Loading...
HomeMy WebLinkAboutHISTORICAL BEFORE 2000 NPDES DOCUWENT SCANNIMS COVER SHEET NPDES Permit: NC0081821 Richmond County WTP Document Type: Permit Issuance Was teload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Staff Report Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Permit History Document Date: June 3, 1993 This document is printed on reuse paper-ignore any content on the resrerse side �• a n:M 1 DIVISION OF ENVIRONMENTAL MANAGEMENT June 3, 1993 aaa4aaapQa TO: Donald Safrit, Unit Supervisor P rmitting and nearing Unit FROM: y teve a,Ang Regiona ti Supervisor Fayetteville Regional Office, SUBJECT: Renewal of NPDES Permit No. NCO081281 Richmond County Water Treatment Plant Pee Doe, North Carolina Richmond County Please find enclosed the staff report and recommendations of the Fayetteville Regional Office concerning the renewal of subject NPDES Permit. If you have any questions or require any further information, please advise. TS/RR/rr Enclosure e*Nt F "� Lat r 'M cc: WN t t �� itCHKKAL SUPPORT ®RANCH PLOTTED SOC PRIORITY PROJECT: Yes No If yes, SOC No. To: Attention: Susan Robson Permits and Engineering Unit Water Quality Section May 28, 1993 NPDES STAFF REPORT AND RECOMMENDATIONS County Richmond Permit No. NCO081281 PART I. GHNBRAL INFOR14ATION 1. Facility and Address: Richmond County Water Treatment Plant Richmond County Board of Commissioners P.O. Box 504 Rockingham, North Carolina 28379 2. Date of Investigation: April 23, 1993 3. Report Prepared By: Ricky Revels, Environmental Technician III 4. Persons Contacted and Telephone Number: Richard Lassiter (919) 895-2180 A.B. Thompson (919) 997-6234 5. Directions to Site: Travel approximately 2.5 miles west of Rockingham on US Hwy 74, turn right on SR 1140, and travel to the intersection of SR 1140 and SR 1141. Plant is located on the right side of the road. 6. Discharge Point(s) , List for all discharge points: Latitude: 340 58' 20" Longitude: 790 50, 20,, Attach a USGS map extract and indicate treatment facility site and discharge point on map. USGS Quad No. : H19NE USGS Quad Name: Rockingham, NC 7. Site size and expansion area consistent with application' _X_ Yes No (If no, explain) B. Topography (relationship to flood plain included) : Hilly, sloping towards the west. 9. Location of nearest dwelling: None within 500 feet. Staff Report and Recommendation Page 2 10. Receiving stream or affected surface waters: U.T. to the Pee Dee River. a. Classification: "C" b. River Basin and Subbasin No. : Yadkin-Pee Dee 030716 C. Describe receiving stream features and pertinent downstream uses: Fishing, Boating, fish and wildlife propagation. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. Volume of Wastewater to be permitted: 0.2574 MGD (Ultimate Design Capacity) b. what is the current permitted capacity of the Wastewater Treatment facility? Same as above. C. Actual treatment capacity of the current facility (current design capacity) . N/A d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two (2) years. A/C issued by Public Water Supply Section I.D. # 03-77-109 e. Please provide a description of existing or substantially constructed wastewater treatment facilities. The substantially constructed wastewater treatment facility (expansion project) will include an additional 126, 500 gallon sludge holding tank, a Trac-Vac continuous sludge removel system, a 80 GPM belt filter press, a 140,000 gallon (polymer chemical feed) sludge thickner tank, and a 1,250 kw diesel engine driven generator. f. Please provide a description of proposed wastewater treatment facilities: N/A g. Possible toxic impacts to surface waters: N/A h. Pretreatment Program (POTWs only) : In development Approved Should be required Not needed _X_ 2. Residuals handling and utilization/disposal scheme: a. If residuals are being land applied, please specify