HomeMy WebLinkAbout20061376 Ver 1_Year 1 Monitoring Report_20091110Npkl • 1 ova . 2pp gv,9 sT ? ?ry November 9, 2009 Ms. Cyndi Karoly NC Department of Environment and Natural Resources Division of Water Quality Wetlands/401 Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 MULKEY ENGINEERS & CONSULTANTS oLP - 13-7 LP ) (C wu.e_8. C )Lc, RE: Novartis Corrective Action Restoration Monitoring; Holly Springs, North Carolina First Year Monitoring (Six Months Post-Construction) Dear Ms. Karoly: Enclosed are the results of the data collected for the Novartis Restoration Site for the first monitoring period. The data indicates great success for the site six months post-construction and therefore no remediation measures are recommended at this time. If you have any questions or comments concerning the Novartis Stream Restoration Project, please contact me at (919) 858-1874. Sincerely, Mulkey Engineers & Consultants, Inc. Emmett Perdue, EI Project Manager Copies: Mr. Monte Matthews USACE, Raleigh, NC Field Office Mr. Lee Willmon Novartis Vaccines and Diagnostics File: 2007169.00 MULKEY INC. 6750 TRYON ROAD CARY. NO 27518 PO Box 33127 RALEIGH, NO 27636 PH: 919-851-1912 FAX: 919.851-1918 Www.MULKEYINC.COM 1 1 1 1 NOVARTIS STREAM RESTORATION SITE 6 MONTH MONITORING REPORT Novartis Vaccines and Diagnostics - Holly Springs Site Wake County, North Carolina November 9, 2009 This report provides the status of stream restoration monitoring activities conducted at the Novartis Vaccines and Diagnostics - Holly Springs, North Carolina Site. As part of mitigation efforts, Mulkey Engineers and Consultants (Mulkey) was retained to monitor the stream restoration activities associated with an unnamed tributary (UT) to Utley Creek. Based on ' mitigation requirements, monitoring results will be submitted annually to the United States Army Corps of Engineers (USACE) and the North Carolina Division of Water Quality (NCDWQ) for three years following construction, twice the first year and once the next two years. These reports are intended to summarize the results of both vegetation survivability and stream stability ' assessments. A map depicting the project area with the associated monitoring aspects is attached (Figure 1). The project area consists of a restored 153-linear foot reach of perennial channel (Phase 2), the creation of 129 linear feet of channel (Phase 3), and approximately fifty-foot wide riparian buffer along both sides of the restored 153-foot channel; the created rip-rap channel was not included in the conservation easement and therefore no riparian buffer was required (See Appendix A, Photo Point 1). Target plant species similar to those in a Piedmont Mixed Pine/Hardwood ecosystem were installed in the riparian buffer to not only stabilize the construction area but also to encourage a native natural community. The plantings that were installed included 1/0 bare root seedlings, native grass seed, and live stakes. Construction was completed in April 2009. Approximately 680 stems per acre were planted or transplanted within the project area immediately following construction. Two permanent vegetation sampling plots were established upon completion of construction activities (see Figure 1). Each sampling plot is 1,000 ftz (100 feet by 10 feet) and has been permanently staked. Survivability success is based on the presence of 320 stems per acre of total woody plants at the end of the three year monitoring period. If at any point during monitoring this does not seem achievable, installation of additional plantings as replacement for the mortality will be required. Survivability at Vegetation Plot #1 was determined to be 566 stems per acre, which meets the minimum criteria. Vegetation