HomeMy WebLinkAbout20200187 Ver 1_050001_HYD_PERMITS_COMPLETE_20200204H1 hwa North Carolina Department of Transportation �t
Stot7lYlWiltel Highway Stormwater Program ./mil?
STORMWATER MANAGEMENT PLAN
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 176P.R.11.175 TIP No.: SF-050001 Count ies : Avery Page 1 of 9
General Project Information
WBS Element:
17BP.R.11.175 ITIP Number: SF-050001 Project Type: Bridge Replacement Date: 10/23/2019
NCDOT Contact:
Kevin Hinin - Division Environmental Officer
Contractor / Designer:
RK&K - Audrey Burnette, PE
Address:
801 Statesville Road
North Wilkesboro, 28659
Address:
900 Ridgefield Drive
Suite 350
Raleigh, NC 27609
Phone:
336-903-9129
Phone:
919-878-9560
Email:
k'hinin ncdot. ov
Email:
aburnette rkk.com
City/Town:
Linville
County(ies):
Avery
River Basins :
Catawba I
ICAMA County?
No
Wetlands within Project Limits?
No
Project Description
Project Length (lin. miles or feet):
316 ft. 0.060 mi.) Surrounding Land Use: JRural
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.3 ac.
0.2 ac.
Typical Cross Section Description:
2-lanes at 10' each with 4'-9" paved shoulders that taper down to 3'-0' unpaved
shoulders for the last 200' of the project.
2-lanes at 8' each with 1' unpaved shoulders
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: Year:
I Existing: Year:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
This project replaces existing bridge #01: 2@36', for an overall length of 70'. The bridge consists of timber floor on I -beams with reinforced concrete abutments and pier. The
bridge is 18' wide out -to -out. The proposed bridge will be a 2@45' cored slab for an overall length of 90'. The bridge width is 33' out to out. The proposed bridge will
incorporate a 4' cap with sloped abutment on the right side and a vertical abutment on the left. There is a slight increase in the impervious area of the project, however there is
no significant increase in the discharge from the roadway runoff.
Waterbody Information
Surface Water Body (1): Linville River
NCDWR Stream Index No.:
11-29- 1
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Trout Waters Tr
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
Yes
Deck Drains Discharge Over Buffer? N/A
Dissipator Pads Provided in Buffer? I N/A
Deck Drains Discharge Over Water Body?
No
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
LL.
yo66,
dON
,.tiey Rd4.1
a,
�\ a oe
R`
Ln
°o o'-and-Rd z J
e<e�h S rn
BRIDGE 1 0
a. US-221
m4.1 As St' .
.r 3; Beech St.
NeWWrdNw�y�
Ilk
� a
¢e�
A��
0,6
m �° Fir St -' Gr 0o
c
Grape Q� o
Hi
o Hickory Y
U 1.
00 1,000 2,000 o
-- — Feet,
��
R#fg!(
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 10+75 LT
Bank Stabilization
< 0.01
< 0.01
52
36
2
-L- 10+g5 - 11+30 LT
Work Pad Removal of Interior Bent
0.0
40
3
-L- 11+05 - 11+15 RT
Vork Pad Installation of Interior Ben
< 0.01
24.7
TOTALS*:
< 0.01
0.0
52
101
0
*Rounded totals are sum of actual impacts
NOTES:
Total amount of clearing is 0.14 acres
TEMPORARY WORK PAD DETAIL
NOT TO SCALE
WIDTH OF EXISTING INTERIOR BENT
\.I IP INIYLL ULV
NATURAL GROUND
TOB EL. = 3627.3'
-----------------------
GEOTEXTILE FABRIC
SECTION A -A
FACE OF EXISTING
INTERIOR BENT
i
i
r
CLASS A RIP RAP
i
t. L/'1JJ 11 nll I\/11
SECTION B-B
WORK PAD FOR INSTALLING PROPOSED BRIDGE
= 3623.5'
7
-------------------
CHANNEL BOTTOM
APPROX. EL. = 3622.4'
TEMPORARY WORK PAD DETAIL
NOT TO SCALE
WIDTH OF EXISTING INTERIOR BENT
= 3623.5'
7
\.I IP INIYLL ULV
SECTION C-C
FACE OF EXISTING
INTERIOR BENT
i
i
NATURAL GROUND CLASS A RIP RAP
TOB EL. = 3626.8'
1.0'
X NA
NWS EL.
