HomeMy WebLinkAboutNCC200366_ESC Approval Submitted_20200204Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
WAKE
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
C TEL 919 856-7400 • FAX 919 743-4772
I N %
SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
Wexford
Reserve Lots
16,22,30 and
Project Name 107
Date Received 12/19/19
Watershed Falls Lake
Date Processing
Initiated 12/19/19
Disturbed
Acreage 1.1 acres Plan Review Fee $275(paid)
Applicant: Engineer:
Name Speight Built -Ryan Speight Standard Plan
------------------ --------------------------
Address: 12333 Wingspread, Raleigh, NC 27616
------ --------------------------
Phone: 919-889-5694
---------------------------------------------------------------------- --------------------------
Email: ryan@speightbuilt.com
---------------------------------------------
Plan Date/Revision Date: 12/19/19
Jurisdiction Wake Co
Project Number SEC-30471-2019
Permit Fee $275 (paid)
Approval Date: ® Construction Plan Approved with the following Conditions of Approval and Applicable Standards.
1/21/19
Conditions of Approval
Items marked with an "X" were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise
noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06.
A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to
®
1'
issuance of the Land Disturbance Permit. The permit fee is due at that time. [10-30-7(C)]
a. Once the above condition is fulfilled, contact Scott Reams (919-868-4986) to schedule the
preconstruction meeting and provide four (4) sets of plans at the meeting.
Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to
®
2.
the submitting filled Certificate of Compliance form. [10-30-7(D)]
Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field
®
3.
modifications to erosion and sediment control devices. No devices shall be removed without prior approval
from Wake County.
Wake County's sedimentation pollution control program is performance oriented, requiring protection of the
natural resources and adjoining properties. If at any time during the project it is determined that the Erosion
®
4.
and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation
Control Ordinance of Wake County, this office may require revisions in the plan and its implementation to
ensure compliance with the Ordinance.
1
APPROVAL 5&EConstructionPlan ReviewChecklist-V.2 WM
WAKE
COUNTY
1, I N %
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
SECPA — SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
Effective April 1, 2019, prior to the preconstruction meeting with the county, the applicant must obtain from
NCDEQ-DEMLR the NCG-010000 NPDES Construction Stormwater General Permit coverage by completing an
®
5'
electronic Notice of Intent (NOI). The online NOI submittal must include the completed and notarized Financial
Responsibility/Ownership Form and this approval letter. See NCDEQ web site at:
https://deg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stormwater-
permits/construction-sw
®
6.
SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre
(including non-contiguous lots).
Applicable Regulations Unless otherwise noted, all references shown in brackets are for the Wake County Unified
Development Ordinance (UDO), adopted 04/17/06.
10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2
®
7.
calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year
period, the erosion and sedimentation control plan approval becomes null and void.
❑
8.
10-30-8 Actions Required Prior to Land Disturbance
S&EC plan approval and land disturbance permit issued must be prominently displayed until all
❑
a.
construction is complete, all permanent sedimentation and erosion control measures are installed and the
site has been stabilized. A copy of the approved plan must be kept on file at the job site.
No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land-
❑
b.
disturbing activity will begin.
®
9.
10-31-1 Authority
County officials may enter any property, public or private, at reasonable times for the purpose of
investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access
®
a•
to any authorized representative or agent for the County who requests entry for purposes of inspections,
and presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such
representatives while in the process of carrying out their official duties.
Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance
with the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or
®
b.
issued pursuant to this article, and to determine whether the measures required in the erosion and
sedimentation control plan are effective in controlling erosion and sedimentation resulting from land -
disturbing activity.
®
c'
Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing
activity, including the property owners. Failure to prevent off site sedimentation will be deemed a
violation of the erosion and sedimentation control regulations of this article.
2
APPROVAL 5&EConstructionPlanReviewChecklist-V.2 WM
WAKE
COUNTY
NOR I11 l:AKV1 Irv-1
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
15A NCAC28.0233 - Due to the location of this project, it should be noted that a rule to protect and maintain
existing buffers along watercourses in all of Wake County became effective in 2006. The Neuse River Riparian
Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds and
estuaries in Wake County with forest vegetation on the adjacent land or "riparian area". In riparian areas with
existing forest vegetation in the first 30 feet directly adjacent to the stream, the rule prohibits land disturbance,
® 10. new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with
forest vegetation that is less than 30 feet wide, the rule prohibits land disturbance, new development and
fertilizer use within the area that contains forest vegetation (but not the entire 50 foot riparian area). For more
information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at
919-807-6300. Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse
River Basin except when superseded by the Jordan Buffer Rules[15A NCAC 02B.0265].
Other:
a. If lots other than shown in the plan is disturbed in the future, they must be shown in a revision.
b. Ensure land disturbance does not impact septic field or repair field as this may void on -site
waste water permit validity. Silt fences can not be installed in areas labelled as drain field
easement as installation of silt fence may damage supply lines. Recommend alternative
measures or proof these will not damage supply lines.
c. If any drainage ditches exist in front of the lot, install 12" driveway culvert below the
construction entrance. The permission from NCDOT might be needed.
d. Other Agency Approvals/Enforcement: Wake County's approval of this plan does not
supersede any other required approvals or permits. See Wake County Unified Development
Ordinance (UDO)1-18-6 References to Other Regulations and 1-19-1 Conflict with State or
Federal Regulations and 10-30-3 (H). Should touch base with NCDOT about inlet/ inlet
protections in ROW.
❑X 11. e. Setbacks must be unobstructed from the ground to the sky except as expressly stated.
Parking and driveways are allowed within required setbacks except where they conflict
with required buffer yards or tree and vegetation protection zones.
f. The Planning Director may approve encroachments it deems necessary to permit
reasonable use and development. Examples of encroachments that may be permitted
include utilities, driveways, sidewalks, entrances and entrance features, supplemental
landscaping, as well as access routes for construction vehicles or equipment where no
alternative means of access exists on the site.
g. Install all sediment control measures after obtaining all required permits and fill the
attached Certificate of Compliance form. Upload the form to the Wake County portal and
inform Jeevan Neupane.
Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water
Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401
(Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit
requirements. The approval issued in this letter cannot supersede anv other required permit or approval.
3
APPROVAL 5&EConstructionPlan ReviewChecklist-V.2 WM
WAKE
COUNTY
1, I N %
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL
Wake County PE: A-L- jeevan.neupane@wakegov.com
Contact Info: 919-819-8907
Jeevan Neupane,PE
4
APPROVAL 5&EConstructionPlan ReviewChecklist-V.2 WM