DEM Permit No. Residual Contractor Telephone No. Staff Report and Recommendation Page 3 b. Residuals stabilization: PSRP PFRP Other C. Landfill: Richmond County Landfill d. Other disposal/utilization scheme (Specify) : 3. Treatment plant classification (attach completed rating sheet) : Grade I 4. SIC Code(s) : 4941 Wastewater Code(s) of actual wastewater, not particular facilities; i.e. , non-contact cooling water discharge from a metal plating company would be 14, not 56. Primary _21 Secondary _ Main Treatment Unit Code: 5 0 0 0 1 PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grants Funds or are any public monies involved (municipals only) ? N/A 2. Special monitoring or limitations (including toxicity) requests: N/A 3. Important SOC, JOC, or Compliance Schedule dates (please indicate) : N/A Date Submission of Plans and Specifications . . . . . . . . Begin Construction . . . . . . . . . . . . . . . . . . Complete Construction . . . . . . . . . . . . . . . . 4. Alternative Analysis Evaluation: Has the facility evaluated all of the nondischarge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: N/A Connection to Regional Sewer System: N/A Subsurface: N/A Other disposal options: N/A 5. Other Special Items: None Staff Report and Recommendation Page 4 PART IV — EVTALUATION AND RECOMMENDATION It is the recommendation of the Fayetteville Regional Office that NPDES Permit No. NCO081281 for the Richmond County Water Treatment Plant be reissued for the appropriate time period. SignaturePof Report Preparer Water Quality Regional Supervisor Date 14: 13 FROM DEM WATEF QUALITY" SECTION TO FRO F.03'b? J — \ Vol WATER TRBATMSNT PIAM141 alls '' I ding -)VR=UN BOX ` ' L. M-/CL Vl DRAINAGE PATH TO STRFAM �� � _ .. Em ��lll�• 11 ��\\�� %✓��f—\ y . � . i r�)r rLT IN SGALE food o 100D 2= zoo 4= 5= coon NOD rm Hayes" Scay, Mattem & Mattern, Inc. LOCATION MAP-R{G1�noND Architects -Engineers - Planners COUNTY WATI�--9, nW -T 9ELA1n Florence, South Carolina A tZ 9156MAROE WU-rS j0%S nE F\\&R • RATING SCALE FOR7,*''16LASSIFICATION OF FACILITIES Name of Plant:_ R.C.h vKcjd CC,'Ni ti 00'-k ' i r ce-+;%&ti. t F 1�+e f Owner or Contact Person: Mailing Address: P.C. IS,-/ Syj , Rr,-K%'N5 kk,,,.r � AIL 2 R3-7 11 County: ?;c►-%v_-,c,4 d Telephone: NPDES Permit No. NC00 BiZ? 1 Nondisc. Per. No. _ IssueDate: Expiration Date: Existing Facility ✓ New Facility ✓� Rated By: Rt`c.K,, R.w z I Date: -J-we- 3, l j y-1 Reviewed (Train. & Cert.) Reg. Office Reviewed (Train. & Cert.) Central Office ORC Grade Plant Class: (circle one) (I II III IV Total Points—?— 5 J — — ITEM POINTS (5)SECONDARY TREATMENT UNITS (a) Carbonaceous Stage (1) Industrial Pretreatment Units and/or (i)Aeration - High Purity Oxygen System . . . . . 20 Industrial Pretreatment Program Diffused Air System . .. . . . . . . . . 10 (2) DESIG FLOW OF PLANT IN GPD (see definition No. A 4 Mechanical Air System (fixed, N (not" applicable to non-contaminated cooling waters, sludge floating or rotor) ... .. .. . .. . . . . • 8 Separate Sludge Reaeration 3 handling facilities for water purification plants, totally (H) Trickling Filler closed cycle systems (def. No. 11), and facilities High Rate...................consisting only of Item (4) (d) or Items (4) (d) and (11) (d)) Standard Rate. 7 0 -- 20.000. 1 Packed Tower. 20.001 — 50.000.......................... 2 5 5 50,001 — 100,000.. .... 3 (iii) Biological Aerated Filler or Aerated - 100,001 -- 250,000............ ... .. .. ... .... 4 (iv) Aerated La Biological Filler. . ............ . . .. . .. 10 Lagoons . 250.001 — 500,000.......................... 5 ............... .. .. . . 10 500,001 —1,000,000.................... .. .. .. 8 (v) Rotating Biological Contactors . . . . . . . . . . 10 1,000.001 .-2,000.000.... ..... .......... . .. .. 10 2.000.001 (and up) - rate 1 point additional for each (vi) Sand Filters- 200,000 gpd capacity up to a intermittent biological . . . . . 