Loading...
HomeMy WebLinkAboutNCC200397_ESC Approval Submitted_20200204ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director , ,QUAM North Carolina Environmental Quality January 17, 2020 LETTER OF APPROVAL Family Fun Entertainment, LLC Attention: Kyle J. Abee, Owner PO Box 2111 Burlington, NC 27216 RE: Project Name: Hwy 54 Business Park Project ID: ALAMA-2020-020 Total Acres: 2 County: Alamance River Basin: Cape Fear Project Location: NC Hwy 54 — Melville Submitted By: LEADS Group Date Received by LQS: January 17, 2020 Plan Type: Commercial — Regular - Express Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on this project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucasnncdenr, ov or Paul Clark at Paul.clark cr ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May1.2019, a $100 fee will be charged annually. 4fi �_. North Carolina Department of Environmental Quality I Division of Energy, minerals & Land Resources Winston-Salem Regional Office / 450 West Hanes Mill Road, Suite 300 / Winston-Salem. North Carolina 27105 (336)776-9800 Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, after it is received. 3. Records of inspections made during the previous 30 days. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sin Assistant Regional Engineer DEMLR Enclosures: Certificate of Approval NCG01 Fact Sheet Cc: LEADS Group 505 E Davis St Burlington, NC 27215 Le