Plot #2 was determined to have a survivability of 436 stems per acre, also meeting the minimum criteria (See Appendix B). Photo documentation of each vegetation plot is also included in Appendix A. In an effort to monitor stream stability, detailed photo documentation coupled with two downstream, off site surveyed cross sections are compared annually to determine the constructed channel's success. The restored stream has stabilized and shows no evidence of bed or bank erosion throughout the restored reach. All of the inverts associated with the structures are intact and holding grade as designed and the overall structures show no signs of failure. Similarly, the constructed channel is maintaining the designed dimension, pattern, and profile. Cross sections surveyed downstream of the restored area prior to construction, immediately after construction, and again six months post-construction reveal that the stream has maintained its stable state as depicted in Appendix C. Photo documentation of each cross section and structure are available in Appendix A. The analysis of the data indicates great success for the site six months post-construction and therefore no remediation measures are recommended at this time. x311, ll.,, 13il l O Z w ? - w 0 w (1? V O W F• Z a H J w .. ? W m F Z z W Q U O z o 1Cj O ly v r ri NNmZ LLj v z ¢ ? r W N .PPW ? LLj O ? :3 w I?y W Z x=WWF w W WPP3 l7 F- w x ly ICS Z 0 < w CL4mm3 O ? IL o z W w U 2 W O C 0 P Q. O N r? V I ? I I I I 1 W i 1 i 1 I I 1 I I 1 1 k m S W W 2 ¢ 2 O m 2 p W h o ? ? ? tau- LLJ ~ W ?i c1l: it, m a MULKEY PHOTOGRAPHIC LOG PHOTO POINTS Novartis Stream Restoration Photo Point 1; Looking Downstream Across Site Pre Construction: February 2008 r> a.+tC t 411, ' x` t P 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 1 M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration VEGETATION PLOTS Vegetation Plot 1 i Pre Construction: February. 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 1 MULKEY PHOTOGRAPHIC LOG Novartis Stream Restoration VEGETATION PLOTS Vegetation Plot 2 K2 f ST ?' y}k} S + f '. ._ - j ? r P ?, . r l p A yy? aa Pre Construction: February 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 PHOTOGRAPHIC LOG Novartis Stream Restoration ?L? CROSS SECTIONS Permanent Cross Section 1 Pre Construction: Februaq 2008 As-Built: April 2009 6 Month Monitoring: October 2009 Year 1 Monitoring: April 2010 ' Year 2 Monitoring: April 2011 Year 3 Monitoring: April 2012 1 M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration CROSS SECTIONS Permanent Cross Section 2 ?=•_? 77 Pre Construction: February 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 _. M U L_K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Plunge Pool and Cross Vane 1 Not Applicable Pre Construction: February 2008 G Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 1 -M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Cross Vane 4 Not Applicable Pre Construction: February- 2008 r t Y A - - ? y aA,C a " ? 4 A• ?T ?sF kkk Y? 4ef:???6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 4 r As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 M V L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Cross Vane 5 Not Applicable Pre Construction: February 2008 t ?w t rls5' C it 46 .: {a ., m: ?iL;::la 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 3 -- --- M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Cross Vane 6 Not Applicable Pre Construction: Februaii, 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 4 M U LL K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Plunge Pool and Cross Vane 7 NotApplicable Pre Construction: February, 2008 ' t ? J p I ?? 3Y - s 7N d'A?? ;r ; p , ? Reel',. . 