMOTE ELEVATION 380 HYDRAULIC LENGTH: 2830 OUTFALL ELEVATION 292 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 88 TIME OF CONC.: 13.52 LAND USE/COVER AREA AREA % OF RATIONAL DELTA CU RVE DELTA (SF) (AC) TOTAL C C CN CN AREA 2A - COMMERCIAL IMPERVIOUS AREA ROOF 45451 1.04 0.02 0.95 0.02 98 2 PARKING LOT 76165 1.75 0.03 0.95 0.03 98 3 ROADWAY 119019 2.73 0.05 0.95 0.04 98 5 GRAVEL 6485 0.15 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 5523 0.13 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMM E RCIAUBUS I NESS 141043 3.24 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 491217 11.28 0.20 0.20 0.04 55 11 WOODS, POOR COVER 54685 1.26 0.02 0.25 0.01 66 1 LAWN/PASTURE, GOOD 721404 16.56 0.29 0.30 0.09 61 18 AREA 26 - RESIDENTIAL IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/5 AC LOTS 851699 19.55 0.34 0.52 0.18 78 26 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 WEIGHTED C/CN 1.00 0.45 71 Page 2 of 5 to STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 7 UhbUKIPTION: UNDEVELOPED PREDOMINENT SOIL GROUP: Type B REMOTE ELEVATION 353 OUTFALL ELEVATION 280 ELEVATIONAL DIFFERENCE: 73 SURFACE TYPE AREA AREA (SF) (AC) IMPERVIOUS AREA ROOF 15092 0.35 PARKING LOT 14500 0.33 ROADWAY 25293 0.58 GRAVEL 36000 0.83 ROCKS 2902 0.07 MISC. IMPERVIOUS 250 0.01 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 GREEN/NATURAL AREAS WOODS, GOOD COVER 559533 12.85 WOODS, POOR COVER 14799 0.34 LAWN/PASTURE, GOOD 290243 6.66 EIGHTED C/CN -00 I U 1 AL AKL-A (5F): 958612 OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 22.01 HYDRAULIC LENGTH: 1700 BASIN SLOPE: 0.043 TIME OF CONC.: 8.06 % OF RATIONAL DELTA CURVE #, DELTA TOTAL C C CN CN 0.02 0.95 0.01 98 2 0.02 0.95 0.01 98 1 0.03 0.95 0.03 98 3 0.04 0.80 0.03 85 3 0.00 0.90 0.00 95 0 0.00 0.95 0.00 98 0 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.58 0.20 0.12 55 32 0.02 0.25 0.00 66 1 0.30 0.30 0.09 61 18 1.00 0.30 61 DRAINAGE AREA #: 4 TOTAL AREA (SF): 4016127 OUTFALUSTRUCTURE #: RESIDENTI AL (1/3-1/5 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 92.20 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3450 OUTFALL ELEVATION 267 BASIN SLOPE: 0.033 ELEVATIONAL DIFFERENCE: 114 TIME OF CONC.: 15.38 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 4016127 92.20 1.00 0.50 0.50 75 75 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 ,WEIGHTED C/CN 1.00 0.50 75 Page 3 of 5 STORM DRAINAGE CALCULATIONS DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEUELOPMENT CONDITIONS 71-Apr-oo FFALUSTRUCTURE #: UNDEVELOPED :DOMINENT SOIL GROUP: Type B AOTE ELEVATION 344 (FALL ELEVATION 263 VATIONAL DIFFERENCE: 81 ZFACE TYPE AREA AREA (SF) (AC) ERVIOUS AREA ROOF 264 0.01 PARKING 0 0.00 ROADWAY 29227 0.67 CONCRETE, MISC 0 0.00 GRAVEL 18225 0.42 'ELOPED AREAS COMMERCIAUBUSINESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 :EN/NATURAL AREAS WOODS, GOOD COVER 507246 11.64 WOODS, POOR COVER 67817 1.56 LAWN/PASTURE, GOOD 186373 4.28 GHTED C/CN TOTAL AREA (SF): 809152 OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 18.58 HYDRAULIC LENGTH: 1850 BASIN SLOPE: 0.04 TIME OF CONC.: 8.54 % OF RATIONAL DELTA CURVE #, DELTA TOTAL C C CN CN 0.00 0.95 0.00 98 0 0.00 0.95 0.00 98 0 0.04 0.95 0.03 98 4 0.00 0.95 0.00 98 0 0.02 0.80 0.02 85 2 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.63 0.20 0.13 55 34 0.08 0.25 0.02 66 6 0.23 0.30 0.07 61 14 1.00 0.27 60 DRAINAGE AREA #: 6 OUTFALUSTRUCTURE #: UNDEVELOPED PREDOMINENT SOIL GROUP: Type B REMOTE ELEVATION 335 OUTFALL ELEVATION 245 ELEVATIONAL DIFFERENCE: 90 SURFACE TYPE AREA AREA (SF) (AC) IMPERVIOUS AREA ROOF 324 0.01 PARKING LOT 0 0.00 ASPHALT 61153 1.40 CONCRETE, MISC 0 0.00 GRAVEL 16066 0.37 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 GREEN/NATURAL AREAS WOODS, GOOD COVER 425695 9.77 WOODS, POOR COVER 124297 2.85 LAWN/PASTURE, GOOD 775205 17.80 EIGHTED C/CN TOTAL AREA (SF): 1402740 OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 32.20 HYDRAULIC LENGTH: 2650 BASIN SLOPE: 0.034 TIME OF CONC.: 12.42 % OF RATIONAL DELTA CURVE #, DELTA TOTAL C C CN CN 0.00 0.95 0.00 98 0 0.00 0.95 0.00 98 0 0.04 0.95 0.04 98 4 0.00 0.95 0.00 98 0 0.01 0.80 0.01 85 1 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.30 0.20 0.06 55 17 0.09 0.25 0.02 66 6 0.55 0.30 0.17 61 34 1.00 0.30 62 Page 4 of 5 Z. 4. ? STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 7 OUTFALUSTRUCTURE #: RESIDENTIAL (1/2 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 79.65 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3700 OUTFALL ELEVATION 243 BASIN SLOPE: 0.037 ELEVATIONAL DIFFERENCE: 138 TIME OF CONC.: 15.50 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE #, DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0:00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAL/BUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/2 AC LOTS 3153178 72.39 0.91 0.40 0.36 70 64 GREEN/NATURAL AREAS WOODS, GOOD COVER 316427 7.26 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 EIGHTED C/CN 1.00 0.38 69 Page 5 of 5 13 DRAINAGE AREA 1A - 1.696.750 V COMAERCIAL - SNOPPNO CENTER DRAINAGE AREA 2A - 1.6606992 SF RESIDENT1A1,/CO M"AL DRAINAGE AREA 10 - SEE BREAKOUT COMMERCIAL - MINI DIKE AREA - 814,248 S AL (1/5 AC TATS) DRAINAGE AREA 14 - 4.016.127 SF RESIDENTIAL (1/5 TO 1/3 AC) DRAINAGE AREA ROADWAY DRAINAGE TO OFFSITE DRAINAGE AREA 3A AND B - SEE BREAKOUT DEPARTMOIT STORE DRAINAGE AREA 5A AND B - SEE BREAKOUT NOME IMM%SIENT/ANCHOR STORES DRAINAGE AREA /7 - 3.469.605 SF WOODS - 310.427 SF REMANDER - RESIDENTIAL (1/2 AC) DRAINAGE AREA 6A. B. AND C - SEE BREAKOUT CUTPARCELS AND ACCESS ROAD POST DEVELOPMENT CONDITIONS REVISED 0002 05:t;:;; iI add and 6Mp'Ej-lsod-ep\E609\rOdd\NSOS\:O Iy A4", C:\SDSK\PROJ\6013\area-lb-post-rl.dwg Tue Apr 04 14:54:32 2000 . ie?Pi?f VN? N yaVy ? V Is .\SDSK\PROJ\6013\Post-3-ri.dwg Tue Apr 04 16:27:23 2000 y ° c°aa%o c i t ? a?v?i=ry°<°?? a mr?i n? u n HP ° C11 II °< M y A o 0 o II N II c c p < oNoN W 0 ?. C C N O f*1 ZI S N it f7 N D Q` II c 'I II I N N ?/ ?/ 0 % co .0 T ll /\ 90 y co N **'. I I ? C O u . J Q O U 0? 0 II W ~ z W 0 n O O 0% CD V U) O0 v O Oj O OWN co .-. W J W 00 J ?p O O II ?I II II 11 (L W O > II U 0 '-' 11 Z II j A C7 f? t m NL ?j 0_ L. V A 1 0 Q? C3 3 O O 0 N W 7 Q1 X0 AqAq ?OL O CL ¢ .: (U (') 4 V5 ,6 n 00 0? 0002 92:05:9ti b0 jdd and 5mp•j,1-qE-jsod\Eb09\rodd\NSaS\:0 17 POST DEVELOPMENT (REVISED) AREA 5A = 291,990.27 1. ROOF = 130184.00 2. PARKING = 112,568.86 3.ROAD =0 4. GRAVEL = 0 5. WOODS = XXX 6. BRUSH = XXX 7. ROCKS = 0 8. CONCRETE = 41530.85 9. OUTPARCELS (COMMERCIAL) 10. RETENTION = 29,606.50 000e b5 ,EE :E6 90 unr ani 6Mp'le9-ls0d\E609\f O8d\?SOS\ '0 1A ? all AIR a POST DEVELOPMENT (REVED) 5A2 AREA SA • 1,233,933,02 L ROOF 74,06721 2. PARKING • 647,33331 3. ROAD • 114,313.66 4. GRAVEL • 0 3. WOODS xxx 6. BRUSH xxx 7. ROCKS • 0 8. CONCRETE • 29,067.63 9. OUTPARCELS (COMMERCIAL) ¦ 73,037.80 000e 6E Vc- 'Z> 90 --)r a-l bm+ zec_- -1- sc;:' -kd\?SCS\ C 2 N POST DEVELOPMENT 5B 42EVISED> AREA 58 - 286,758.84 L ROOF ¦ 0 2. PARKING ¦ 0 3. ROAD - 0 4. GRAVEL - 0 3. VOODS ¦ 72,920.57 6. BRUSH ¦ 0 7. ROCKS - 0 8. MISC. IMPERVIOUS - 0 9. OUTPARCELS (COMMERCIAL) - 0 000a 80 :LE :Zi 1; jdd and 6Np, qq-ls0d\U09\r0dd\NSOS\ :0 POST DEVELOPMENT 6A AREA 6A - 281,444.10 1. ROOF 0 7. ROM 0 0008 6;:90:0I ti6 jdd and 6Mp•e9-Isod\E;09\rOdd\NSOS\:3 2I 1-. POST DEVELOPMENT 6 B AREA 6B = 404,621.96 1. ROOF = 0 2. PARKING = 0 3. ROAD = 39,350.71 4. GRAVEL = 0 5. WOODS = 870.61 6. BRUSH = 0 7. ROCKS = 0 8. MISC. IMPERVIOUS = 0 9. OUTPARCELS (COMMERCIAL) = 243,760.15 oooZ EO:5b:o; ;? jdq and 6Mp-g9-ls0d\E609\r08d\NS0S\ :0 zz .. 4 C: \SOSK\PROJ\6013\Post-6c.dwg Tue Apr 11 11:04:24 2000 ?D9D'4o"cn:?, wroc" D ^-o o O C'3-' O;V Q;0 0O D 03 ;o D < P I ? (n O v n X 0 d< b 7 A A" a 0 rl >MVIMOM II Z II C ') rl t:j (7 II II II r ? ? o II m r m o o II o 11 N O V o p tk -V Q O 4%. A z 3 N cn N -I II ?,D LA (7 0 D r CF\) 0 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 1A1113 AREA 1A (SF) 1696750 DESCRIPTION AREA 1A: COMMERCI AL / SHOPPING CENTER AREA 1 B (SF) 1165911 DESCRIPTION AREA 1 B: COMMERCI AL/ WINN DIXIE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 65.72 REMOTE ELEVATION 398 HYDRAULIC L ENGTH: 4750 OUTFALL ELEVATION 292 BASIN SLOPE : 0.022 ELEVATIONAL DIFFERENCE: 106 TIME OF CONC.: 22.89 LAND USEICOVER AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN REA 1A - SHOPPING CENTER IMPERVIOUS AREA ROOF 182317 4.19 0.06 0.95 0.06 98 6 PARKING LOT 543125 12.47 0.19 0.95 0.18 98 19 ROADWAY 125934 2.89 0.04 0.95 0.04 98 4 GRAVEL 660 0.02 0.00 0.80 0.00 85 0 ROCKS 1433 0.03 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 230 0.01 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 318998 7.32 0.11 0.85 0.09 92 10 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67118 1.54 0.02 0.20 0.00 55 1 WOODS, POOR COVER 56377 1.29 0.02 0.25 0.00 66 1 LAWN/PASTURE, GOOD 400558 9.20 0.14 0.30 0.04 61 9 AREA 1 B - WINN DIXIE IMPERVIOUS AREA ROOF 99440 2.28 0.03 0.95 0.03 98 3 ROADWAY 219604 5.04 0.08 0.95 0.07 98 8 PARKING LOT 278528 6.39 0.10 0.95 0.09 98 10 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 6918 0.16 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 60480 1.39 0.02 0.85 0.02 92 2 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 80770 1.85 0.03 0.20 0.01 55 2 WOODS, POOR COVER 12343 0.28 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 407828 9.36 0.14 0.30 0.04 61 9 WEIGHTED C/CN 1.00 0.70 84 Page 1 DA-POST zy STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 EA #: 2A/2B AREA 1A (SF) 1660992 AREA 1A: F COMMERC IAL AND RESIDENTIAL AREA 1 B (SF) 814248 RIPTION AREA 2B: RESIDENTIAL (1/5 ACRE LOTS) OFFSITE AREA (AC): 0.00 T SOIL GROUP: Type B TOTAL AREA (AC): 56.82 REMOTE ELEVATION 380 HYDRAULIC LENGTH: 2830 OUTFALL ELEVATION 292 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 88 TIME OF CONC.: 13.52 LANE) USE/COVER AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN RE/12A - COMMERCIAL IMPERVIOUS AREA ROOF 45451 1.04 0.02 0.95 0.02 98 2 PARKING LOT 76165 1.75 0.03 0.95 0.03 98 3 ROADWAY 119019 2.73 0.05 0.95 0.05 98 5 GRAVEL 6485 0.15 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 5523 0.13 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 141043 3.24 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 491217 11.28 0.20 0.20 0.04 55 11 WOODS, POOR COVER 54685 1.26 0.02 0.25 0.01 66 1 LAWN/PASTURE, GOOD 721404 16.56 0.29 0.30 0.09 61 18 AREA 2113 - RESIDENTIAL IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/5 AC LOTS 814248 18.69 0.33 0.52 0.17 78 26 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 -WEIGHTED C/CN 1.00 0.45 71 Page 2 DA-POST 25 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA M 3A TOTAL AREA (SF): 503230 DESCRIPTION: DEPARTMENT STORE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 11.55 REMOTE ELEVATION 354 HYDRAULIC LENGTH: 1400 OUTFALL ELEVATION 310 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 44 TIME OF CONC.: 7.83 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE #, DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 120220 2.76 0.24 0.95 0.23 98 23 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 92291 2.12 0.18 0.95 0.17 98 18 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 2668 0.06 0.01 0.95 0.01 98 1 DEVELOPED AREAS COMMERCIAL/BUSINESS 229899 5.28 0.46 0.85 0.39 92 42 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 58153 1.34 0.12 0.30 0.03 61 7 IWEIGHTED C/CN 1.00 0.83 91 DRAINAGE AREA M 3B TOTAL AREA (SF): 82976 DESCRIPTION: OUTFALL F ROM POND @ 3A OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 1.90 REMOTE ELEVATION 310 HYDRAULIC LENGTH: 850 OUTFALL ELEVATION 280 BASIN SLOPE: 0.035 ELEVATIONAL DIFFERENCE: 30 TIME OF CONC.: 5.10 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 17450 0.40 0.21 0.20 0.04 55 12 WOODS, POOR COVER 683 0.02 0.01 0.25 0.00 66 1 LAWN/PASTURE, GOOD 64843 1.49 0.78 0.30 0.23 61 48 [WEIGHTED C/CN 1.00 0.28 60 Page 3 DA-POST Z& STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 4 TOTAL AREA (SF): 4016127 OUTFALUSTRUCTURE #: RESIDENTIAL (1/3-1/5 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 92.20 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3450 OUTFALL ELEVATION 267 BASIN SLOPE: 0.033 ELEVATIONAL DIFFERENCE: 114 TIME OF CONC.: 15.38 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 4016127 92.20 1.00 0.50 0.50 75 75 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 EIGHTED C/CN 1.00 0.50 75 Page 4 DA-POST 2-7 ? M STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 5A1 TOTAL AREA (SF): 291990 OUTFALUSTRUCTURE #: HOME IMPROVEMENT CENTER OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 6.70 REMOTE ELEVATION 319 HYDRAULIC LENGTH: 1150 OUTFALL ELEVATION 275 BASIN SLOPE: 0.04 ELEVATIONAL DIFFERENCE: 44 TIME OF CONC.: 6.24 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 130184 2.99 0.45 0.95 0.42 98 44 PARKING 112569 2.58 0.39 0.95 0.37 98 38 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 4531 0.10 0.02 0.95 0.01 98 2 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 44706 1.03 0.15 0.30 0.05 61 9 EIGHTED C/CN 1.00 0.85 92 DRAINAGE AREA #: 5A2 TOTAL AREA (SF): 1233933 OUTFALUSTRUCTURE M PARKING LOTS /ANCHOR STORES OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 28.33 REMOTE ELEVATION 350 HYDRAULIC LENGTH: 2800 OUTFALL ELEVATION 263 BASIN SLOPE: 0.03 ELEVATIONAL DIFFERENCE: 87 TIME OF CONC.: 13.41 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 74067 1.70 0.06 0.95 0.06 98 6 PARKING 647535 14.87 0.52 0.95 0.50 98 51 ROADWAY 114514 2.63 0.09 0.95 0.09 98 9 CONCRETE, MISC 28088 0.64 0.02 0.95 0.02 98 2 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 73058 1.68 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 296672 6.81 0.24 0.30 0.07 61 15 EIGHTED C/CN 1.00 0.79 89 Page 5 DA-POST 2a STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 5B TOTAL AREA (SF): 257152 OUTFALUSTRUCTURE #: AREA BEHI ND CURB/OUTFALL OF 5A OFFSITE AREA (AC): 0.D0 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 5.90 REMOTE ELEVATION 344 HYDRAULIC LENGTH: 2140 OUTFALL ELEVATION 263 BASIN SLOPE: 0.04 ELEVATIONAL DIFFERENCE: 81 TIME OF CONC.: 10.11 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 72921 1.67 0.28 0.20 0.06 55 16 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 184232 4.23 0.72 0.30 0.21 61 44 EIGHTED C/CN 1.00 0.27 59 Page 6 DA-POST 2 C) STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 6A TOTAL AREA (SF): 281444 OUTFALUSTRUCTURE #: DRAINAGE FROM US 1 OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 6.46 REMOTE ELEVATION 335 HYDRAULIC LENGTH: 2500 OUTFALL ELEVATION 255 BASIN SLOPE: 0.032 ELEVATIONAL DIFFERENCE: 80 TIME OF CONC.: 12.15 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 60055 1.38 0.21 0.95 0.20 98 21 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 23985 0.55 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 197404 4.53 0.70 0.30 0.21 61 43 EIGHTED C/CN 1.00 0.43 68 DRAINAGE AREA #: 6B TOTAL AREA (SF): 404622 OUTFALUSTRUCTURE #: COMMERC IAL OUTPARCELS OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 9.29 REMOTE ELEVATION 316 HYDRAULIC LENGTH: 1100 OUTFALL ELEVATION 260 BASIN SLOPE: 0.051 ELEVATIONAL DIFFERENCE: 56 TIME OF CONC.: 5.40 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 39351 0.90 0.10 0.95 0.09 98 10 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 243760 5.60 0.60 0.85 0.51 92 55 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 871 0.02 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 120640 2.77 0.30 0.30 0.09 61 18 EIGHTED C/CN 1.00 0.69 83 Page 7 DA-POST 30 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 6C TOTAL AREA (SF): 249843 OUTFALUSTRUCTURE #: UNDEVELOPED AREA OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 5.74 REMOTE ELEVATION 302 HYDRAULIC LENGTH: 925 OUTFALL ELEVATION 245 BASIN SLOPE: 0.062 ELEVATIONAL DIFFERENCE: 57 TIME OF CONC.: 4.39 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE #, DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67745 1.56 0.27 0.20 0.05 55 15 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 182098 4.18 0.73 0.30 0.22 61 44 EIGHTED C/CN 1.00 0.27 59 DRAINAGE AREA #: 7 TOTAL AREA (SF): 3469605 OUTFALUSTRUCTURE #: RESIDENTIAL (1/2 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 79.65 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3700 OUTFALL ELEVATION 243 BASIN SLOPE: 0.037 ELEVATIONAL DIFFERENCE: 138 TIME OF CONC.: 15.50 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/2 AC LOTS 3153178 72.39 0.91 0.40 0.36 70 64 GREEN/NATURAL AREAS WOODS, GOOD COVER 316427 7.26 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 [WEIGHTED C/CN 1.00 0.38 69 Page 8 DA-POST 31 HYDROLOGIC ANALYSIS PRE- AND POST- DEVELOPMENT 2 AND 10 YEAR STORMS The hydrologic analysis presented was prepared using Hydroflow Hydrographs 6.0. Only summary information is presented for the 2 year storm. 32 Q O z O CL I -- z w a O (/? J 0 ti P- COMIp qt V1? NNM?? J W Q ? z ~ Q N ?a W5QNNM V-o Q?'NNehCl)leU) a }WOQ CD W W C3 (DOtiorn Wce?Nc)m CL Q, H z w a O J W) N I* CO N 0 W O r 00 00 w N N W 5 J ? y Z0 O W yW 'OOo.oM 04 } 0 Q N W W W -t M co co It Q co O r- r- 00 N z ?- r r r N a? W Q CN t M 'at Ln Co I,- } J Q z Q W C7 Q z E M "t u) CO I- ww CC cv N cv co W 0 0 0 0 0 ~wwww?« ?,o----- LL «. ,? w v0 0 :3 :3 S :3 I-u.00000 z O CL 9 G a? w E o O 0) Ln o •°? E o 2 7< m) y ` >, 0 a U Ca W p r- N 2 :3 cu Q O CL (n cc cu CV t N r.+ ? L.L.. cu o L c c V C 0 O N O - ., d o o cu °-? c y CC 0) X 'o (n 3 ?. CD 0 fl. CO .+ C L V C 13 c ? > o C O E CU w O C N N « U) > v>>> 0 rn c O cu cn L c H.c?L 0) 0) +? C L C C cn CO 3 LO 0) O L cu E O a) CL 0 `O 0E ca co ca 7 .U N > O U O (n 'D O 0 Co O E g 3 a o p 0) O O U 0 cn C > v C C N 0) cc -20 ° U 0 a O O O C V O L Cp C N 0) n 03 w H 0 z N rn ca a Q CO 0 z O a 3'3 DETENTION/RETENTION REQUIREMENTS POST DEVELOPMENT CONDITIONS TOTAL BASE OUTPARCEL TOTAL ADJ. PERCENT PERCENT AREA POND DRAINAGE NON-IMP NON-IMP NON4MP. NON-IMP IMPERVIOUS NUMBER NUMBER AREA SURFACE SURFACE AREA AREA AREA 3A 1 503230 58153 34485 92638 18 82 SA1 2 291991 15100 29607 44707 15 85 6A2 3 1233933 369729 10959 380688 31 69 6B 4 404622 121511 36564 158075 39 61 PERMANENT POOL ANALYSIS RETENTION SA REQ'D FOR SURFACE PERM POOL AREA POND SA/DA 5'PERM AREA DEPTH NUMBER NUMBER REQ'D, 5' DEEP POOL PROVIDED REQ'D 3A 1 2.23 11222 11810 6.0 SA1 2 2.31 6745 7130 5.0 6A2 3 1.94 23938 22810 6.5 6B 4 1.78 7202 7300 5.0 TEMPORARY STORAGE POOL DEPTH RETENTION RETENTION RETENTION DEPTH TOTAL AREA POND RUNOFF STORAGE STORAGE OF TEMP DEPTH FOR NUMBER NUMBER COEF, Rv VOL. REQ'D PROVIDED POOL RETENTION 3A 1 0.78 32891 33900 2.5 7.50 5A1 2 0.81 19763 21200 2.5 7.50 5A2 3 0.67 69135 74550 3.0 8.00 6B 4 0.60 20177 21225 2.5 7.50 DETENTION POO L DEPTHS DETENTION DEPTH OF TOTAL TOTAL TOTAL AREA POND STORAGE DETENTION DEPTH OF DEPTH OF VOLUME OF NUMBER NUMBER BELOW WEIR POOL STORAGE POND STORAGE 3A 1 0 0.00 2.50 7.60 33900 SA1 2 0 0.00 2.50 7.60 21200 5A2 3 136040 4.50 7.50 12.50 210590 613 4 0 0.00 2.60 7.50 21225 OUTLET DESIGN FLOW FOR FLOW FOR ORIFICE ORIFICE ORIFICE CALCULATED APPROX. AREA POND OUTLET IN OUTLET IN SIZE AREA AREA FLOW DAYS TO NUMBER NUMBER 2 DAYS 5 DAYS (INCHES) SQ. IN SF CFS OUTLET 3A 1 0.196 0.078 1.75 2.40 0.02 0.13 3.13 5A1 2 0.123 0.049 1.50 1.77 0.01 0.09 2.66 5A2 3 1.219 0.487 2.00 3.14 0.02 0.29 3.02 6B 4 0.123 0.049 1.50 1.77 0.01 0.09 2.66 EMERGENCY SPILLWAY DESIGN 100 YEAR FLOW, DEPTH CALC. WEIR WEIR AREA POND C AREA STORM Q H, LENGTH,L LENGTH,L NUMBER NUMBER VALUE (ac) (in/hr) (cfs) (ft) (ft) (ft) 3A 1 0.830 11.550 8.83 84.68 1.00 28.23 30.00 5A1 2 0.850 6.240 9.15 48.52 1.00 16.17 20.00 6A2 3 0.790 28.330 7.65 168.98 1.00 56.33 60.00 6B 4 0.690 9.290 9.54 61.15 1.00 20.38 20.00 MAINTENANCE DRAIN DESIGN VOLUME OF FLOW FOR CALCULATED MIN. CALC ACTUAL CALCULATED APPROX. AREA POND PERMANENT OUTLET IN PIPE AREA PIPE DIA ORIFICE FLOW HRS TO NUMBER NUMBER POOL 24 HOURS (SF) (IN) (IN) CFS OUTLET 3A 1 43425 0.503 0.05 1.471 1.626 0.54 22.48 SA1 2 26125 0.302 0.03 1.141 1.250 0.32 22.86 5A2 3 117560 1.361 0.13 2.420 2.750 1.54 21.26 68 4 28725 0.332 0.03 1.196 1.375 0.38 20.77 Page 1 RETENTION 34 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB "t<r ©wIV P1T?'Q SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE ?oND Z ?ETENTI ON O N L?' EL Z?o TOP or-- ?EKM EL- 234 - Too Yz WElR E?.. 283 - ToP o 1= ?i s? 2.5 ---- ?(? _280 s - ?%z,. D_ E?. 2 7 ? S- So-r'fo M PRODUCT 204 1 IS vlo Shun 1205.11P?OOMI CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE crni F Pomp 4 - F?ETENTON OtJL`r EL 270 - OF ot= BERM EL- 2(Z 5 - loo Y2 WEIR EL- 967 r' - ToP oI= F t:569 2 Tom ar- PE?r?t ?, ZQ PRMT204 I (SMOSo MI205I (P?Ml 36 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB 16LAMMAEYE OF REA 11'< SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE PR4517,5 451- 0rvMeAl7r __ 2 r 290 830 28d ? 3 10 20 4 ? ZtoB 32? 