Loading...
HomeMy WebLinkAbout20180049 Ver 2_Buffer Approval Letter_20200205ROY COOPER Covcrrtnr MICHAEL S. REGAN secremry S. DANIEL SMITH Director February 5, 2020 City of Durham Don Greeley 101 City Hall Plaza Durham, NC 27701 NORTH CAROL: NA Environmental Quality DWR # 18-0049 v2 Durham County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (iSA NCAC 02B .0Z33) WITH ADDITIONAL CONDITIONS Eno River Outfall Upgrade Phases I & II -East and West Dear Mr. Greeley: You have our approval for the impacts listed below for the purpose described in your application dated December 10, 2019 and received by the Division of Water Resources (Division) on December 23, 2019. These impacts are covered by the attached Water Quality General Certification Number 4133 the conditions listed below. This certification is associated with the use of Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This 401 Water Quality Certification and Authorization Certificate for DWR #18-0049 v2 replaces the 401 Water Quality Certification and Authorization Certificate for #18-0049 v1 dated April S, 2018. This approval requires you to follow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B .0233(8)] 0North.�Carolina Department ol'Envi�unmental Quality Division of Water Resources D_ E�Raleigh Regionil Office ' 3800 ttarrett Dtive Raleigh, North Cirofina 27609 910 7914200 Eno River Outfall Phase I & 11-East and West DWR #18-0049 v2 401 AND BUFFER APPROVAL Page 2 of 6 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Wetland Site 1 WB: Excavation 0.0004 (acres) 0 (acres) Site 1 WB: Land Clearing 0 (acres) 0.008 (acres) Site 4 WA: Excavation 0.003 (acres) 0 (acres) Site 4 WA: Land Clearing 0 (acres) 0.006 (acres) Site 10 WH: Land Clearing 0 (acres) 0.001(acres) Site 10 WD: Land Clearing 0 (acres) 0.010 (acres) Site 11 WD: Land Clearing 0 (acres) 0.020 (acres) Site 13 WF: Excavation 0.025 (acres) 0 (acres) Site 13 WF: Land Clearing 0 (acres) 0.199 (acres) Site 13 WG: Land Clearing 0 (acres) 0.010 (acres) Site 14 WC: Land Clearing 0 (acres) 0.004 (acres) Stream Site 1: Fill 60 (linear feet) 0 (linear feet) Site 2: Fill 60 (linear feet) 0 (linear feet) Site 3: Fill 60 (linear feet) 1 0 (linear feet) Site 6: Excavation 0 (linear feet) 60 (linear feet) Site 8 SL: Excavation 60 (linear feet) 0 (linear feet) Site 9 SL: Excavation 62 (linear feet) 0 (linear feet) Site 10 SN: Excavation 0 (linear feet) 60 (linear feet) Site 10 SH: Excavation 0 (linear feet) 60 (linear feet) Site 10 51: Excavation 0 (linear feet) 35 (linear feet) Site 11 SL: Excavation 42 (linear feet) 0 (linear feet) Site 12 Sh Excavation 0 (linear feet) 50 (linear feet) Site 12 SK: Excavation 44 (linear feet) 0 (linear feet) Site 14 S5: Excavation 0 (linear feet) 61 (linear feet) Buffers -Zone 1 Site 1-Sewer line 0 (square feet) 3,666 (square feet) Site 2-Sewer Line 0 (square feet) 3,606 (square feet) Site 2-Sewer Line 0 (square feet) 318 (square feet) Site 3-Sewer Line 0 (square feet) 3,694 (square feet) Site 3-Sewer Line 121 (square feet) 1,686 (square feet) Site 4-Sewer Line 3,876 (square feet) 20,344 (square feet) Site 5-Sewer Line 0 (square feet) 1,874 (square feet) Site 5-Sewer Line 387 (square feet) 6,102 (square feet) Site 6-Sewer Line 0 (square feet) 3,711(square feet) Site 8-Sewer Line 0 (square feet) 3,660 (square feet Eno River Outfall Phase I & II -East and West DWR #18-0049 Q 401 AND BUFFER APPROVAL Page 3 of 6 Site 8-Sewer Line 237 (square feet) 2,907 (square feet) Site 9-Sewer Line 0 (square feet) 4,036 (square feet) Site 9-Sewer Line 0 (square feet) 4,826 (square feet) Site 11-Sewer Line 0 (square feet) 2.760 (square feet) Site 12-Sewer Line 0 (square feet) 5,235 (square feet) Site 12-Sewer Line 0 (square feet) 872 (square feet) Site 13-Sewer Line 0 (square feet) 423 (square feet) Site 14-Sewer