Loading...
HomeMy WebLinkAbout20140723_RE B-4722B - Moratorium Extension_20200204 Carpenter,Kristi From:Ward, Garcy Sent:Tuesday, February 04, 2020 3:13 PM To:Mcmannen, Brad T Cc:Lane, Stephen; Steffens, Thomas A SAW; Johnson, Jay B Subject:RE: B-4722B - Moratorium Extension Brad, st DWR approves of the proposed work being done during the moratorium until March 31 provided the work area is contained within turbidity curtains as stipulated by DMF. This e-mail satisfies Condition 5 of Water Quality Certification No. 3891 issued to the Department of Transportation on August 15, 2014. Let me know if you have any questions. Garcy Ward Environmental Specialist NC Divison of Water Resources (252)948-3917 From: Mcmannen, Brad T Sent: Tuesday, January 28, 2020 1:43 PM To: Johnson, Jay B <jbjohnson@ncdot.gov>; Ward, Garcy <garcy.ward@ncdenr.gov>; Steffens, Thomas A SAW (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Lane, Stephen <stephen.lane@ncdenr.gov>; Blankenship, Andrew <ablankenship@ncdot.gov> Cc: Pittman, Elbert W <ewpittman@ncdot.gov> Subject: RE: B-4722B - Moratorium Extension See attached plan sheets showing the work that has been completed and what is remaining. Currently we have 41 spans of the 47 removed and 17 bents of the 46 removed. The contractor can remove between 3 and 9 bents per week based on rough weather or perfect weather conditions with piles precut. Therefore, let’s assume the contractor can average 6 bents a week, it will take another 6 weeks for bent removal. In addition, the 6 spans (deck and rail) will take about 3 weeks to remove. We would anticipated being able to complete bridge demo by March 31, 2020. Thank you, Brad McMannen, PE Resident Engineer New Bern Construction N.C Department of Transportation 252 649-6520 Office 252 649-6524 Main 252 514 4761 Fax btmcmannen@ncdot.gov 209 S. Glenburnie Road New Bern, NC 28560 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Mcmannen, Brad T Sent: Monday, January 27, 2020 10:39 AM To: Johnson, Jay B <jbjohnson@ncdot.gov>; Ward, Garcy <garcy.ward@ncdenr.gov>; Steffens, Thomas A SAW (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Lane, Stephen <stephen.lane@ncdenr.gov>; Blankenship, Andrew <ablankenship@ncdot.gov> Cc: Pittman, Elbert W <ewpittman@ncdot.gov> Subject: B-4722B - Moratorium Extension All, The NCDOT would like to request an extension to the moratorium for B-4722B North River. Currently the moratorium as listed in the permits doesn’t allow in water work between Feb. 15 and September 30. We are requesting an allowance to March 31 to perform and complete in water work of removal of all existing bridge structure and existing causeway as shown in the contract/permit drawings. The contractor has had a few set backs at no fault of their own. The utility company Conterra (Broadplex) did not complete the switch over to their new fiber line until 90 days after traffic was placed on the new structure, thus delaying the date Carolina Bridge could begin demo. The location of the North River bridge is prone to strong winds and rough water, slowing the demo for safety of the workers. In addition, new piles not shown in the contract plans have been found under the existing causeway that will have to be removed increasing the amount of work. If you have any questions, please let me know. Thank you, Brad McMannen, PE Resident Engineerjbj New Bern Construction N.C Department of Transportation 252 649-6520 Office 252 649-6524 Main 252 514 4761 Fax btmcmannen@ncdot.gov 209 S. Glenburnie Road New Bern, NC 28560 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3