5 Z?2 Zyd 830' .3 2? low 4\-,4 2?8 aid 25G 5 /?o 7 24ri Z APEA 0LrT'F4LL.. IU2rJ' L?:NGT?? ter- `m°' -A 7 LJNAZU- sew. Z ? ZZ4 arS 232 C-r I o? R = 441o cF5 X07 cF5 ?ieE- DEV??op ? T Project: wake-pre2.GPW IDF file: Raleigh-malco IwIELM 04-13-2000 ?, 38 Hydrograph Summary Report Page 1 ' Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuR) Hydrograph description 1 SCS Runoff 63.3 1 756 452,835 2 -- - ------ Area 1 - Commercia 2 SCS Runoff 36.3 1 747 231,703 2 - ---- Area 2 -Commer/Res 3 Combine 97.5 1 754 684,539 2 1 +2 ----- First Fork 4 Reach 97.4 1 755 684,508 2 3 -- ---- Stream Section 1 6 SCS Runoff 7.3 1 741 48,680 2 -- -- Area 3 - Undevelop 7 Combine 103.6 1 755 733,187 2 4+6 Outfall of Area 3 8 Reach 103.6 1 756 732,871 2 7 -- - Stream Section 2 10 SCS Runoff 72.4 1 748 453,048 2 -__ --- Area 4 - Residenti 11 Combine 173.1 1 752 1,185,919 2 8+10 -- -- Outfall of Area 4 13 SCS Runoff 5.0 1 744 38,131 2 ---- - ---- Area 5 - Undevelop 14 Combine 177.9 1 751 1,224,051 2 11 +13 - - Outfall Area 5 15 Reach 177.6 1 754 1,223,356 2 14 - ---- Stream Section 4 17 SCS Runoff 8.7 1 755 76,033 2 --- - -- Area 6 - Undevelop 18 Combine 186.3 1 754 1,299,388 2 15 + 17 Outfall Area 6 20 SCS Runoff 37.6 1 755 287,645 2 -- - Area 7 - Residenti 21 Combine 223.9 1 754 1,587,033 2 18 + 20 Area 7 Outfall Proj. file: wake-pre2.GPW OF file: Raleigh-malcolm.IDF Run date: 04-13-2000 2 Yp. PRE 37 .Hycirograph Summary Report Page 1 Hyd. No. ' Iydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 117.2 1 756 831,912 10 - - - Area 1 - Commercia 2 SCS Runoff 83.3 1 746 495,843 10 - -- Area 2 -Commer/Res 3 Combine 194.8 1 752 1,327,757 10 1 +2 - -- First Fork 4 Reach 194.8 1 753 1,327,755 10 3 - Stream Section 1 6 SCS Runoff 24.0 1 739 126,586 10 - - Area 3 - Undevelop 7 Combine 214.1 1 752 1,454,340 10 4+6 -- -- Outfall of Area 3 8 Reach 214.1 1 753 1,453,882 10 7 Stream Section 2 10 SCS Runoff 151.7 1 747 912,794 10 --- --- -- Area 4 - Residenti 11 Combine 362.4 1 749 2,366,677 10 8+10 -- - Outfall of Area 4 13 SCS Runoff 17.5 1 742 101,729 10 -- ---- --- Area 5 - Undevelop 14 Combine 378.8 1 749 2,468,406 10 11+13 -- -- Outfall Area 5 15 Reach 378.4 1 751 2,467,454 10 14 --- - Stream Section 4 17 SCS Runoff 27.0 1 753 193,380 10 - - - Area 6 - Undevelop 18 Combine 405.4 1 751 2,660,834 10 15+17 Outfali Area 6 20 SCS Runoff 91.5 1 754 636,658 10 -- Area 7 - Residenti 21 Combine 496.1 1 752 3,297,492 10 18 + 20 -- - Area 7 Outfall Proj. file: wake-pre10.GPW OF file: Raleigh-malcolm.IDF Run date: 04-13-2000 10 YW, FRE YO A. -v I,--L-%--' f IV1 GN I iji Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuff) Hydrograph description 1 SCS Runoff 70.6 1 753 475,865 2 - - - Area 1 - Commercia 2 SCS Runoff 35.8 1 747 228,248 2 - - Area 2 -Commer/Res 3 Combine 105.2 1 751 704,114 2 1+2 - - First Fork 4 Reach 105.2 1 753 704,083 2 3 Stream Section 1 6 SCS Runoff 38.2 1 723 111,567 2 - Area 3a - Dept. St 7 Reservoir 31.1 1 728 77,570 2 6 307.50 86,114 POND 1 - RET ONLY 8 SCS Runoff 0.8 1 732 3,957 2 - Area 3B - Area be] 9 Combine 31.8 1 728 81,527 2 7+8 Area 3 to Stream 10 Combine 112.4 1 751 785,609 2 4+9 Outfall of Area 3 11 Reach 112.4 1 752 785,275 2 10 Stream Section 2 13 SCS Runoff 72.4 1 748 453,048 2 - Area 4 - Residenti 14 Combine 183.7 1 750 1,238,323 2 11+13 Outfall of Area 4 16 SCS Runoff 26.7 1 720 67,509 2 - Area 5A1 17 Reservoir 22.9 1 723 46,279 2 16 283.40 52,098 Pond 2 - Rat Only 18 SCS Runoff 60.8 1 732 252,091 2 - Area 5a - Stores 19 Reservoir 1.7 1 1097 38,268 2 18 275.06 318,984 Pond 3 - Ret/Det 20 SCS Runoff 1.3 1 749 11,236 2 - Area 5B - Area Bel 21 Combine 23.3 1 723 57,516 2 17 + 20 Total Area 5 22 Combine 23.4 1 723 95,784 2 19 + 21 Outfall Area 5 23 Combine 188.4 1 750 1,334,107 2 14 + 22 - Outfall at 5 24 Reach 188.3 1 751 1,333,550 2 23 - Stream Section 4 26 SCS Runoff 3.4 1 747 22,246 2 - Area 6A - US 1 Dra 27 SCS Runoff 24.4 1 722 65,314 2 - Area 6B - Outparce 28 Reservoir 1.5 1 803 22,808 2 27 267.53 69,545 Pond 4 - Ret Only 29 Combine 3.4 1 747 45,053 2 26 + 28 Area 6 Development 30 SCS Runoff 2.3 1 729 11,124 2 - - Area 6C - Undevelo 31 Combine 4.7 1 740 56,178 2 29 + 30 Total Area 6 32 Combine 192.4 1 751 1,389,726 2 24 + 31 Outfall Area 6 34 SCS Runoff 37.6 1 755 287,645 2 - Area 7 - Residenti 35 Combine 229.4 1 752 1,677,371 2 32+34, - Area 7 Outfall Proj. file: 6013-final 2yr.GPW OF file: Raleigh-malcolm.IDF Run date: 07-03-2000 2 YR. o5-r 4Z Hyc#rograph Summary Report Page 1 Hyd. ' Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No. type now interval peak period hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (yrs) (lt) (cult) 1 SCS Runoff 126.4 1 752 2 SCS Runoff 82.1 1 746 3 Combine 205.7 1 750 4 Reach 205.7 1 751 6 SCS Runoff 61.5 1 723 7 Reservoir 58.7 1 725 8 SCS Runoff 2.6 1 730 9 Combine 60.9 1 725 10 Combine 217.2 1 750 11 Reach 217.2 1 751 13 SCS Runoff 151.7 1 747 14 Combine 366.9 1 749 16 SCS Runoff 42.4 1 720 17 Reservoir 40.3 1 722 18 SCS Runoff 100.9 1 732 19 Reservoir 21.7 1 763 20 SCS Runoff 4.7 1 747 21 Combine 41.8 1 722 22 Combine 42.1 1 722 23 Combine 398.0 1 749 24 Reach 397.9 1 750 26 SCS Runoff 8.4 1 745 27 SCS Runoff 43.6 1 722 28 Reservoir 32.0 1 728 29 Combine 37.2 1 728 30 SCS Runoff 8.4 1 727 31 Combine 45.6 1 728 32 Combine 414.7 1 750 34 SCS Runoff 91.5 1 754 35 Combine 504.3 1 751 Proj. file: 6013-final 10yr.GPW 852,976 I 10 488,449 10 1,341,425 10 1+2 - 1,341,423 10 3 - 184,226 10 - - 150,151 10 6 307.7 10,541 10 - - 160,692 10 7+8 - 1,502,115 10 4+9 - 1,501,632 10 10 - 912,794 10 - - 2,414,426 10 11 +13 - 110,225 10 - - 88,968 10 16 283.6 425,893 10 - - 211,339 10 18 276.1 30,809 10 -- - 119,777 10 17 + 20 - 331,116 10 19+21 -- 2,745,541 10 14 + 22 - 2,744,803 10 23 - 50,070 10 --- --- 118,364 10 - - 75,817 10 27 268.0 125,887 10 26 + 28 - 30,418 10 - - 156,305 10 29 + 30 - 2,901,107 10 24 + 31 - 636,658 10 - - 3,537,766 10 32+34, - OF file: Raleigh-malcolm.IDF - Area 1 - Commercia - Area 2 -Commer/Res - First Fork - Stream Section 1 - Area 3a - Dept. St 90,924 POND 1 - RET ONLY - Area 3B - Area bel - Area 3 to Stream - Outfall of Area 3 - Stream Section 2 - Area 4 - Residenti - Outfall of Area 4 - Area 5A1 54,511 Pond 2 - Ret. Only - Area 5a - Stores 354,690 Pond 3 - Ret/Det - Area 5B - Area Bel - Total Area 5 - Outfall Area 5 -- Outfall at 5 - Stream Section 4 - Area 6A - US 1 Dra - Area 6B - Outparce 75,169 Pond 4 - Ret Only - Area 6 Development - Area 6C - Undevelo - Total Area 6 - Outfall Area 6 - Area 7 - Residenti - Area 7 Outfall Run date: 07-03-2000 10 YR Po5-r 143 Hydrograph Report Page 1 Hyd. No. 1 Area 1 - Commercial Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 65.72 ac = 2.2% = LAG = 5.38 in = 24 hrs English Peak discharge = 126.44 cfs Time interval = 1 min Curve number = 84 Hydraulic length = 4750 ft Time of conc. (Tc) = 65.5 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.23 89.47 12.77 111.29 12.25 92.41 12.78 109.79 12.27 95.31 12.80 108.27 12.28 98.16 12.82 106.72 12.30 100.95 12.83 105.15 12.32 103.66 12.85 103.55 12.33 106.30 12.87 101.93 12.35 108.84 12.88 100.30 12.37 111.29 12.90 98.64 12.38 113.63 12.92 96.96 12.40 115.85 12.93 95.26 12.42 117.94 12.95 93.55 12.43 119.86 12.97 91.82 12.45 121.59 12.98 90.07 12.47 123.11 12.48 124.38 12.50 125.38 ... End 12.52 126.07 12.53 126.44 << 12.55 126.43 12.57 126.04 12.58 125.39 12.60 124.50 12.62 123.42 12.63 122.23 12.65 120.97 12.67 119.67 12.68 118.35 12.70 117.00 12.72 115.61 12.73 114.20 12.75 112.76 Total Volume = 852,976 cult 7y Hydrograph Report Page 1 Hyd. No. 2 Area 2 -Commer/Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 56.82 ac = 3.1 % = LAG = 5.38 in = 24 hrs English Peak discharge = 82.08 cfs Time interval = 1 min Curve number = 71 Hydraulic length = 2830 ft Time of conc. (Tc) = 53.9 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.18 57.56 12.72 66.36 12.20 59.93 12.73 65.11 12.22 62.25 12.75 63.83 12.23 64.52 12.77 62.54 12.25 66.73 12.78 61.22 12.27 68.87 12.80 59.88 12.28 70.92 12.82 58.53 12.30 72.88 12.32 74.73 12.33 76.43 ... End 12.35 77.96 12.37 79.30 12.38 80.41 12.40 81.27 12.42 81.84 12.43 82.08 << 12.45 81.96 12.47 81.61 12.48 81.03 12.50 80.28 12.52 79.41 12.53 78.48 12.55 77.51 12.57 76.52 12.58 75.50 12.60 74.45 12.62 73.37 12.63 72.27 12.65 71.14 12.67 69.98 12.68 68.80 12.70 67.59 Total Volume = 488,449 cult y? 'Hydrograph Report Page 1 English Hyd. No. 3 First Fork Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 1 Peak discharge = 205.65 cfs Time interval = 1 min 2nd inflow hyd. No.= 2 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.22 86.49 62.25 148.75 12.23 89.47 64.52 154.00 12.25 92.41 66.73 159.15 12.27 95.31 68.87 164.18 12.28 98.16 70.92 169.08 12.30 100.95 72.88 173.83 12.32 103.66 74.73 178.39 12.33 106.30 76.43 182.73 12.35 108.84 77.96 186.81 12.37 111.29 79.30 190.59 12.38 113.63 80.41 194.04 12.40 115.85 81.27 197.12 12.42 117.94 81.84 199.77 12.43 119.86 82.08 << 201.93 12.45 121.59 81.96 203.55 12.47 123.11 81.61 204.71 12.48 124.38 81.03 205.41 12.50 125.38 80.28 205.65 << 12.52 126.07 79.41 205.48 12.53 126.44 << 78.48 204.91 12.55 126.43 77.51 203.95 12.57 126.04 76.52 202.56 12.58 125.39 75.50 200.89 12.60 124.50 74.45 198.95 12.62 123.42 73.37 196.80 12.63 122.23 72.27 194.49 12.65 120.97 71.14 192.10 12.67 119.67 69.98 189.65 12.68 118.35 68.80 187.15 12.70 117.00 67.59 184.59 12.72 115.61 66.36 181.97 12.73 114.20 65.11 179.31 12.75 112.76 63.83 176.59 12.77 111.29 62.54 173.82 12.78 109.79 61.22 171.01 12.80 108.27 59.88 168.15 Continues on next page... Total Volume = 1,341,425 cult V6 First Fork Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.82 106.72 58.53 165.25 12.83 105.15 57.16 162.30 12.85 103.55 55.77 159.32 12.87 101.93 54.36 156.30 12.88 100.30 52.94 153.24 12.90 98.64 51.51 150.14 12.92 96.96 50.06 147.02 End Page 2 !? Hydrograph Report Page 1 English Hyd. No. 4 Stream Section 1 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 3 = 830.0 ft = 0.040 = 2.0:1 = 1.395 = 20.23 ft/s Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 205.65 cfs = 1 min = Trapezoidal = 1.2% = 5.0 ft = 2.9 ft = 1.362 = 0.9980 Modified Att-Kin routing method used. Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.23 154.00 148.74 12.25 159.15 153.99 12.27 164.18 159.14 12.28 169.08 164.17 12.30 173.83 169.07 12.32 178.39 173.82 12.33 182.73 178.38 12.35 186.81 182.72 12.37 190.59 186.80 12.38 194.04 190.58 12.40 197.12 194.04 12.42 199.77 197.11 12.43 201.93 199.77 12.45 203.55 201.93 12.47 204.71 203.55 12.48 205.41 204.71 12.50 205.65 << 205.40 12.52 205.48 205.65 << 12.53 204.91 205.48 12.55 203.95 204.91 12.57 202.56 203.95 12.58 200.89 202.57 12.60 198.95 200.89 12.62 196.80 198.95 12.63 194.49 196.80 12.65 192.10 194.50 12.67 189.65 192.11 12.68 187.15 189.66 12.70 184.59 187.15 12.72 181.97 184.59 12.73 179.31 181.98 12.75 176.59 179.31 Continues on next page... Total Volume = 1,341,423 cutt V8 Stream Section 1 Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.77 173.82 176.59 12.78 171.01 173.83 12.80 168.15 171.01 12.82 165.25 168.15 12.83 162.30 165.25 12.85 159.32 162.31 12.87 156.30 159.32 12.88 153.24 156.30 12.90 150.14 153.24 12.92 147.02 150.15 12.93 143.86 147.02 ... End Page 2 /? Hydrograph Report Page 1 English Hyd. No. 6 Area 3a - Dept. Store Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 11.55 ac = 3.1 % = LAG = 5.38 in = 24 hrs Peak discharge = 61.45 cfs Time interval = 1 min Curve number 91 Hydraulic length = 1400 ft Time of conc. (Tc) = 15.9 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.93 45.57 11.95 49.40 11.97 52.99 11.98 56.14 12.00 58.67 12.02 60.44 12.03 61.40 12.05 61.45 << 12.07 60.53 12.08 58.57 12.10 55.98 12.12 52.83 12.13 49.31 12.15 45.58 End Total Volume = 184,226 cult 5a Hydrograph Report Page, English Hyd. No. 7 POND 1 - RET ONLY Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 6 Max. Elevation = 307.77 ft Peak discharge Time interval Reservoir name Max. Storage = 58.67 cfs = 1 min = POND 1 = 90,924 cuft Storage Indication method used. Hydrograph Discharge Table Total Volume = 150,151 cuft Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.98 56.14 307.65 87.74 0.14 ----- ----- 44.67 ----- ----- ----- 44.82 12.00 58.67 307.68 87.98 0.14 ----- ----- 48.65 ----- ----- ----- 48.80 12.02 60.44 307.72 88.18 0.14 ----- ----- 52.06 ----- ----- ----- 52.20 12.03 61.40 307.74 88.34 0.14 ----- ----- 54.81 ----- ----- ----- 54.95 12.05 61.45 << 307.76 88.47 0.14 ----- ----- 56.86 ----- ----- ----- 57.00 12.07 60.53 307.77 88.54 0.14 ----- ----- 58.12 ----- ----- ----- 58.26 12.08 58.57 307.77 << 88.57 0.14 ----- ----- 58.52 ----- ---- ----- 58.67 << 12.10 55.98 307.77 88.54 0.14 ----- ----- 58.09 ----- ----- ----- 58.23 12.12 52.83 307.76 88.47 0.14 ----- ----- 56.88 ----- ----- ---- 57.02 12.13 49.31 307.74 88.36 0.14 ----- ----- 55.00 ----- ----- ----- 55.14 12.15 45.58 307.72 88.21 0.14 ----- ----- 52.56 ----- ----- ---- 52.71 12.17 41.85 307.69 88.04 0.14 ----- ----- 49.72 ----- ----- ----- 49.86 12.18 38.20 307.67 87.86 0.14 ----- ----- 46.61 ----- ----- ----- 46.75 12.20 34.66 307.64 87.66 0.14 ----- ----- 43.35 ----- ----- ----- 43.49 End ft Reservoir Report Page 1 English Reservoir No. 1 - POND 1 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft cult 0.00 299.50 5,560 0 0 5.00 304.50 11,810 43,425 43,425 7.50 307.00 15,310 33,900 77,325 10.50 310.00 19,830 52,710 130,035 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 36.0 1.8 0.0 0.0 Span in = 36.0 1.8 0.0 0.0 No. Barrels = 1 1 0 0 Invert El. ft = 299.50 304.50 0.00 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multistage = ----- Yes No No Weir Structures [A] [B] [C] [D] Crest Len ft = 28.3 30.0 0.0 0.0 Crest El. ft = 307.00 308.00 0.00 0.00 Weir Coeff. = 3.00 3.00 0.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Multistage = Yes No No No Tailwater Elevation = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage / Storage / Disch arge Table Stage Storage Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 299.50 0.00 0.00 --- --- 0.00 0.00 --- --- 0.00 5.00 43,425 304.50 63.67 0.00 --- --- 0.00 0.00 --- --- 0.00 7.50 77,325 307.00 83.36 0.13 --- --- 0.00 0.00 --- --- 0.13 10.50 130,035 310.00 102.09 0.00 --- --- 440.53 254.56 --- --- 356.65 52 Hydrograph Report Page 1 English Hyd. No. 8 Area 3B - Area below Pond Hydrograph type = SCS Runoff Peak discharge = 2.59 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.90 ac Curve number = 60 Basin Slope = 3.5% Hydraulic length = 850 ft Tc method = LAG Time of conc. (Tc) = 25.8 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Total Volume = 10,541 cuR Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.03 1.85 12.05 1.99 12.07 2.12 12.08 2.24 12.10 2.35 12.12 2.44 12.13 2.52 12.15 2.57 12.17 2.59 << 12.18 2.59 12.20 2.56 12.22 2.52 12.23 2.46 12.25 2.39 12.27 2.32 12.28 2.24 12.30 2.17 12.32 2.09 12.33 2.01 12.35 1.93 12.37 1.85 End S? Hydrograph Report Hyd. No. 9 Area 3 to Stream Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 7 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) cfs cfs 11.98 44.82 1.40 12.00 48.80 1.56 12.02 52.20 1.71 12.03 54.95 1.85 12.05 57.00 1.99 12.07 58.26 2.12 12.08 58.67 << 2.24 12.10 58.23 2.35 12.12 57.02 2.44 12.13 55.14 2.52 12.15 52.71 2.57 12.17 49.86 2.59 << 12.18 46.75 2.59 12.20 43.49 2.56 12.22 40.16 2.52 ... End Page 1 English Peak discharge = 60.91 cfs Time interval = 1 min 2nd inflow hyd. No: 8 Total Volume =160,692 cuft Outflow cfs 46.22 50.35 53.90 56.81 58.99 60.39 60.91 << 60.58 59.46 57.66 55.27 52.46 49.34 46.05 42.68 sy Hydrograph Report Page 1 English Hyd. No. 10 Outfall of Area 3 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 4 Peak discharge = 217.23 cfs Time interval = 1 min 2nd inflow hyd. No,= 9 Total Volume = 1,502,115 cult Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.07 94.08 60.39 154.46 12.08 99.56 60.91 << 160.47 12.10 105.06 60.58 165.64 12.12 110.57 59.46 170.03 12.13 116.08 57.66 173.74 12.15 121.60 55.27 176.87 12.17 127.10 52.46 179.56 12.18 132.58 49.34 181.92 12.20 138.02 46.05 184.07 12.22 143.41 42.68 186.09 12.23 148.74 39.82 188.56 12.25 153.99 36.98 190.96 12.27 159.14 34.08 193.21 12.28 164.17 31.19 195.36 12.30 169.07 28.38 197.45 12.32 173.82 25.69 199.51 12.33 178.38 23.18 201.56 12.35 182.72 20.89 203.61 12.37 186.80 18.86 205.65 12.38 190.58 17.10 207.68 12.40 194.04 15.66 209.70 12.42 197.11 14.89 212.01 12.43 199.77 14.18 213.94 12.45 201.93 13.52 215.45 12.47 203.55 12.91 216.46 12.48 204.71 12.35 217.06 12.50 205.40 11.83 217.23 << 12.52 205.65 << 11.34 216.99 12.53 205.48 10.88 216.35 12.55 204.91 10.44 215.35 12.57 203.95 10.03 213.98 12.58 202.57 9.65 212.21 12.60 200.89 9.29 210.18 12.62 198.95 8.95 207.90 12.63 196.80 8.64 205.44 12.65 194.50 8.35 202.85 Continues on next page... 55 Outfall of Area 3 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.67 192.11 8.08 200.19 12.68 189.66 7.83 197.49 12.70 187.15 7.59 194.74 12.72 184.59 7.37 191.96 12.73 181.98 7.16 189.14 12.75 179.31 6.96 186.28 12.77 176.59 6.78 183.38 12.78 173.83 6.61 180.44 12.80 171.01 6.45 177.46 12.82 168.15 6.30 174.45 12.83 165.25 6.16 171.41 12.85 162.31 6.03 168.34 12.87 159.32 5.91 165.23 12.88 156.30 5.79 162.10 12.90 153.24 5.69 158.93 12.92 150.15 5.59 155.74 12.93 147.02 5.50 152.52 End Page 2 54 Hydrograph Report Hyd. No. 11 Stream Section 2 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 10 = 1020.0 ft = 0.040 = 2.0:1 = 1.383 = 19.55 ft/s Modified Aft-Kin routing method used. Hydrograph Discharge Table Time Inflow O utflow (hrs) cfs cfs 12.08 160.47 153.50 12.10 165.64 159.63 12.12 170.03 164.91 12.13 173.74 169.41 12.15 176.87 173.22 12.17 179.56 176.43 12.18 181.92 179.18 12.20 184.07 181.59 12.22 186.09 183.77 12.23 188.56 185.80 12.25 190.96 188.22 12.27 193.21 190.63 12.28 195.36 192.90 12.30 197.45 195.06 12.32 199.51 197.16 12.33 201.56 199.23 12.35 203.61 201.28 12.37 205.65 203.32 12.38 207.68 205.37 12.40 209.70 207,40 12.42 212.01 209.42 12.43 213.94 211.69 12.45 215.45 213.67 12.47 216.46 215.24 12.48 217.06 216.31 12.50 217.23 << 216.97 12.52 216.99 217.20 << 12.53 216.35 217.01 12.55 215.35 216.43 12.57 213.98 215.48 12.58 212.21 214.17 12.60 210.18 212.45 Continues on next page... Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Page 1 English = 217.20 cfs = 1 min = Trapezoidal = 1.2% = 5.0 ft = 3.0 ft = 1.363 = 0.8788 Total Volume = 1,501,632 cuft .97 Stream Section 2 Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.62 207.90 210.46 12.63 205.44 208.21 12.65 202.85 205.78 12.67 200.19 203.21 12.68 197.49 200.55 12.70 194.74 197.86 12.72 191.96 195.12 12.73 189.14 192.35 12.75 186.28 189.53 12.77 183.38 186.67 12.78 180.44 183.77 12.80 177.46 180.84 12.82 174.45 177.87 12.83 171.41 174.87 12.85 168.34 171.83 12.87 165.23 168.76 12.88 162.10 165.66 12.90 158.93 162.53 12.92 155.74 159.37 12.93 152.52 156.18 12.95 149.28 152.96 ... End Page 2 58 . Hydrograph Report Page 1 Hyd. No. 13 Area 4 - Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 92.20 ac = 3.3% = LAG = 5.38 in = 24 hrs English Peak discharge = 151.70 cfs Time interval = 1 min Curve number = 75 Hydraulic length = 3450 ft Time of conc. (Tc) = 54.8 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.20 110.33 12.73 122.53 12.22 114.45 12.75 120.27 12.23 118.49 12.77 117.97 12.25 122.41 12.78 115.63 12.27 126.21 12.80 113.26 12.28 129.88 12.82 110.86 12.30 133.39 12.83 108.43 12.32 136.73 12.33 139.84 12.35 142.69 ... End 12.37 145.24 12.38 147.44 12.40 149.24 12.42 150.58 12.43 151.42 12.45 151.70 << 12.47 151.36 12.48 150.61 12.50 149.47 12.52 148.05 12.53 146.42 12.55 144.69 12.57 142.91 12.58 141.08 12.60 139.20 12.62 137.27 12.63 135.29 12.65 133.27 12.67 131.21 12.68 129.10 12.70 126.95 12.72 124.76 Total Volume = 912,794 cult s9 Hydrograph Report Hyd. No. 14 Outfall of Area 4 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 11 Page 1 English Peak discharge = 366.92 cfs Time interval = 1 min 2nd inflow hyd. No= 13 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.13 169.41 93.19 262.60 12.15 173.22 97.55 270.76 12.17 176.43 101.87 278.29 12.18 179.18 106.13 285.31 12.20 181.59 110.33 291.92 12.22 183.77 114.45 298.22 12.23 185.80 118.49 304.29 12.25 188.22 122.41 310.63 12.27 190.63 126.21 316.84 12.28 192.90 129.88 322.78 12.30 195.06 133.39 328.45 12.32 197.16 136.73 333.89 12.33 199.23 139.84 339.07 12.35 201.28 142.69 343.97 12.37 203.32 145.24 348.57 12.38 205.37 147.44 352.81 12.40 207.40 149.24 356.64 12.42 209.42 150.58 360.00 12.43 211.69 151.42 363.11 12.45 213.67 151.70 << 365.37 12.47 215.24 151.36 366.59 12.48 216.31 150.61 366.92 << 12.50 216.97 149.47 366.44 12.52 217.20 << 148.05 365.25 12.53 217.01 146.42 363.43 12.55 216.43 144.69 361.12 12.57 215.48 142.91 358.39 12.58 214.17 141.08 355.24 12.60 212.45 139.20 351.65 12.62 210.46 137.27 347.73 12.63 208.21 135.29 343.51 12.65 205.78 133.27 339.05 12.67 203.21 131.21 334.41 12.68 200.55 129.10 329.65 12.70 197.86 126.95 324.81 12.72 195.12 124.76 319.88 Continues on next page Total Volume = 2,414,426 cuft 4 o Outfall of Area 4 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.73 192.35 122.53 314.88 12.75 189.53 120.27 309.80 12.77 186.67 117.97 304 64 12.78 183.77 115.63 . 299 41 12.80 180.84 113.26 . 294 10 12.82 177.87 110.86 . 288.73 12.83 174.87 108.43 283 30 12.85 171.83 105.97 . 277.80 12.87 168.76 103.48 272 24 12.88 165.66 100.97 . 266.63 12.90 162.53 98.43 260.96 ... End Page 2 1./ Hydrograph Report Paae 1 Hyd. No. 16 Area 5A1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration English = SCS Runoff Peak discharge = 42.38 cfs = 10 yrs Time interval = 1 min = 6.70 ac Curve number = 92 = 4.0% Hydraulic length = 1150 ft = LAG Time of conc. (Tc) = 11.4 min = 5.38 in Distribution = Type Il = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.90 30.09 11.92 33.13 11.93 36.00 11.95 38.58 11.97 40.64 11.98 41.98 12.00 42.38 << 12.02 41.68 12.03 39.80 12.05 37.23 12.07 34.07 12.08 30.54 ..End Total Volume = 110,225 cuft 1Z Hydrograph Report Page 1 English Hyd. No. 17 Pond 2 - Ret. Only Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 16 Max. Elevation = 283.61 ft Storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage = 40.25 cfs = 1 min = Pond 2 = 54,511 cuft Total Volume = 88,968 cult Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.93 36.00 283.48 61.31 0.10 ----- ----- 29.36 ----- ----- ----- 29 46 11.95 38.58 283.51 61.46 0.10 ----- ----- 32.14 ----- ----- ----- . 32 24 11.97 40.64 283.55 61.60 0.10 ----- ----- 34.76 ----- ----- ----- . 34 86 11.98 41.98 283.57 61.73 0.10 ----- ----- 37.05 ----- ----- ----- . 37 15 12.00 42.38 << 283.59 61.82 0.10 ----- ----- 38.84 ----- ----- . 38 94 12.02 41.68 283.61 61.88 0.10 ----- ----- 40.10 ----- ----- ----- . 40 01 12.03 39.80 283.61 << 61.89 0.10 ----- ----- 40.44 ----- ----- . 40 25 << 12.05 37.23 283.60 61.86 0.10 ----- ----- 39.63 ----- ----- ----- . 39 67 12.07 34.07 283.59 61.78 0.10 ----- ----- 38.15 ----- ----- . 38 25 12.08 30.54 283.56 61.67 0.10 ----- ----- 36.04 ----- ----- ----- . 36 14 12.10 26.87 283.53 61.53 0.10 ----- ----- 33.40 ----- ----- . 33 50 12.12 23.32 283.49 61.37 0.10 ----- ----- 30.41 ----- ----- . 30.51 ... End 63 Reservoir Report Page 1 Reservoir No. 4 - Pond 2 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage ft 0.00 5.00 7.50 10.50 Elevation ft 275.50 280.50 283.00 286.00 Contour area sgft 3,320 7,130 9,830 13,750 Incr. Storage Total storage tuft cult 0 0 26,125 26,125 21,200 47,325 35,370 82,695 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 30.0 1.5 0.0 0.0 Crest Len ft = 28.3 20.0 0.0 0.0 Span in = 30.0 1.5 0.0 0.0 Crest El. ft = 283.00 284.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 3.00 0.00 0.00 Invert El. ft = 275.50 280.50 0.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Length ft = 50.0 0.0 0.0 0.0 Multi-Stage = Yes No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = ----- Yes No No Tailwater Elevation = 0.00 ft Stage / Storage / Discharge Table Note: All outFlows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Discharge ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 5.00 0 26,125 275.50 280 50 0.00 45 76 0.00 0 00 --- --- 0.00 0.00 --- --- 0.00 7.50 47,325 . 283.00 . 59.08 . 