Line 0 (square feet) 5,759 (square feet) Site 15-Sewer Line 0 (square feet) 327 (square feet) Site 16-Sewer Line 0 (square feet) 492 (square feet) Site 16-Sewer Line 0 (square feet) 4,084 (square feet) Buffers -Zone 2 Site 1-Sewer Line 8,236 (square feet) 2,454 (square feet) Site 2-Sewer Line 884 (square feet) 2,420 (square feet) Site 3-Sewer Line 12,734 (square feet) 2,605 (square feet) Site 4-Sewer Line 36,377 (square feet) 0 (square feet) Site 5-Sewer Line 16,016 (square feet) 987 (square feet) Site 6-Sewer Line 0 (square feet) 2,489 (square feet) Site 7-Sewer Line 928 (square feet) 0 (square feet) Site 8-Sewer Line 9,095 (square feet) 2,442 (square feet) Site 9-Sewer Line 10,383 (square feet) 3,017 (square feet) Site 10-Sewer Line 3,562 (square feet) 0 (square feet) Site 11-Sewer Line 1,517 (square feet) 1,322 (square feet) Site 12-Sewer Line 3,525 (square feet) 2,063 (square feet) Site 13-Sewer Line 509 (square feet) 0 (square feet) Site 14-Sewer Line 7,273 (square feet) 0 (square feet) Site 15-Sewer Line 1,557 (square feet) 0 (square feet) Site 16-Sewer Line 4,116 (square feet) 204 (square feet) 2. Diffuse Flow All stormwater must be directed and maintained as diffuse flow at non -erosive velocities through the protected stream buffers such that it will not re -concentrate before discharging into a stream. [15A NCAC 02H .0506(b)(5)] 3. The City of Durham shall submit to DWR final dewatering plans with a detailed analysis or construction sequence of how work will be conducted in the dry. The plans should include details showing how turbidity curtains or other sediment barriers will be installed where the open-cut/excavation method will be utilized. This dewatering plan must to be approved by DWR before any impacts authorized in this certification occur. [15A NCAC 02H .507 (c)] Eno River Outfall Phase I & II -East and West DWR #18-0049 v2 401 AND BUFFER APPROVAL Page 4 of 6 4. The City of Durham shall schedule and conduct a pre -construction meeting with the construction contractors and DWR to review the conditions and requirements of the respective certification for clarity and understanding before any impacts authorized in this certification occur. Please contact Stephanie Goss at 919-791-4256 to schedule the pre - construction meeting. [15A NCAC 02H .0502(e) and .507(c)] 5. Compensatory Mitigation Using a Private Mitigation Bank Compensatory Mitigation Bank Sponsor River & Sub -basin Number Required EBX Buffer 15,829.14 (square feet) 03020201 and in the Falls Lake Paid on June 5, 2018 Watershed 6. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 026.0200] including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. 7. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 8. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] Eno River Outfall Phase I & II -East and West DWR #18-0049 v2 401 AND BUFFER APPROVAL Page S of 6 This approval and its conditions are final and binding unless contested. (G.S. 143-215.51 This Certification and Buffer Authorization can be contested as provided in General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR —401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR —401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 Eno River Outfall Phase I & II -East and West DWR #18-0049 v2 401 AND BUFFER APPROVAL Page 6 of 6 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse River Riparian Buffer Protection Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or stephanie.goss ncdenr.eov if you have any questions or concerns. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Enclosure: GC 4133 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, Ste. 105; Wake Forest, NC 27597 DWR RRO 401 file DWR 401 & Buffer Permitting Unit via Laserfiche Bob Lepsic via e-mail at blepsic@sepiinc.com