Loading...
HomeMy WebLinkAboutWQ0041458_Application_20200205d C�ly State of North Carolina �V Department of Environmental Quality ®3 �d � 2020 Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: J (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Harnett Regional Water (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Steve Ward per 15A NCAC 02T ,0106(b) Title: Director 4. Applicant's mailing address: PO Box 1119 City: Lillington State: NC Zip: 27546-_ 5. Applicant's contact information: Phone number: 910 893-7575 Email Address: swardehatnett.org H. PROJECT INFORMATION: 1. Project name: Campbell Pointe Townhomes Phases 5-6 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.421304' Longitude:-78.733585' 5. Parcel ID (if applicable): 110670005404 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Andrew P. Mericle, PE License Number: 041595 Firm: Draper Aden Associates Mailing address: 114 Edinburgh South Drive, Suite 200 City: Cary State: NC Zip: 27511- Phone number: 9l9 827-0864 Email Address: americle@daa.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional WWI? Owner Name: Harnett County Permit Number: NHW WTP NCO021636 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W OOQ 40040 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS000166 Owner Name(s): Hamett County FORM: ETA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes [—]No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes [—]No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial Industrial (See 15A NCAC 02T .0103(20)) 3,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? []Yes ®No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow',' No. of Units Flow Townhomes (per bedroom) 120 gal/day 111 13,320 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gall GPD Total 13,320 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 13320 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: ETA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1202 SDR 35 PVC 8 225 C900 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDM 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(i)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (g) ➢ 15A NCAC 02T.0305( contains minimum separations that shall be provided for sewers stems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage ➢ If noncompliance with 02T.0305() or (g). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ®N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ®Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: I, AetA'(CS4...1- "Erica attest that this application for (Professional Engineer's name from Application Item Ill.l.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): attest that this application for name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 9 Signature: Date: FORM: FTA 04-16 Page 5 of 5 417" Draper Aden Associates Engineenng , Surveying Eavb'nnmentaf Services 114 Edinburgh South Drive Suite 200 Cary, North Carolina 27511 919.827.0864 www.daa.com January 29, 2020 NCDEQ - Division of Water Resources Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301-5095 RE: Campbell Pointe Townhomes PH 5 & 6 Draper Aden Associates Project No. R14245N-05 Project Narrative: This project is the 5" and 6tn phases of a multifamily townhome community consisting of 83 units and a total of 111 bedrooms. All gravity sewer mains, with the exception of the main connecting SSMH 12 and SSMH 6, are SDR-35 PVC. The main from SSMH 12 and SSMH 6 will be C-900 PVC. The total length of gravity main to be installed includes 1202 LF of 8" SDR-35 PVC and 225 LF of 8" C900 PVC. Each unit within the proposed phases of development will be served by a 4" SDR-35 service lateral. The termination point for this phase of the development and permit will be "EXISTING SSMH 4", shown on the previously submitted asbuilt plans for Phase 4, and constructed under permit number W00040040. From this point, the system continues on towards the main entrance of the development, constructed under permit number W00038236. No additional future phases of the development are anticipated at this time. Please find the following items included with this submission: • $480 Application Fee • FTA 04-16: Fast Track Application for Gravity Sewer Extension (x2) • USE 4-16: Downstream Flow Tracking Form (x2) • USGS Exhibit Map (x2) • Street Level Vicinity Map (x2) Sincerely, Draper Aden s o i tes C. Y T rus Cla ton,VJr.,PE Y Regional Growth Leader Principal cc: Andrew Mericle, DAA Alex Amavizca, DAA Blackybwg • Charlottesville • Manassas • Newport Netis • Rie mtond • firginia Beoch Fgvetteville • Raleigh State of North Carolina Department of Environmental Quality Division of Water Resources F,14,Mni, „r Nra ie , ,Ef x, , ,* Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested: Campbell Pointe Townhomes Phases 5-6 More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route oftheproposed wastewaterjlow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NCO021636 All flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 1.172 MGD FV Obligated Flow NYT 0.572 MGD Lillington Obligated Flow NYT 0.113 MGD HC Obligated Flow NYT 0.339 MGD Angier Obligated Flow NYT 0.148 MGD e. WWTP facility's actual avg. flow 4.617 MGD FV Actual Flow 1.314 MGD Lillington Actual Flow 0.723 MGD