0.09 --- --- 0.00 --- --- 0.00 0.00 --- 0.00 --- --- 0.00 --- 0 09 10.50 82,695 286.00 71.88 0.00 --- --- 440.53 169.71 --- . --- 241.58 1.41 Hydrograph Report Page 1 Hyd. No. 18 English Area 5a - Stores Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 28.33 ac = 3.0% = LAG = 5.38 in = 24 hrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.02 72.98 12.03 77.14 12.05 81.09 12.07 84.82 12.08 88.29 12.10 91.45 12.12 94.24 12.13 96.62 12.15 98.53 12.17 99.91 12.18 100.70 12.20 100.86 << 12.22 100.32 12.23 99.03 12.25 97.26 12.27 95.05 12.28 92.51 12.30 89.75 12.32 86.89 12.33 84.00 12.35 81.06 12.37 78.10 12.38 75.11 12.40 72.10 End Peak discharge = 100.86 cfs Time interval = 1 min Curve number = 89 Hydraulic length = 2800 ft Time of conc. (Tc) = 30.6 min Distribution = Type II Shape factor = 484 Total Volume = 425,893 cult 44z Hydrograph Report Page 1 Hyd. No. 19 English Pond 3 - Ret/Det Hydrograph type = Reservoir Peak discharge = 21 69 cis Storm frequency = 10 yrs Time interval . = 1 i Inflow hyd. No. = 18 Reservoir name m n = Pond 3 Max. Elevation = 276.11 ft Max. Storage = 354,690 cuft Storage Indication method used, Total Volume = 211,339 cuff Hydrograph Discharge Table Time Inflow Elevation Clv A (hrs) cfs ft Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.42 69.08 275.41 21.12 ----- 0.29 ----- 15 49 ---- 2.43 66.04 275.50 21.20 ----- 0.28 . - ----- 21 13 -- ----- 15.47 2.45 63.01 275.58 21.27 ----- 0.27 . --- ----- 26 14 ----- ----- 18.24 12.47 59.98 275.65 21.33 ----- 0.19 . ----- ----- 31 26 --- ----- 20.70 12.48 56.96 275.72 21.38 ---- 0.11 . -- ----- 36 15 ---- ----- 21.33 2.50 53.96 275.78 21.43 ----- 0.03 . - ----- 40 64 --- ----- 21.38 52 50.98 275.84 21.47 ----- ----- . -- ----- --- 45 08 ----- ----- 21.43 12.53 48.04 275.89 21.51 ----- ----- . ----- 49 27 ---- 21.47 2.55 45.15 275.93 21.55 ---- ----- . - ----- - --- 53 01 --- ----- 21.51 12.57 42.30 275.97 21.58 ----- ----- . -- ----- 56 32 ---- ----- 21.55 12.58 39.51 276.00 21.61 ----- ----- . - ----- ----- 59 21 ----- ----- 21.58 60 36.80 276.03 21.63 ----- ----- . ----- ----- 61 71 ---- ----- 21.61 12.62 34.16 276.05 21.65 ----- ----- . - ----- 63 80 --- ----- 21.63 12.63 31.63 276.07 21.67 ----- ----- . -- ----- ----- 65 50 ----- ----- 21.65 12.65 29.22 276.09 21.68 ----- ----- . ----- ----- 66 82 ----- ----- 21.67 67 26.96 276.10 21.69 ----- ----- . ----- ----- 67 79 ---- ----- 21.68 12.68 24.86 276.10 21.69 ----- ----- . - ----- ----- 68 43 ----- ----- 21.69 70 22.95 276.11 ' 21.69 ----- ----- . ----- ----- 68 76 -- ----- 21.69 2.72 21.25 276.11 << 21.69 ----- ----- . --- ----- 68 83 ----- ----- 21.69 73 19.78 276.11 21.69 ----- ----- . ----- ----- 68 65 --- ----- 21.69 << 12.75 18.57 276.10 21.69 ----- ----- . -- ----- 68 2 ----- 21.69 12.77 17.63 276.10 21.68 ----- ----- . 7 ----- ----- ----- 67 73 ---- ----- 21.69 12.78 16.87 276.09 21.68 ----- ----- . - ----- 67 06 -- ----- 21.68 12.80 16.27 276.08 21.67 ----- ----- . --- ----- ----- 66 28 --- ----- 21.68 12.82 15.80 276.07 21.66 ----- ----- . -- ----- 65 43 ---- ----- 21.67 12.83 15.41 276.06 21.66 ----- ----- . - ----- ----- 64 52 --- ----- 21.66 12.85 15.05 276.05 21.65 ----- ----- . -- ----- ----- 63 55 --- ----- 21.66 2.87 14.71 276.04 21.64 ----- ----- . -- ----- ----- 62 53 --- ----- 21.65 2.88 14.39 276.03 21.63 ----- ----- . -- ----- 61 45 --- ----- 21.64 12.90 14.08 276.02 21.62 ----- ----- . -- ----- ----- 60 34 ----- ----- 21.63 12.92 13.78 276.00 21.61 ----- ----- . ----- ----- 59 17 -- ----- 21.62 2.93 13.49 275.99 21.60 ----- ----- . --- ----- ----- 57 98 --- ----- 21.61 2.95 13.22 275.98 21.59 ----- ----- . -- ----- 56 75 ----- ----- 21.60 12.97 12.96 275.96 21.57 ----- ----- . ----- ----- 55 48 --- ----- 21.59 12.98 12.71 275.94 21.56 ----- ----- . -- ----- ----- 54 18 ----- ----- 21.57 13.00 12.47 275.93 21.55 ----- ----- . -- ----- 52 84 --- 21.56 . -- ----- 21.55 Continues on next page... ?o(o Pond 3 - ReUDet Page 2 Hydrograph Discharge Table Time (hrs) Inflow cfs Elevation ft Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow cfs Cfs Cfs Cfs cfs Cfs Cfs Cfs cfs 13.02 12.25 275.91 21 54 ----- 13.03 12.03 275.90 . 21 52 ----- ----- ----- 51.46 ----- _""'" ----- 21.54 13.05 11.82 275.88 . 21 51 ---- ----- ----- 50.06 ----- '"'"" ----- 21.52 13.07 11.62 275.86 . 21 49 ----- ----- ----- 48.63 ----- ----' ----- 21.51 13.08 11.44 275.84 . 21 48 ----- ----- ----- 47.17 ----- """_- ----- 21.49 13.10 11.26 275.83 . 21 47 ----- ----- ----- 45.68 ----- _-""' ----- 21.48 13.12 11.08 275.81 . 21 45 ----- ----- ----- 44.17 ----- --- - """"' 21.47 13.13 10.92 275.79 . 21.44 ----- ----- 0.02 ----- ----- 42.63 41 19 ----- _-'-- ----- 21.45 13 .15 10.76 275.77 21.42 _____ 0.04 ----- . 39 79 ----- ----- 21.44 13.17 13 18 10.61 10 47 275.75 21.40 _____ 0.07 ----- . 38.38 ----- --- - ----- ----- ---- - 21.42 . 13.20 . 10.33 275.73 275 71 21.39 21 37 _____ 0.09 ----- 36.95 ---- ----- ----- ___ 21.40 21.39 1 3.22 10.20 . 275.69 . 21.36 _____ ----- 0.12 0 14 ----- 35.50 ----- ----- ----- 21.37 13.23 10.08 275.67 21.34 ----- . 0.17 ----- ----- 34.04 32 56 ----- """-- ----- 21.36 13 .25 3 1 27 9.96 9 84 275.65 21.32 _____ 0.20 ----- . 31.07 ----- ----- ----- ----- - 21.34 . 1 3.28 . 9.73 275.63 275 61 21.31 21 29 _____ 0.23 ----- 29.57 ---- ----- ----- ----- 21.32 21.31 13 .30 9.62 . 275.59 . 21.27 _____ _____ 0.25 27 0 ----- 28.05 ----- ----- ----- 21.29 1 3.32 9.52 275.57 21.26 ----- . 0.27 ----- ----- 26.66 25 43 ----- ----- ----- 20.95 13 .33 13 35 9.42 9 32 275.55 21.24 ----- 0.27 '"""" . 24.25 ----- ----- ----- ----- ----- 20.35 . 13 .37 . 9.22 275.53 275 52 21.23 21 21 --___ 0.27 ----- 23.12 ----- ----- ----- ----- 19.77 19.22 13 .38 9.13 . 275.50 . 21.20 ----- ----- 0 .28 0 28 -"--" 22.05 ----- ----- ----- 18.69 13 .40 9.03 275.48 21.19 _____ . 0.28 ----- ----- 21.02 20 03 ---- ----- -__ 18.18 1 3.42 13 43 8.94 8 85 275.47 21.17 _____ 0.28 ---- . 19.09 ----- ----- ----- ----- ----- 17.70 . 1 3.45 . 8.76 275.45 275 44 21.16 21 15 _____ 0.29 ----- 18.18 ----- ----- ----- ----- 17.24 16.79 13.47 8.68 . 275.43 . 21.14 ----- _____ 0.29 0 29 ----- 17.32 ----- - 16.37 1 3.48 8.59 275.41 21.13 ----- . 0.29 ----- ----- 16.49 15 70 ----- ----- ----- 15.96 1 3.50 8.51 275.40 21.12 _____ 0.29 ----- . ----- ----- 14 93 ----- 15.57 . ----- 15.20 ... End l '9 F eservoir Report Page 1 rvoir No. 2 - Pond 3 i Data storage is based on known contour areas St ge /Storage Table St. ge Elevation ft ft 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Contour area Incr. Storage Total storage sgft cuft cuft 15,950 0 0 18,270 34,220 34,220 20,800 39,070 73,290 23,470 44,270 117,560 26,190 49,660 167,220 29,070 55,260 222,480 32,020 61,090 283,570 35,120 67,140 350,710 38,290 73,410 424,120 262.00 264.00 266.00 268.00 270.00 272.00 274.00 276.00 278.00 English Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [13] [C] [D] Rise in = 15.0 0.0 2.0 0.0 Crest Len ft = 19.6 60.0 0.0 0 0 Span in = 15.0 0.0 2.0 0.0 Crest El. ft = 275.00 276.5 0 0.00 . 0 00 No. Barrels = 1 0 1 0 Weir Coeff. = 3.00 3.00 0.00 . 0 00 Invert El. ft = 262.00 0.00 267.50 0.00 Eqn. Exp. = 1.50 1.50 0.00 . 0 00 Length ft = 50.0 0.0 0.0 0.0 Multi-Stage = Yes No No . No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = ----- Yes Yes No Tailwater Elevation = 0.00 ft Stage / Storage / Disc harge Table Note All outflows have been analyzed under inlet and outlet control. Stage Storage ft ft Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Discharge tu ft cfs cfs cfs Us cfs cfs cfs cfs cfs 0.00 0 00 34 220 262.00 264 00 0.00 --- 6 76 0.00 --- 0.00 0.00 --- 0.00 , 4.00 73,290 . 266.00 . --- 10.85 --- 0.00 0.00 0.00 --- 0 00 0.00 0 00 --- --- 0.00 6.00 117,560 8.00 167 220 268.00 270 00 13.70 --- 16 04 0.07 . --- 0.00 . 0.00 --- --- --- --- 0.00 0.07 , 10.00 222,480 . 272.00 . --- 18.09 --- 0.16 0.22 --- 0.00 --- 0 00 0.00 0 00 --- --- 0.16 12.00 283,570 274.00 19.93 --- 0.27 . --- 0 00 . 0 00 --- --- 0.22 14.00 350,710 16.00 424 120 276.00 278 00 21.61 --- 23 17 0.00 . --- 58.80 . 0.00 --- --- --- --- 0.27 21.61 , . . --- 0.00 --- 305.53 330.68 --- --- 353.85 J- - Hydrograph Report Page 1 Hyd. No. 20 Area 5B - Area Below Outfall Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 5.90 ac = 4.0% = LAG = 5.38 in = 24 hrs English Peak discharge = 4.69 cfs Time interval = 1 min Curve number = 59 Hydraulic length = 2140 ft Time of conc. (Tc) = 51.9 min Distribution = Type II Shape factor = 484 Total Volume = 30,809 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.22 3.28 12.75 3.83 12.23 3.44 12.77 3.76 12.25 3.59 12.78 3.69 12.27 3.73 12.80 3.62 12.28 3.88 12.82 3.55 12.30 4.01 12.83 3.48 12.32 4.14 12.85 3.40 12.33 4.26 12.87 3.32 12.35 4.38 12.37 4.47 12.38 4.56 ... End 12.40 4.62 12.42 4.67 12.43 4.68 12.45 4.69 << 12.47 4.68 12.48 4.65 12.50 4.62 12.52 4.58 12.53 4.54 12.55 4.50 12.57 4.46 12.58 4.41 12.60 4.36 12.62 4.31 12.63 4.26 12.65 4.20 12.67 4.14 12.68 4.09 12.70 4.02 12.72 3.96 12.73 3.90 /9 Hydrograph Report Page 1 English Hyd. No. 21 Total Area 5 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 17 Peak discharge = 41.85 cfs Time interval = 1 min 2nd inflow hyd. No: 20 Total Volume =119,777 cult Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) cfs cfs 11.93 29.46 0.75 11.95 32.24 0.88 11.97 34.86 1.02 11.98 37.15 1.16 12.00 38.94 1.30 12.02 40.01 1.45 12.03 40.25 << 1.59 12.05 39.67 1.74 12.07 38.25 1.89 12.08 36.14 2.05 12.10 33.50 2.20 12.12 30.51 2.35 12.13 27.37 2.51 ... End Outflow cfs 30.22 33.13 35.88 38.31 40.24 41.45 41.85 << 41.41 40.15 38.19 35.70 32.87 29.88 70 Hydrograph Report Page 1 English Hyd. No. 22 Outfall Area 5 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 19 Peak discharge = 42.05 cfs Time interval = 1 min 2nd inflow hyd. No.= 21 Total Volume = 331,116 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) cfs cfs 11.93 0.18 30.22 11.95 0.19 33.13 11.97 0.19 35.88 11.98 0.20 38.31 12.00 0.20 40.24 12.02 0.20 41.45 12.03 0.21 41.85 << 12.05 0.21 41.41 12.07 0.22 40.15 12.08 0.22 38.19 12.10 0.23 35.70 12.12 0.23 32.87 12.13 0.24 29.88 12.45 20.70 10.14 12.47 21.33 9.94 12.48 21.38 9.73 12.50 21.43 9.53 12.52 21.47 9.33 12.53 21.51 9.13 12.55 21.55 8.94 12.57 21.58 8.75 12.58 21.61 8.56 12.60 21.63 8.38 12.62 21.65 8.20 12.63 21.67 8.03 12.65 21.68 7.87 ... End Outflow cfs 30.40 33.31 36.07 38.51 40.44 41.66 42.05 << 41.63 40.36 38.41 35.93 33.10 30.11 30.84 31.26 31.11 30.96 30.80 30.65 30.49 30.33 30.18 30.01 29.86 29.70 29.54 7/ Hydrograph Report Page 1 English Hyd. No. 23 Outfall at 5 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 14 Peak discharge = 398.03 cfs Time interval = 1 min 2nd inflow hyd. No: 22 Total Volume = 2,745,541 cuft Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.10 244.03 35.93 279.95 12.12 253.71 33.10 286.81 12.13 262.60 30.11 292.72 12.15 270.76 27.12 297.89 12.17 278.29 24.24 302.53 12.18 285.31 21.54 306.85 12.20 291.92 19.10 311.02 12.22 298.22 17.21 315.44 12.23 304.29 16.17 320.46 12.25 310.63 15.20 325.83 12.27 316.84 14.33 331.17 12.28 322.78 13.59 336.36 12.30 328.45 12.98 341.43 12.32 333.89 12.49 346.38 12.33 339.07 12.10 351.16 12.35 343.97 11.77 355.75 12.37 348.57 13.06 361.62 12.38 352.81 16.26 369.06 12.40 356.64 21.46 378.09 12.42 360.00 26.02 386.02 12.43 363.11 28.58 391.69 12.45 365.37 30.84 396.21 12.47 366.59 31.26 397.86 12.48 366.92 << 31.11 398.03 << 12.50 366.44 30.96 397.40 12.52 365.25 30.80 396.05 12.53 363.43 30.65 394.08 12.55 361.12 30.49 391.61 12.57 358.39 30.33 388.73 12.58 355.24 30.18 385.42 12.60 351.65 30.01 381.66 12.62 347.73 29.86 377.58 12.63 343.51 29.70 373.21 12.65 339.05 29.54 368.60 12.67 334.41 29.39 363.81 12.68 329.65 29.24 358.90 Continues on next page... 721 Outfall at 5 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.70 324.81 29.10 353.91 12.72 319.88 28.96 348.84 12.73 314.88 28.82 343.70 12.75 309.80 28.69 338.48 12.77 304.64 28.55 333.19 12.78 299.41 28.42 327.83 12.80 294.10 28.30 322.40 12.82 288.73 28.17 316.91 12.83 283.30 28.05 311.35 12.85 277.80 27.92 305.72 12.87 272.24 27.80 300.04 12.88 266.63 27.68 294.30 12.90 260.96 27.55 288.51 12.92 255.24 27.43 282.66 End Page 2 '7 3 Hydrograph Report Page 1 Hyd. No. 24 Stream Section 4 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 23 = 1190.0 ft = 0.040 = 2.0:1 = 1.221 = 20.32 ft/s Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. English = 397.92 cfs = 1 min = Trapezoidal = 0.9% = 5.0 ft = 3.0 ft = 1.363 = 0.8223 Modified Att-Kin routing method used. Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.13 292.72 285.27 12.15 297.89 291.39 12.17 302.53 296.73 12.18 306.85 301.50 12.20 311.02 305.90 12.22 315.44 310.11 12.23 320.46 314.49 12.25 325.83 319.40 12.27 331.17 324.69 12.28 336.36 330.02 12.30 341.43 335.24 12.32 346.38 340.33 12.33 351.16 345.30 12.35 355.75 350.12 12.37 361.62 354.75 12.38 369.06 360.40 12.40 378.09 367.52 12.42 386.02 376.21 12.43 391.69 384.28 12.45 396.21 390.38 12.47 397.86 395.17 12.48 398.03 << 397.38 12.50 397.40 397.92 << 12.52 396.05 397.49 12.53 394.08 396.31 12.55 391.61 394.48 12.57 388.73 392.12 12.58 385.42 389.33 12.60 381.66 386.11 12.62 377.58 382.45 12.63 373.21 378.45 12.65 368.60 374.14 Continues on next page... Total Volume = 2,744,803 cult ?Y Stream Section 4 Hydrograph Discharge Table Time Inflow O utflow (hrs) cfs cfs 12.67 363.81 369.58 12.68 358.90 364.83 12.70 353.91 359.95 12.72 348.84 354.98 12.73 343.70 349.93 12.75 338.48 344.81 12.77 333.19 339.61 12.78 327.83 334.33 12.80 322.40 328.99 12.82 316.91 323.57 12.83 311.35 318.09 12.85 305.72 312.54 12.87 300.04 306.94 12.88 294.30 301.27 12.90 288.51 295.54 12.92 282.66 289.76 12.93 276.76 283.92 End Page 2 7S Hydrograph Report Page 1 Hyd. No. 26 Area 6A - US 1 Drainage Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 6.46 ac = 3.2% = LAG = 5.38 in = 24 hrs English Peak discharge = 8.41 cfs Time interval = 1 min Curve number = 68 Hydraulic length = 2500 ft Time of conc. (Tc) = 52.1 min Distribution = Type II Shape factor = 484 Total Volume = 50,070 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.18 5.94 12.72 6.72 12.20 6.19 12.73 6.59 12.22 6.44 12.75 6.45 12.23 6.68 12.77 6.32 12.25 6.91 12.78 6.18 12.27 7.14 12.80 6.04 12.28 7.36 12.82 5.90 12.30 7.56 12.32 7.75 12.33 7.92 ... End 12.35 8.08 12.37 8.21 12.38 8.31 12.40 8.38 12.42 8.41 << 12.43 8.41 12.45 8.38 12.47 8.33 12.48 8.25 12.50 8.17 12.52 8.07 12.53 7.98 12.55 7.88 12.57 7.78 12.58 7.67 12.60 7.56 12.62 7.45 12.63 7.33 12.65 7.22 12.67 7.10 12.68 6.97 12.70 6.85 0 I Hydrograph Report Hyd. No. 27 Area 6B - Outparcels Hydrograph. type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 9.29 ac = 5.1 % = LAG = 5.38 in = 24 hrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.93 32.60 11.95 35.54 11.97 38.24 11.98 40.54 12.00 42.28 12.02 43.33 12.03 43.63 << 12.05 43.09 12.07 41.65 12.08 39.67 12.10 37.20 12.12 34.40 12.13 31.42 ....End Page 1 English Peak discharge = 43.63 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 1100 ft Time of conc. (Tc) = 13.8 min Distribution = Type II Shape factor = 484 Total Volume = 118,364 cult '7 7 Hydrograph Report Page , English Hyd. No. 28 Pond 4 - Ret Only Hydrograph type = Reservoir Peak discharge = 32.04 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 27 Reservoir name = POND 4 Max. Elevation = 268.05 ft Max. Storage = 75,169 cuft storage indication method used. Total Volume = 75,817 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.08 39.67 267.97 39.92 ----- 0.04 ----- 27.33 ----- ----- ----- 27.36 12.10 37.20 268.02 40.07 ----- 0.04 ----- 31.70 ----- ----- ----- 30.75 12.12 34.40 268.04 40.14 --- 0.05 ----- 34.19 ----- ---- ----- 31.81 12.13 31.42 268.05 << 40.15 ----- 0.05 ----- 34.73 ----- ----- ----- 32.04 << 12.15 28.45 268.04 40.12 ---- 0.05 ----- 33.70 ----- ----- ----- 31.60 12.17 25.56 268.01 40.06 ----- 0.04 ----- 31.43 ----- ----- ----- 30.63 12.18 22.79 267.98 39.97 ---- 0.04 ----- 28.75 ----- ----- ---- 28.79 12.20 20.16 267.95 39.88 ----- 0.04 ----- 26.19 ----- ----- ----- 26.23 12.22 17.70 267.92 39.78 ---- 0.03 ----- 23.64 ----- ----- ---- 23.67 ...End 7$ Reservoir Report Page 1 English Reservoir No. 3 - POND 4 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage ft 0.00 5.00 7.50 10.00 Elevation ft 260.00 265.00 267.50 270.00 Contour area sqft 3,390 7,300 9,680 12,220 Incr. Storage Total storage cuft cult 0 0 26,725 26,725 42,450 69,175 27,375 96,550 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 0.0 1.5 0.0 Crest Len ft = 28.3 20.0 0.0 0.0 Span in = 24.0 0.0 1.5 0.0 Crest El. ft = 267.50 268.50 0.00 0.00 No. Barrels = 1 0 1 0 Weir Coeff. = 3.00 3.00 0.00 0.00 Invert El. ft = 260.00 0.00 265.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Length ft = 50.0 0.0 50.0 0.0 Multi-Stage = Yes No No No Slope % = 1.00 0.00 1.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = ----- No Yes No Tailwater Elevation = 0.00 ft Stage / Storage / Discharge Table Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 260.00 0.00 --- 0.00 --- 0.00 0.00 --- --- 0.00 5.00 26,725 265.00 30.25 --- 0.00 --- 0.00 0.00 --- --- 0.00 7.50 69,175 267.50 38.56 --- 0.03 --- 0.00 0.00 --- --- 0.03 10.00 96,550 270.00 45.37 --- 0.97 --- 335.12 110.23 --- --- 155.60 Q9 Hydrograph Report Page English Hyd. No. 29 Area 6 Development Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 26 Peak discharge = 37.20 cfs Time interval = 1 min 2nd inflow hyd. No.= 28 Total Volume = 125,887 cuft Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.08 4.37 27.36 31.73 12.10 4.63 30.75 35.38 12.12 4.90 31.81 36.71 12.13 5.16 32.04 << 37.20 << 12.15 5.42 31.60 37.02 12.17 5.68 30.63 36.32 12.18 5.94 28.79 34.73 12.20 6.19 26.23 32.42 12.22 6.44 23.67 30.11 12.23 6.68 21.18 27.86 End SD Hydrograph Report Page 1 Hyd. No. 30 Area 6C - Undeveloped Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 5.74 ac = 6.2% = LAG = 5.38 in = 24 hrs English Peak discharge = 8.45 cfs Time interval = 1 min Curve number = 59 Hydraulic length = 925 ft Time of conc. (Tc) = 21.3 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.00 5.98 12.02 6.53 12.03 7.03 12.05 7.48 12.07 7.85 12.08 8.15 12.10 8.36 12.12 8.45 << 12.13 8.41 12.15 8.29 12.17 8.09 12.18 7.83 12.20 7.52 12.22 7.20 12.23 6.87 12.25 6.54 12.27 6.20 ...End Total Volume = 30,418 cult $1 Hydrograph Report Page 1 English Hyd. No. 31 Total Area 6 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 29 Peak discharge = 45.62 cfs Time interval = 1 min 2nd inflow hyd. No= 30 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.07 24.30 7.85 32.15 12.08 31.73 8.15 39.88 12.10 35.38 8.36 43.74 12.12 36.71 8.45 << 45.16 12.13 37.20 << 8.41 45.62 << 12.15 37.02 8.29 45.32 12.17 36.32 8.09 44.41 12.18 34.73 7.83 42.55 12.20 32.42 7.52 39.94 12.22 30.11 7.20 37.31 12.23 27.86 6.87 34.74 12.25 25.73 6.54 32.27 ... End Total Volume = 156,305 cuft A2 Hydrograph Report Page 1 Hyd. No. 32 Outfall Area 6 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 24 English Peak discharge = 41.4.69 cfs Time interval = 1 min 2nd inflow hyd. No= 31 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.08 260.07 39.88 299.95 12.10 269.79 43.74 313.53 12.12 278.15 45.16 323.30 12.13 285.27 45.62 << 330.89 12.15 291.39 45.32 336.71 12.17 296.73 44.41 341.14 12.18 301.50 42.55 344.06 12.20 305.90 39.94 345.84 12.22 310.11 37.31 347.42 12.23 314.49 34.74 349.23 12.25 319.40 32.27 351.67 12.27 324.69 29.95 354.64 12.28 330.02 27.82 357.84 12.30 335.24 25.91 361.14 12.32 340.33 24.25 364.58 12.33 345.30 23.07 368.37 12.35 350.12 22.25 372.38 12.37 354.75 21.48 376.23 12.38 360.40 20.76 381.16 12.40 367.52 20.08 387.61 12.42 376.21 19.45 395.66 12.43 384.28 18.84 403.11 12.45 390.38 18.26 408.64 12.47 395.17 17.72 412.89 12.48 397.38 17.22 414.60 12.50 397.92 << 16.77 414.69 << 12.52 397.49 16.36 413.85 12.53 396.31 15.98 412.28 12.55 394.48 15.62 410.10 12.57 392.12 15.28 407.40 12.58 389.33 14.95 404.28 12.60 386.11 14.63 400.74 12.62 382.45 14.31 396.76 12.63 378.45 13.99 392.44 12.65 374.14 13.68 387.82 12.67 369.58 13.38 382.96 Continues on next page... Total Volume = 2,901,107 cult g3 Qutfall Area 6 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.68 364.83 13.08 377.91 12.70 359.95 12.79 372.75 12.72 354.98 12.52 367.50 12.73 349.93 12.24 362.18 12.75 344.81 11.98 356.79 12.77 339.61 11.72 351.33 12.78 334.33 11.47 345.81 12.80 328.99 11.23 340.22 12.82 323.57 10.99 334.56 12.83 318.09 10.76 328.85 12.85 312.54 10.53 323.08 12.87 306.94 10.31 317.24 12.88 301.27 10.09 311.36 12.90 295.54 9.87 305.41 12.92 289.76 9.66 299.42 12.93 283.92 9.44 293.37 ... End Page 2 a? IHydrograph Report Page 1 English Hyd. No. 34 Area 7 - Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 79.65 ac = 3.7% = LAG = 5.38 in = 24 hrs Peak discharge = 91.48 cfs Time interval = 1 min Curve number = 69 Hydraulic length = 3700 ft Time of conc. (Tc) = 64.6 min Distribution = Type II Shape factor = 484 Total Volume = 636,658 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.28 65.69 12.82 80.45 12.30 67.94 12.83 79.46 12.32 70.15 12.85 78.45 12.33 72.32 12.87 77.41 12.35 74.45 12.88 76.36 12.37 76.52 12.90 75.28 12.38 78.53 12.92 74.18 12.40 80.46 12.93 73.07 12.42 82.32 12.95 71.94 12.43 84.07 12.97 70.79 12.45 85.70 12.98 69.62 12.47 87.18 13.00 68.44 12.48 88.49 13.02 67.24 12.50 89.60 13.03 66.03 12.52 90.48 13.05 64.80 12.53 91.11 12.55 91.46 12.57 91.48 << ...End 12.58 91.29 12.60 90.90 12.62 90.36 12.63 89.71 12.65 89.01 12.67 88.27 12.68 87.51 12.70 86.72 12.72 85.90 12.73 85.06 12.75 84.19 12.77 83.29 12.78 82.37 12.80 81.42 SS IHydrograph Report Page 1 Hyd. No. 35 Area 7 Outfall Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 32 eak discharge = Time interval = 2nd inflow hyd. No.= English 504.33 cfs 1 min 34 Total Volume = 3,537,766 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.10 313.53 40.37 353.90 12.12 323.30 42.64 365.94 12.13 330.89 44.93 375.82 12.15 336.71 47.24 383.94 12.17 341.14 49.55 390.69 12.18 344.06 51.87 395.92 12.20 345.84 54.19 400.03 12.22 347.42 56.51 403.93 12.23 349.23 58.82 408.05 12.25 351.67 61.13 412.80 12.27 354.64 63.42 418.06 12.28 357.84 65.69 423.53 12.30 361.14 67.94 429.08 12.32 364.58 70.15 434.73 12.33 368.37 72.32 440.69 12.35 372.38 74.45 446.82 12.37 376.23 76.52 452.74 12.38 381.16 78.53 459.68 12.40 387.61 80.46 468.07 12.42 395.66 82.32 477.98 12.43 403.11 84.07 487.19 12.45 408.64 85.70 494.34 12.47 412.89 87.18 500.07 12.48 414.60 88.49 503.09 12.50 414.69 << 89.60 504.29 12.52 413.85 90.48 504.33 << 12.53 412.28 91.11 503.39 12.55 410.10 91.46 501.55 12.57 407.40 91.48 << 498.88 12.58 404.28 91.29 495.57 12.60 400.74 90.90 491.64 12.62 396.76 90.36 487.12 12.63 392.44 89.71 482.15 12.65 387.82 89.01 476.82 12.67 382.96 88.27 471.23 12.68 377.91 87.51 465.42 Continues on next page... 86 Area 7 Outfall Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.70 372.75 86.72 459.47 12.72 367.50 85.90 453.40 12.73 362.18 85.06 447.24 12.75 356.79 84.19 440.97 12.77 351.33 83.29 434.62 12.78 345.81 82.37 428.17 12.80 340.22 81.42 421.64 12.82 334.56 80.45 415.02 12.83 328.85 79.46 408.31 12.85 323.08 78.45 401.52 12.87 317.24 .77.41 394.66 12.88 311.36 76.36 387.71 12.90 305.41 75.28 380.69 12.92 299.42 74.18 373.60 12.93 293.37 73.07 366.44 12.95 287.27 71.94 359.20 End Page 2 S'7 INLET/OUTLET PROTECTION Rip rap apron sizes calculated using NYDOT/USDA Soil Conservation Sevice methods as outlined in the NC State manual. 06 60" Culvert Worksheet for Circular Channel Project Description Project File c:\haestad\academic\fmw\wake for.fm2 Worksheet Culvert Crossing Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.005000 ft/ft Diameter 60.00 in Discharge 152.86 cfs Results Depth 3.48 ft Flow Area 14.58 ftz Wetted Perimeter 9.86 ft Top Width 4.60 ft Critical Depth 3.55 ft Percent Full 69.54 Critical Slope 0.0047 55 ft/ft Velocity 10.49 ft/s Velocity Head 1.71 ft Specific Energy 5.19 ft Froude Number 1.04 Mabmum Discharge 198.09 cfs Full Flow Capacity 184.15 cfs Full Flow Slope 0.003445 ft/ft Flow is supercritical. zmNE 3 G? I R, P WAIF T = 24 ' 1?1= 3xUo A USE r OaTL-EE-!T T = 24 „ L= 40' L?/ = 21 I N LET Ct_ l iP WA T = I g'' 06/02100 Academic Edition FlowMaster v5.17 08:29:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 9:? F,???T CIVIL CONSULTANTS, INC. SOB l?11,4^1?5-- le • 3622 Lyckan Pky. Suite 3003 SHEET NO. OF DURHAM, NORTH CAROLINA 27707 CALCULATED BY (919) 490-1645 DATE FAX (919) 403.0336 CHECKED BY DATE LAS /H.w/v r, LAIl - G r PROOMT204 I ISglo SAx412M-I(P '71 9D Outfall @ Pond #1 Worksheet for Circular Channel Project Description Project File c:lhaestad\academic\fmw\wake for.fm2 Worksheet Outfall - Pond 1 Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.010000 ft/ft Diameter 36.00 in Discharge 58.70 cfs Results Depth 26.2 in Flow Area 5.51 ft2 Wetted Perimeter 6.13 ft Top Width 2.67 ft Critical Depth 2.48 ft Percent Full 72.81 Critical Slope 0.007640 ft/ft Velocity 10.65 ft/s Velocity Head 1.76 ft Specific Energy 3.95 ft Froude Number 1.31 Maximum Discharge 71.74 cfs Full Flow Capacity 66.69 cfs Full Flow Slope 0.007746 ft/ft Flow is supercritical. 