3623.5'
I
-------------------
CHANNEL BOTTOM
APPROX. EL. = 3622.1'
/ 36" PIPE CLASS II RIP RAP
(LOCATION
GEOTEXTILE FABRIC MAY VARY)
SECTION D-D
WORK PAD FOR R1EMOVAIL, OF ]EXISTING BRIDGE
050001 PROJECT REFERENCE NO. SHEET NO.
178R.11.R.175 2D-1
RW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
PERMIT DRAWING
SHEET 6 OF 8
DRAINAGE DETAILS
DETAIL A DETAIL B DETAIL C
LATERAL BASE DITCH LATERAL BASE DITCH STANDARD BASE DITCH
( Not to Scale) ( Not to Scale)
b (Not to scale)
b
Natural
� Natural
_
Natural Natural
• N Ground 1 1 Ground
Ground % 1'iFi. FIII ?, 1 [Ft. Fill Ground �.
D ti' Slope D D
d Slope
GEOTEXTILE B " p Min. D= 1.5 Ft. Min. D=1.5 Ft.
Min. D=1.5 Ft. +_• B= 2 Ft.
Max. d = 1.5 Ft. b = 5 Ft. B = 2.0 Ft.
'When B is < 6.0' B= 2 Ft. —L— STA 12+73 RT L=53'; s=1.32 %
Type of Liner= CL B Rip —Rap b= 5 Ft. FROM —L— STA. 11+75 TO STA. 12+25 RT BEGIN EL=3,627.7'; END EL=3,628.4'
FROM —L— STA. 11 + 52 TO STA. 11 + 75 RT
DETAIL D
RIP RAP AT EMBANKMENT
( Not to Scale)
10'min.
1.0'nnl , 1:5
GEOTEXTILE
Type of Liner= 40 TONS•CL B Rip -Rap
Geotextile= 85 s
FROM —L— STA. 10 + 72 LT
FROM —L— STA. 10 + 74 RT
FROM —L— STA. 11+28 RT
FROM —L— STA. 11 +45 RT
PLANS PREPARED BY
R�C�C
RUMMEL, KLEPPER & KAHL, LLP
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
NC LICENSE NO. F-0112 • (919) 878-9560
- 050001.- PROJECT REFERENCE NO. SHEET NO.
17BP.N.R.175 4
WETLAND AND SURFACE WATER I M PA PERMIT NAo 8� 7G ROADWAYIGN HY
SHEET NO.DRAUS
\ 11 ENGINEER ENGINEELIC
R
6 PERMIT DRAWING
1 1 1 SHEET 7 OF 9
INSE B
I I NO MORE THAN 50% OF RIVER FLOW
m� ��
' SHALL BE BLOCKED AT ANY ONE TIME. UNLESS ALL COMPLETED
I
ORK PAD 72•WW
x %
INSE A I� zo . �'� -z
I
\ —> N
-ilVILLEIRESORTS, INC. g o
SCALE
\ I PER IOUs 00
\ F SCALE XMARION /P. CALHOUN
_ Ef INSET m DI TEMPORARY SURFACE 1" 40`
WATER IMPACTS I NO TAGS I
UNKNOWN
36 INCH ,� esr
i
` PIPES N OWNER
1 —2 - REBAR
y
W1 I , CCNC \ �
SEE INSET B � 1
I L — PD E
44
�- _
SY TEM - -- DRVAWAY IN / a TYflM,'5-5.-SHEETS ~48, 3 RROPEarr
` �_ � wA uNE = Exl r1Nc Ri
C -
_ _— Rt'TA pNrER
LINV N TEMP RAR S RFACE S r BRA TO DRAIN < SYSiEM '-- -- W
!$BIG IL S SHEETS ! ----- --_
WA E IM AC S � �` I'`RcPrs
n1
�
1 F
RIP �I RIP tAPB---- C
• 0 I; � ag RUFF/M ST �'— -
-
S H
040 GREU ITL-2
o J'' ___—
~
` r
C1 I R Tp
N O
.,
H5
TAIc F �� 48, Wo X NolR'y0
sr
1
--
l0 00 I - TB2cl gsI // i ' �'� w I,
w -� _ \
- _ _
PUE 0 -+ - c c _ � --GKEff N'L� '! F�ROPTy ERLINE_
PERMANENT SURFACE- I I m R=25' �xlsTING R1W �l
WATER IMPACTS II RIP ,� 21' REBAR
�S F W/GEO c 51' - F REBa
I I m oos 40 \
I �
_ '041
^' � ' � STANDARD BASE DIT6f01L
R=2S' // S ��� ��PDE �1 SEE DETAIL C
I - Lu PD E 40 ,J, DAVID R. DEAL
III I m \ i R -111 pRIPRAP AT BAN EN F D LATERAL BASE DITCH, JENNIFER F. EVERHART
cl-JAB ICE S. DEAL
SEE TAIL D SEE DETAI B
�F P E T5 SEE I SET C 8 TONS CLASB RIP RAP c�o
W/21 SY GEOF B, MATTI
f m x 1 2G1 SORTS, INC.