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 ¢¢$l As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 5 M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoration STRUCTURES Cross Vane 8 Not Applicable Pre Construction: February 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 n° ?.?ij?',,j•,~: LE+^?„ '? ? , tea k? ?; 'rr Kf, '? o 1 ?£ ? J 2R 4 y _ .` 1 ?" N Y ? ? Y ? ,F i krYr? - 1 J As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 6 M U L K E Y PHOTOGRAPHIC LOG Novartis Stream Restoratioll STRUCTURES Cross Vane 9 Not Applicable Pre Construction: February 2008 6 Month Monitoring: October 2009 Year 2 Monitoring: April 2011 As-Built: April 2009 Year 1 Monitoring: April 2010 Year 3 Monitoring: April 2012 7 c c 0 c; o? O z } W Y J 7 = ? c c c o c c _ ? :J ? °' c c ? c c o c o c c O G G r c - + ^? _ 00 C O C M C C v n J f •Q C C C '7 M 't N M N A y z v. C N N r- N •-- C M O C ? _ •-- 'r M M •-- •- M M p ? C ? R '?. c c o 0 0 . _ ?i ° \ _ C C C C C C C C C C!) G M J O N •-- N M Fn G? U o a ? , c r - o o ?` c c o G O O O O O C O ?? 1 .tom.. C: v •? ?y ? C G J C C C O O C C '?+ f V C p C C O z ? C C o \ ? o c ?° ? o c ? ° C C C C O C C r1 ~~ i.4 J C O v ? ?, O c c `j C C C O C C O O N E-" l ?' ~ r Fi r?--I f? ?••i N ? C C N ;I" ? C C O z ? ? C ?v v U rn -?- M U LL K E Y CROSS SECTION DATA Novartis Stream Restoration 1 7,- XS I - RIFFLE Pre Construction (2008) Date: Obsenmers: Station 0+07.36 0+12.88 0+15.62 0+17.09 0+18.23 0+18.76 0+19.11 0+19.88 0+20.70 0+21.48 0+22.07 0+22.56 0+25.04 0+29.90 0+37.93 02/24/08 HB/EMP BS (ft) Channel Parameters Cross Sectional Area: Width: Mean Depth: Max Depth: Entrenchment Ratio: Rosgen Channel Classification: HI (ft) FS (ft) Ele (ft) Notes 294.43 294.41 294.21 LTOB 293.98 293.58 292.83 292.27 LEW 292.06 291.99 TW 292.07 292.29 REW 293.08 BKF 293.78 RTOB 293.91 293.73 3.32 sq. ft 3.98 ft 0.84 ft 1.09 ft 5.55 E5 1 4--MULKEY CROSS SECTION DATA Novartis Stream Restoration XS 1 - RIFFLE As-Built (April 2009) Date: Obsen,ers: Station BM 1 0+00.00 0+05.00 0+10.00 0+15.00 0+16.00 0+17.00 0+18.00 0+19.00 0+19.70 0+19.90 0+20.30 0+20.70 0+21.30 0+21.80 0+21.80 0+22.00 0+22.70 0+23.00 0+23.50 0+24.00 0+25.00 0+27.00 0+30.00 0+35.00 0+40.00 0+45.00 04/16/09 TBB/EMP BS (ft) 2.83 Channel Parameters Cross Sectional Area: Width: Mean Depth: Max Depth: Entrenchment Ratio: Rosgen Channel Classification: HI (ft) FS (ft) Ele (ft) Notes 306.78 303.95 BM 306.78 12.11 294.67 LPIN 306.78 12.33 294.45 306.78 12.53 294.25 306.78 12.60 294.18 306.78 12.69 294.09 LTOB 306.78 12.92 293.86 306.78 13.23 293.55 306.78 13.82 292.96 306.78 14.51 292.27 LEW 306.78 14.68 292.10 306.78 14.77 292.01 306.78 14.81 291.97 TW 306.78 14.75 292.03 306.78 14.68 292.10 306.78 14.54 292.24 REW 306.78 14.17 292.61 306.78 13.78 293.00 BKF 306.78 13.70 293.08 306.78 13.49 293.29 306.78 13.26 293.52 RTOB 306.78 13.05 293.73 306.78 12.78 294.00 306.78 12.80 293.98 306.78 13.07 293.71 306.78 13.03 293.75 306.78 12.87 293.91 RPIN 2.53 sq. ft 3.77 ft 0.67 ft 1.03 ft 7.63 E5 2 -=- M U L K E Y CROSS SECTION DATA Novartis Stream Restoration XS I - RIFFLE 6 Month Monitoring (October 2009) Date: 10/07/09 Observers: WSH/EMP Station BS (ft) HI (ft) FS (ft) Ele (ft) , Notes BM #2 8.20 302.01 293.81 BM 0+00,00 302.01 7.35 294.66 LPIN 0+05.00 302.01 7.75 294.26 0+10.00 302.01 7.82 294.19 0+15.00 302.01 7.85 294.16 0+16.00 302.01 7.93 294.08 LTOB 0+17.00 302.01 8.22 293.79 0+18.00 302.01 8.47 293.54 0+19.00 302.01 9.14 292.87 0+19.40 302.01 9.70 292.31 LEW 0+19.70 302.01 9.84 292.17 0+20.30 302.01 9.88 292.13 0+20.70 302.01 9.94 292.07 0+21.30 302.01 9.98 292.03 TW 0+21.80 302.01 10.05 291.96 0+21.90 302.01 9.70 292.31 REW 0+22.00 302.01 9.18 292.83 0+22.70 302.01 8.99 293.02 BKF 0+23.00 302.01 8.88 