07/03/00 Academic Edition FlowMaster v5.17 11:43:58 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-16W Page 1 of 1 91 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE Z- w PNOOUC1204 1 ISgk Wmi 205.1(PW*i 9Z Outfall @ Pond 2 Worksheet for Circular Channel Project Description Project File cAhaestad\academic\fmw\wake for.fm2 Worksheet Outfall @ Pond 2 Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.010000 ft/ft Diameter 30.00 in Discharge 40.25 cfs Results Depth 2.01 ft Flow Area 4.23 ft2 Wetted Perimeter 5.56 ft Top Width 1.99 ft Critical Depth 2.13 ft Percent Full 80.33 Critical Slope 0.0090 11 fttft Velocity 9.52 ftts Velocity Head 1.41 ft Specific Energy 3.42 ft Froude Number 1.15 Maximum Discharge 44.12 cfs Full Flow Capacity 41.01 cfs Full Flow Slope 0.009630 fttft Flow is suaercritical. Cass ,? ?C =????r? 7" /r? ', 07/03/00 Academic Edition FlowMaster v5.17 11:46:36 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 4.,-? CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB- SHEET NO. SHEET OF CALCULATED BY v/ DATE 7 3 CHECKED BY DATE -601 Z? - 2¢ -a = . ? 2 ? Lq = 20 PRODUCT 204 1 (Sept Skeh) 205 t (Padded( 9'{ CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 ' DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB SHEET NO. OF CALCULATED BY DATE J oCJ CHECKED BY DATE Sr.Ai F Z Gv ? 22 7`= MUUK T MA I, 5rrgk 5hms1205 1 I IWM I 4 5" e ? la i VT aoCD ?CD Y ? tirnOD Cf) -°ooo m LM QD c a? iw ? O ° t y r yc (0 co o? rn CO) N -r- N? ag Y ? V J L »r 0 OOOO r°? u .- r- .- .- m ?ti Z O 00 L ow Mtc) L .?. y O r M M r- 00 co w p LL Z p ?ay?O0C1 Z ? ? `0 ? ? V Z a oa o rn 0 Q z U o Z O ~ M C) Oft 2048 0) ? C14 et .- o co jMNr- N W > 2 U) .. LLj CL N O J 0 O O O O ooOO 0 0) y 0 Co C? 0? 0 0 a aoaoad ao 0 OOtr)CD - OCN W c NN m? W m V Y W Q W Y CD Q ca E CMCO)?N V ????? a m a m t Z ? H- Q O a/ L a) O CN C%4 O M O 04 0 yam. O O O O C? C) LO 0 LOLOcOO? m.2 ? OOr`O G F L O O O O tnM?Lo N Mm r Y 'L O O Cl O 0 c OO?O (n - jE(D r-: r•Cl) t- m J C6 a6 r`6 L 0 x 00 c LM 0 U) ,=0000 E 0 0 m o° E co (6 lei (6 tntnLOl) ? L L 0 E?- NMst 0 E ?NMst az a z 9( Pond 1 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File c:lhaestadlacademiclfmwlwake ec.fm2 Worksheet Permanent Weir - Pond 1 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.130000 ftfft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 30.00 ft Discharge 84.68 cfs Results Depth 0.55 ft Flow Area 17.53 ftz Wetted Perimeter 33.50 ft Top Width 33.32 ft Critical Depth 0.61 ft Critical Slope 0.091235 ft/ft Velocity 4.83 ftis Velocity Head 0.36 ft Specific Energy 0.92 ft Froude Number 1.17 Flow is suaercritical. -T'=-, ¢xa15;?r-x,?3 4? IZ5 ?ztP RAP, C?..?ss I 07/24100 Academic Edition Fla M star v5.17 03:50:45 PM Haestad M@thods, Inc. 37 Brookside Road Waterbury, CT 06708 (203)755.-IOW Page 1 of 1 93 Pond 2 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File c.1haestadlacademic1fmwlwake ec.fm2 Worksheet Permanent Weir - Pond 2 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.250000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 48.52 cfs Results Depth 0.41 It Flow Area 8.81 ftz Wetted Perimeter 22.62 ft Top Width 22.49 ft Critical Depth 0.55 ft Critical Slope 0.095362 ft/ft Velocity 5.50 ft/s Velocity Head 0.47 It Specific Energy 0.89 ft Froude Number 1.55 Flow is supercritical. X2,4 x .¢1 x,ZS 6.4 ?8v R?P Pp C c s? 2 so 07/24/00 Academic Edition FbwMaster v5.17 03:47:58 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 99 Pond 4 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File cAhaestadlacademiclfmYAwake ec.fm2 Worksheet Permanent Weir - Pond 4 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.070 Channel Slope 0.330000 ft( ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 It Discharge 61.15 cfs Results Depth 0.43 ft Flow Area 9.18 ftz Wetted Perimeter 22.73 ft Top Width 22.59 ft Critical Depth 0.64 ft Critical Slope 0.086171 ft/ft Velocity 6.66 ft 1s Velocity Head 0.69 ft Specific Energy 1.12 ft Froude Number 1.84 Flow is supercritical. T=-? ? 5 _ ?Z.4 x .4-3 x e 3, = 9,S5; 2¢" ;;E'1 ;v 2A r Cass 2 f ?1? P ZeO // -r4 rc.K 07/24/00 Academic Edition FlowMaster v5.17 03:37:30 PM Haested Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 4, Pond 3 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File cAhaestadlacademicVfmwlwake ec.fm2 Worksheet Permanent Weir - Pond 3 Flow Element Trapezoidal Channel Method Manning's Formula Sohn For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.330000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 60.00 ft Discharge 168.98 cfs Results Depth 0.42 ft Flow Area 25.77 ftz Wetted Perimeter 62.66 ft Top Width 62.52 ft Critical Depth 0.62 ft Critical Slope 0.089821 ftfft Velocity 6.56 ft/s Velocity Head 0.67 ft Specific Energy 1.09 ft Froude Number 1.80 Flow is suaercritical. ?- \ ? d5 (a Z,4x 10 42 24'? Rr4v Woe " Tu t c+C - G L A!Ss Z 07/24/00 Academic Edition FbwMaster v5.17 03:38:06 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 /0,0 d i*- CIVIL CONSULTANTS INC. Civil Engineers 4 Land Development Consultants STORMWATER MANAGEMENT CALCULATIONS for CAPITAL PLAZA Wake Forest, North Carolina June 13, 2000 Revised July 3, 2000 Revised July 14, 2000 Revised July 24, 2000 Project No. 06013 Prepared for: Wake Forest/Granite, LLC 001047 P.O. Box 1928 Mount Airy, NC 27030 ?Iff' ii 3 tM Q,tii' ?j??4Ii?6l:SSS! 3622 Lyckan Parkway Suite 3003 Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax civilengr@aol.com ,I DRAINAGE AREA ANALYSIS PRE- AND POST- DEVELOPMENT l DRAINAGE AREA to - 1,6964760 Sr COMMERCIAL - SHOPPING CENTER DRAINAGE AREA 2A - 1.660.992 SF RESIDENTIAL/COMMERCIAL DRAINAGE AREA IB - SEE BREAKOUT COMMERCIAL - MANN DOGE VNAOE AREA - 861.699 SF RESIDENTIAL (1/6 AC LOTS), DRAINAGE AREA 04 - 4,016,127 SF RESIDENTIAL (1/5 TO 1/3 AC) DRAINAGE AREA J7 - 3.469.606 SF WOODS - 316.427 SF REMAINDER - RESIDENTIAL (1/2 AC) PREDEVELOPMENT CONDITIONS DRAINAGE AREA ROADWAY DRAINAGE M OFFSITE DRAINAGE AREA 3 - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) DRAINAGE AREA 6 - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) DRAINAGE AREA 6 - SEE BREAKOUT UNDEVELOPED (PROPOSED SITE) oooZ 8j :Lb :dj £Z jew nqi 6Mp • j j-ajd-ep\£j09\f 0dd\NSOS\ :9 2 r 3 WAK LDE O 0 ? 0 0 12 ?1 \ o OC 0 0 \ L `E OQ 0 17 n , i C t ?,? ? vG ? I 19 1A AREA tA. IA96.77a17 L Ml W • ID2.31"7 2 PMKD1fi 543J25M 1 D?AD 127.931.19 l GRAVEL . 139.7 S Vmw JAM2 MUSH • 76.3".9 7. MOOS • 1.13279 a HIM DrERVMUS • 229.64 !. CCPOC LAL AREA . 315.99141 3 IB 1261,736.79 99 ,440.12 'Q i a6y.,bi 27$, 77 c{7 156,017.83 5,084.33 179,410.{5 15,860.20 3,196.5.4 1PERVIOUS - 6,91&17 "AKM- = l00, 490 y OOOZ SV :LO :S; EZ jeW nUl 9MO' U8-eaJd\U09\rOdd\NSOS\ :O 5 3 A 3 958,6!1.38 OOi 15,092.44 ARKI116 - 14,500.7 TOAD - 25293,4 TRAVEL - 36,000.25 /ODDS 559,333.19 (RUSH 14,79922 OCKS 2,901.86 IISC. IMPERVIOUS - 250.48 6 .f , R ° o "'333333 -=NofevS?d?ada: 0002 6; U :06 Ed Jehl nql 6Ma u---5-eaj \E609\f Odd\NsaS\ 0 7 t °Illilll (S AREA C • 1402,74021 L RW . 324.33 2, MR)a . 0 3. ROAD • 61463.37 4. GRAVEL • 16063.70 5. V= 426694.73 6. ]RUSH 124t9713 7. ROCKS • 0 s. HsSG PIERViOUS • o 1.'^iV? r r r ^r C7 FV? \nnk3 v 8 t STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 12-Aar-00 DRAINAGE AREA #: 1A/1B AREA 1A (SF) 1696750 DESCRIPTION AREA 1A: COMMERC IAL / SHOPPING CENTER AREA 1B (SF) 1261757 DESCRIPTION AREA 1B: COMMERC IAL/ WINN DIXIE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 67.92 REMOTE ELEVATION 398 HYDRAULIC LENGTH: 4750 OUTFALL ELEVATION 292 BASIN SLOPE: 0.022 ELEVATIONAL DIFFERENCE: 106 TIME OF CONC.: 22.89 LAND USE/COVER AREA AREA W OF RATIONAL DELTA CU RVE #, DELTA (SF) (AC) TOTAL C C CN CN AREA 1A - SHOPPING CENTER IMPERVIOUS AREA ROOF 182317 4.19 0.06 0.95 0.06 98 6 PARKING LOT 543125 12.47 0.18 0.95 0.17 98 18 ROADWAY 125934 2.89 0.04 0.95 0.04 98 4 GRAVEL 660 0.02 0.00 0.80 0.00 85 0 ROCKS 1433 0.03 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 230 0.01 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 318998 7.32 0.11 0.85 0.09 92 10 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67118 1.54 0.02 0.20 0.00 55 1 WOODS, POOR COVER 56377 1.29 0.02 0.25 0.00 66 1 LAWN/PASTURE, GOOD 400558 9.20 0.14 0.30 0.04 61 8 AREA 1 B - WINN DIXIE IMPERVIOUS AREA ROOF 99440 2.28 0.03 0.95 0.03 98 3 ROADWAY 156018 3.58 0.05 0.95 0.05 98 5 PARKING LOT 278528 6.39 0.09 0.95 0.09 98 9 GRAVEUDIRT ROAD 5084 0.12 0.00 0.80 0.00 85 0 ROCKS 3196 0.07 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 6918 0.16 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSI NESS 60480 1.39 0.02 0.85 0.02 92 2 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 179410 4.12 0.06 0.20 0.01 55 3 WOODS, POOR COVER 15860 0.36 0.01 0.25 0.00 66 0 LAWN/PASTURE, GOOD 456823 10.49 0.15 0.30 0.05 61 9 WEIGHTED C/CN 1.00 0.67 82 Page 1 of 5 9 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 12-Aar-00 DRAINAGE AREA #: 2A/2B AREA 1A (SF) 1660992 DESCRIPTION AREA 1A: COMMERC IAL AND RESIDENTIAL AREA 1 B (SF) 851699 DESCRIPTION AREA 213: RESIDENTI AL (1/5 ACRE LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 57.68 REMOTE ELEVATION 380 HYDRAULIC LENGTH: 2830 OUTFALL ELEVATION 292 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 88 TIME OF CONC.: 13.52 LAND USE/COVER AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN AREA 2A - COMMERCIAL IMPERVIOUS AREA ROOF 45451 1.04 0.02 0.95 0.02 98 2 PARKING LOT 76165 1.75 0.03 0.95 0.03 98 3 ROADWAY 119019 2.73 0.05 0.95 0.04 98 5 GRAVEL 6485 0.15 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 5523 0.13 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 141043 3.24 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 491217 11.28 0.20 0.20 0.04 55 11 WOODS, POOR COVER 54685 1.26 0.02 0.25 0.01 66 1 LAWN/PASTURE, GOOD 721404 16.56 0.29 0.30 0.09 61 18 AREA 2B - RESIDENTIAL IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/5 AC LOTS 851699 19.55 0.34 0.52 0.18 78 26 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 WEIGHTED C/CN 1.00 0.45 71 Page 2 of 5 10 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 1 DESCRIPTION: UNDEVELOPED PREDOMINENT SOIL GROUP: Type B REMOTE ELEVATION 353 OUTFALL ELEVATION 280 ELEVATIONAL DIFFERENCE: 73 SURFACE TYPE AREA AREA (SF) (AC) IMPERVIOUS AREA ROOF 15092 0.35 PARKING LOT 14500 0.33 ROADWAY 25293 0.58 GRAVEL 36000 0.83 ROCKS 2902 0.07 MISC. IMPERVIOUS 250 0.01 DEVELOPED AREAS COMMERCIAL/BUSINESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 GREEN/NATURAL AREAS WOODS, GOOD COVER 559533 12.85 WOODS, POOR COVER 14799 0.34 LAWN/PASTURE, GOOD 290243 6.66 EIGHTED C/CN OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 22.01 HYDRAULIC LENGTH: 1700 BASIN SLOPE: 0.043 TIME OF CONC.: 8.06 % OF RATIONAL DELTA CURVE DELTA TOTAL C C CN CN 0.02 0.95 0.01 98 2 0.02 0.95 0.01 98 1 0.03 0.95 0.03 98 3 0.04 0.80 0.03 85 3 0.00 0.90 0.00 95 0 0.00 0.95 0.00 98 0 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.58 0.20 0.12 55 32 0.02 0.25 0.00 66 1 0.30 0.30 0.09 61 18 1.00 0.30 61 DRAINAGE AREA #: 4 TOTAL AREA (SF): 4016127 OUTFALUSTRUCTURE #: RESIDENTI AL (1/3-1/5 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 92.20 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3450 OUTFALL ELEVATION 267 BASIN SLOPE: 0.033 ELEVATIONAL DIFFERENCE: 114 TIME OF CONC.: 15.38 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 4016127 92.20 1.00 0.50 0.50 75 75 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 EIGHTED C/CN 1.00 0.50 75 Page 3 of 5 STORM DRAINAGE CALCULATIONS DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 7 DRAINAGE AREA #: 5 OUTFALUSTRUCTURE #: UNDEVELOPED PREDOMINENT SOIL GROUP: Type B REMOTE ELEVATION 344 OUTFALL ELEVATION 263 ELEVATIONAL DIFFERENCE: 81 SURFACE TYPE AREA AREA (SF) (AC) IMPERVIOUS AREA ROOF 264 0.01 PARKING 0 0.00 ROADWAY 29227 0.67 CONCRETE, MISC 0 0.00 GRAVEL 18225 0.42 DEVELOPED AREAS COMMERCIAUBUSI NESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 GREEN/NATURAL AREAS WOODS, GOOD COVER 507246 11.64 WOODS, POOR COVER 67817 1.56 LAWN/PASTURE, GOOD 186373 4.28 EIGHTED C/CN -00 TOTAL AREA (SF): 809152 OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 18.58 HYDRAULIC LENGTH: 1850 BASIN SLOPE: 0.04 TIME OF CONC.: 8.54 % OF RATIONAL DELTA CURVE #, DELTA TOTAL C C CN CN 0.00 0.95 0.00 98 0 0.00 0.95 0.00 98 0 0.04 0.95 0.03 98 4 0.00 0.95 0.00 98 0 0.02 0.80 0.02 85 2 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.63 0.20 0.13 55 34 0.08 0.25 0.02 66 6 0.23 0.30 0.07 61 14 1.00 0.27 60 DRAINAGE AREA #: 6 OUTFALUSTRUCTURE #: UNDEVELOPED PREDOMINENT SOIL GROUP: Type B REMOTE ELEVATION 335 OUTFALL ELEVATION 245 ELEVATIONAL DIFFERENCE: 90 SURFACE TYPE AREA AREA (SF) (AC) IMPERVIOUS AREA ROOF 324 0.01 PARKING LOT 0 0.00 ASPHALT 61153 1.40 CONCRETE, MISC 0 0.00 GRAVEL 16066 0.37 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 INDUSTRIAL 0 0.00 RESIDENTIAL, 1/4 AC LOTS 0 0.00 GREEN/NATURAL AREAS WOODS, GOOD COVER 425695 9.77 WOODS, POOR COVER 124297 2.85 LAWN/PASTURE, GOOD 775205 17.80 EIGHTED C/CN TOTAL AREA (SF): 1402740 OFFSITE AREA (AC): 0.00 TOTAL AREA (AC): 32.20 HYDRAULIC LENGTH: 2650 BASIN SLOPE: 0.034 TIME OF CONC.: 12.42 % OF RATIONAL DELTA CURVE DELTA TOTAL C C CN CN 0.00 0.95 0.00 98 0 0.00 0.95 0.00 98 0 0.04 0.95 0.04 98 4 0.00 0.95 0.00 98 0 0.01 0.80 0.01 85 1 0.00 0.85 0.00 92 0 0.00 0.75 0.00 88 0 0.00 0.50 0.00 75 0 0.30 0.20 0.06 55 17 0.09 0.25 0.02 66 6 0.55 0.30 0.17 61 34 1.00 0.30 62 Page 4 of 5 /2. STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER PREDEVELOPMENT CONDITIONS 1 OUTFALUSTRUCTURE #: RESIDENTIAL (1/2 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 79.65 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3700 OUTFALL ELEVATION 243 BASIN SLOPE: 0.037 ELEVATIONAL DIFFERENCE: 138 TIME OF CONC.: 15.50 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE #, DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAL/BUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/2 AC LOTS 3153178 72.39 0.91 0.40 0.36 70 64 GREEN/NATURAL AREAS WOODS, GOOD COVER 316427 7.26 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 EIGHTED C/CN 1.00 0.38 69 Page 5 of 5 13 ? r DRAINAGE AREA 1A - 1.696,750 SF COMMERCIAL - SHOPPING CENTER DRAINAGE AREA 2A - 1.660.992 SF K DRAINAGE AREA 18 - SEE BREAKOUT COWERCIK - 16NN DIME AREA - 814,248 SF IAL (1/5 AC LOTS) DRAINAGE AREA 04 - 4,016,127 RESIDENTIAL (1/5 TO 1/3 DRAINAGE AREA ROADWAY DRAINAGE TO OFFSITE DRAINAGE AREA 3A AND B - SEE BREAKOUT DEPARTMENT STORE DRAINAGE AREA SA AND 8 - SEE BREAKOUT NOME IMPROM*NT/ANCHOR STORES DRAINAGE AREA F - 3.469.905 SF WOODS - 316.427 SF RUANOEA - RESIDENTIAL (1/2 AC) DRAINAGE AREA 6A, B. AND C - SEE BREAKOUT OUTPARCELS AND ACCESS ROAD POST DEVELOPMENT CONDITIONS (REVISED) 000E 05:L;:6; ;; add and 6Mp•Ej-lsod-ep\E609\rOad\NSOS\:O ly C:\SDSK\PROJ\6013\area-lb-post-rl.dwg Tue Apr 04 14:54:32 2000 poP?PSSPtVNr' ?3 ? V 15 . C.'\SOSK\PROJ\6013\Post-3-rl.dwg Tue Apr 04 16:27:23 2000 C O A p A O D 3 3- Z. C ? A 'O S' 0 A C 4 < 7 ' C W rO, a N S N m = 11 ? ?° a O rn " c ??null n II N II c n m p N A o o° °f U Of c ? p V C f^'f C 8 o W N m C3 C .01 N O 3 ?D C II + N A n N a? v C u °o N N D CD %D m co UI rn m 0 II r. J Q O U N w II LLJ LO LO z W 0 ^ 0 O ON C) (n v (L Q; N CD C p. N OC) V) O W J W O O o II o II ? W II II II (L II U 0 II Z II '" w LLI W (4 O ° aaW C F v ¢ w o W D 3- O? CL Q? L:;3m0? x0 , M O` ¢ r: (U M ? In I'D ? co ON 3 OOOZ 9Z :05 :96 b0 jdd and 6Mp, jj-qE-Isod\E609\roHd\HSOS\ .3 POST DEVELOPMENT (REVISED) AREA 5A = 291,990.27 1. ROOF = 130184.00 2. PARKING = 112,568.86 3. ROAD =0 4, GRAVEL = 0 5. WOODS = XXX 6. BRUSH = XXX 7. ROCKS = 0 8. CONCRETE = 4,530.85 9. OUTPARCELS (COMMERCIAL) _ 10. RETENTION = 29,606.50 oooZ b5 ,EE ,Eti 90 unr and 5Mp ley-ls0d\M9\r0dd\NG0S\ :0 1g ?I f I a? ? Il POST DEVELOPMENT SED> <REVI 5A2 AREA SA - 1,233,933.02 L ROOF . 74,067.21 2. PARKING • 647,533.31 3. ROAD • 114,313.66 4. GRAVEL - 0 S. WOODS - Xxx 6. BRUSH : XXX 7. ROCKS a 0 8. CONCRETE . 28487.65 9. OUTPARCELS (COMMERCIAL) 000e of hE .e" 90 L-'Ir @7,1 bmG Zec-iscc' G C9Gad\ ? 9\ 3 I iq POST DEVELOPMENT 5B (REVISED) AREA SB - 286,738.84 L ROOF ¦ 0 2. PARKING - 0 3. ROAD ¦ 0 4. GRAVEL - 0 3. VOOD.S ¦ 72,92057 6. BRUSH ¦ 0 7. ROCKS - 0 8. MISC. IMPERVIOUS ¦ 0 9. OUTPARCELS (COMMERCIAL) - 0 0002 80:LE:2t ;? jdd and 6NP'Q5-ls0d\EL09\r08d\NS0S\:0 A--u " . POST DEVELOPMENT 6A AREA 6A - 201,444-10 1. ROOF 0 36 ROAD - 60454.94 4. GRAVEL - 0 7. ROCKS - 0 000a 6; :90:0; ji add and 6Mp,e9-ls0d\E;09\f 0dd\NSOS\ :0 21 POST DEVELOPMENT 6 B AREA 6B = 404,621.96 1. ROOF = 0 2. PARKING = 0 3. ROAD = 39,350.71 4. GRAVEL = 0 5. WOODS = 870.61 6. BRUSH = 0 7. ROCKS = 0 8. MISC. IMPERVIOUS = 0 9. OUTPARCELS (COMMERCIAL) = 243,760.15 0002 EO :5b :o; ; 6 jdd and 6Mp • qq-ls0d\U09\f 0ad\Nsas\ :0 zz C: \5DSK\PHDJ\6013\Post-6c . dwg Tue Apr 11 l is 04: 24 2000 ?o 00 V P', P W N ;-" D ^-0 O O?0?OD? C 3 M D ? I ?-4 C ' ' rn ? p - ?+ ?n;,C 0 d<C7 C'? Mrt=j l M ."O N N 11 Z 11 d v C- II II II Cl C -u II o II m r- 11 r- m o o N C N< :lo o 10 3 " 14 C-) C3 En 00 A M Z C C 3 (n N c N 3 m 11 `0 V T N C-) o D r (T) 0 n v' STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 1A/1 B AREA 1A (SF) 1696750 DESCRIPTION AREA 1A: COMMERC IAL / SHOPPING CENTER AREA 1 B (SF) 1165911 DESCRIPTION AREA 1 B: COMMERCIAL/ WINN DIXIE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 65.72 REMOTE ELEVATION 398 HYDRAULIC LEN GTH: 4750 OUTFALL ELEVATION 292 BASIN SLOPE: 0.022 ELEVATIONAL DIFFERENCE: 106 TIME OF CONC.: 22.89 LAND USEICOVER AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN AREA 1A - SHOPPING CENTER IMPERVIOUS AREA ROOF 182317 4.19 0.06 0.95 0.06 98 6 PARKING LOT 543125 12.47 0.19 0.95 0.18 98 19 ROADWAY 125934 2.89 0.04 0.95 0.04 98 4 GRAVEL 660 0.02 0.00 0.80 0.00 85 0 ROCKS 1433 0.03 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 230 0.01 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 318998 7.32 0.11 0.85 0.09 92 10 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67118 1.54 0.02 0.20 0.00 55 1 WOODS, POOR COVER 56377 1.29 0.02 0.25 0.00 66 1 LAWN/PASTURE, GOOD 400558 9.20 0.14 0.30 0.04 61 9 AREA 1 B - WINN DIXIE IMPERVIOUS AREA ROOF 99440 2.28 0.03 0.95 0.03 98 3 ROADWAY 219604 5.04 0.08 0.95 0.07 98 8 PARKING LOT 278528 6.39 0.10 0.95 0.09 98 10 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 6918 0.16 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 60480 1.39 0.02 0.85 0.02 92 2 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 80770 1.85 0.03 0.20 0.01 55 2 WOODS, POOR COVER 12343 0.28 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 407828 9.36 0.14 0.30 0.04 61 9 -WEIGHTED C/CN 1.00 0.70 84 Page 1 DA-POST 2y STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 EA #: 2A/2B AREA 1A (SF) 1660992 AREA 1A: F COMMERC IAL AND RESIDENTIAL AREA 1 B (SF) 814248 AREA 2B: RESIDENTIAL (1/5 ACRE LOTS) OFFSITE AREA (AC): 0.00 T SOIL GROUP: Type B TOTAL AREA (AC): 56.82 REMOTE ELEVATION 380 HYDRAULIC LENGTH: 2830 OUTFALL ELEVATION 292 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 88 TIME OF CONC.: 13.52 LAND USE/COVER AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN AREA 2A - COMMERCIAL IMPERVIOUS AREA ROOF 45451 1.04 0.02 0.95 0.02 98 2 PARKING LOT 76165 1.75 0.03 0.95 0.03 98 3 ROADWAY 119019 2.73 0.05 0.95 0.05 98 5 GRAVEL 6485 0.15 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC IMPERVIOUS 5523 0.13 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 141043 3.24 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 491217 11.28 0.20 0.20 0.04 55 11 WOODS, POOR COVER 54685 1.26 0.02 0.25 0.01 66 1 LAWN/PASTURE, GOOD 721404 16.56 0.29 0.30 0.09 61 18 AREA 2B - RESIDENTIAL IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 GRAVEUDIRT ROAD 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/5 AC LOTS 814248 18.69 0.33 0.52 0.17 78 26 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 -WEIGHTED C/CN 1.00 0.45 71 Page 2 DA-POST z5 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA 3A TOTAL AREA (SF): 503230 DESCRIPTION: DEPARTME NT STORE OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 11.55 REMOTE ELEVATION 354 HYDRAULIC LENGTH: 1400 OUTFALL ELEVATION 310 BASIN SLOPE: 0.031 ELEVATIONAL DIFFERENCE: 44 TIME OF CONC.: 7.83 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 120220 2.76 0.24 0.95 0.23 98 23 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 92291 2.12 0.18 0.95 0.17 98 18 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 2668 0.06 0.01 0.95 0.01 98 1 DEVELOPED AREAS COMMERCIAUBUSINESS 229899 5.28 0.46 0.85 0.39 92 42 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 58153 1.34 0.12 0.30 0.03 61 7 EIGHTED C/CN 1.00 0.83 91 DRAINAGE AREA #: 3B TOTAL AREA (SF): 82976 DESCRIPTION: OUTFALL F ROM POND @ 3A OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 1.90 REMOTE ELEVATION 310 HYDRAULIC LENGTH: 850 OUTFALL ELEVATION 280 BASIN SLOPE: 0.035 ELEVATIONAL DIFFERENCE: 30 TIME OF CONC.: 5.10 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 ROCKS 0 0.00 0.00 0.90 0.00 95 0 MISC. IMPERVIOUS 0 0.00 0.00 0.95 0.00 98 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 17450 0.40 0.21 0.20 0.04 55 12 WOODS, POOR COVER 683 0.02 0.01 0.25 0.00 66 1 LAWN/PASTURE, GOOD 64843 1.49 0.78 0.30 0.23 61 48 -WEIGHTED C/CN 1.00 0.28 60 Page 3 DA-POST Z& STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA # 4 TOTAL AREA (SF): 4016127 OUTFALUSTRUCTURE #: RESIDENTIAL (1/3-1/5 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 92.20 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3450 OUTFALL ELEVATION 267 BASIN SLOPE: 0.033 ELEVATIONAL DIFFERENCE: 114 TIME OF CONC.: 15.38 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 4016127 92.20 1.00 0.50 0.50 75 75 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 EIGHTED C/CN 1.00 0.50 75 Page 4 DA-POST 27 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 E AREA #: 5A1 TOTAL AREA (SF): 291990 STRUCTURE F HOME IMPROVEMENT CENTER OFFSITE AREA (AC): 0.00 NENT SOIL GROUP: Type B TOTAL AREA (AC): 6.70 REMOTE ELEVATION 319 HYDRAULIC LENGTH: 1150 OUTFALL ELEVATION 275 BASIN SLOPE: 0.04 ELEVATIONAL DIFFERENCE: 44 TIME OF CONC.: 6.24 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 130184 2.99 0.45 0.95 0.42 98 44 PARKING 112569 2.58 0.39 0.95 0.37 98 38 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 4531 0.10 0.02 0.95 0.01 98 2 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 44706 1.03 0.15 0.30 0.05 61 9 EIGHTED C/CN 1.00 0.85 92 DRAINAGE AREA #: 5A2 TOTAL AREA (SF): 1233933 OUTFALUSTRUCTURE PARKING LOTS /ANCHOR STORES OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 28.33 REMOTE ELEVATION 350 HYDRAULIC LENGTH: 2800 OUTFALL ELEVATION 263 BASIN SLOPE: 0.03 ELEVATIONAL DIFFERENCE: 87 TIME OF CONC.: 13.41 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 74067 1.70 0.06 0.95 0.06 98 6 PARKING 647535 14.87 0.52 0.95 0.50 98 51 ROADWAY 