1 40Q
c1d�A�PAHLl
1 GREU ATERAL BASE DITCH DRIVEWAY
/CLASS B RIP RAP
m 1 2 T INS CLASS B RIP PAP r
/ SEE DETAIL A F =
W/ SY GEOFAB MATTING
j IMPERVIOUS
DIKE —
m
SCALE
BRIDGE SKETCH /
BEGIN APPROACH SLAB END BRIDGE I I
0 �^ BEGIN BRIDGE J
o` -L- STAX-F57.84 -L- STAll+6I.09
i 1 0 -L- STA10+68.71 TYPE -III
m
TEMPORARY SURFACE I N SET C. SHOP CURVE
m b WATER IMPACTS TYPE -III
� Io ��� /T �ES REBAR ,
I
w c N If 02' 28-l' N o�'2G'ss° E
°a"�
-L- o aa.ao
I DENOTES IMPACTS IN o N 02*21
w a SURFACE WATER TYPE -III g, RK K END APPROACH SLAB
P: (018) 87&8560
-L - STA. II +71.96 8601 Six Forks Road, Forum 1,Suite 700
JTYPE—ul o Raklgh, Norih Carolina 2767 S39fi0
T DENOTES TEMPORARY PROP.s OULOEH BERM GUT NCLeasallo.Fo„z
;= IMPACTS IN SURFACE WATER -L- sTA.u+7LOI To II+8s.69 LT & HT —Ak. Cooalm wo Managers Rlannars 5cientlas
PAVEMENT REMOVAL FOR PROFILE SEE SHT. 5 Resp... -Paonl, I Greatry SWatlons
LIN
050001 PROJECT REFERENCE NO. SHEET NO.
17BPJl.R.175 1 4
RW SHEET NO.
X WETLAND AND SURFACE WA I M PACTS PERMIT NAD �,n 8 6 ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
O
o I /W
NO MORE THAN 50% OF RIVER FLOW PERMIT DRAWING
SHALL BE BLOCKED AT ANY ONE TIME. SHEET S OF 9
INSE B '
ca l-"\ DOCUMENT NOT CONSIDERED FINAL
, � UNLESS ALL SIGNATURES COMPLETED
I ' '
m x ORK PAD — se°woa
m � _
' ' Tz°ww z
X
INS B ,� A IF o
0
1 rA40' �JVILLE RESORTS, INC. I o o I F
\ I PER IOU00 S uu
65 EEmINSET m scALE 'MARION P. CALHOUN� '
w \ DI TEMPORARY SURFACE 1"=40' I z WATER IMPACTS NO TAGS�UNKNOWN
OI � 36 IN � _
2 ` PIPES U WNER
I
REBAR A vi
D -D
SEE INSET B I C°NC
— I
- RE AIN PD E—� �ASPAHLT I X— 48"' WD 3 PRoRrY aE
I LINE =EXISTING R/W
S (� SY TEM - Ilrly=d� d1,VEWAY PLANTER
- SYSTEN / Tt4OMA5-5.-SHEETS------------- ----
NC. S , GRA TO DRAIN M GBIG�iIL S. SHEETS i
PO IM SURFA E - = 1-
WA ER IMP CTS � � � ' RCP C � I � cR
L.
