HomeMy WebLinkAboutNCG120108_SW Inspection with Coverletter_20200205 ROY COOPER
IA
Gm ernnr t X. �o
MICHAEL S.REGANr�.
Secretary rr aw,fi"
S.DANIEL SMITH hORTM CAROLINA
Dirt700)' Environmental Quality
February 5, 2020
Edgecombe County Landfill
Attn: Larry Moore
2872 Colonial Road
Tarboro, North Carolina 27886
Subject: COMPLIANCE EVALUATION INSPECTION
Edgecombe County Landfill
Certificate of Coverage-NCG0120108
NPDES Stormwater General Perm it-NCG120000
Edgecombe County
Mr. Moore:
On January 24, 2020 a site inspection was conducted for the Edgecombe County Landfill facility located
at the 2872 Colonial Road, Edgecombe County, North Carolina. A copy of the Compliance Inspection
Report is enclosed for your review. The site visit and file review revealed that the subject facility is
covered by NPDES Stormwater General Permit-NCG120000, Certificate of Coverage-NCG120108.
Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated
as Jerrys Creek, a Class QNSW waterbody in the Tar-Pamlico River Basin.
As a result of the inspection, the facility was found not to be in comp_iance with the conditions of the
NCG120000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments
and observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff has any
questions, comments, or needs assistance with understanding any aspect of your permit, please contact
me at (919) 791-4200 or by e-mail at Thad.v_alentine(@ncdenr.go_v.
Sincerely,
`14(�l<'1y4_S LAL"
Thad Valentine
Environmental Senior Specialist
��\ Ntwth cw of ws Elr Pmuiiw of Ltnirw,wn Tgal Qti:i'it;' DMAV)n of Enc:u; �fincr�l and L�nr:R:s,tu:c's
�� 51!�:urtttS�I,,hur:�tr'rct I+i1�1.1.t315[•tv,r.cE:cucr i?ai[ycjh `:•;rt'tl:.ir.rlin: ?il¢%'d IuIZ
\ �� W?70,11:f)n
Compliance Inspection Report
Permit: NCG120108 Effective: 1110108 Expiration: 05/31/21 Owner: Edgecombe County
SOC: Effective: Expiration: Facility: Edgecombe County landfill
County: Edgecombe 2872 Colonial Rd
Region: Raleigh
Tarboro NC 27886
Contact Person: Larry Moore Title: Phone: 252-827-4253
Directions to Facility:
from us hwy 64 eastbound,take exit 485 for us hwy 258 turn right onto 258 south.travel 1.7 mites.turn slight left onto cotonial rd.
travel 2 9 miles,turn right onto landfill access drive.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 01/24/2020 Entry Time: 09-30AM Exit Time: 12:30PM
Primary Inspector: Thaddeus W Valentine Phone:
Secondary Inspector(s):
Natalie Norberg Phone:
Reason for Inspection: Routine inspection Type: Compliance Evaluation
Permit Inspection Type: Landfill Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCG120108 Owner-Facility:Edgecombe County
Inspection Date: 01/24/2020 Inspection Type,.Compliance Evaluation Reason for Visit: Routine
Inspection Summary
I visited the site to review the facility for a Representative Outfall Assessment,but the permit has not been implemented and
there are no samples to compare. Please implement your permit requirements and identify all your outfalls for sampling.A
Notice of Violation will be drafted and there will be strict requirements for developing and executing the conditions of that
permit
Page 2 of 3
Permit: NCG120108 Owner-Facility:Edgecombe County
Inspection hate: 01/24/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ 0 ❑
#Does the Plan include a General Location(USGS)map? ❑ ❑ E ❑
#Does the Plan Include a"Narrative Description of Practices"? ❑ ❑ 0 ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ E ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ 0 ❑
#Does the Plan include a BMP summary? ❑ ❑ 0 ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? ❑ ❑ 0 ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ 0 ❑
#Does the facility provide and document Employee Training? ❑ ❑ N ❑
#Does the Plan include a list of Responsible Party(s)? ❑ ❑ 0 ❑
#Is the Plan reviewed and updated annually? ❑ ❑ E ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ E ❑
Has the Stormwaler Pollution Prevention Plan been implemented? ❑ E ❑ ❑
Comment; This portion not required In the General stormwater permit
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑
Comment: No monitoring has been done
Analytical Monitoring Yes-No-NA-NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ E 1111
Comment: No analytical samples have been taken
Permit and outfalls
Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ 0 ❑ ❑
#If the facility has representative oulfall status,is it properly documented by the Division? ❑ 0 ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑
Comment: The facility has the COC, but where all there outfalls_were couldn't be determined
Page 3 of 3