114514 2.63 0.09 0.95 0.09 98 9 CONCRETE, MISC 28088 0.64 0.02 0.95 0.02 98 2 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 73058 1.68 0.06 0.85 0.05 92 5 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 0 0.00 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 296672 6.81 0.24 0.30 0.07 61 15 [WEIGHTED C/CN 1.00 0.79 89 Page 5 DA-POST 28 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE ARE % #: 5B TOTAL AREA (SF): 257152 OUTFALUSTRUGTURE AREA BEHI ND CURB/OUTFALL OF 5A OFFSITE AREA (AC): 0.00 PREDOMINENT 301L GROUP: Type B TOTAL AREA (AC): 5.90 REMOTE ELEVATION 344 HYDRAULIC LENGTH: 2140 OUTFALL ELEW.TION 263 BASIN SLOPE: 0.04 ELEVATIONAL DIFFERENCE: 81 TIME OF CONC.: 10.11 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING 0 0.00 0.00 0.95 0.00 98 0 ROADWAY 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOOD 3, GOOD COVER 72921 1.67 0.28 0.20 0.06 55 16 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 184232 4.23 0.72 0.30 0.21 61 44 EIGHTED C/C? 1.00 0.27 59 Page 6 DA-POST 29 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 6A TOTAL AREA (SF): 281444 OUTFALUSTRUCTURE #: DRAINAGE FROM US 1 OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 6.46 REMOTE ELEVATION 335 HYDRAULIC LENGTH: 2500 OUTFALL ELEVATION 255 BASIN SLOPE: 0.032 ELEVATIONAL DIFFERENCE: 80 TIME OF CONC.: 12.15 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE # DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 60055 1.38 0.21 0.95 0.20 98 21 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 23985 0.55 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 197404 4.53 0.70 0.30 0.21 61 43 EIGHTED C/CN 1.00 0.43 68 DRAINAGE AREA #: 6B TOTAL AREA (SF): 404622 OUTFALUSTRUCTURE #: COMMERC IAL OUTPA RCELS OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 9.29 REMOTE ELEVATION 316 HYDRAULIC LENGTH: 1100 OUTFALL ELEVATION 260 BASIN SLOPE: 0.051 ELEVATIONAL DIFFERENCE: 56 TIME OF CONC.: 5.40 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 39351 0.90 0.10 0.95 0.09 98 10 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 243760 5.60 0.60 0.85 0.51 92 55 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 871 0.02 0.00 0.20 0.00 55 0 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 120640 2.77 0.30 0.30 0.09 61 18 EIGHTED C/CN 1.00 0.69 83 Page 7 DA-POST 30 STORM DRAINAGE CALCULATIONS - DRAINAGE AREA BREAKDOWN WAKE FOREST TOWN CENTER POSTDEVELOPMENT CONDITIONS 12-Jun-00 DRAINAGE AREA #: 6C TOTAL AREA (SF): 249843 OUTFALUSTRUCTURE #: UNDEVELOPED AREA OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 5.74 REMOTE ELEVATION 302 HYDRAULIC LENGTH: 925 OUTFALL ELEVATION 245 BASIN SLOPE: 0.062 ELEVATIONAL DIFFERENCE: 57 TIME OF CONC.: 4.39 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 PARKING LOT 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/4 AC LOTS 0 0.00 0.00 0.50 0.00 75 0 GREEN/NATURAL AREAS WOODS, GOOD COVER 67745 1.56 0.27 0.20 0.05 55 15 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 182098 4.18 0.73 0.30 0.22 61 44 [WEIGHTED C/CN 1.00 0.27 58 DRAINAGE AREA #: 7 TOTAL AREA (SF): 3469605 OUTFALUSTRUCTURE M RESIDENTIAL (1/2 AC LOTS) OFFSITE AREA (AC): 0.00 PREDOMINENT SOIL GROUP: Type B TOTAL AREA (AC): 79.65 REMOTE ELEVATION 381 HYDRAULIC LENGTH: 3700 OUTFALL ELEVATION 243 BASIN SLOPE: 0.037 ELEVATIONAL DIFFERENCE: 138 TIME OF CONC.: 15.50 SURFACE TYPE AREA AREA % OF RATIONAL DELTA CURVE DELTA (SF) (AC) TOTAL C C CN CN IMPERVIOUS AREA ROOF 0 0.00 0.00 0.95 0.00 98 0 ASPHALT 0 0.00 0.00 0.95 0.00 98 0 CONCRETE, MISC 0 0.00 0.00 0.95 0.00 98 0 GRAVEL 0 0.00 0.00 0.80 0.00 85 0 DEVELOPED AREAS COMMERCIAUBUSINESS 0 0.00 0.00 0.85 0.00 92 0 INDUSTRIAL 0 0.00 0.00 0.75 0.00 88 0 RESIDENTIAL, 1/2 AC LOTS 3153178 72.39 0.91 0.40 0.36 70 64 GREEN/NATURAL AREAS WOODS, GOOD COVER 316427 7.26 0.09 0.20 0.02 55 5 WOODS, POOR COVER 0 0.00 0.00 0.25 0.00 66 0 LAWN/PASTURE, GOOD 0 0.00 0.00 0.30 0.00 61 0 -WEIGHTED C/CN 1.00 0.38 69 Page 8 DA-POST 3) HYDROLOGIC ANALYSIS PRE- AND POST- DEVELOPMENT 2 AND 10 YEAR STORMS The hydrologic analysis presented was prepared using Hydroflow Hydrographs 6.0. Only summary information presented for the 2 year storm. 32 Q 0 z O a H z w 2 IL O yJ c0titio0wd U1> NNMM?1p J W Q ? 40 2 IL D W o N ti IM r O a'NNV)CV) tw COQ o W W ? a a 0, 0 r- O 0) LU LU, c%4 M M It st a n. H z w 2 IL O J W) N V 00 N m W o.-00w0N U) > CM J E" N Z0 Q ? O W ? 1-ZNw??-co?N w N 0°a N W W W Q Oo et m Go <0 et m o? r- w N aZ N W a?c??cncor` 0 E M'-ttoc0r` f" m m m m m m N 0 0 0 0 0 0 W Lm m m m o w c E E E E E 2 0 0 0 0 0 w w w w w m m m m m 1? ??- w w w w O 7 7 > > ?a- 00000 z 0 a } J a z Q W a z 9 0 a? w E o O 0 to o w co o 2 'R u) 0 c0) c C m m (D v O 5 cc a O 0 G. cn ca m N E_ N ? L w c C m 2 L 40- 0 0 0 m N O o o E ? c y c`u m $ 'o in 3 0 a c O w c 0 v c c c > 3 o c o m c 0 0 aEi N=? > to > > 0 2 rn c E 2.2 CU N 0 8 w y o N L CU C C L LO CD cu E O E??oco co O U C > O O 0 .. h O N ^ O E o CL a 1: 8 o o 0 0 cn- c > ai o 0 0M E a L w cc o CL (D 0 - 0) C (Lj 0) H C 0 ^. ^. O L ..N a W F- 0 z T- 0 rn m a Q D 0 z O 0- .33 DETENTION/RETENTION REQUIREMENTS POST DEVELOPMENT CONDITIONS TOTAL BASE OUTPARCEL TOTAL ADJ. PERCENT PERCENT AREA POND DRAINAGE NON-IMP NON-IMP NON4MP. NON-IMP IMPERVIOUS NUMBER NUMBER AREA SURFACE SURFACE AREA AREA AREA 3A 1 503230 58153 34485 92638 18 82 6A1 2 291991 15100 29607 44707 15 86 6A2 3 1233933 369729 10959 380688 31 69 6B 4 404822 121511 36564 168075 39 61 PERMANENT POOL ANALYSIS RETENTION SA REQ'D FOR SURFACE PERM POOL AREA POND SA/DA 5'PERM AREA DEPTH NUMBER NUMBER REQ'D, 5' DEEP POOL PROVIDED REQ'D 3A 1 2.23 11222 11810 6.0 6A1 2 2.31 6745 7130 5.0 6A2 3 1.94 23938 22810 5.5 613 4 1.78 7202 7300 5.0 TEMPORARY STORAGE POOL DEPTH RETENTION RETENTION RETENTION DEPTH TOTAL AREA POND RUNOFF STORAGE STORAGE OF TEMP DEPTH FOR NUMBER NUMBER COEF, Rv VOL. REQ'D PROVIDED POOL RETENTION 3A 1 0.78 32891 33900 2.5 7.60 5A1 2 0.81 19763 21200 2.5 7.50 6A2 3 0.67 69135 74550 3.0 8.00 6B 4 0.60 20177 21225 2.5 7.60 DETENTION POOL DEPTHS DETENTION DEPTH OF TOTAL TOTAL TOTAL AREA POND STORAGE DETENTION DEPTH OF DEPTH OF VOLUME OF NUMBER NUMBER BELOW WEIR POOL STORAGE POND STORAGE 3A 1 0 0.00 2.50 7.60 33900 6A1 2 0 0.00 2.60 7.60 21200 5A2 3 136040 4.50 7.50 12.50 210590 613 4 0 0.00 2.60 7.60 21225 OUTLET DESIGN FLOW FOR FLOW FOR ORIFICE ORIFICE ORIFICE CALCULATED APPROX. AREA POND OUTLET IN OUTLET IN SIZE AREA AREA FLOW DAYS TO NUMBER NUMBER 2 DAYS 5 DAYS (INCHES) SQ. IN SF CFS OUTLET 3A 1 0.196 0.078 1.75 2.40 0.02 0.13 3.13 6A1 2 0.123 0.049 1.60 1.77 0.01 0.09 2.66 SA2 3 1.219 0.487 2.00 3.14 0.02 0.29 3.02 6B 4 0.123 0.049 1.60 1.77 0.01 0.09 2.66 EMERGENCY SPILLWAY DESIGN 100 YEAR FLOW, DEPTH CALC. WEIR WEIR AREA POND C AREA STORM Q H. LENGTH,L LENGTH,L NUMBER NUMBER VALUE (ac) (in/hr) (cfs) (ft) (ft) (ft) 3A 1 0.830 11.550 8.83 84.68 1.00 28.23 30.00 5A1 2 0.850 6.240 9.15 48.52 1.00 16.17 20.00 6A2 3 0.790 28.330 7.65 168.98 1.00 56.33 60.00 6B 4 0.690 9.290 9.54 61.15 1.00 20.38 20.00 MAINTENANCE DRAIN DESIGN VOLUME OF FLOW FOR CALCULATED MIN. CALC ACTUAL CALCULATED APPROX. AREA POND PERMANENT OUTLET IN PIPE AREA PIPE DIA ORIFICE FLOW HRS TO NUMBER NUMBER POOL 24 HOURS (SF) (IN) (IN) CFS OUTLET 3A 1 43425 0.503 0.05 1.471 1.625 0.54 22.48 5A1 2 26125 0.302 0.03 1.141 1.250 0.32 22.86 5A2 3 117560 1.361 0.13 2.420 2.750 1.54 21.26 6B 4 28725 0.332 0.03 1.196 1.375 0.38 20.77 Page 1 RETENTION 34 CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB 1.?.4?CF oR :s-r©WN 1 ?.t?---- SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE EL 206 Top or k7EKM EL 283 - ToP o F Ri sEP, l - ? !z" p_ E7L ?-60'3 -1_o P O F P?21? ( ono L \ I EL 975 5- So-r`fo M PAM12N I (Slo SAeq) MI jPaWed) 3S 1nlak?CF_ ?o RF-?T T ? ? rl ??1?_ CIVIL CONSULTANTS, INC. JOB- 3622 Lyckan Pky. Suite 3003 SHEET NO. OF DURHAM, NORTH CAROLINA 27707 CALCULATED BY DATE (919) 490-1645 FAX (919) 403-0336 CHECKED BY DATE crei F PPOOUCT 204 1(Smk WM) 2051 (Padded1 3 W CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 roe ScJMMAE i" OF l?j5:ACA 1125 SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE crei P k, c?ES 2 2ga 83?? 28d )0 20 4 320 ? 2?2 1700/ poST ??v?,oj?? ?- 2 ? Z9a 830' 2? low 2( '8 sad 254 / ? /9o 7 \ XI/ (a 2411? 2 ApeA ©LR'F-ALI 294 Ct-E:Y G orr, aF IN-r ?' 1021J' L.E:N&ri-j en r ?Ri~AC -A 17 GNAW. Aw. Z R 224 ars 232 cFs 10? R = 4q to c?5 ?io7 CF5 Pty- 7JEVE: Lop T Project: wake-pre2.GPW IDF file: Raleigh-malco ImLEMEyd's 04-13-2000 y 38 .Mydrograph Summary Report Page 1 'Hyd. No. Aydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (yrs) Inflow hyd(s) Maximum elevation (fl) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 63.3 1 756 452,835 2 -- - - Area 1 - Commercia 2 SCS Runoff 36.3 1 747 231,703 2 - Area 2 -Commer/Res 3 Combine 97.5 1 754 684,539 2 1 +2 --- -- First Fork 4 Reach 97.4 1 755 684,508 2 3 -- - Stream Section 1 6 SCS Runoff 7.3 1 741 48,680 2 - --- - Area 3 - Undevelop 7 Combine 103.6 1 755 733,187 2 4+6 --- --- Outfall of Area 3 8 Reach 103.6 1 756 732,871 2 7 -- -- Stream Section 2 10 SCS Runoff 72.4 1 748 453,048 2 ---- - ---- Area 4 - Residenti 11 Combine 173.1 1 752 1,185,919 2 8+10 --- --- Outfall of Area 4 13 SCS Runoff 5.0 1 744 38,131 2 ---- - ---- Area 5 - Undevelop 14 Combine 177.9 1 751 1,224,051 2 11 +13 Outfall Area 5 15 Reach 177.6 1 754 1,223,356 2 14 Stream Section 4 17 SCS Runoff 87 1 755 76,033 2 ---- - -- Area 6 - Undevelop 18 Combine 186.3 1 754 1,299,388 2 15 + 17 Outfall Area 6 20 SCS Runoff 37.6 1 755 287,645 2 -- -- - Area 7 - Residenti 21 Combine 223.9 1 754 1,587,033 2 18 + 20 Area 7 Outfall Proj. file: wake-pre2.GPW OF file: Raleigh-malcolm.lDF F Run date: 04-13-2000 2 Y(2 PRE 39 -Hydrograph Summary Report Page 1 Hyd. No. ?iydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (CUR) Return period (yrs) Inflow hyd(sl Maximum elevation (R) Maximum storage (cult) Hydrograph description 1 SCS Runoff 117.2 1 756 831,912 10 - -- Area 1 - Commercia 2 SCS Runoff 83.3 1 746 495,843 10 - - Area 2 -Commer/Res 3 Combine 194.8 1 752 1,327,757 10 1+2 - -- First Fork 4 Reach 194.8 1 753 1,327,755 10 3 - - Stream Section 1 6 SCS Runoff 24.0 1 739 126,586 10 -- - - - Area 3 - Undevelop 7 Combine 214.1 1 752 1,454,340 10 4+6 --- --- Outfall of Area 3 8 Reach 214.1 1 753 1,453,882 10 7 - - Stream Section 2 10 SCS Runoff 151.7 1 747 912,794 10 --- --- Area 4 - Residenti 11 Combine 362.4 1 749 2,366,677 10 8+10 -- -- Outfall of Area 4 13 SCS Runoff 17.5 1 742 101,729 10 -- Area 5 - Undevelop 14 Combine 378.8 1 749 2,468,406 10 11+13 -- -- Outfall Area 5 15 Reach 378.4 1 751 2,467,454 10 14 --- - Stream Section 4 17 SCS Runoff 27.0 1 753 193,380 10 - -- -- Area 6 - Undevelop 18 Combine 405.4 1 751 2,660,834 10 15 + 17 - Outfali Area 6 20 SCS Runoff 91.5 1 754 636,658 10 -- Area 7 - Residenti 21 Combine 496.1 1 752 3,297,492 10 18 + 20 - Area 7 Outfall Proj. file: wake-pre10.GPW 7 O file: Raleigh-malcolm.IDF Run date: 04-13-2000 10 YI PRE Y0 Ljl Hydrograph Summary Report Page 1 .Hyd. No. hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 70.6 1 753 475,865 2 - Area 1 - Commercia 2 SCS Runoff 35.8 1 747 228,248 2 - - Area 2 -CommedRes 3 Combine 105.2 1 751 704,114 2 1+2 - First Fork 4 Reach 105.2 1 753 704,083 2 3 Stream Section 1 6 SCS Runoff 38.2 1 723 111,567 2 - - Area 3a - Dept. St 7 Reservoir 31.1 1 728 77,570 2 6 307.50 86,114 POND 1 - RET ONLY 8 SCS Runoff 0.8 1 732 3,957 2 - - Area 3B - Area bell 9 Combine 31.8 1 728 81,527 2 7+8 - Area 3 to Stream 10 Combine 112.4 1 751 785,609 2 4+9 Outfall of Area 3 11 Reach 112.4 1 752 785,275 2 10 Stream Section 2 13 SCS Runoff 72.4 1 748 453,048 2 - Area 4 - Residenti 14 Combine 183.7 1 750 1,238,323 2 11+13 Outfall of Area 4 16 SCS Runoff 26.7 1 720 67,509 2 - Area 5A1 17 Reservoir 22.9 1 723 46,279 2 16 283.40 52,098 Pond 2 - Ret Only 18 SCS Runoff 60.8 1 732 252,091 2 - - Area 5a - Stores 19 Reservoir 1.7 1 1097 38,268 2 18 275.06 318,984 Pond 3 - Ret/Det 20 SCS Runoff 1.3 1 749 11,236 2 - - Area 5B - Area Be[ 21 Combine 23.3 1 723 57,516 2 17 + 20 Total Area 5 22 Combine 23.4 1 723 95,784 2 19 + 21 Outfall Area 5 23 Combine 188.4 1 750 1,334,107 2 14 + 22 Outfall at 5 24 Reach 188.3 1 751 1,333,550 2 23 Stream Section 4 26 SCS Runoff 3.4 1 747 22,246 2 - Area 6A - US 1 Dra 27 SCS Runoff 24.4 1 722 65,314 2 - Area 6B - Outparce 28 Reservoir 1.5 1 803 22,808 2 27 267.53 69,545 Pond 4 - Rat Only 29 Combine 3.4 1 747 45,053 2 26 + 28 Area 6 Development 30 SCS Runoff 2.3 1 729 11,124 2 - - Area 6C - Undevelo 31 Combine 4.7 1 740 56,178 2 29 + 30 Total Area 6 32 Combine 192.4 1 751 1,389,726 2 24 + 31 - Outfall Area 6 34 SCS Runoff 37.6 1 755 287,645 2 - Area 7 - Residenti 35 Combine 229.4 1 752 1,677,371, 2 32 +34, Area 7 Outfall Proj. file: 6013-final 2yr.GPW OF file: Raleigh-malcolm.IDF Run date: 07-03-2000 Z Yp_ pOST- 4Z .Hydrograph Summary Report Page 1 Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No. type flow interval peak period hyd(s) elevation storage description (origin) (cis) (min) (min) (cult) (yrs) (fl) (cult) 1 SCS Runoff 126.4 1 752 852,976 10 - Area 1 - Commercia 2 SCS Runoff 82.1 1 746 488,449 10 - Area 2 -Commer/Res 3 Combine 205.7 1 750 1,341,425 10 1+2 - First Fork 4 Reach 205.7 1 751 1,341,423 10 3 - Stream Section 1 6 SCS Runoff 61.5 1 723 184,226 10 - Area 3a - Dept. St 7 Reservoir 58.7 1 725 150,151 10 6 307.77 90,924 POND 1 - RET ONLY 8 SCS Runoff 2.6 1 730 10,541 10 - - Area 3B - Area bell 9 Combine 60.9 1 725 160,692 10 7+8 - Area 3 to Stream 10 Combine 217.2 1 750 1,502,115 10 4+9 - - Outfall of Area 3 11 Reach 217.2 1 751 1,501,632 10 10 Stream Section 2 13 SCS Runoff 151.7 1 747 912,794 10 - -- Area 4 - Resident! 14 Combine 366.9 1 749 2,414,426 10 11 +13 - Outfall of Area 4 16 SCS Runoff 42.4 1 720 110,225 10 -- - Area 5A1 17 Reservoir 40.3 1 722 88,968 10 16 283.61 54,511 Pond 2 - Ret. Only 18 SCS Runoff 100.9 1 732 425,893 10 - - - Area 5a - Stores 19 Reservoir 21.7 1 763 211,339 10 18 276.11 354,690 Pond 3 - Ret/Det 20 SCS Runoff 4.7 1 747 30,809 10 - -- Area 5B - Area Bel 21 Combine 41.8 1 722 119,777 10 17 + 20 Total Area 5 22 Combine 42.1 1 722 331,116 10 19 + 21 - Outfall Area 5 23 Combine 398.0 1 749 2,745,541 10 14 + 22 - -- Outfall at 5 24 Reach 397.9 1 750 2,744,803 10 23 - - Stream Section 4 26 SCS Runoff 8.4 1 745 50,070 10 --- -- - Area 6A - US 1 Dra 27 SCS Runoff 43.6 1 722 118,364 10 - - Area 6B - Outparce 28 Reservoir 32.0 1 728 75,817 10 27 268.05 75,169 Pond 4 - Ret Only 29 Combine 37.2 1 728 125,887 10 26 + 28 Area 6 Development 30 SCS Runoff 8.4 1 727 30,418 10 - - Area 6C - Undevelo 31 Combine 45.6 1 728 156,305 10 29 + 30 Total Area 6 32 Combine 414.7 1 750 2,901,107 10 24 + 31 Outfall Area 6 34 SCS Runoff 91.5 1 754 636,658 10 - -- - Area 7 - Residenti 35 Combine 504.3 1 751 3,537,766 10 32+34, Area 7 Outfall Proj. file: 6013-final 10yr.GPW OF file: Raleigh-malcolm.IDF Run date: 07-03-2000 (O YR PoST ?I Hydrograph Report Page 1 Hyd. No. 1 Area 1 - Commercial Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 65.72 ac = 2.2% = LAG = 5.38 in = 24 hrs English Peak discharge = 126.44 cfs Time interval = 1 min Curve number = 84 Hydraulic length = 4750 ft Time of conc. (Tc) = 65.5 min Distribution = Type II Shape factor = 484 Total Volume = 852,976 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.23 89.47 12.77 111.29 12.25 92.41 12.78 109.79 12.27 95.31 12.80 108.27 12.28 98.16 12.82 106.72 12.30 100.95 12.83 105.15 12.32 103.66 12.85 103.55 12.33 106.30 12.87 101.93 12.35 108.84 12.88 100.30 12.37 111.29 12.90 98.64 12.38 113.63 12.92 96.96 12.40 115.85 12.93 95.26 12.42 117.94 12.95 93.55 12.43 119.86 12.97 91.82 12.45 121.59 12.98 90.07 12.47 123.11 12.48 124.38 12.50 125.38 ... End 12.52 126.07 12.53 126.44 << 12.55 126.43 12.57 126.04 12.58 125.39 12.60 124.50 12.62 123.42 12.63 122.23 12.65 120.97 12.67 119.67 12.68 118.35 12.70 117.00 12.72 115.61 12.73 114.20 12.75 112.76 qy 'Hydrograph Report Page 1 Hyd. No. 2 Area 2 -Commer/Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 56.82 ac = 3.1 % = LAG = 5.38 in = 24 hrs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.18 57.56 12.72 66.36 12.20 59.93 12.73 65.11 12.22 62.25 12.75 63.83 12.23 64.52 12.77 62.54 12.25 66.73 12.78 61.22 12.27 68.87 12.80 59.88 12.28 70.92 12.82 58.53 12.30 72.88 12.32 74.73 12.33 76.43 ... End 12.35 77.96 12.37 79.30 12.38 80.41 12.40 81.27 12.42 81.84 12.43 82.08 << 12.45 81.96 12.47 81.61 12.48 81.03 12.50 80.28 12.52 79.41 12.53 78.48 12.55 77.51 12.57 76.52 12.58 75.50 12.60 74.45 12.62 73.37 12.63 72.27 12.65 71.14 12.67 69.98 12.68 68.80 12.70 67.59 English Peak discharge = 82.08 cfs Time interval = 1 min Curve number = 71 Hydraulic length = 2830 ft Time of conc. (Tc) = 53.9 min Distribution = Type II Shape factor = 484 Total Volume = 488,449 cult y4 Hydrograph Report Hyd. No. 3 First Fork Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 1 Page 1 English Peak discharge = 205.65 cfs Time interval = 1 min 2nd inflow hyd. No: 2 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.22 86.49 62.25 148.75 12.23 89.47 64.52 154.00 12.25 92.41 66.73 159.15 12.27 95.31 68.87 164.18 12.28 98.16 70.92 169.08 12.30 100.95 72.88 173.83 12.32 103.66 74.73 178.39 12.33 106.30 76.43 182.73 12.35 108.84 77.96 186.81 12.37 111.29 79.30 190.59 12.38 113.63 80.41 194.04 12.40 115.85 81.27 197.12 12.42 117.94 81.84 199.77 12.43 119.86 82.08 << 201.93 12.45 121.59 81.96 203.55 12.47 123.11 81.61 204.71 12.48 124.38 81.03 205.41 12.50 125.38 80.28 205.65 << 12.52 126.07 79.41 205.48 12.53 126.44 << 78.48 204.91 12.55 126.43 77.51 203.95 12.57 126.04 76.52 202.56 12.58 125.39 75.50 200.89 12.60 124.50 74.45 198.95 12.62 123.42 73.37 196.80 12.63 122.23 72.27 194.49 12.65 120.97 71.14 192.10 12.67 119.67 69.98 189.65 12.68 118.35 68.80 187.15 12.70 117.00 67.59 184.59 12.72 115.61 66.36 181.97 12.73 114.20 65.11 179.31 12.75 112.76 63.83 176.59 12.77 111.29 62.54 173.82 12.78 109.79 61.22 171.01 12.80 108.27 59.88 168.15 Continues on next page... Total Volume = 1,341,425 cult y? First Fork Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.82 106.72 58.53 165.25 12.83 105.15 57.16 162.30 12.85 103.55 55.77 159.32 12.87 101.93 54.36 156.30 12.88 100.30 52.94 153.24 12.90 98.64 51.51 150.14 12.92 96.96 50.06 147.02 End Page 2 Y7 Hydrograph Report Hyd. No. 4 Stream Section 1 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 3 = 830.0 ft = 0.040 = 2.0:1 = 1.395 = 20.23 ft/s Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Page 1 English = 205.65 cfs = 1 min = Trapezoidal = 1.2% = 5.0 ft = 2.9 ft = 1.362 = 0.9980 Modified Aft-Kin routing method used. Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.23 154.00 148.74 12.25 159.15 153.99 12.27 164.18 159.14 12.28 169.08 164.17 12.30 173.83 169.07 12.32 178.39 173.82 12.33 182.73 178.38 12.35 186.81 182.72 12.37 190.59 186.80 12.38 194.04 190.58 12.40 197.12 194.04 12.42 199.77 197.11 12.43 201.93 199.77 12.45 203.55 201.93 12.47 204.71 203.55 12.48 205.41 204.71 12.50 205.65 << 205.40 12.52 205.48 205.65 << 12.53 204.91 205.48 12.55 203.95 204.91 12.57 202.56 203.95 12.58 200.89 202.57 12.60 198.95 200.89 12.62 196.80 198.95 12.63 194.49 196.80 12.65 192.10 194.50 12.67 189.65 192.11 12.68 187.15 189.66 12.70 184.59 187.15 12.72 181.97 184.59 12.73 179.31 181.98 12.75 176.59 179.31 Continues on next page... Total Volume = 1,341,423 cult /O Stream Section 1 Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.77 173.82 176.59 12.78 171.01 173.83 12.80 168.15 171.01 12.82 165.25 168.15 12.83 162.30 165.25 12.85 159.32 162.31 12.87 156.30 159.32 12.88 153.24 156.30 12.90 150.14 153.24 12.92 147.02 150.15 12.93 143.86 147.02 End Page 2 /? Hydrograph Report Page 1 English Hyd. No. 6 Area 3a - Dept. Store Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 11.55 ac = 3.1 % = LAG = 5.38 in = 24 hrs Peak discharge = 61.45 cfs Time interval = 1 min Curve number 91 Hydraulic length = 1400 ft Time of conc. (Tc) = 15.9 min Distribution = Type II Shape factor = 484 Total Volume = 184,226 cuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.93 45.57 11.95 49.40 11.97 52.99 11.98 56.14 12.00 58.67 12.02 60.44 12.03 61.40 12.05 61.45 << 12.07 60.53 12.08 58.57 12.10 55.98 12.12 52.83 12.13 49.31 12.15 45.58 .End 50 Hydrograph Report Page 1 English Hyd. No. 7 POND 1 - RET ONLY Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 6 Max. Elevation = 307.77 ft S'tmage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage = 58.67 cfs = 1 min = POND 1 = 90,924 cult Total Volume = 150,151 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.98 56.14 307.65 87.74 0.14 12.00 58.67 307.68 87.98 0.14 12.02 60.44 307.72 88.18 0.14 12.03 61.40 307.74 88.34 0.14 12.05 61.45 << 307.76 88.47 0.14 12.07 60.53 307.77 88.54 0.14 12.08 58.57 307.77 << 88.57 0.14 12.10 55.98 307.77 88.54 0.14 12.12 52.83 307.76 88.47 0.14 12.13 49.31 307.74 88.36 0.14 12.15 45.58 307.72 88.21 0.14 12.17 41.85 307.69 88.04 0.14 12.18 38.20 307.67 87.86 0.14 12.20 34.66 307.64 87.66 0.14 ... End ----- ----- 44.67 ----- ----- ----- 44.82 ----- ----- 48.65 ----- ----- ----- 48.80 ----- ----- 52.06 ----- ----- ----- 52.20 ----- ----- 54.81 ----- ----- ----- 54.95 ----- ----- 56.86 ----- ----- ----- 57.00 ----- ----- 58.12 ----- ----- ----- 58.26 ----- ----- 58.52 ----- ----- ----- 58.67 << ----- ----- 58.09 ----- ----- ----- 58.23 ----- ----- 56.88 ---- ----- ----- 57.02 ----- ----- 55.00 ----- ----- ----- 55.14 ----- ----- 52.56 ----- ----- ----- 52.71 ----- ----- 49.72 ----- ----- ----- 49.86 ----- ----- 46.61 ----- ----- ----- 46.75 ----- ----- 43.35 ----- ----- ----- 43.49 ft Reservoir Report Page 1 Reservoir No. 1 - POND 1 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cult cult 0.00 299.50 5,560 0 0 5.00 304.50 11,810 43,425 43,425 7.50 307.00 15,310 33,900 77,325 10.50 310.00 19,830 52,710 130,035 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 36.0 1.8 0.0 0.0 Span in = 36.0 1.8 0.0 0.0 No. Barrels = 1 1 0 0 Invert El. ft = 299.50 304.50 0.00 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-stage = ----- Yes No No Weir Structures [A] [B] [C] Crest Len ft = 28.3 30.0 0.0 Crest El. ft = 307.00 308.00 0.00 Weir Coeff. = 3.00 3.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 Multi-Stage = Yes No No Tailwater Elevation = 0.00 ft English 0.0 0.00 0.00 0.00 No Note: All outflows have been analyzed under inlet and outlet control. Stage / Storage / Disch arge Table Stage Storage Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Discharge ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 299.50 0.00 0.00 --- --- 0.00 0.00 --- --- 0.00 5.00 43,425 304.50 63.67 0.00 --- --- 0.00 0.00 --- --- 0.00 7.50 77,325 307.00 83.36 0.13 --- --- 0.00 0.00 --- --- 0.13 10.50 130,035 310.00 102.09 0.00 --- --- 440.53 254.56 --- --- 356.65 52 Hydrograph Report' Page 1 Hyd. No. 8 Area 3B - Area below Pond Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 1.90 ac = 3.5% = LAG = 5.38 in = 24 hrs English Peak discharge = 2.59 cfs Time interval = 1 min Curve number = 60 Hydraulic length = 850 ft Time of conc. (Tc) = 25.8 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.03 1.85 12.05 1.99 12.07 2.12 12.08 2.24 12.10 2.35 12.12 2.44 12.13 2.52 12.15 2.57 12.17 2.59 << 12.18 2.59 12.20 2.56 12.22 2.52 12.23 2.46 12.25 2.39 12.27 2.32 12.28 2.24 12.30 2.17 12.32 2.09 12.33 2.01 12.35 1.93 12.37 1.85 End Total Volume = 10,541 cuft S: Hydrograph Report Hyd. No. 9 Area 3 to Stream Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 7 Page 1 English Peak discharge = 60.91 cfs Time interval = 1 min 2nd inflow hyd. No.