HomeMy WebLinkAbout20200187 Ver 1_SF-050001_HYD_EC_20200204.■`n
0
a
min
_ Clearing and Gruhhing
Phase
Final Phase
Both Phases
GRAPHIC SCALE
50 25 0 50 100
PLANS
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH
THE APPLICABLE REGULATIONS SET FORTH BY THE NCG-010000
GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019
AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES.
DIVISION OF HIGHWAYS
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
A VERY COUNTY
LOCATION: BRIDGE No. 050001 OVER LINVILLE RIVER
ON SR 1349 (RUFFIN ST.)
TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES AND
RESURFACING
NC GRID 4
O BRIDGE NO. 050001
83y6
C
RK K
Prepared In Me Office of.
RUMMEL, KLEPPER & KAHL, LLP
7609
RiC ff
R 88I8-NC 5 1-444E58 OR 9119I8878295
Desl9ned by.
Audrey B. Burnette, P.E. 3081
NAME LEVEL III CERTIFICATION NO.
Stan
DI'ATB PK.-'UtH. .E., NQ
SHHHT
-
-
SHEETS
N.C.
17.BP.11.R.175
I EN
1RAU PIUAM
P.A.M Ift
DEIWRI pH
EROSION
AND SEDIMENT CONTROL MEASURES
SLA
1630.03
Temporary Silt Ditch _ - - - - - - _
-
1630.05
Temporary ➢Dtrerstom _ _ _ _ _ _ _ _ _ _
1605.01
Temporary Silt Fence _ _ _ _ _ _ _ _
1606.01
Special Sediment Control Fence
1622.01
Temporary Berms and Slope Drain-_ _ _ _
_ _ _ ~
1630.02
Silt Basin Type B-----------
��
1633.01
Temporary Rock Silt Check Type -A- _
_ _ _ _
Temporary Rook Silt Check Type -A with
Matting and Polyacry➢amide (PAMI _ _
_ _ _ _
1633.02
Temporary bock Silt Check Type-B_ _
_ _'
Wattle //Coir Fiber Wattle_ _ _ _ _ _ _ _
_ _ _
Wifb /.4.rr Fiber Wattle
with Pe➢yacrylamidio cPAMa_ _ _ _ _ _ _
_ _ _ _ _ _
1634.01
Temporary Rock Sediment Dam Type -A-
_ _ _ CM
16U.02
Temporary Rock Sediment Dam Type-B_
-:D-
1635.01
Rock Pipe Inlet Sedimcmt Trap Type -A-
U
1635.02
Rock Pipe Inlet Sediment Trap Type-B-
- ()
1630.04
Sti➢lingBe-i-------------- -
- - --
®
1630.06
Special Stilling Basin_ _ _ _ _ _ _ _ _ _ _
.®
Rock Inlet Sediment Trap:
1632.01
TypeA------------------
A®
1632.02
TypeB------------ - - -
- -- B®
1632.03
Type - - - -------- - - -
- -- C®
Skimmer Basin- - - - - - - - - - - - - -
- - -
Tiered Skimmer Basin- - - - - - - - - -
dnfi➢tratiom Basin_ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _[�E@`
THIS PROJECT CONTAINS
EROSION CONTROL PLANS
FOR CLEARING AND
GRUBBING PHASE OF
CONSTRUCTION.
THIS PROJECT HAS
BEEN DESIGNED TO
SENSITIVE WATERSHED
STANDARDS.
ENVIRONMENTALLY
SENSITIVE AREA(S) EXIST
ON THIS PROJECT
Refer To E. C. Special Provisions
for Special Considerations.
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
rewison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
1604.01 Railroad Erosion Control Detail
1632.01 Rock Inlet Sediment Trap Type A
1605.01 Temporary Silt Fence
1632.02 Rock Inlet Sediment Trap Type B
1606.01 Special Sediment Control Fence
1632.03 Rock Inlet Sediment Trap Type C
1607.01 Gravel Construction Entrance
1633.01 Temporary Rock Silt Check Type A
1622.01 Temporary Berms and Slope Drains
1633.02 Temporary Rock Silt Check Type B
1630.01 Riser Basin
1634.01 Temporary Rock Sediment Dam Type A
1630.02 Silt Basin Type B
1634.02 Temporary Rock Sediment Dam Type B
1630.03 Temporary Silt Ditch
1635.01 Rock Pipe Inlet Sediment Trap Type A
1630.04 Stilling Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1630.05 Temporary Diversion
1640.01 Coir Fiber Baffle
1630.06 Special Stilling Basin
1645.01 Temporary Stream Crossing
1631.01 Matting Installation
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
EXCELSIOR
NOTES:
MATTING
FLOW
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
B�-Ill
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
SEDIMENT CONTROL STONE
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
�o
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
A
A
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION OBTAIN
°��°moo, o O o OoD�O�D
11
A SOIL SAMPLE FROM PROJECT LOCATION AND FROM OFFSITE
'
D D O� D
J
MATERIAL AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
°�OJ
°o
OOD O OCT
0e
D
���°��� �� ��
o Oo OOD �O
TO BE APPLIED TO EACH ROCK SILT CHECK.