2 Design Flow (gpd) maximum of 30 recirculating biological . . . . . 3 (3j PRELIMINARY UNITS (see definition no.32 (vii) Stabilization Lagoons .......... .. . . . . . . . 5 (viii)Clarifier 5 (a) Bar Screens................................ 1 (ix) Single stage system 'for combined. of carbonaceous removal of BOD and (b) Mechanical Screens, Static Screens or nitrogenous removal by nitrification Comminuting Devices........... ........... 2 (see def. No. 12) (Points for this item (c) Grit Removal............................. 1 have to be in addition to items (5) (a) or (d) Mechan'�cal or Aerated Grit Removal. . . . . .. . . .. 2 () through (5) (a) (vie', ......... . . . . . . . . 8 (e) Flow Measuring Device....................... 1 (x) Nutrient additions to enhance BOD removal..... 5 .......................... r (Q Instrumented Flow Measurement.. . .. . . . . . . . . . 2 (xi) Biological Culture ('Super'Bugs') addition to enhance organic compound removal . . . . . 5 (g)Preaeraion................................ 2 (b) Nitrogenous Stage (h) Influent Flow-Equalization .. .. . . .. . . . . . .... . . 2 (i) Aeration - High Purity Oxygen System . . . . . 20Dillused Air System . . . . . . . . . .. 1 0 n Grease or Oil Separators- Gravity. ....... .. 2 Mechanical Air System (fixed, Mechanical. 3 floating, or rotor). 8 Dissolved Air Flotation. 8(j Prechb Separate Sludge Reaeration . . . . . 3 rination.............................. 5 (ii) Trickling Filter - (4) PRIMARY TREATMENT UNITS High Rate.............. 7 (a) Septic Tank(see definition no.43) . . . . . . . ... .. . . 2 Standard Rate......... . .. 5 (b) Imhoff Tank................................. . 5 Packed Tower............ 5 (c) Primary Clarifiers............... ............ . 5 (iii) Biological Aerated Filter or AeratedBiologicalFilter. . ......... ..... ...... 10 ... ) Settling Ponds or Settling Tanks for Inorganic Non-toxic Materials (sludge handling facilities ( Filter- stone. (iv) Sand Filte) Rotating Biological Contactors . . . . . . . . . . . . 10 for water purification plants, sand, gravel, intermittent biological . . . . . . . . 2 stone, and other mining operations except recreational activities such as gem or gold recirculating biological . . . . . . . . 3 mining)...................................... . . 2 (vi) Clarifier..... . . .................. . ...... 5 (6) TERTIARY OR ADVANCED TREATMENT UNIT (10) CHEMICAL ADDITION SYSTEM(S)(See definition No.9) (a) Activated Carbons Beds - without Arbon regeneration.................. 5 (not applicable to chemical additions rated as item with carbon regeneration.................... 15 () a). (5) (a) (xi), (6) (a), (6) (b),each: : st (e), (b) Powdered or Granular Activated Carbon Feed - (9) (a), (9) (b), or(9) (c)5 points each: List: without carbon regeneration................. 5 . . . 5 with carbon regeneration.................... 1 5 . . 5 (c) Air Stripping.............................. 5 . . . . . 5 (d) DeriMificalion Process (separate process) . . . . . 10 ' ' ' ' . 5 (e) Eledrodialysis............................. 5 (11) MISCELLANEOUS UNITS (f) Foam Separation............................. 5 (a) Holding Ponds, Hong Tanks or Settling Ponds (g) Ion Exchange.....;......""" '''.'' S for Organic or Toxic Materials including wastes (h) Land Application of Treated Effluent from mining operations containing nitrogen and/or (see definition Lno. 22b) (not applicable for phosphorous compounds In amounts significantly sand. gravel, stone and other similar mining greater than is common for domestic wastewater .......... 4 operations) (b) Effluent Flow Equalization (not applicable to storage (7 on agriculturally managed sites (See del. basins which are inherent in land application systems)..2 No.4)................................... 