= 8 Total Volume = 160,692 cult Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) cfs cfs 11.98 44.82 1.40 12.00 48.80 1.56 12.02 52.20 1.71 12.03 54.95 1.85 12.05 57.00 1.99 12.07 58.26 2.12 12.08 58.67 << 2.24 12.10 58.23 2.35 12.12 57.02 2.44 12.13 55.14 2.52 12.15 52.71 2.57 12.17 49.86 2.59 << 12.18 46.75 2.59 12.20 43.49 2.56 12.22 40.16 2.52 Outflow cfs 46.22 50.35 53.90 56.81 58.99 60.39 60.91 << 60.58 59.46 57.66 55.27 52.46 49.34 46.05 42.68 ...End 5V Hydrograph Report Page 1 English Hyd. No. 10 Outfall of Area 3 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No. = 4 Peak discharge = 217.23 cfs Time interval = 1 min 2nd inflow hyd. No= 9 Total Volume = 1,502,115 cult Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow (hrs) cfs cfs 12.07 94.08 60.39 12.08 99.56 60.91 << 12.10 105.06 60.58 12.12 110.57 59.46 12.13 116.08 57.66 12.15 121.60 55.27 12.17 127.10 52.46 12.18 132.58 49.34 12.20 138.02 46.05 12.22 143.41 42.68 12.23 148.74 39.82 12.25 153.99 36.98 12.27 159.14 34.08 12.28 164.17 31.19 12.30 169.07 28.38 12.32 173.82 25.69 12.33 178.38 23.18 12.35 182.72 20.89 12.37 186.80 18.86 12.38 190.58 17.10 12.40 194.04 15.66 12.42 197.11 14.89 12.43 199.77 14.18 12.45 201.93 13.52 12.47 203.55 12.91 12.48 204.71 12.35 12.50 205.40 11.83 12.52 205.65 << 11.34 12.53 205.48 10.88 12.55 204.91 10.44 12.57 203.95 10.03 12.58 202.57 9.65 12.60 200.89 9.29 12.62 198.95 8.95 12.63 196.80 8.64 12.65 194.50 8.35 Outflow cfs 154.46 160.47 165.64 170.03 173.74 176.87 179.56 181.92 184.07 186.09 188.56 190.96 193.21 195.36 197.45 199.51 201.56 203.61 205.65 207.68 209.70 212.01 213.94 215.45 216.46 217.06 217.23 << 216.99 216.35 215.35 213.98 212.21 210.18 207.90 205.44 202.85 Continues on next page... 5f Outfall of Area 3 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.67 192.11 8.08 200.19 12.68 189.66 7.83 197.49 12.70 187.15 7.59 194.74 12.72 184.59 7.37 191.96 12.73 181.98 7.16 189.14 12.75 179.31 6.96 186.28 12.77 176.59 6.78 183.38 12.78 173.83 6.61 180.44 12.80 171.01 6.45 177.46 12.82 168.15 6.30 174.45 12.83 165.25 6.16 171.41 12.85 162.31 6.03 168.34 12.87 159.32 5.91 165.23 12.88 156.30 5.79 162.10 12.90 153.24 5.69 158.93 12.92 150.15 5.59 155.74 12.93 147.02 5.50 152.52 End Page 2 5 Cp HI ydrograph Report Page 1 English Hyd. No. 11 Stream Section 2 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 10 = 1020.0 ft = 0.040 = 2.0:1 = 1.383 = 19.55 ft/s Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 217.20 cfs = 1 min = Trapezoidal = 1.2% = 5.0 ft = 3.0 ft = 1.363 = 0.8788 Modified Att-Kn routing method used. Hydrograph Discharge Table Time Inflow O utflow (hrs) cfs cfs 12.08 160.47 153.50 12.10 165.64 159.63 12.12 170.03 164.91 12.13 173.74 169.41 12.15 176.87 173.22 12.17 179.56 176.43 12.18 181.92 179.18 12.20 184.07 181.59 12.22 186.09 183.77 12.23 188.56 185.80 12.25 190.96 188.22 12.27 193.21 190.63 12.28 195.36 192.90 12.30 197.45 195.06 12.32 199.51 197.16 12.33 201.56 199.23 12.35 203.61 201.28 12.37 205.65 203.32 12.38 207.68 205.37 12.40 209.70 207,40 12.42 212.01 209.42 12.43 213.94 211.69 12.45 215.45 213.67 12.47 216.46 215.24 12.48 217.06 216.31 12.50 217.23 << 216.97 12.52 216.99 217.20 << 12.53 216.35 217.01 12.55 215.35 216.43 12.57 213.98 215.48 12.58 212.21 214.17 12.60 210.18 212.45 Continues on next page... Total Volume = 1,501,632 cult 57 Stream Section 2 Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.62 207.90 210.46 12.63 205.44 208.21 12.65 202.85 205.78 12.67 200.19 203.21 12.68 197.49 200.55 12.70 194.74 197.86 12.72 191.96 195.12 12.73 189.14 192.35 12.75 186.28 189.53 12.77 183.38 186.67 12.78 180.44 183.77 12.80 177.46 180.84 12.82 174.45 177.87 12.83 171.41 174.87 12.85 168.34 171.83 12.87 165.23 168.76 12.88 162.10 165.66 12.90 158.93 162.53 12.92 155.74 159.37 12.93 152.52 156.18 12.95 149.28 152.96 End Page 2 58 Hydrograph Report Page 1 Hyd. No. 13 Area 4 - Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 92.20 ac = 3.3% = LAG = 5.38 in = 24 hrs English Peak discharge = 151.70 cfs Time interval = 1 min Curve number = 75 Hydraulic length = 3450 ft Time of conc. (Tc) = 54.8 min Distribution = Type II Shape factor = 484 Total Volume = 912,794 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.20 110.33 12.73 122.53 12.22 114.45 12.75 120.27 12.23 118.49 12.77 117.97 12.25 122.41 12.78 115.63 12.27 126.21 12.80 113.26 12.28 129.88 12.82 110.86 12.30 133.39 12.83 108.43 12.32 136.73 12.33 139.84 12.35 142.69 ... End 12.37 145.24 12.38 147.44 12.40 149.24 12.42 150.58 12.43 151.42 12.45 151.70 << 12.47 151.36 12.48 150.61 12.50 149.47 12.52 148.05 12.53 146.42 12.55 144.69 12.57 142.91 12.58 141.08 12.60 139.20 12.62 137.27 12.63 135.29 12.65 133.27 12.67 131.21 12.68 129.10 12.70 126.95 12.72 124.76 59 Hydrograph Report Hyd. No. 14 Outfall of Area 4 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 11 Page 1 English Peak discharge = 366.92 cfs Time interval = 1 min 2nd inflow hyd. No: 13 Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.13 169.41 93.19 262.60 12.15 173.22 97.55 270.76 12.17 176.43 101.87 278.29 12.18 179.18 106.13 285.31 12.20 181.59 110.33 291.92 12.22 183.77 114.45 298.22 12.23 185.80 118.49 304.29 12.25 188.22 122.41 310.63 12.27 190.63 126.21 316.84 12.28 192.90 129.88 322.78 12.30 195.06 133.39 328.45 12.32 197.16 136.73 333.89 12.33 199.23 139.84 339.07 12.35 201.28 142.69 343.97 12.37 203.32 145.24 348.57 12.38 205.37 147.44 352.81 12.40 207.40 149.24 356.64 12.42 209.42 150.58 360.00 12.43 211.69 151.42 363.11 12.45 213.67 151.70 << 365.37 12.47 215.24 151.36 366.59 12.48 216.31 150.61 366.92 << 12.50 216.97 149.47 366.44 12.52 217.20 << 148.05 365.25 12.53 217.01 146.42 363.43 12.55 216.43 144.69 361.12 12.57 215.48 142.91 358.39 12.58 214.17 141.08 355.24 12.60 212.45 139.20 351.65 12.62 210.46 137.27 347.73 12.63 208.21 135.29 343.51 12.65 205.78 133.27 339.05 12.67 203.21 131.21 334.41 12.68 200.55 129.10 329.65 12.70 197.86 126.95 324.81 12.72 195.12 124.76 319.88 Continues on next page Total Volume = 2,414,426 cuft G0 Outfall of Area 4 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.73 192.35 122.53 314.88 12.75 189.53 120.27 309 80 12.77 186.67 117.97 . 304 64 12.78 183.77 115.63 . 299 41 12.80 180.84 113.26 . 294.10 12.82 177.87 110.86 288.73 12.83 174.87 108.43 283 30 12.85 171.83 105.97 . 277.80 12.87 168.76 103.48 272.24 12.88 165.66 100.97 266 63 12.90 162.53 98.43 . 260.96 ... End Page 2 Hydrograph Report Page 1 Hyd. No. 16 Area 5A1 Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration English = SCS Runoff Peak discharge = 42.38 cfs = 10 yrs Time interval = 1 min = 6.70 ac Curve number = 92 = 4.0% Hydraulic length = 1150 ft = LAG Time of conc. (Tc) = 11.4 min = 5.38 in Distribution = Type II = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.90 30.09 11.92 33.13 11.93 36.00 11.95 38.58 11.97 40.64 11.98 41.98 12.00 42.38 << 12.02 41.68 12.03 39.80 12.05 37.23 12.07 34.07 12.08 30.54 End Total Volume= 110,225 cuft t2 Hydrograph Report Page 1 Hyd. No. 17 Pond 2 - Ret. Only Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 16 Max. Elevation = 283.61 ft Storage Indication method used. Hydrograph Discharge Table English Peak discharge Time interval Reservoir name Max. Storage = 40.25 cfs = 1 min = Pond 2 = 54,511 cult Total Volume = 88,968 cuft Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.93 36.00 283.48 61.31 0.10 11.95 38.58 283.51 61.46 0.10 11.97 40.64 283.55 61.60 0.10 11.98 41.98 283.57 61.73 0.10 12.00 42.38 << 283.59 61.82 0.10 12.02 41.68 283.61 61.88 0.10 12.03 39.80 283.61 << 61.89 0.10 12.05 37.23 283.60 61.86 0.10 12.07 34.07 283.59 61.78 0.10 12.08 30.54 283.56 61.67 0.10 12.10 26.87 283.53 61.53 0.10 12.12 23.32 283.49 61.37 0.10 ... End ----- ----- 29.36 ----- ----- ----- 29.46 ----- ----- 32.14 ----- ----- ----- 32.24 ----- ----- 34.76 ----- ----- ----- 34.86 ----- ----- 37.05 ----- ----- ----- 37.15 ----- ----- 38.84 ----- ----- ----- 38.94 ----- ----- 40.10 ----- ----- ----- 40.01 ----- ----- 40.44 ----- ----- ----- 40.25 « ----- ----- 39.63 ----- ----- ----- 39.67 ----- ----- 38.15 ----- ----- ----- 38.25 ----- ----- 36.04 ----- ----- ----- 36.14 ----- ----- 33.40 ----- ----- ----- 33.50 ----- ----- 30.41 ----- ----- ----- 30.51 G3 Reservoir Report Weir Structures [A] [B] [C] Reservoir No. 4 - Pond 2 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cult cult 0.00 275.50 3,320 0 0 5.00 280.50 7,130 26,125 26 125 7.50 283.00 9,830 21,200 , 47 325 10.50 286.00 13,750 35,370 , 82,695 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 30.0 1.5 0.0 0.0 Span in = 30.0 1.5 0.0 0.0 No. Barrels = 1 1 0 0 Invert El. ft = 275.50 280.50 0.00 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = ----- Yes No No Stage / Storage / Discharge Table Crest Len ft = 28.3 20.0 0.0 Crest El. ft = 283.00 284.00 0.00 Weir Coeff. = 3.00 3.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 Multi-Stage = Yes No No Tailwater Elevation = 0.00 ft Page 1 English [D] 0.0 0.00 0.00 0.00 No Note: All outFlows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Discharge ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 275.50 0.00 0.00 --- --- 0.00 0.00 --- --- 0 00 5.00 26,125 280.50 45.76 0.00 --- --- 0.00 0.00 --- . --- 0 00 7.50 47,325 283.00 59.08 0.09 --- --- 0.00 0.00 --- . --- 0 09 10.50 82,695 286.00 71.88 0.00 --- --- 440.53 169.71 --- . --- 241.58 to q `Hydrograph Report Page 1 Hyd. No. 18 Area 5a - Stores Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 28.33 ac = 3.0% = LAG = 5.38 in = 24 hrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.02 72.98 12.03 77.14 12.05 81.09 12.07 84.82 12.08 88.29 12.10 91.45 12.12 94.24 12.13 96.62 12.15 98.53 12.17 99.91 12.18 100.70 12.20 100.86 << 12.22 100.32 12.23 99.03 12.25 97.26 12.27 95.05 12.28 92.51 12.30 89.75 12.32 86.89 12.33 84.00 12.35 81.06 12.37 78.10 12.38 75.11 12.40 72.10 ...End English Peak discharge = 100.86 cfs Time interval = 1 min Curve number = 89 Hydraulic length = 2800 ft Time of conc. (Tc) = 30.6 min Distribution = Type II Shape factor = 484 Total Volume = 425,893 cuft /„ g Hydrograph Report Page 1 Hyd. No. 19 English Pond 3 - Ret/Det Hydrograph type = Reservoir Peak discharge = 21 69 cfs Storm frequency = 10 yrs Time interval . = 1 mi Inflow hyd. No = 18 n . Max. Elevation = 276 11 ft Reservoir name = Pond 3 . Max. Storage = 354,690 cuft Storage Indication method used, Total Volume = 211,339 cult Hydrograph Discharge Table Time Inflow Elevation Clv A (hrs) cfs Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.42 69.08 275.41 21.12 ----- 0.29 ----- 15 49 ----- 12.43 66.04 275.50 21.20 ----- 0.28 . ----- 21 13 ~~ --- ----- 15.47 12.45 63.01 275.58 21.27 ----- 0.27 . -- ----- ----- 26 14 -- ----_ 18.24 2.47 59.98 275.65 21.33 ----- 0.19 . --- ----- 31 26 ---- ----- 20.70 12.48 56.96 275.72 21.38 ----- 0.11 . - ----- 36 15 ----- ----- 21.33 2.50 53.96 275.78 21.43 ----- 0.03 . ----- 40 64 --- ----- 21.38 2.52 50.98 275.84 21.47 ----- ----- . -- ----- 45 08 ----- ----- 21.43 12.53 48.04 275.89 21.51 ----- ----- . -- -- - ----- 49 27 ---- ----- 21.47 2.55 45.15 275.93 21.55 ----- ----- . - ----- 53 01 -- ----- 21.51 12.57 42.30 275.97 21.58 ----- ----- . --- ----- ----- 56 32 ----- ----- 21.55 12.58 39.51 276.00 21.61 ----- ----- . ----- 59 21 ---- ----- 21.58 12.60 36.80 276.03 21.63 ----- ----- . ----- 61 71 ---- ----- 21.61 2.62 34.16 276.05 21.65 ----- ----- . - ----- 63 80 ----- ----- 21.63 12.63 31.63 276.07 21.67 ----- ----- . ----- ----- 65 50 ---- ----- 21.65 12.65 29.22 276.09 21.68 ----- ----- . - ----- ----- 66 82 ----- ----- 21.67 12.67 26.96 276.10 21.69 ----- ----- . ----- ----- 67 79 --- ----- 21.68 12.68 24.86 276.10 21.69 ----- ----- . -- ----- ----- 68 43 ----- ----- 21.69 0 22.95 276.11 ' 21.69 ----- ----- . ----- ----- 68 76 --- ----- 21.69 12.72 21.25 276.11 << 21.69 ----- ----- . -- ----- ----- 68 83 ---- ----- 21.69 12.73 19.78 276.11 21.69 ----- ----- . - - - -- ----- 68 65 --- ----- 21.69 << 12.75 18.57 276.10 21.69 ----- ----- . -- ----- ----- 68 27 ---- ----- 21.69 12.77 17.63 276.10 21.68 ----- ----- . - ----- ----- 67 73 --- ----- 21.69 12.78 16.87 276.09 21.68 ----- ----- . -- ----- ----- 67 06 ---- ----- 21.68 12.80 16.27 276.08 21.67 ----- ----- . - ----- ----- 66 28 ---- ----- 21.68 12.82 15.80 276.07 21.66 ----- ----- . - ----- ----- 65 43 ---- ----- 21.67 12.83 15.41 276.06 21.66 ----- ----- . - ----- ----- 64 52 --- ----- 21.66 12.85 15.05 276.05 21.65 ----- ----- . -- ----- ----- 63 55 ---- ----- 21.66 12.87 14.71 276.04 21.64 ----- ----- . - ----- ----- 62 53 --- ----- 21.65 12.88 14.39 276.03 21.63 ----- ----- . -- ----- 61 45 ---- ----- 21.64 12.90 14.08 276.02 21.62 ----- ----- . - 60 34 --- ----- 21.63 12.92 13.78 276.00 21.61 ----- ----- . -- ----- ----- 59 17 ---- ----- 21.62 93 13.49 275.99 21.60 ----- ----- . - ----- ----- 57 98 --- ----- 21.61 2.95 13.22 275.98 21.59 ----- ----- . -- ----- 56 75 --- ----- 21.60 12.97 12.96 275.96 21.57 ----- ----- . -- ----- ---- 55 48 ----- 21.59 ----- 12.98 12.71 275.94 21.56 ----- ----- . ----- 54 18 ---- ----- 21.57 13.00 12.47 275.93 21.55 ----- ----- . - ----- 52 84 - ----- 21.56 . ---- ----- 21.55 Continues on next page... L'o?o Pond 3 - ReMet Hydrograph Discharge Table Page 2 Time Mrs) Inflow cfs Elevation ft Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflo cfs cfs cfs cfs cfs cfs cfs cfs w cfs 13.02 12.25 275.91 21 54 ----- 13.03 12.03 275.90 . 21 52 ----- ----- ----- 51.46 ----- ----- - 21.54 13.05 11.82 275.88 . 21 51 ---- ----- ----- 50.06 - -- ----- ----- - 21.52 13.07 11.62 275.86 . 21 49 ----- ----- ----- 48.63 - ----- " ----- 21.51 13.08 11.44 275.84 . 21 48 ----- ----- ----- 47.17 ----- ---- - -' 21.49 13.10 11.26 275.83 . 21 47 ----- ----- ----- 45.68 - - ----- _----- ----- 21.48 13.12 11.08 275.81 . 21 45 ---- ----- ----- 44.17 ----- ----- 21.47 13.13 10.92 275.79 . 21.44 ----- ---_ 0.02 ----- ----- 42.63 41 19 ----- -- __ ----- 21.45 1 3.15 13 17 10.76 10 61 275.77 21.42 _____ 0.04 ----- . 39.79 ----- ----- ----- ----- 21.44 . 13.18 . 10.47 275.75 275 73 21.40 21 39 _____ 0.07 ----- 38.38 ----- ----- ----- ----- 21.42 21.40 13.20 10.33 . 275.71 . 21.37 _____ _____ 0.09 12 0 ----- 36.95 ----- ----- ---- 21.39 13.22 10.20 275.69 21.36 _-__ . 0.14 ----- ----- 35.50 34 04 ----- ----- ----- 21.37 13.23 13 25 10.08 9 96 275.67 21.34 _____ 0.17 ----- . 32.56 ----- ----- ----- ----- ----- 21.36 . 13.27 . 9.84 275.65 275.63 21.32 21 31 ----- 0.20 ----- 31.07 ----- ----- ----- ----- 21.34 21.32 13.28 9.73 275.61 . 21.29 _____ ----- 0.23 0 25 ----- 29.57 ----- ----- ----- 21.31 13.30 9.62 275.59 21.27 _____ . 0.27 ----- ----- 28.05 26 66 ----- ----- 21.29 13 .32 13 33 9.52 9 42 275.57 21.26 ----- 0.27 ----- . 25.43 ----- ----- - -' ----- 20.95 . 1 3.35 . 9.32 275.55 275 53 21.24 21 23 _____ 0.27 ----- 24.25 - - ----- ----- ----- ----- 20.35 19.77 1 3.37 9.22 . 275.52 . 21.21 ----- ----- 0.27 0 28 ----- 23.12 ----- ----- ----' 19.22 13 .38 9.13 275.50 21.20 _____ . 0 28 ----- 22.05 ----- ----- 18.69 1 3.40 9.03 275.48 21.19 ----- . 0.28 ----- ----- 21.02 20 03 --- ----- ----" 18.18 1 3.42 1 3 43 8.94 8 85 275.47 21.17 _____ 0.28 ----- . 19.09 ----- ----- ----- ----- 17.70 . 1 3.45 . 8.76 275.45 275 44 21.16 21 15 ----- 0.29 ----- 18.18 ----- ----- ----- 17.24 16.79 1 3.47 8.68 . 275.43 . 21.14 _____ ----- 0.29 29 0 ----- 17.32 ----- ----- ----- 16.37 1 3.48 8.59 275.41 21.13 _____ . 0.29 ----- ----- 16.49 15 70 ----- ----- 15.96 1 3.50 8.51 275.40 21.12 _____ 0.29 ----- . 14 93 ----- ----- ----- ----- 15.57 . ----- 15.20 ..End ly Reservoir Report Page 1 Reservoir No. 2 - Pond 3 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 262.00 264.00 266.00 268.00 270.00 272.00 274.00 276.00 278.00 Contour area Incr. Storage Total storage sgft cuft cult 15,950 0 0 18,270 34,220 34,220 20,800 39,070 73,290 23,470 44,270 117,560 26,190 49,660 167,220 29,070 55,260 222,480 32,020 61,090 283,570 35,120 67,140 350,710 38,290 73,410 424,120 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 15.0 0.0 2.0 0.0 Crest Len ft = 19.6 60.0 0.0 0 0 Span in = 15.0 0.0 2.0 0.0 Crest El. ft = 275.00 276.50 0.00 . 0 00 No. Barrels = 1 0 1 0 Weir Coeff. = 3.00 3.00 0.00 . 0 00 Invert El. ft = 262.00 0.00 267.50 0.00 Eqn. Exp. = 1.50 1.50 0.00 . 0 00 Length ft = 50.0 0.0 0.0 0.0 Multi-Stage = Yes No No . No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = ----- Yes Yes No Tailwater Elevation = 0.00 ft Stage / Storage / Disc harge Table Note All outflows have been analyzed under inlet and outlet control. Stage Storage ft lt Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cu ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 2.00 34 220 262.00 264 00 0.00 --- 6 76 0.00 --- 0.00 0.00 0.00 , 4.00 73,290 . 266.00 . 10.85 --- 0.00 0.00 --- 0.00 --- 0 00 0.00 0 00 0.00 6.00 117,560 268.00 13.70 --- 0.07 . 0 00 . 0 00 0.00 8.00 167,220 10.00 222 480 270.00 272 00 16.04 --- 18 09 0.16 . --- 0.00 . 0.00 --- --- --- --- 0.07 0.16 , 12.00 283,570 . 274.00 . --- 19.93 --- 0.22 0.27 --- 0.00 --- 0 00 0.00 0 00 --- --- 0.22 14.00 350,710 16.00 424 120 276.00 278 00 21.61 --- 23 17 0.00 . --- 58.80 . 0.00 --- --- --- --- 0.27 21.61 , . . --- 0.00 --- 305.53 330.68 --- --- 353.85 I _ Hydrograph Report Page , English Hyd. No. 20 Area 5B - Area Below Outfall Hydrograph type = SCS Runoff Peak discharge = 4.69 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 5.90 ac Curve number = 59 Basin Slope = 4.0% Hydraulic length = 2140 ft Tc method = LAG Time of conc. (Tc) = 51.9 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Total Volume = 30,809 cult Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.22 3.28 12.75 3.83 12.23 3.44 12.77 3.76 12.25 3.59 12.78 3.69 12.27 3.73 12.80 3.62 12.28 3.88 12.82 3.55 12.30 4.01 12.83 3.48 12.32 4.14 12.85 3.40 12.33 4.26 12.87 3.32 12.35 4.38 12.37 4.47 12.38 4.56 ...End 12.40 4.62 12.42 4.67 12.43 4.68 12.45 4.69 << 12.47 4.68 12.48 4.65 12.50 4.62 12.52 4.58 12.53 4.54 12.55 4.50 12.57 4.46 12.58 4.41 12.60 4.36 12.62 4.31 12.63 4.26 12.65 4.20 12.67 4.14 12.68 4.09 12.70 4.02 12.72 3.96 12.73 3.90 49 Hydrograph Report Hyd. No. 21 Total Area 5 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 17 Page 1 English Peak discharge = 41.85 cfs Time interval = 1 min 2nd inflow hyd. No: 20 Total Volume =119,777 cuft Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow Mrs) cfs cfs 11.93 29.46 11.95 32.24 11.97 34.86 11.98 37.15 12.00 38.94 12.02 40.01 12.03 40.25 << 12.05 39.67 12.07 38.25 12.08 36.14 12.10 33.50 12.12 30.51 12.13 27.37 ... End 0.75 0.88 1.02 1.16 1.30 1.45 1.59 1.74 1.89 2.05 2.20 2.35 2.51 Outflow cfs 30.22 33.13 35.88 38.31 40.24 41.45 41.85 << 41.41 40.15 38.19 35.70 32.87 29.88 70 Hydrograph Report Page 1 English Hyd. No. 22 Outfall Area 5 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 19 Peak discharge = 42.05 cfs Time interval = 1 min 2nd inflow hyd. No= 21 Total Volume = 331,116 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) cfs cfs 11.93 0.18 30.22 11.95 0.19 33.13 11.97 0.19 35.88 11.98 0.20 38.31 12.00 0.20 40.24 12.02 0.20 41.45 12.03 0.21 41.85 << 12.05 0.21 41.41 12.07 0.22 40.15 12.08 0.22 38.19 12.10 0.23 35.70 12.12 0.23 32.87 12.13 0.24 29.88 12.45 20.70 10.14 12.47 21.33 9.94 12.48 21.38 9.73 12.50 21.43 9.53 12.52 21.47 9.33 12.53 21.51 9.13 12.55 21.55 8.94 12.57 21.58 8.75 12.58 21.61 8.56 12.60 21.63 8.38 12.62 21.65 8.20 12.63 21.67 8.03 12.65 21.68 7.87 ... End Outflow cfs 30.40 33.31 36.07 38.51 40.44 41.66 42.05 << 41.63 40.36 38.41 35.93 33.10 30.11 30.84 31.26 31.11 30.96 30.80 30.65 30.49 30.33 30.18 30.01 29.86 29.70 29.54 7/ Outfall at 5 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.70 324.81 29.10 353.91 12.72 319.88 28.96 348.84 12.73 314.88 28.82 343.70 12.75 309.80 28.69 338.48 12.77 304.64 28.55 333.19 12.78 299.41 28.42 327.83 12.80 294.10 28.30 322.40 12.82 288.73 28.17 316.91 12.83 283.30 28.05 311.35 12.85 277.80 27.92 305.72 12.87 272.24 27.80 300.04 12.88 266.63 27.68 294.30 12.90 260.96 27.55 288.51 12.92 255.24 27.43 282.66 End Page 2 ?3 Hydrograph Report Page 1 Hyd. No. 24 Stream Section 4 Hydrograph type Storm frequency Inflow hyd. No. Reach length Manning's n Side slope Rating curve x Ave. velocity = Reach = 10 yrs = 23 = 1190.0 ft = 0.040 = 2.0:1 = 1.221 = 20.32 ft/s Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. English = 397.92 cfs = 1 min = Trapezoidal = 0.9% = 5.0 ft = 3.0 ft = 1.363 = 0.8223 Modified Aft-Kin routing method used. Hydrograph Discharge Table Time Inflow Outflow (hrs) cfs cfs 12.13 292.72 285.27 12.15 297.89 291.39 12.17 302.53 296.73 12.18 306.85 301.50 12.20 311.02 305.90 12.22 315.44 310.11 12.23 320.46 314.49 12.25 325.83 319.40 12.27 331.17 324.69 12.28 336.36 330.02 12.30 341.43 335.24 12.32 346.38 340.33 12.33 351.16 345.30 12.35 355.75 350.12 12.37 361.62 354.75 12.38 369.06 360.40 12.40 378.09 367.52 12.42 386.02 376.21 12.43 391.69 384.28 12.45 396.21 390.38 12.47 397.86 395.17 12.48 398.03 << 397.38 12.50 397.40 397.92 << 12.52 396.05 397.49 12.53 394.08 396.31 12.55 391.61 394.48 12.57 388.73 392.12 12.58 385.42 389.33 12.60 381.66 386.11 12.62 377.58 382.45 12.63 373.21 378.45 12.65 368.60 374.14 Continues on next page... Total Volume = 2,744,803 cuft 7y Stream Section 4 Hydrograph Discharge Table Time Inflow O utflow (hrs) cfs cfs 12.67 363.81 369.58 12.68 358.90 364.83 12.70 353.91 359.95 12.72 348.84 354.98 12.73 343.70 349.93 12.75 338.48 344.81 12.77 333.19 339.61 12.78 327.83 334.33 12.80 322.40 328.99 12.82 316.91 323.57 12.83 311.35 318.09 12.85 305.72 312.54 12.87 300.04 306.94 12.88 294.30 301.27 12.90 288.51 295.54 12.92 282.66 289.76 12.93 276.76 283.92 End Page 2 7S Hydrograph Report Page 1 Hyd. No. 26 Area 6A - US 1 Drainage Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 6.46 ac Basin Slope = 3.2% Tc method = LAG Total precip. = 5.38 in Storm duration = 24 hrs English Peak discharge = 8.41 cfs Time interval = 1 min Curve number = 68 Hydraulic length = 2500 ft Time of conc. (Tc) = 52.1 min Distribution = Type II Shape factor = 484 Total Volume = 50,070 cult Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.18 5.94 12.72 6.72 12.20 6.19 12.73 6.59 12.22 6.44 12.75 6.45 12.23 6.68 12.77 6.32 12.25 6.91 12.78 6.18 12.27 7.14 12.80 6.04 12.28 7.36 12.82 5.90 12.30 7.56 12.32 7.75 12.33 7.92 ...End 12.35 8.08 12.37 8.21 12.38 8.31 12.40 8.38 12.42 8.41 << 12.43 8.41 12.45 8.38 12.47 8.33 12.48 8.25 12.50 8.17 12.52 8.07 12.53 7.98 12.55 7.88 12.57 7.78 12.58 7.67 12.60 7.56 12.62 7.45 12.63 7.33 12.65 7.22 12.67 7.10 12.68 6.97 12.70 6.85 r) & Hydrograph Report Page 1 English Hyd. No. 27 Area 6B - Outparcels Hydrograph. type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 9.29 ac = 5.1 % = LAG = 5.38 in = 24 hrs Peak discharge = 43.63 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 1100 ft Time of conc. (Tc) = 13.8 min Distribution = Type II Shape factor = 484 Total Volume =118,364 cuff Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.93 32.60 11.95 35.54 11.97 38.24 11.98 40.54 12.00 42.28 12.02 43.33 12.03 43.63 << 12.05 43.09 12.07 41.65 12.08 39.67 12.10 37.20 12.12 34.40 12.13 31.42 End 77 Hydrograph Report Page 1 English Hyd. No. 28 Pond 4 - Ret Only Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 27 Max. Elevation = 268.05 ft Peak discharge = 32.04 cfs Time interval = 1 min Reservoir name = POND 4 Max. Storage = 75,169 cuft Storage Indication method used. Hydrograph Discharge Table Total Volume = 75,817 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.08 39.67 267.97 39.92 ----- 0.04 ----- 27.33 ----- ----- ----- 27.36 12.10 37.20 268.02 40.07 ----- 0.04 ----- 31.70 ----- ----- ----- 30.75 12.12 34.40 268.04 40.14 ----- 0.05 ----- 34.19 ----- ----- ----- 31.81 12.13 31.42 268.05 << 40.15 ----- 0.05 ----- 34.73 ----- ----- ----- 32.04 << 12.15 28.45 268.04 40.12 ----- 0.05 ----- 33.70 ----- ----- ----- 31.60 12.17 25.56 268.01 40.06 ----- 0.04 ----- 31.43 ----- ----- ----- 30.63 12.18 22.79 267.98 39.97 ----- 0.04 ----- 28.75 ----- ----- ----- 28.79 12.20 20.16 267.95 39.88 ----- 0.04 ----- 26.19 ----- ----- ----- 26.23 12.22 17.70 267.92 39.78 ----- 0.03 ----- 23.64 ----- ----- ----- 23.67 ,..End 7$ Reservoir Report Page 1 English Reservoir No. 3 - POND 4 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft tuft cult 0.00 260.00 3,390 0 0 5.00 265.00 7,300 26,725 26,725 7.50 267.50 9,680 42,450 69,175 10.00 270.00 12,220 27,375 96,550 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 24.0 0.0 1.5 0.0 Span in = 24.0 0.0 1.5 0.0 No. Barrels = 1 0 1 0 Invert El. ft = 260.00 0.00 265.00 0.00 Length ft = 50.0 0.0 50.0 0.0 Slope % = 1.00 0.00 1.