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
STRUCTURAL STONE
,
L
1' MIN c3 0
EXCELSIOR
MATTING
IaA_1►
2/3 CHANNEL
WIDTH
SECTION A -A
See Inset A
INSET A
CLASS B STONE
1' MIN
0 0 0
H = 2' MIN 71 Lo 6
SECTION B-B
12"
EXCELSIOR
MATTING
CLASS B STONE
NOT TO SCALE
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
MATTING FOR EROSION CONTROL EXCELSIOR MATTING FOR
CONST LINE FROM TO SIDE T I MAT ( Y)
SHEET NO. STATION STATION ES E S
li -L - / / t 75 / 2� 25 e/G/-/r 65
EROSION CONTROL
CONST LINE FROM TO SIDE ESTIMATE (SY)
SHEET NO. STATION STATION
OF HIGHWAYS
NOI`
SOIL STABIL.IZATION
TIMEFRAMES
SITE
DESCRIFTION
STABILIZATION TIME
TIMEFRAME EXCEFTIONS
PERIMETER DIKES,
SWALES, DITCHES AND SLOPES
7
DAYS
NONE
HIGH QUALITY WATER (HOW) ZONES
7
DAYS
NONE
SLOPES STEEPER
THAN 301
7
DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2a19 14 DAYS ARE ALLOWED.
SLOPES 3o1OR FLATTER
14
DAYS
7 DAYS FOR SLOPES GREATER THAN 50'IN
LENGTH.
ALL OTHER AREAS
WITH SLOPES FLATTER THAN 401
14
DAYS
NONE9 EXCEPT FOR PERIMETERS AND HOW ZONESo
0I-1
4;
rZA/ZZME
J
O 1
:NTALYY SENSITIVE ARE
:T SPECIAL PROVISION
0
on
CLEARING AND GRUBBING
EROSION CONTROL FOR
CONSTRUCTION SHEET 4
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
DRAINAGE OUTLETS.
UTILIZE SPECIAL STILLING
BASIN(S) WHERE APPLICABLE
' PA
n
woof
OU L VILLE RESORTS, INC.
DB 0 PG 85
� Z 14",P V-�"/ ,BPIF
RIP
,P AT EMBANKMENT w 1J
SEE DETAIL D N SSB [
BR
DETAIL
.LE RESORTS, INC.
)B 40 PG 85 , ✓ \
2 TONS CLASS B RIP RAP,
W/7 SY GEOFAB MATTI G ;
PERVIOUS WORK PAD
DIKE
BRIDGE SKETCH
0
P
36'wO&
X 72'ww I
�XN ' `
'MARION . CALHOUN
I DB 12 P110281AGS
UNKNOWN
rA" i i OWNER BST
O I D 1
A 1
ti
i
I ,
I GR
E,_- �> !A THOM S-S:-SHEI
ABI IL S. SHEE
— CP — 36_7 PG 2(
49 RUFF/A
O �
17BPJI.RJ75 I EC-04/CONST.
� D—}— SHEET NO.
8�20RN/ ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
2
to
o
N
I �®9
N
3 m
ti
CONC
X 48' wD 3 PROPERTY LINE = EXISTING R/w
------- PLANTER —
rs-------- -_- 5 GR
---C _
Sr ---_-.� 12_
m
w
ROPERTY LINE XIS TIN
40
STANDARD BASE DITC OIL
SEE ETAIL C
JENNI ER F. EVE HART
D 317 PG 7 8
P 37 PG 7
V
0.09 A& t/- TO
- _ SR 1350
F 48' wD R°�
,
BAR
REB
DAVID R. DEAL
_ JANICE S. DEAL
DB 462 PG 66
PB 37 PG 57
O .
o .