,
_ _
RIP F -�_ _ _ _ - — R(/FF/N ST '2"
S
o F GREU ITL-2 W
F ° x
N
J = o " —
Q W —_--- --� 009 M/T
0
woo
_
SR
1 I I N - O O O4O A REBAR �,pR TAPE F i',4 D �\ _ Np�
I -i
IQ �� TB2'GI �of EMp -
N PULE. —) c G O - `--GRELT 7L--2 �/ PROPERTY LINE _
PERMANENT SURFACE I I F c m R=25' ExlsnNCR/w r`J
WATER IMPACTS I ' I CL II RIP 211 REBAR
I N w W/GEO -
I 40 REBA
ODS
1 �
041 I = STANDARD BASE DITCH "h
R=25' S PDE SEE DETAIL C
CRIPRAP AT MBAN EN PDE pE 40 I DAVID R. DEAL
RCp_III, LATERAL RA
BASE DITCH, ? JENNIFER F. EVERHART
m 1 SEE ETAIL D SEE DETAI B o _ JANICE S. DEAL
I PDE SEE I SET C 8 TONS CLAS B RIP
Y A
W/21 SY GEOF B MAT1I1
4 LINVILLL SORTS, INC. m T
2GI
1�3 ✓ �040 = S I A AAHLT
I GREU CLASS
BASE DITCH VEWAY
2 T INS CLASS B RIP RAP /CLS B RIP RAP
/ W/7 SY GEOFAB MATTING SEE DETAIL A
IMPERVIOUS
F/ DIKE WORK PAD o
1"=40'
REBAR
N 02'26'S3° c
N 02`21'I9,,
P:(919)878-9560
8601 Six Forks Road, Forum 1,Suite 700
Raleigh, Noah Carolina 27615-3960
N Li n N. -
C Engineers I Construction Managers I Planners I Sciendsls
PAVEMENT REMOVAL FOR PROFILE SEE SHT. 5 —.d..�m
ReaPonarve People I creanve somnoaa
TEMPORARY SURFACE _ INSET
'
i o WATER IMPACTS
m
jSz DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPA TS IN RFACE WATER
IIIIIIIIIIIIIII IIII IILII I
TEMPOARY WORKPAD
-'II', IIII IIIIIII
PROJECT REFERENCE NO. SHEET NO.
ROADWAY DESIGN HYDRAULICS
. ENGINEER ENGINEER
Pl = 13+10.00
EL = 3,631.95'
VC = 185' PERMIT DRAWING
-- --- = 29 MPH - SHEET 9 OF 9
(+)4.3620% DOCUMENT NOT CONSIDERED FINAL
)0hlh�.; 872% END GRADE T UNLESS ALL SIGNATURES COMPLETED
-L- Sto.14+05.00
III ELEV = 3,636.09'1. T
3,628
...
BRIDGE HYDRAULIC DATA
3,624
STR *050001 Sto.11+14.90 -L-
DESIGN FREQUENCY = 25 YRS
.::
DESIGN DISCHARGE = 2,100 CFS
3,629.3 FT DESIGN Hw ELEVATION =
3,620
_
-i-
-
- --
-
7 --- -
r--- --
T—
r
l00 YEAR DISCHARGE = 3,000 CFS
l00 YEAR FREQUENCY = I00 YRS
{
l00 YEAR HW ELEVATION = 3,630.6 FT
-
_
-
_
- OVERTOPPING FREQUENCY= 500+ YRs
--
_
-
=
F;
3,616
-
-
OVERTOPPING DISCHARGE = 4,350 CFS
-
_-'
_
_ OVERTOPPING ELEVATION = 3,632.6 FT
MILLING
uMlTs.
__
k
_
= NORMAL WATER SURFACE ELEV = 3.62 3.5 FT
--
L
Sta.13+66.88
TO
14+05.00
-.-
-.
--
_
--
—_
- DATE OF SURVEY = 7/6/I7
all - -----
3,608
_ _
-_ -�
BY "2 - -
-L- STA.12+71.72 OFFSET 27.8' RT _
N 857287 E 1150230 ELEV 3632.1' -- _ -
3.600