293.13 0+23.50 302.01 8.70 293.31 0+24.00 302.01 8.49 293.52 RTOB 0+25.00 302.01 8.30 293.71 0+27.00 302.01 8.02 293.99 0+30.00 302.01 8.06 293.95 0+35.00 302.01 8.24 293.77 0+40.00 302.01 8.25 293.76 0+45.00 302.01 8.12 293.89 RPIN Channel Parameters Cross Sectional Area: 2.61 sq. ft Width: 3.92 ft Mean Depth: 0.66 ft Max Depth: 1.06 ft Entrenchment Ratio: 7,39 Rosgen Channel Classification: E5 3 C O M C v W ..r rl t"r 0 U U O U C C M C G C O O C C ? C M O + N C G O C C O M v. C O ?' C Lr) N 0 + C ? i O C o ? N O + C :J O Lr)_ 1 + T C G O G + G G G + C O G O O G O C` N O Lq G O L G Lq G Q V' v) N et' 7 M M N N - N N Cl N N N N N N N (13) UOIJVnalg 1 1 1 1 1 1 1 1 1 1 1 1 MULKEY CROSS SECTION DATA XS 2 - RIFFLE Novartis Stream Restoration Pre Construction (2008) Date: Observers Station 0+10.18 0+16.68 0+20.25 0+20.99 0+21.74 0+22.06 0+22.09 0+22.44 0+23.00 0+23.67 0+24.09 0+24.71 0+25.15 0+26.35 0+29.51 0+35.34 02/24/08 HB/EMP BS (ft) Channel Parameters Cross Sectional Area: Width: Mean Depth: Max Depth: Entrenchment Ratio: Rosgen Channel Classification: HI (ft) FS (ft) Ele (ft) Notes 291.15 290.68 290.47 LTOB 290.31 BKF 290.03 289.72 289.31 LEW 289.18 289.10 TW 289.21 289.43 REW 289.71 289.99 290.40 RTOB 290.96 291.28 3.30 sq. ft 5.10 ft 0.65 ft 1.21 ft 4.94 E5 1 "-M U LK EY CROSS SECTION DATA Novartis Stream Restoration XS 2 - RIFFLE As-Built (April 2009) Date: 04/16/09 Observers: TBB/EMP Station BS (ft) HI (ft) FS (ft) Ele (ft) Notes BM 2 11.40 305.21 293.81 BM 0+00.00 305.21 13.41 291.80 LPIN 0+05.00 305.21 13.57 291.64 0+10.00 305.21 14.03 291.18 0+15.00 305.21 13.84 291.37 TREE ROOT 0+17.00 305.21 14.52 290.69 0+19.00 305.21 14.69 290.52 0+20.00 305.21 14.71 290.50 LTOB 0+21.00 305.21 15.00 290.21 0+21.80 305.21 15.20 290.01 0+22.00 305.21 15.67 289.54 LEW 0+22.00 305.21 15.79 289.42 0+22.60 305.21 15.96 289.25 0+23.00 305.21 16.02 289.19 TW 0+23.40 305.21 15.83 289.38 0+23.50 305.21 15.70 289.51 REW 0+23.80 305.21 15.32 289.89 0+24.00 305.21 15.21 290.00 0+24.50 305.21 15.08 290.13 0+25.00 305.21 14.98 290.23 0+27.00 305.21 14.82 290.39 BKF 0+30.00 305.21 14.74 290.47 0+33.00 305.21 14.88 290.33 0+37.00 305.21 14.74 290.47 0+41.00 305.21 14.93 290.28 0+45.00 305.21 -- RPIN Not Shot Channel Parameters Cross Sectional Area: 2.76 sq. ft Width: 6.62 ft Mean Depth: 0.42 ft Max Depth: 1.20 ft Entrenchment Ratio: 5.36 Rosgen Channel Classification: E5 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -k MULKEY CROSS SECTION DATA Novartis Stream Restoration XS 2 - RIFFLE 6 Month Monitoring (October 2009) Date: Observers: Station BS (ft) HI (ft) FS (ft) Ele (ft) Notes BM #2 3.61 297.42 293.81 BM 0+00.00 297.42 5.68 291.74 LPIN 0+05.00 297.42 5.76 291.66 0+10.00 297.42 6.18 291.24 0+15.00 297.42 5.96 291.46 TREE ROOT 0+17.00 297.42 6.74 290.68 0+19.00 297.42 6.88 290.54 LTOB 0+20.00 297.42 6.92 290.50 0+21.00 297.42 7.26 290:16 0+21.80 297.42 7.72 289.70 0+22.00 297.42 7.92 289.50 LEW 0+22.60 297.42 8.16 289.26 0+23.00 297.42 8.26 289.16 TW 0+23.40 297.42 8.23 289.19 0+23.50 297.42 8.16 289.26 0+23.80 297.42 7.91 289.51 REW 0+24.00 297.42 7.44 289.98 0+24.50 297.42 7.31 290.11 0+25.00 297.42 7.21 290.21 0+27.00 297.42 7.06 290.36 BKF 0+30.00 297.42 6.95 290.47 0+33.00 297.42 7.09 290.33 0+37.00 297.42 6.93 290.49 0+41.00 297.42 7.16 290.26 0+45.00 297.42 7.18 290.24 RPIN Channel Parameters Cross Sectional Area: 3.08 sq. ft Width: 6.62 ft Mean Depth: 0.47 ft Max Depth: 1.21 ft Entrenchment Ratio: 5.90 Rosgen Channel Classification: E5 3 C C Lr) + C v W •.r N L." O U U N m O U O O N + O C C O <7' + C C C N C M C ?- N O G C C O M ? + C P ? rl N O O C c 00 N c c 'n 1 + T c c c 0 0 c 0 Llr) 0 c c 0 c c ± 00 00 N 0 or c c ° c ° c Lq C C ? 00 00 N N N N N N N N (1,j) UOTlrnajg