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = ----- No Yes No Weir Structures [A] [B] [C] [D] Crest Len ft = 28.3 20.0 0.0 0.0 Crest El. ft = 267.50 268.50 0.00 0.00 Weir Coeff. = 3.00 3.00 0.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Multi-Stage = Yes No No No Tailwater Elevation = 0.00 ft Stage / Storage / Discharge Table Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 260.00 0.00 --- 0.00 --- 0.00 0.00 --- --- 0.00 5.00 26,725 265.00 30.25 --- 0.00 --- 0.00 0.00 --- --- 0.00 7.50 69,175 267.50 38.56 --- 0.03 --- 0.00 0.00 --- --- 0.03 10.00 96,550 270.00 45.37 --- 0.97 --- 335.12 110.23 --- --- 155.60 r19 Hydrograph Report Page English Hyd. No. 29 Area 6 Development Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 26 Peak discharge = 37.20 cfs Time interval = 1 min 2nd inflow hyd. No.= 28 Total Volume =125,887 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.08 4.37 27.36 31.73 12.10 4.63 30.75 35.38 12.12 4.90 31.81 36.71 12.13 5.16 32.04 << 37.20 << 12.15 5.42 31.60 37.02 12.17 5.68 30.63 36.32 12.18 5.94 28.79 34.73 12.20 6.19 26.23 32.42 12.22 6.44 23.67 30.11 12.23 6.68 21.18 27.86 ... End SD Hydrograph Report Page English Hyd. No. 30 Area 6C - Undeveloped Hydrograph type = SCS Runoff Peak discharge = 8.45 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 5.74 ac Curve number = 59 Basin Slope = 6.2% Hydraulic length = 925 ft Tc method = LAG Time of conc. (Tc) = 21.3 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Total Volume = 30,418 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.00 5.98 12.02 6.53 12.03 7.03 12.05 7.48 12.07 7.85 12.08 8.15 12.10 8.36 12.12 8.45 << 12.13 8.41 12.15 8.29 12.17 8.09 12.18 7.83 12.20 7.52 12.22 7.20 12.23 6.87 12.25 6.54 12.27 6.20 End a/ Hydrograph Report Page 1 English Hyd. No. 31 Total Area 6 Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 29 Peak discharge = 45.62 cfs Time interval = 1 min 2nd inflow hyd. No; 30 Total Volume = 156,305 cult Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = (hrs) cfs cfs 12.07 24.30 12.08 31.73 12.10 35.38 12.12 36.71 12.13 37.20 << 12.15 37.02 12.17 36.32 12.18 34.73 12.20 32.42 12.22 30.11 12.23 27.86 12.25 25.73 ... End 7.85 8.15 8.36 8.45 << 8.41 8.29 8.09 7.83 7.52 7.20 6.87 6.54 Outflow cfs 32.15 39.88 43.74 45.16 45.62 << 45.32 44.41 42.55 39.94 37.31 34.74 32.27 A2 Hydrograph Report Page 1 English Hyd. No. 32 Outfall Area 6 Hydrograph type = Combine Peak discharge = 41.4.69 cfs Storm frequency = 10 yrs Time interval = 1 min 1 st inflow hyd. No.= 24 2nd inflow hyd. No.= 31 Total Volume = 2,901,107 cuft Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.08 260.07 39.88 299.95 12.10 269.79 43.74 313.53 12.12 278.15 45.16 323.30 12.13 285.27 45.62 << 330.89 12.15 291.39 45.32 336.71 12.17 296.73 44.41 341.14 12.18 301.50 42.55 344.06 12.20 305.90 39.94 345.84 12.22 310.11 37.31 347.42 12.23 314.49 34.74 349.23 12.25 319.40 32.27 351.67 12.27 324.69 29.95 354.64 12.28 330.02 27.82 357.84 12.30 335.24 25.91 361.14 12.32 340.33 24.25 364.58 12.33 345.30 23.07 368.37 12.35 350.12 22.25 372.38 12.37 354.75 21.48 376.23 12.38 360.40 20.76 381.16 12.40 367.52 20.08 387.61 12.42 376.21 19.45 395.66 12.43 384.28 18.84 403.11 12.45 390.38 18.26 408.64 12.47 395.17 17.72 412.89 12.48 397.38 17.22 414.60 12.50 397.92 << 16.77 414.69 << 12.52 397.49 16.36 413.85 12.53 396.31 15.98 412.28 12.55 394.48 15.62 410.10 12.57 392.12 15.28 407.40 12.58 389.33 14.95 404.28 12.60 386.11 14.63 400.74 12.62 382.45 14.31 396.76 12.63 378.45 13.99 392.44 12.65 374.14 13.68 387.82 12.67 369.58 13.38 382.96 Continues on next page... 63 Outfall Area 6 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.68 364.83 13.08 377.91 12.70 359.95 12.79 372.75 12.72 354.98 12.52 367.50 12.73 349.93 12.24 362.18 12.75 344.81 11.98 356.79 12.77 339.61 11.72 351.33 12.78 334.33 11.47 345.81 12.80 328.99 11.23 340.22 12.82 323.57 10.99 334.56 12.83 318.09 10.76 328.85 12.85 312.54 10.53 323.08 12.87 306.94 10.31 317.24 12.88 301.27 10.09 311.36 12.90 295.54 9.87 305.41 12.92 289.76 9.66 299.42 12.93 283.92 9.44 293.37 End Page 2 &V Hydrograph Report Page 1 Hyd. No. 34 Area 7 - Residential Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 79.65 ac = 3.7% = LAG = 5.38 in = 24 hrs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 12.28 65.69 12.82 80.45 12.30 67.94 12.83 79.46 12.32 70.15 12.85 78.45 12.33 72.32 12.87 77.41 12.35 74.45 12.88 76.36 12.37 76.52 12.90 75.28 12.38 78.53 12.92 74.18 12.40 80.46 12.93 73.07 12.42 82.32 12.95 71.94 12.43 84.07 12.97 70.79 12.45 85.70 12.98 69.62 12.47 87.18 13.00 68.44 12.48 88.49 13.02 67.24 12.50 89.60 13.03 66.03 12.52 90.48 13.05 64.80 12.53 91.11 12.55 91.46 12.57 91.48 << ... End 12.58 91.29 12.60 90.90 12.62 90.36 12.63 89.71 12.65 89.01 12.67 88.27 12.68 87.51 12.70 86.72 12.72 85.90 12.73 85.06 12.75 84.19 12.77 83.29 12.78 82.37 12.80 81.42 English Peak discharge = 91.48 cfs Time interval = 1 min Curve number = 69 Hydraulic length = 3700 ft Time of conc. (Tc) = 64.6 min Distribution = Type II Shape factor = 484 Total Volume = 636,658 cuft g5 Hydrograph Report Page 1 English Hyd. No. 35 Area 7 Outfall Hydrograph type = Combine Peak discharge = 504.33 cfs Storm frequency = 10 yrs Time interval = 1 min 1 st inflow hyd. No.= 32 2nd inflow hyd. No. 34 Hydrograph Discharge Table Time 1 st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.10 313.53 40.37 353.90 12.12 323.30 42.64 365.94 12.13 330.89 44.93 375.82 12.15 336.71 47.24 383.94 12.17 341.14 49.55 390.69 12.18 344.06 51.87 395.92 12.20 345.84 54.19 400.03 12.22 347.42 56.51 403.93 12.23 349.23 58.82 408.05 12.25 351.67 61.13 412.80 12.27 354.64 63.42 418.06 12.28 357.84 65.69 423.53 12.30 361.14 67.94 429.08 12.32 364.58 70.15 434.73 12.33 368.37 72.32 440.69 12.35 372.38 74.45 446.82 12.37 376.23 76.52 452.74 12.38 381.16 78.53 459.68 12.40 387.61 80.46 468.07 12.42 395.66 82.32 477.98 12.43 403.11 84.07 487.19 12.45 408.64 85.70 494.34 12.47 412.89 87.18 500.07 12.48 414.60 88.49 503.09 12.50 414.69 << 89.60 504.29 12.52 413.85 90.48 504.33 << 12.53 412.28 91.11 503.39 12.55 410.10 91.46 501.55 12.57 407.40 91.48 << 498.88 12.58 404.28 91.29 495.57 12.60 400.74 90.90 491.64 12.62 396.76 90.36 487.12 12.63 392.44 89.71 482.15 12.65 387.82 89.01 476.82 12.67 382.96 88.27 471.23 12.68 377.91 87.51 465.42 Continues on next page... Total Volume = 3,537,766 cult 86 Area 7 Outfall Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 12.70 372.75 86.72 459.47 12.72 367.50 85.90 453.40 12.73 362.18 85.06 447.24 12.75 356.79 84.19 440.97 12.77 351.33 83.29 434.62 12.78 345.81 82.37 428.17 12.80 340.22 81.42 421.64 12.82 334.56 80.45 415.02 12.83 328.85 79.46 408.31 12.85 323.08 78.45 401.52 12.87 317.24 77.41 394.66 12.88 311.36 76.36 387.71 12.90 305.41 75.28 380.69 12.92 299.42 74.18 373.60 12.93 293.37 73.07 366.44 12.95 287.27 71.94 359.20 End Page 2 87 INLET/OUTLET PROTECTION Rip rap apron sizes calculated using NYDOT/USDA Soil Conservation Sevice methods as outlined in the NC State manual. 06 60" Culvert Worksheet for Circular Channel Project Description Project File c:\haestadftacademic\fmw\wake for.fm2 Worksheet Culvert Crossing Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.005000 ft/ft Diameter 60.00 in Discharge 152.86 cfs Results Depth 3.48 ft Flow Area 14.58 ftz Wetted Perimeter 9.86 ft Top Width 4.60 ft Critical Depth 3.55 ft Percent Full 69.54 Critical Slope 0.0047 55 ft/ft Velocity 10.49 ft/s Velocity Head 1.71 ft Specific Energy 5.19 ft Froude Number 1.04 Maximum Discharge 198.09 cfs Full Flow Capacity 184.15 cfs Full Flow Slope 0.003445 fttft Flow is supercritical. ZaNe 3 G? I RI P WAF T= 24?' mil = 3 >e = 3 x 5' = ? `' ZIP U s E -- Oa-rLJE-T L- ' -r = 24 " L=40' I N L.ET C? 1 ?iPP T = 18" L - 2D W = 1?`. 06/02/00 Academic Edition FlowMaster v5.17 08:29:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 t7 / CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 JOB -1, ?? Ate-. Aei ?,,cST -- , 40.40 /4S SHEET NO. '/ OF ? CALCULATED BY 9: DATE CHECKED BY c(e(F DATE Z 7// wd? //v Y.-I I?ES!-rte' SASS / ?f' ? F' PRODUCT 204 1 (S." X1203-1 ft MI 9e) Outfall @ Pond #1 Worksheet for Circular Channel Project Description Project File c:lhaestadlacademic\fmvAwake for.fm2 Worksheet Outfall - Pond 1 Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.010000 ft/ft Diameter 36.00 in Discharge 58.70 cfs Results Depth 26.2 in Flow Area 5.51 ftz Wetted Perimeter 6.13 ft Top Width 2.67 ft Critical Depth 2.48 ft Percent Full 72.81 Critical Slope 0.007640 fttft Velocity 10.65 ftts Velocity Head 1.76 ft Specific Energy 3.95 ft Froude Number 1.31 Maximum Discharge 71.74 cfs Full Flow Capacity 66.69 cfs Full Flow Slope 0.007746 fttft Flow is supercritical. ZDh1,E5 3 cuss i ,?,? ??r Z- x 07/03100 Academic Edition FlowMaster v5.17 11:43:58 AM Haested Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 or 1 91 CIVIL CONSULTANTS, INC. JOB 3622 Lyckan Pky. Suite 3003 SHEET NO. OF DURHAM, NORTH CAROLINA 27707 CALCULATED DATE (919) 490-1645 FAX (919) 403-0336 CHECKED BY DATE W = 21J, _ PRODUCT 204 1 15npk Shedd 205.1 IPaW) 92 Outfall @ Pond 2 Worksheet for Circular Channel Project Description Project File c:\haestadlacademiclfmvAwake for.fm2 Worksheet Outfall @ Pond 2 Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.010000 ft/ft Diameter 30.00 in Discharge 40.25 cfs Results Depth 2.01 ft Flow Area 4.23 ft2 Wetted Perimeter 5.56 ft Top Width 1.99 ft Critical Depth 2.13 ft Percent Full 80.33 Critical Slope 0.009011 ft/ft Velocity 9.52 ft/s Velocity Head 1.41 ft Specific Energy 3.42 ft Froude Number 1.15 Maximum Discharge 44.12 cfs Full Flow Capacity 41.01 cfs Full Flow Slope 0.009630 ft/ft Flow is supercritical. %/mar G??'EuE' r? 1 ?5 ,/ 07/03/00 Academic Edition FlowMaster v5.17 11:46:36 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 4? CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490.1645 FAX (919) 403.0336 SHEET NO. OF CALCULATED BY__ elc \ DATE 7 CHECKED BY SCALE DATE ?"? ?Ns?L ??Sf?l 7. Z PRODUCT 2011 RS+gk SIMSI 205 1 (PaM) 4.4 = 20 9'q CIVIL CONSULTANTS, INC. 3622 Lyckan Pky. Suite 3003 DURHAM, NORTH CAROLINA 27707 (919) 490-1645 FAX (919) 403-0336 joB SHEET NO. OF CALCULATED BY = -•? r`. DATE J ?V i CHECKED BY SCALF DATE Z -7- = /v6 'i PROOUCT 204 1 iS.ngM ShMs, 2051 i.PjWMi Y V O J m z O I-- Q O W O J?- ?- W p Z(.) z 0 Z ui Uj CL mo a o U O W Uj LL, V Oda z 9 C? LN tL O v Q Y ? ? M N N V +-' n O O M C L- 0 0 0 N c C) o E CA cO ti CO = O N M 0? O O O O n Q N .- CM T L_ 0 0000 co U ° L_ OIt Mto t .0.. N O ?- M M m r- co 0 3:- .- ?- ? CL C? 0) 0 CO 1w M 5 to ? t 0 ? o CO CO M I- w 0 = N N V- CO O (D CD ? CN j m Ct) Q LO 't ? 04 t C ? J O O O O a o 0 0 0 Coao00 cc m CD w a) CO t E CP))t°M?N N m Q v- O +- OCD co CD (D V) O N tN tN MO tN CD Q' LO LO CO tO ,cz ool- o U ONOO qt CD • ootno -0 j ?2 N N O N 2 U C LO to t1') LO m H r U O O O O OOOtoO m? wwr-w w LL 0000 .) 0000 t/) M ? W) Lo qto O C, C) CD LOO = I? ti ? m J O 00 1? CO C) yL y_ ? O O O O N E,= 0000 R w m m ui c6 D U Z O O O O C to 0 0 0 0 U(D m0000 u1 to tf) u) r ? ? r L O E CL = z L- O G ?- N M ct a = z 96 Pond 1 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File c:lhaestaftcademic\fmvAwake ec.fm2 Worksheet Permanent Weir - Pond 1 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.130000 ft(ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 30.00 ft Discharge 84.68 cfs Results Depth 0.55 ft Flow Area 17.53 ftz Wetted Perimeter 33.50 ft Top Width 33.32 ft Critical Depth 0.61 ft Critical Slope 0.091235 ft/ft Velocity 4.83 ft/s Velocity Head 0.36 ft Specific Energy 0.92 ft Froude Number 1.17 Flow is supercritical. xe?? ?,13 - 4e fZtP RAP, C?,?Ss T Imo, 07/24100 Academic Edition RmWaster v5.17 03:50:45 PM HaestadM@thods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1866 Page 1 of 1 97 Pond 2 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File cAhaestad\academic%fmw\wake ec.fm2 Worksheet Permanent Weir - Pond 2 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.250000 ftfft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 48.52 cfs Results Depth 0.41 ft Flow Area 8.81 fl2 Wetted Perimeter 22.62 ft Top Width 22.49 ft Critical Depth 0.55 ft Critical Slope 0.095362 ft/ft Velocity 5.50 ft/s Velocity Head 0.47 ft Specific Energy 0.89 ft Froude Number 1.55 Flow is supercritical. =?2,4x.41x,ZS _ <;.4 S ??, F, ?P C c.AS?6 e":2.) 30 `' Tl?tc 07124100 Academic Edition FlowMaster v5.17 03:47:58 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 9k Pond 4 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File cAhaestad\academic\fmw\wake ec.fm2 Worksheet Permanent Weir - Pond 4 Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.070 Channel Slope 0.330000 ft1ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 20.00 ft Discharge 61.15 cfs Results Depth 0.43 ft Flow Area 9.18 ftz Wetted Perimeter 22.73 ft Top Width 22.59 ft Critical Depth 0.64 ft Critical Slope 0.086171 ft/ft Velocity 6.66 ftis Velocity Head 0.69 ft Specific Energy 1.12 ft Froude Number 1.84 Flow is supercritical. T=-? <? s = ('OZ-4.x . ?3 x e 3? = 8.815; 2¢„ f;FtP 2AP Cis Z F??P ??Ap Zoo " ?t4 ccCK 0724/00 Academic Edition Fl)wMaster v5.17 03:37:30 PM Haested Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 99 Pond 3 - Outfall Protection Worksheet for Trapezoidal Channel Project Description Project File c:lhaestad\academiclfmwlwake ec.fm2 Worksheet Permanent Weir - Pond 3 Flow Element Trapezoidal Channel Method Manning's Formula Sohn For Channel Depth Input Data Mannings Coefficient 0.072 Channel Slope 0.330000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 60.00 ft Discharge 168.98 cfs Results Depth 0.42 ft Flow Area 25.77 fl? Wetted Perimeter 62.66 ft Top Width 62.52 ft Critical Depth 0.62 ft Critical Slope 0.089821 ft/ft Velocity 6.56 ftfs Velocity Head 0.67 ft Specific Energy 1.09 ft Froude Number 1.80 Flow is suaercritical. T 1/) s o42 24'? Rrp WAe . '? TN i c.+< - G Lass 7- 07/24100 Academic Edition FkrWaster v5.17 03:38:06 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ioo APR-25-00 TUE 11:50 AM CIVIL CONSULTANTS, INC. 919 403 0336 P.02 CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants #6013 April 25, 2000 Mr. Todd Tugweil U.S. Army Corps of Engineers 6508 Fails of the Neuse Road Suite 120 Raleigh, NC 27615 Re: Wake Forest Town Center (proposed 63 acre shopping center) U. S. Highway 1 Wake Forest, NC Dear Mr. Tugwell: This letter will document the meeting in your office this morning between you, Harlan Britt, and myself regarding the referenced project- Based on the land title information presented and the other items discussed, you agreed that the subject property will not be linked to the adjoining State Properties, LLC property (Winn-Dixie) for wetlands permitting purposes. in the next few days, we will forward application materials to you for the modest impacts that we discussed. Kevin Martin of S&EC will be the contact person for permitting issues. Thank you again for your time this morning. Regards, Tony M. Whitaker, P.E. CC' Harlan Britt Kevin Martin Tim Dockery Pat Crosby 3622 Lyckan Parkway Suite 3003 Durham, N.C. 27707 919-490-1645 Phone 919-403-0336 Fax ¦ civilengr@aoi.com 16:3; 9198785416 RAMEY KEMP & ASSOC. PAGE 02 Ramey Kemp & Associates, Transportation Engineers Inc. May 3, 2000 Mr. Twy Whitaker, PE Ci ' Cdrultants, Inc. 36 Ly*m Parkway, Suite 3003 NC 27707 RE:; Wake Forest Town Center SubjW: Primary Access to NC 98 As per our recent conversation, I am writing to reconfirm to you that the proposed US 1 paisllel access road of Wake Forest Town Center must be connected to NC 98 at a location other than the existing Cloverleaf Drive. As determined through signal systems analysis, the intersection of Cloverleaf Drive and NC 98 is the cause of the existing system bottleneck due to its close spacing to the US 1 ramp interchange signals. In fact, these series of intersections are so closely spaced that the North Carolina Department of Tr9wPoRstion had considered closure and/or restricting the movements at the Cloverleaf intersection during their review of the adjacent Winn Dixie site plan. These restrictions eouW again be a possibility upon completion of NCDOT's review of the proposal that is presently before them for Wake Forest Town Center. When Meted, the US 1 parallel. access road will transport large traffic volumes, both site generated traffic as well as a considerable volume of traffic that will divert to the parallel access road in lieu of travelling through the congested NC 98 / US 1 interchange ramp area. Cloverleaf Drive alone will certainly not be capable of supporting the pmiocicid traffic loading; thus, it is absolutely necessary that a second point of major full moveiment access be provided on NC 98, preferably as far to the west from the Cloverleaf Drive traffic signal as is feasible. If you have any questions or need additional information, please call. Sincerely, Ramey Kemp & Associates, Inc. Kenneth L. Clark, PF. 4928-A Windy Hill Drive • Raleigh. North Carolina 27609 Phone: (919) 872-5115 • Fax: (9191 878-5416 CIVIL CONSULTANTS INC. #6013 Civil Engineers July 24, 2000 Land Development Consultants Mr. John Dorney NCDENR 1621 Mail Service Center vo 4 T Raleigh, NC 27699 Re: Capital Plaza (formerly Wake Forest Town Center) Proposed Shopping Center Wake Forest, NC Dear Mr. Dorney: Please find enclosed application materials for an Authorization Certificate for a public street crossing of a stream tributary to Richlands Creek in the Town of Wake Forest. The Applicant for this Certificate is Wake Forest/Granite, L.L.C., P.O. Box 1928, Mount Airy, NC 27030, (336-786-1356). The proposed crossing will provide much-needed relief to current and projected traffic congestion problems at the NC 98/U.S. 1 interchange (see attached letter from Ramey Kemp and Associates, Inc.) as well as serve the subject shopping center as shown on the enclosed plans. The existing site access called Cloverleaf Drive cannot fulfill the traffic capacity needs at this interchange because its proximity to the U.S. 1 ramps does not allow nearly enough vehicle stacking space for peak traffic hours. The Applicant has received Site Plan approval from the Town of Wake Forest for the subject project. As a firm condition of this Site Plan approval, the Town requires the construction of a service (frontage) road configured as shown on the plans (see attached letter from the Town of Wake Forest). This configuration requires bending the frontage road westerly as it approaches NC 98, maximizing the spacing along NC 98 from the new intersection to the U.S. 1 ramps. In addition to providing extensive traffic studies and coordination with Town of Wake Forest staff, the Applicant has worked with NCDOT to meet State requirements for the proposed roadway improvements. Both agencies. agree on the necessity of the roadway as currently designed. In view of the foregoing, it is clear that reasonable development of the subject property allows no practical alternative to crossing the stream in question. Consequently, the Applicant proposes to minimize buffer impacts by crossing the stream perpendicularlyand minimizing the street cross section while still meeting NCDOT criteria. The total area of buffer disturbance for the street crossing is 0.22 acres, and the length of disturbed buffer is approximately 147 feet. The Applicant further proposes to provide water quality retention onsite to better protect water quality. Consequently, we have enclosed stormwater quality pond construction plans and calculations for the site, for your review. Please call me if you have any questions about this matter. Regards, Tony M. Whitaker, P.E. Attachments cc: Tim Dockery (with plans) Kevin Martin (with plans) 3622 Lyckan Parkway Suite 3003 . Durham, N.C. 27707 A 919-490-1645 Phone 919-403-0336 Fax civilengr@aol.com Y ` Soil & Environmental Consultants, Inc. 11010 Raven Ridge Road Raleigh, North Carolina 27614 • Phone: ?? 