10 (c) Stage Discharge (not applicable'to storage basins (it) by high rate infiltration on non-agriculturally inherent in land application systems..._.................._.......... 5 managed sites (includes rotary distributorsPimps.--"— "" and similar fixed nozzles stems (e) Power Sup " 3 systems)... ... . . . . . . 4 (e) stand-By Power supply..._._....._. ._.G (ii) by subsurface disposal (includes low pressure (f) Thermal Pollution Control Device._._........_........_................... 3 pipe systems and gravity systems except at plants consisting of septic tank and nitrifica- tion fines only)............................. 4 TOTAL POINTS ZS (7 Microscreens.................................. 5 (j) Phosphorus Remo{al by Biological Processes CLASSIFICATION (See def.No.26) 20 (k) Polishing Ponds - without aeration. .. . . . . 2 Class 1---- 5 - 25 Points with aeration......... . 5 Class II... _. 26- 50 Points (I) Post Aeration - cascade .............. 0 Class III.__..__...._..._ _ 51- 65 Points diffused or mechanical . . . 5 Class IV... r___... _ 66- Up Points (m) Reverse Osmosis............................... 5 (n) Sand or Mixed-Media Fillers-low rate .. .. . . . . . . . 2 Facilities having a rating of one through four points, inclusive, high rate.......... 5 do not require a certified operator. Classification o1 all other (o) Treatment processes for removal of metal or facilities requires a comparable grade operator in responsible cyanide.................................... 15 charge. (p) Treatment processes for removal of toxic materials other than metal or cyanide . . . . . . . . . 15 Facilities having an activated sludge process will be assigned a minimum classification of Class It. SLUDGE TREATMENT Facilities having treatment processes for the removal of metal (a) Sludge Digestion Tank -Heated............... 10 or cyanide will be assigned a minimum classification of Class If. Aerobic............... 5 Unheated...... ....... 3 Facilities having treatment processes for the biological removal (b) Sludge Stabilization (chemicat or thermal) . . . . . . . 5 of phosphorus will be assigned a minimum classification of Class (c) Sludge Drying Beds - Gravity................. 2 Ill. Vacuum Assisted. . . . . . . 5 (d) Sludge Eluldation......................... .... 5 In-plant processes and related control equipment which are an (e) Sludge Conditioner (chemical or thermal) . . . . . . . . 0 integral part of industrial production shall not be considered waste (1) Sludge Thickener(gravity)................. ..... 5 treatment. Likewise, discharges of wastewater from residences (g) Dissolved Air Flotation Unit having a design flow of 1.000 gpd or less, shall not be subject to (not applicable to a unit rates as (3) (1) . . . . . . . . . 6 rating. (h) Sludge Gas Utilization (including gas storage) . . . . 2 (i) Sludge Holding Tank- . Aerated................ �5, ADDITIONAL COMMENTS- Non-aerated............ C2 (j) Sludge Incinerator - (not including activated carbon regeneration) .. . 10 (k) Vacuum Filter, Centrifuge or Filter Press or other similar dewatering devices............... . . . .. 10 (8) SLUDGE DISPOSAL(including incineraled ash) (a)Lagoons........................................ 2 (b) Land Application (surface and subsurface) (see definition 22a) -where the facility holds the land app. permit . . . 10 -by contracting to a land application operator who holds the land application permit..... . . .. . . . . . .. 2 -land application of sludge by a contractor who does not hold the permit for the wastewater treatment facility where the sludge is generated . . . . . . . .. 10 (c) Landfilled(burial)............................. 5 (9) DISINFECTION (a) Chlorination........................ ..... 5 (b) Dechlorinal'ron........................ 5 (c) Ozone.............................. 5 (d) Radiation.......................... 5