REBAR
N 02.26'S3• E
88.40' —
N 02°21'1a-
88.5 RKliic�
P:(919)$78-9560
900 RdgeBeld Ddve Suite 3501 Raleigh, Nodh Carolina
NC License No. F-0112
Engineers I Conshuclion Managers I Planners I Sdemil
vRw kk.com
PAVEMENT REMOVAL FOR PROFILE SEE SHT. 5
Responsive People I Creative Solutions
60.00'
I
A If
' I 1
1
I
IN
WOODS — R EM
S T
LINVI LE RESORTS, INC. I
B 40 PG 85
/ PROJECT REFERENCE NO. SHEET NO.
17BPJIRJ75 EC-051CONST.
I SHEET NO.
NAD 83 20�. ROADWAY DESIGN HYDRAULICS
.y ENGINEER ENGINEER
Ii.
UTILIZE SPECIAL STILLING
BASIN(S) WHERE APPLICABLE
COIR FIBER
MATTI N G
.LE RESORTS, INC.
DB 40 PG 85
--+-- POE
RIPRAP AT EMIIBANKME
SEE DETATC-D—
I 36•WD&
X Tz•ww I
WOODS
X
° I uuJ I 'MARION I P. CALI
DB 312 PG
m t
m t
I
REBAR
I
se /
i
POE
�PDEKETAAIN TI-
AE
12•RCP C=J
LIN= R/W
ib I III ZU9U GR
49 RUFF/ -- _ —
CR � SR /310
50
F '46•WO
\ \
PROPERTY
�\ LINE =EXISTING R/W
5' A 4Q REBAR
o
)IDS n
A
E�
m STANDEARD ITCHSOIL
F
E DEBASE TAIL C
DAVID R. DEAL
RIPRAP AT EMBANKMENT
DE-40
LATERAL BASE DITCH, ?
BA DITCH
JENNIFER F, EVERHART
JANICE S. DEAL
SEE DETAIL D
SEE DETAIL B o
/CLASS B R RAP
B TONS CLASS B RIP RAP
pg 317 PG T68
-
DB 462 PG 66
SEE DETAIL
W/21 SY GEOFAB MATT
PB 37 PG 57
PB 37 PG 57
INVILLE F«SORT C.
DB 40 PG ✓
40
I
2 TO CLASS B RIP RAP
I
W/7 GEOFAB MATTING
\
IMPERVIOUS DIKE
REMOVE AFTER BRIDGE
APPROACH FILL IS
STABILIZED
BRIDGE SKETCH
H SLAB BEGIN BRIDGE
TYPE -III
��
i�
SHOMIDURVE
b
� p
REBAR
o a
1 O
o b N I W ti o c
N
o b
N
O �
TYPE-UPE-III
L gun wnnnnwnu e-. wn
RK K
PAVEMENT REMOVAL
P:(919)878 9560
900 Ridgefield Drive Suite 350I Raleigh, North Carolina 2:
NC License No. F-0112
EngineersI Construction Mangers) Planners Scientists
rkk.enm
FOR PROFILE SEE SHT. 5 w
PLANTING DETAILS
SEEDLING / LINER BAREROOT PLANTING DETAIL
HEALING IN
1. Locate a healing -in site in a shady, well
protected area.
2. Excavate a flat bottom trench
12 inches deep and provide drainage.
3. Backfill the trench with 2 inches well
rotted sawdust. Place a 2 inch layer of
well rotted sawdust at a sloping angle
at one end of the trench.
4. Place a single layer of plants
against the sloping end so that
the root collar is at ground level.
5. Place a 2 inch layer of well rotted
sawdust over the roots maintaining
a sloping angle.
6. Repeat layers of plants and sawdust
as necessary and water thoroughly.
DIBBLE PLANTING METHOD
USING THE KBC PLANTING BAR
1. Insert planting bar
as shown and pull handle
toward planter.
I
4. Pull handle of bar
toward planter, firming
soil at bottom.
2. Remove planting bar
and place seedling at
correct depth.
5. Push handle forward
firming soil at top.
PLANTING NOTES:
PLANTING BAG
During planting, seedlings
shall be kept in a moist
canvas bag or similar
container to prevent the
root systems from drying.
KBC PLANTING BAR
Planting bar shall have a
blade with a triangular
cross section, and shall
be 12 inches long,
4 inches wide and
1 inch thick at center.
ROOT PRUNING
All seedlings shall be root
pruned, if necessary, so that
no roots extend more than
10 inches below the
root collar.
3. Insert planting bar
2 inches toward planter
from seedling.
6. Leave compaction
hole open. Water
thoroughly.
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS_
N.C.
17BP.11.R.175
RF 1
STATE PROJ. NO.
F. A. PROD. NO.
DESCRIPTION