846-5900 Fax: (919) 846-9467 Web Page: www.SandEC.com (?? ?? ;tf e This is a 401 water quality certification request for a road crossibg wi ? channel impacts less than 150 linear feet; therefore, a check for $200 is'enelosed. August 8, 2000 M a C-, I NCDENR-DWQ US Army Corps of Engineers M Attn: Mr. John Dorney Attn: Mr. Todd Tugwell Q 4401 Reedy Creek Road 6508 Falls of the Neuse Rd., Ste. 120 Raleigh, NC 27606 Raleigh, NC 27615 RE: Nationwide Permit Courtesy Notification/401 Water Quality Certification Request Capital Center Wake Forest, Wake County, NC 001047 (UTM coordinates: Zone 17: 3983500 N, 721500 E) S&EC Project #: 00-5282 Dear Mr. Dorney and Mr. Tugwell, On behalf of Wake Forest/Granite, LLC (property owner), we hereby notify the US Army Corps of Engineers and request written concurrence from the North Carolina Division of Water Quality (NC-DWQ) of our client's intent to use Nationwide Permits 39 and 14 and their associated 401 Water Quality Certifications for the subject project to cover permanent impacts to stream channels and wetlands. A Pre-construction Notification Application (PCN) is attached, which includes an agent authorization form. The subject property, which consists of a proposed home improvement store, department store, and other smaller stores, is located southwest of the intersection of US Highway 1 and State Highway 98 in Wake Forest, NC. Please refer to the attached map (Figure 1) for the project's location on a USGS topographic quadrangle. The property comprises 66.31 acres, 1.64 acres of which were determined to meet jurisdictional wetland criteria. Wetland Delineation/Permitting/Mitigation Soil/Site Evaluations On-Site Septic Systems Environmental Assessments/Audits Neuse Basin and Watershed Buffer Evaluations Groundwater Hydrology Endangered Species Charlotte Office: (704) 516-3922 • Hickory Office: (828) 312-7902 August 8, 2000 S&EC Project #: 00-5282 Page 2 of 3 Proposed impacts to waters of the US resulting from the site plan consist of one road crossing, comprising 3,294 ft2 of stream channel (Impact #1), and the construction of retention walls impacting two wetland areas, comprising 8 ft2 (Impact # 2) and 713 ft2 (Impact # 3). Total impacts include 0.092 acre of wetlands and stream channel, which includes 147 linear feet of stream channel. An aerial sanitary sewer line will be constructed on piers across the stream channel that runs generally along the western property boundary (Impact # 4). This sanitary sewer line has been designed to avoid impacting or impeding the stream channel. Enclosed is a cross-sectional diagram of the sewer line, as well as maps depicting all of the proposed wetland and stream channel impacts. The USACE's current policy requires mitigation for impacts that exceed the requirements for notification. Because impacts resulting from the road crossing covered under NWP 14 do not exceed 1/10 of an acre or involve discharge into a special aquatic site, notification to the USACE is not required. Likewise, because impacts resulting from proposed wetland fills covered under NWP 39 do not exceed 1/10 of an acre, notification to the USACE is not required. NC-DWQ's current policy does not require mitigation for wetland and stream channel impacts below 1 /3 of an acre and 150 linear feet. Because the proposed cumulative impacts resulting from the project do not exceed the aforementioned thresholds, S&EC believes that wetland or stream channel mitigation should not be required. Additionally, three copies of the grading plan, stormwater detention/retention ponds plans and details, and the stormwater management calculations have been enclosed for NC- DWQ's review. The stream channel that will be impacted by the proposed road and aerial sanitary sewer line crossing is subject to the Neuse River Basin (NRB) riparian buffer rules. On April 11, 2000, Charles Brown conducted a site visit to confirm the presence of the buffered stream (DWQ Reference # NBRRO 00-108). Enclosed is a copy of Mr. Brown's letter confirming the buffer determination. The road crossing will impact approximately 0.22 acres of riparian buffer (0.14 acres in Zone 1 of the buffer and 0.081 in Zone 2) and 147 linear feet of stream channel. The aforementioned sanitary sewer line will be constructed perpendicularly over the buffered channel using a 30-foot-wide wide construction corridor, which is an "exempt" activity under the non-electric utility line provision. Three "no practical alternative" letters are enclosed that explain the need to construct a road across the buffered channel. Current NC-DWQ policy allows road crossing without mitigation if the impacts are less than or equal to 150 linear feet of stream channel or 1/3 of an acre of riparian buffer. Because the project impacts are within these thresholds, S&EC believes that riparian buffer mitigation should not be required. It is also important to note that this project is separate from the adjacent Winn Dixie development as determined in the meeting discussed in the attached letter to the USACE. August 8, 2000 S&EC Project #: 00-5282 Page 3 of 3 Although all proposed impacts are under the NWP 14 and 39 thresholds required for notification to the USACE, S&EC believes that the town of Wake Forest may require written concurrence from the USACE as well as the NC-DWQ. Sincerely, A ?VJ /ow- James D. Cooper Environmental Scientist Kevin C. Martin President Attachments: Pre-construction (PCN) notification form Site Location Map Site Plan/Impact Map + Sewer Line Cross-sectional Diagram Agent Authorization Form Three (3) letters of "no practical alternatives" NC-DWQ Buffer Subjectivity Letter (5111/00) Civil Consultants, Inc. Letter (4/25/00) Grading Plan (NC - DWQ copy only) Stormwater Detention/Retention Ponds Plans and Details (NC - DWQ copy only) Stormwater Management Calculations (NC - DWQ copy only) $200.00 Check for 401 WQC Processing Fee (NC - DWQ copy only) c: Craig Hunter, Wake Forest/Granite, LLC DWQ ID: 001047 Corps Action ID: Nationwide Permit Requested (Provide Nationwide Permit ft 39 & 14 Pre-Construction Notification Application For Nationwide Permits that Require: 1) Notification to the Corps of Engineers 2) Application for Section 401 Certification 3) Coordination with the NC Division of Coastal Management Send the original and (1) copy of this completed form to the appropriate field office of the Corps of Engineers (see agency addresses sheet). Seven (7) copies should be sent to the NC Division of Environmental Management (see agency addresses sheet). PLEASE PRINT. 1. Owner's Name: Wake Forest/Granite, LLC (Attn: Craig Hunter, manager) 2. Mailing Address: PO Box 1928 Subdivision Name: City: Mount Airy State: NC Zip Code: 27030 Project location address, including subdivision name (if different from mailing address above): Proposed Capital Plaza is located on the southwest side of the intersection of US Highway 1 and State Highway 98 (see vicinity map); UTM coordinates: Zone 17, 3983500 N, 721500 E. 3) Telephone Number (Home): N/A (Work): (336)-786-1356 4) If applicable, agent's name or responsible corporate official, address, phone number: Soil and Environmental Consultants, Inc Phone: (919) 846-5900 11010 Raven Ridge Road Fax: (919) 846-9467 Raleigh, NC 27614 5. Location of work (provide a map, preferable a copy of USGS topographic map or aerial photograph with scale): County: Wake Nearest town or city: Wake Forest Specific Location (include road numbers, landmarks, etc.): See #2 above 6. Impacted or nearest stream/ river: unnamed tributary to Richland Creek River Basin: Neuse 7a. Is project located near water classified as trout, tidal saltwater (SA), high quality waters (HQW), outstanding resource waters (ORW), water supply (WS-I or WS- II)? YES E] NO ® If yes, explain: 7b. If the project is located within a North Carolina division of coastal management area of environmental concern (AEC)? YES ? NO 7c. If the project is located within a coastal county (see page 7 for list of coastal counties), what is the land use plan (LUP) designation? 8a. Have any Section 404 permits been previously requested for use on this property? YES ? NO ® If yes, provide Action ID number of pervious permit and any additional information (including photocopy of 401 certification). 8b. Are additional permit requests expected for this property in the future? YES ? NO ® If yes, describe anticipated work: 9a. Estimated total number of acres in tract of land: 66.31 9b. Estimated total number or acres of wetlands located on project site: 1.635 10a. Number of acres of wetlands impacted by the proposed project by: Filling: 0.092* Flooding: Excavation: Other: Drainage: Total acres to be impacted: 0.092 Includes jurisdictional wetlands and other waters of the US 10b. (1) Stream channel to be impacted by the proposed project (if relocated, provide distance both before and after relocation): Length before: 147 After: 140 Width Before (based on normal high water contours): approximately 5 ft. Width After: Average depth before: After: (2) Stream channel impacts will result from: (check all that apply) Open channel relocation: ? Placement of pipe in channel: Channel Excavation: ? Construction of a Dam/ Flooding: ? Other: 11. If construction of a pond is proposed, what is the size of the watershed draining to the pond? Pond 1: 503.230 sq ft., Pond 2: 291.991 sq ft.. Pond 3: 1,233,933 sq ft., Pond 4: 404, 622sq ft. What is the expected pond surface area? Pond 1: 11,810 sq ft_, Pond 2: 7,130 sq ft., Pond 3: 22,810 sq ft., Pond 4: 7,300 sq ft. 12. Description of proposed work including discussion of type of mechanical equipment to be used (attach plans 81/2" x 11" drawings only): Placement of a pipe and fill material within a stream channel for the purpose of constructing a road and placement of fill material in wetlands to construct retaining walls. Mechanical equipment will include heavy machinery typically used to complete the activities mentioned above. 13. Purpose of proposed work: The purpose of the proposed work is to provide road acess to the proposed development. 14. State reasons why it is believed that this activity must be carried out in wetlands (include any measures taken to minimize wetland impacts): Please see enclosed no practical alternatives explanation provided in the letters provided by Tony Whitaker of Civil Consultants, Chip Russell of AICP, and Kenneth Clark, PE. 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) (see agency addresses sheet) regarding the presence of any federally listed or proposed for listing endangered or threatened species or critical habitat in the permit area that may be affected by the proposed project. Date contacted: (attach responses from these agencies). Performed by USACE 16. You are required to contact the state historic preservation officer (SHPO) (see agency address sheet) regarding the presence of historic properties in the permit area which may be affected by the proposed project. Date contacted: Performed by USACE 17. Does the project involve an expenditure of public funds or the use of public (state) land? YES ? NO ® If no, go to 18. a. If yes, does the project require preparation of an environmental document pursuant to the requirements of the North Carolina Environmental Policy Act? YES ? NO ? b. If yes, has the document been reviewed through the North Carolina Department of Administration State Clearinghouse? YES ? NO ? If answers to 17b is YES, then submit appropriate documentation from the state clearinghouse to division of environmental management regarding compliance with the North Carolina Environmental Policy Act. Questions regarding the State Clearinghouse review process should be directed to Ms. Chrys Baggett, Director State Clearinghouse, North Carolina Department of Administration, 116 West Jones Street, Raleigh, North Carolina 27603-8003, telephone (919) 733-6369. 18. The following items should be included with this application if proposed activity involves the discharge of excavated or fill material into wetlands: a. Wetland delineation map showing all wetlands, streams, lakes and ponds on the property (for Nationwide Permit numbers 14, 18, 21, 26, 29 and 38). All streams (intermittent and permanent) on the property must be shown on the map. Map scales should be 1 inch equals 50 feet or 1 inch equals 100 feet or their equivalent. b. If available, representative photograph of wetlands to be impacted by project. C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. d. Attach a copy of the stormwater management plan, if required. e. What is land used of surrounding property? Residential and commercial f. If applicable, what is proposed method of sewage disposal? Sanitary sewer g. Signed and dated agent authorization letter, if applicable. NOTE: Wetlands or Waters of the U.S. may not be impacted prior to: 1. Issuance of a Section 404 Corps of Engineers Permit, 2. Either the issuance or waiver of a 401 Division of Environmental Management (Water Quality) certification, and 3. (in the twenty coastal counties only) A letter from the North Carolina Division of Coastal Management stating the proposed activity is consistent with the North Carolina C astal Management pro rams Owner' /Agent's Signature Date (Agent's signature valid only if Agent Authorization Letter from the owner is provided (18 g.)) N Project t Scale: 00.5282 V = 2000' Figure 1- Project Mgr.:KCM Date:3128100 Location Map Soil 6 Environmental Consultants , Inc . ropo quad: 11010 Raven Ridge Rd.- Raleigh, NC 27529 Wake Forest (919) 846-5900 • (9 19) 846-9467 Web Page: www.SandEC.com ?/ I V ??l ' 110 350 ? ? ? ? ? 11 350 L„? I 300 37 •??? 1 ?• ? 1 I 3 / O 300 - _ ` .?' 1 ? ? 11 350 O 1 11 1 • \\\ Q j ?rr '\\II ' \ \ ! 1 1 \ I V i `` O 1 2? J ? 0 \ O ? 1 ® II Z - \, ; y50 I ' II ? p i w V r O ? O 1 - ? p 3 2 7 O 35 e? 'tv 0 00 0 Op 0 d 0 00 0 0 0 0 09 ?4 p 0? 0 0 0 0 D 0 0 0 0 0 0 0 00 0 0 0 d 0 5 do d> 04 U w CL wN :mw l.J • oh Ila: 46 V w LLJ r? W w LL, Q crwi f a l3'DMYdLf10 F N a ?? N i <{ U w ?s as W N 0: L'i N ?Q v CL CL (( L J g ? a w U ~ LLJ 0- W cn Q v n 0 0 ?P m m SS`ddX8 86 'O'N 38n.1n4 I 8F Nc a S _ ? Z Fl11URE NC 9a BYPASS 5 L? L,: L?: LL ; fn (N fn (n •t 00 M O N I? Q W Q' li la li L<: Q vi vi vi Lri U z oOOO Q 'n ? M Li LL: L? N Vi (n vi 00000 A 04 Wwww aQaa F- V U U U CL aCL 00- ?=.Mm U WJ Q F- ? M LZ QUcO a.?Z00 Q F- LLJ :) Y 0 a- 3 Li vi tf) O a} M LL (6 co ?o J Fa- 0 1.4 w 0 r? V 1 W P4 w w C:d E? U d a w w w as .9!? 0- 4 a E-? U a A z F w g? p con V 1 0 V I Z N ° U G? E o• zCQ a w s~ N U 1--1 ?o M M O M M 8 0 ,it M >w ao N ? M y O a 0 wQ ? J NV)V z Wm- i f o O < Hz N a Q Z m / r ,`,11111111111f///I? i n ,,, ?,, ' zxa .? v •' P *, Q 6 •. ? ' do ul -j Q F- ; oN W d ; CC a w '.,~bQ ??b • °? •' lv??`?s Z W ,,,' ES?,,? •L /?//f/ /fFILU?? SHFFT i nF .5 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY RALEIGH REGIONAL OFFICE ON OF WATER QUALITY May 11, 2000 Mr. Kevin Martin S&EC,Inc. 110 10 Raven Ridge Road Raleigh, NC 27614 Subject: Neuse River Basin Riparian Buffer Rules NBRRO 00-108 Hwy 98 / Hwy 1 S&EC # 00-5282 Wake County Tract On April 11, 2000, I conducted a site visit of the features involved in the above referenced project. It was determined as a result of the site visit that the water channels present on the property were subject to the Neuse River Basin: Nutrient Sensitive Waters Management Strategy; Protection and Maintenance of Existing Riparian Areas, Administrative Code T15A:02B.0233 (NCAC 0233). The subject water channels are indicated on the attached map. The channel is an annamed tributary to Richland Creek. This office has assigned the reference number of NBRRO 00-108 to this project. Thank you for your attention to this matter and if this Office can be of any assistance or if you have any additional questions concerning this letter, please do not hesitate to contact me at 571-4700 ext. 237. Sincerely, Charles Brown Environmental Specialist cc: John Dorney, DWQ \neusbuf.let\nbr00108.1et 1626 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1628 PHONE 919-571-4700 FAX 919-571-4716 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST-CONSUMER PAPER S 30 5 133HS ui03'1019 J2uaitnio 9££0-£Ob (616) :Xud 91791-06b (616) .auogd L,OLLZ DH `=tljnQ £00£ a;inS AvAmoind uexoAj ZZ9£ sluminsuoo luouxdoianaQ puu7 sJaau12ug itnto .'m SJLNVJL"MSMOD TAID oooz `tz xzrnr VNI'IOZIVa HPION `ZSHZIOd HXVA VZVrld ZVZIdVO dVW 10VdWI S (INV HM 1DVdWI dHddrl[I NVIHVdIH d I?IIS?g 2I?1?I23 ?511?1? 'Sd3ld K 3NMJ3M3S M3N 3H1 ),9 lOVdWl SGN`d 13M ON cc P66 Y HH Y LLDVdlkl SI 32J3H1 aNd ,idIN3X3,, SI 1OddWl NIS` S 2J]AId 3sn3N II OZ = = ate?g Of 0 0 N / ------- _ I -- -- O --_ ` - - - " 31OHNdW cn 9 SS M3N N _ S El 83A nEl NV/,,,,, 117, ---- NI a3dd118 3N02 .... % . . Sbg a-3 Nv"'Vd pq / l -' ?1Q1 3Sn3N .OF o rZ'7 -P Gl) PVV -40 dOl NIS Ve ?i3d 3n8 N 13N b . .- 3i1121 3Sn3N 0p o ? o ... .. 831d NISba a33A/a, 3S 21 do21 ...- .r n3N OZ / SX \? SX 3NI1 83M3S JNIISIX3 31OHNt/W SS 0NIISIX3 S - 7777 -1 3dgdd \ ---?= ---- \\`•?\ \ ----------- --- - --------- ?g ad N r - - - - - - - - - - --\- - - - - - r r i r r r I \ y?`J .. , i Z0N G I 'S IV3S a ?6,?,'b???ss?? a0, •?' 278 276 274 272 270 ass 64 :62 60 58 56 54 52 gar 50, IN E6 -I4 --- .2 7+00 8+00 PROFILE OUTFALL "A" HORIZONTAL V = 40' VERTICAL 1" = 4' 9+00 aye vovM Sc,,,,c.. L ;tc 64is - Sec f :oh 278 276 --274 r- - 272 270 -268 - 266 -264 - 262 ANHOLF7 s 260 258 256 254 252 250 248 246 244 242 AUG-02-00 WED 01:55 PM CIVIL CONSULTANTS,_INC. 919 403 0336 P.03 08%02/00 WED 14:11 FAX 336 786 8398 GRANITE DEVELOPMENT 0 002 09/02/2000 13:19 9198469467 S EC PAGE 02 ill , . r. , a ]j' ' ??rl'1: ???:r? '•?' ?r',, y.. . .? Ra]ei li, AioNh Ca[vI?t427614,I'^;I';?,t Ri* -'-Road ; to SAN" Web paw; ,w,vw.s'ana?e : =t:: A6$1 ALTrTR?I+ fit 1v ': e' ?,G rte'r .. fr o " Sim- ' tJ. 01WHbyJ ci s b Lxtigixi?lelcs,.' f i 6" '?? c? k.1V ayr of 41QaF% i ci'a 't?t? Qar ! +R t.+??tiona. to it t iairCre s ' ila cif + Q E14?'uI' M ?`' t.isiIf sifr[,3ta`s ?t' af`?l? a ? ?'' ebb: £c?m' ids xm. ti '`yj` k3?vfous. cdtid lioc 06 1610 "r' !C?'s'"b:'.,?ober}.. i. ? rop,ectY' . ? fnt?bKr e j' ; s. i g? ,???e ,. +• ,c. +, cc: tv?r. Ke'+ i uCa ` a1 ctm %'fne? g sod& .t ' Q ??uruy'; r 00 Road :' a G .44 Aft."Y, 5gr'f Sl1E y t o SSt iSapkiC SYMUO doer !°n ' dip aliaf ag!ti?tl?'" i,I h[ io Etidad :'.. ° rtM' 8 r lA wiroanriw?ef rYd!'n ?Y, :' '. ?•' ? T'?:\o7vfF-7;702 '.;?g'I??,r r. ??j,ti „'•r .G: ? ?•y .Ir' N t i?'?i?r?,' '''I?Yy ???' .'?. ???.`?:????'•-,/?+:. 1' !, ..... .. ?. r? . .. „?,? at'•rd Ill• ??'• -R'?.'- ? ? ? ? ori•!?Ylfl'f'?., it ?;'??r ,_ ."41'45 •rbl?ir' ?, • r .. , ??*• rss? • ? fifl„ (ITN r 0 ! ??` N ?. 6 CU June 22, 2000 divii Consultants, Inc, Mr. John Dorney Division of Water Quality 4401 Reedy Creek Road Raleigh, NC 27607 Dear Mr. Dorney: (D;t?m 4 (Wae (7ov-'st 401 ELM STREET WAKE FOREST, N. C. 27587-2932 PHONE 919/554-6100 FAX 919/554-6195 Re: Wake Forest/Granite, LLC Shopping Center Wake Forest, NC The Wake Forest Board of Commissioners approved above referenced project on May 16, 2000. The plan for this project proposes a new road which will cross a stream impacting a Neuse River Riparian Buffer area. Prior to the conception of this project, town staff met several times with NCDOT and affected property owners to discuss ways of providing access to the property which would least impact NC-98 from a traffic congestion standpoint. These discussions began with the development of plans for the existing Winn-Dixie Marketplace store and continued through development of plans for the Wake Forest/Granite, LLC project. It was determined that for the adjoining section of NC-98 to adequately move traffic at peak hours, a new road was required to provide access to the site. This road needed to be as far west as possible from the existing signalized intersections to provide sufficient room for vehicle stacking for turning movements. The existing road, Cloverleaf Drive, was initially considered for the primary access but its close proximity to other signalized intersections would produce gridlock at peak hours. Thus, Cloverleaf Drive would need to be de-emphasized. Traffic analysis by both private consultants and NCDOT substantiate these findings. Therefore, based on the analysis done to date, the position of the Town of Wake Forest and NCDOT is that any development of the referenced property will require the construction of the new access road as proposed. . f - If you require additional information, please contact me at 919-554-6142 (telephone) or at ch Qi ,russellac; wake-forest nc us (e-mail). Sincerely, Chip Russell, AICP Planning Director cc: Tony M. Whitaker, Civil Consultants Gary Faulkner, NCDOT Roe O'Donnell, Town of Wake Forest MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: Charles Brown WO Supervisor: Ken Schuster Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Capital Plaza Center c/o Wake Forest/Granite, LLC Project Number 00 1047 Recvd From APP Received Date 8/9/00 Recvd By Region Project Type commercial County Wake County2 Region Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. 39 OTH O Y _0N 27-21 NSW 30,402. 0.09 F_ F_- 14 Stream O YO N ?? ?? ???-F-r- 147.00 Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y 0 N Did you request more info? Q Y O N Have Project Changes/Conditions Been Discussed With Applicant? QQ Y O N Is Mitigation required? p Y 10 N Recommendation: Q Issue O Issue/Cond O Deny Provided by Region: Latitude (ddmmss) 355823 Longitude (ddmmss) 783231 Comments: Stormwater from ponds was a concern the eject needs to achieve sheet flow from ponds. Pond #4 needed nutlet moved from north side to the south side. cc: Regional Office Page Number 1 Central Office \ I \ ?? \ \ \ \ 11 W Q \ \ \\ \\ \ ! \\I I I I I ` I ,'// \\\ \\ \\\\ \\\\ \\ \ `\ I it I (1!) ?r 1 1\ \ / \ \ \ 1 ?s J I \ 713 S. F. OF \ \ h \ \ RE AININ ¦ ,¦ WETLANDS IMPACT I \\ \\ \ `, ,' / / ti "F?1? __-------___ gg------- - cLIpx 'Po?o ce, cGT ? THERE IS NO NEUSE RIVER BASIN IMPACT AND 713 S.F. OF WETLANDS IMPACT BY THE RETAINING WALL AND FILL. ,10 CA110101% .` FES3/0 •. ?9 ?. 4-Q '??• SEAL i innno L o'• I FK C? N - 40 0 40 80..... Scale 1 inch = \40 ft. IMPACT AREA "3" NEUSE RIVER BASIN RIPARIAN BUFFER IMPACT & WETLANDS IMPACT MAP CAPITAL PLAZA WAKE FOREST, NORTH CAROLINA JULY 24, 2000 CIVIL CONSULTANTS INC. Civil Engineers Land Development Consultants 3622 Lyckan Parkway Suite 3003 Durham, NC 27707 Phone: (919) 490-1645 Fax: (919) 403-0336 civilengr@aol.com SHEET 4 OF 5 5 30 Z 133HS uzo3•j0V •Suajtnia 9££0-£OV (616) MA Sb91-06b (616) :auilud LOLLZ OH `Umu-nQ £00£ altnS Aemojmd umloAZ ZZ9£ Siaau ng IiniO •"a SINVIT1SNOD TAID oooz `-Pz kririf vNiriozlvo HIHOM `,LSaxod EIxVM VZVrld 'IVZIdVO dVW ZDVdWI S(INVIIZdM ZJVdWl ?IdddfIR NVIHVdIH NISVS ZIdAIH dSfIRN «T « Vd?IV ZDVdWI \ ..?0z._- trout j\le''rar>?ag - \`\\ I \\\ \ 1 i ZOE6L i , lb3S _ LZ 'A3A\ m 3Hl 1`d 713 3Hl ,l8 G313VdWl (13NNdHO NV23 AiS) SONVIAM 30 '.J'S -V6Z`C V `0310VdV41 8333f18 NVI2IV 8 ?J 3A18 3sn3N Z 3NOZ d0 '.J'S 909'C V l 3NOZ AO '3'S 9W9 SI 3i13H1 oz -0 \ \ ?• , \ \` `\ oG, \ ` \\ \ O \ \ \ \ O - V 20 \ J ?: + V) \ `? \ w 0 , 40. ao 4 s \ \ 1 I+'" \ \ Z Z ;A 4A lOddNl SGNV?13M JO '3'S V6Z`2 X 83dd(18 N`dlilb'dR?? .. ?' ^? ?'?j? 1yISb8 213 18 3sn3N ?OZ ----USX C, m Hw ss x3 a Y t - 1 \ 6o \ \ lO`ddMI Z 3NOZ \ J0 '.J'S' 99L L \3NIl ),i83d6 8d \ \ `?, \ \ \ \ \ 1 .\ NNV@ d0 \ \ + \ \ \ 3a1S \ i .6c) \ \ \ i \ \ \ to \ \ •? 1 \ 1 .` \ --___ \ Q1r? ?.? 1 1 \ \ ?? `?? oc ?vbe AO apt 111 ?; N, roc C \ f I 1 \ \\ N Z? N tea. 2 % \ i \\ ? ?\\ TON d N ? +I I 1 • .I, I 1 ? ?\ I \\\ I i I I I I N Ap F33 --- ------------ ------------ --- ------------------ ------- -- ---------------- ----------- - PROPERTY LINE ---- ---- .... 01F -w.EIR 1909111 N RIPAR IAN'BUFFER .............................. ` \ ? .....» ....... ZONE 2 .. 1 I `\ . ......................................... 1 .. I , ' ,11 .................... . • ......... I I ? I I ' - - ? 30' N?USE RIVER BASIN \ RIPARIAN, BUFFER -? -_ . _ , 1??a . _ -77 _ ONE 1 TOP OF BAND. - - TREO -FB117VK -\ -? - . - - . . EXISTING SS XS SEWERLINE - --- .................. XS i,Lal ? , \ XS \ \ i X \ WETLANDS AREA #2 3p - NEUS - __' __ ?l E \....?.?• i. XS ?oNE I , N BU/ F BASIN _ --' - -. - _ J - _ _ ---- ___\ \ I X 300 20. N _- ELISE RI "-------------- - - - <-- - N RIP V ER' BASIN B N NS . UFFER IO 2 'a S 'a S.F. OF ?ETLANDS IMPACT \ ?? '---'--------- -------1? -`_- _ -- U' DIS rURBANCE LIMIT - '- R TAINING WALL I 320 , \ --------------- \ I (---..-----?_ 0 20 40 ' Scale =;--I inch = 20- ft.' `'\ .,- I- ; THERE IS NO NEUSE RIVER BASIN IMPACT AREA "2" BUFFER ACT A WETLANDS PIMPA TNBY4THE ROETAINING NEUSE RIVER BASIN WALL AND FILL. RIPARIAN BUFFER IMPACT & WETLANDS IMPACT MAP CAPITAL PLAZA WAKE FOREST, NORTH CAROLINA -? A%•iH FARO, ?? . JULY 24, 2000 ? ........,,•.S . = SEAL CIVIL CONSULTANTS INC % 19302 i . Civil Engineers ?';?'?;'•?NGrNE??:•' v?4f;? Land Development Consultants ORGE .?'? - " "' 1??? 3622 Lyckan Parkway Suite 3003 Durham, NC 27707 Phone: (919) 490-1645 Fax: (919) 403-0336 civilengr@aol com L¢-ov . SHEET 3 OF 5