Loading...
HomeMy WebLinkAbout670080_Compliance Evaluation Inspection_20200123.i Division of Water Resources Facility Number u - FTL_J__1 O .Division of Soil and Water Conservation Q Other Agency Type of visit: ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: F L� I Arrival Time: Departure Time: County: Region: Farm Name: 1—o ((y �jY� a%- Fck re Owner Email: T(�j(�]NSO (� fb 22� C►^ � �. Co - Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: , 'C.W - Y �.A C. y— Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Oilier Latitude: Phone: 9 1 Q 3 R-C1 "[ 7^- Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer I I --d Non -Layer Design Current Dry Poultry Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes To ❑ NA ❑ NE ❑ Yes ❑ No r lA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No LJ lit' ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) [:]Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E--N'o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure I Identifier: I v P_Aj Spillway?: Structurepp 2 Structure 3 Structure 4 ® lD ❑ Yes Structure 5 to ❑ NA ❑ NE ❑ No �IA ❑ NE Structure 6 Designed Freeboard (in): Observed Freeboard (in): 37 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes FNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑Yes ,"'o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ZNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [�'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E11 to ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? TYes 5<o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes F31No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes []-/No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes F3/No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ff No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [2"�es ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZNo ❑ NA 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:]No ❑ NA rNE Page 2 of 3 21412015 Continued Facility Number: 7 - (S jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No 64A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [�'No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [3/No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA �NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes rNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations, or any other comments. Use drawings of facility to better explain situations- (use additional pages as necessary). �J-4�t�Jv s�,4 oc,,j we_�"� <,", �'t K .of C'r 1 b r- \,.j , -L c. �.1�-.� Ca - 'rat —a--,�i � S q�n �— C �� �a � •—ems v� �'�r'�. 0 �''L ZO �.� , �C �j 4 :�'�, Reviewer/Inspector Name: e\'j Reviewer/Inspector Signature: �'Ate\ Page 3 of 3 Phone: Date: 2 do 14/2015