HC Actual Flow 1.978 MGD Angier Actual Flow 0.602 MGD f. Total flow for this specific request 0.013 MGD g. Total actual and obligated flows to the facility 5.802 MGD FV Actual Avg. + Obligated Flow 1.886 MGD Lillington Actual Avg. + Obligated Flow 0.836 MGD HC Actual Avg. + Obligated Flow 2.330 MGD Angier Actual + Obligated Flow 0.750 MGD h. Percent of permitted flow used 77.36% Page 1 of 4 FTSE 06-13 i . II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pfl, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** 10B 2.020 0.808 0.538 0.156 0.694 0.114 SLS 120 14.4 5.76 2.755 1.013 3.768 1.992 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Hamett Regional W WTP Downstream Permit Number: NCO021636 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance ohthis w"ewater flow. Signing Official Signature II.3/-I3 Date Page 2 of 4 FTSE 06-13 10/9/2014 Google Maps qp 1136-1178 Main St tltl u Lillington, NC 27546 r 35.420691,-78.722404 la O 1�! Gtt 4,11A, cAoA Community ChOrch mmityChWcs j. 1532 1616 r plt U1 `. i � 90... Gte9oN 1532 & '! OCollins Park Apartments via a, C a SITE d 4qh)CVS Pharmacad y) Photo 1! 9°2 1532 2 1521 �nde//(n j �w�`yl C aSlaJ\�.Ot. ✓E r . Clet, PryCir 1 n 1592 tszl 1 d •ei f Hd ]r McKoY i1 , Chick fil-!1 11 ' Dory L" i - 2002 BurtSt" �+ KiveffRd ✓ ,!r sVA4 s 0 1 .. r Buies Creek . v�Elementary School /ve -_ K ItJRtl OWN Vol', J C4 1532 j ..GC: Map data 02014 Gocgle 500ft https:/Aw .google.com/maps/@35.4203678,-78.7312878,16z 1/1 Draper Aden Ass * Engineering • Surveying • EnvironmetOEWWR 0 3 2020 Letter of Transmittal To: NCDEQ - Division of Water Resources WQe 1.28.20 Water Quality Section — =A T�TI ), y IF P¢Q1?rNu#PLbrpr: R14245N-05 Fayetteville Regional Office Project Name: Campbell Pointe 225 Green Street, Suite 714 Townhomes Phases 5 & 6 Fayetteville, NC 28301-5095 Phone No. 919.826.0864 cc: File We are sending you via: ❑ UPS ❑ USPS ® Hand Delivered ❑ ® Attached ❑ Under separate cover ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Specifications ❑ Samples ❑ Copy of letter ❑ Plats ❑ Proposal ❑ Change Order ❑ Report ❑ Other: Copies Date No. Description 2 12.31.19 1 Fast Track Application for Gravity Sewer Extension (FTA 04-16) 2 12.31.19 2 Downstream Flow Tracking Form (FTSE 4-16) 1 8.21.19 3 $480 Application Fee 2 1.28.20 4 USGS Exhibit Map 2 1.28.20 5 Street Level Vicinity Map These are transmitted as checked below: ® For approval ❑ Returned for corrections ❑ Resubmit copies for review ❑ For your use ❑ Submit copies for distribution ❑ As requested ❑ Return corrected prints ® For review and comment ❑ Prints returned after loan to us ❑ FOR BIDS DUE: ❑ Other: REMARKS: Please contact me directly (919-827-0876; aamavizca@daa.com) should you have any immediate questions, concerns, or if you determine anything is missing and I will fix it as soon as possible. Thank you, Printed Name: Alex C. Amavizca, EIT Signature: Title: Project Engineer P:\R14\200\R14245N\R74245N-05\CORRESP\20 0128 -State Sewer Submission\LOT 20 0128 - NCDEQ DW R Sewer.docx 114 Edinburgh South Drive • Suite 200 • Cary, NC • 27511 • 919.827.0864 • www.daa.com Blacksburg • Charlottesville • Manassas • Newport News • Richmond • Virginia Beach Fayetteville State of North Carolina DEQ/IDVVR Department of Environmental Quality D,W.ftH ..' i L d 0 3 2020 Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION "61vislon of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Harnett Regional Water (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ® State/County ❑ Municipal 3. Signature authority's name: Steve Ward per 15A NCAC 02T .0106(b) Title: Director 4. Applicant's mailing address: PO Box 1119 City: Lillington State: NC Zip: 27546- 5. Applicant's contact information: Phone number: (910) 893-7575 Email Address: sward(phamett.org II. PROJECT INFORMATION: 1. Project name: Campbell Pointe Townhomes Phases 5-6 2. Application/Project status: ® Proposed (New Permit) ❑ Privately -Owned Public Utility ❑ Other FEB 0 3 2020 y.` 00 � ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000_ 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.421304' Longitude:-78.733585° 5. Parcel ID (if applicable): 110670005404 Select Bank and Trust 005334 Winston 104proup LLC - as tzssisat - Corjstructiori (Ycct UFZSnieV- check Fraud 2323 Keith Hills Road Protecticnfor8eemew Lillinqton, NC 27546 8/21/2019 $ `480.00 0 DOLLARS e MP FORM: FTA 04-16 Page 1 of 5 R FED 0 0 20°0 y; vv� Permit Number WQ0041468 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer stephanie.zono Coastal SWRule Permitted Flow 13,320 Facility Central Files: APS _ SWP 2/4/2020 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region Campbell Pointe Townhomes Phases 5-6 Minor Fayetteville Location Address County Harnett Facility Contact Affiliation Owner Owner Name Owner Type Harnett Regional Water Non -Government Owner Affiliation Steve Ward Director Interim Public Utilities of PO Box 1119 DateslEvents Lillington NC 27546111 Scheduled Ong Issue App Received Draft Initiated Issuance 2/4/2020 2/3/2020 Regulated Activities Wastewater collection Outfall Public Notice Issue Effective Expiration 2/4/2020 2/4/2020 Requested/Received Events Additional information requested Additional information received Waterbody Name Streamindex Number Current Class Subbasin