HomeMy WebLinkAbout20171409 Ver 3_08_2020-01-06 SW Impact Analysis_20200131 STORMWATER IMPACT ANALYSIS LINDEN – LOT 22 / DRB-19010 / JANUARY 2020 NARRATIVE > DRB-19010 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 creating experiences through experience LINDEN – LOT 22 Stormwater Impact Analysis GENERAL DESCRIPTION The proposed residential development includes 11 single-family units which shall front Pricewood Lane (to be renamed Linden Grove Lane with the first Phase of the Linden Subdivision Plat). Utilities will be served by the infrastructure installed with the Linden Subdivision. There is a potential that the front portion of this site will be carved out for a non-residential use along Olive Chapel Road. One stormwater control measure (SCM) device will be used to serve the development. The proposed development is located within the Cape Fear River basin with all stormwater runoff draining into Reedy Branch (WS-IV; NSW), which is located in the Jordan Lake Watershed. Per the Town of Apex regulations, stormwater management on this site shall meet the stormwater management performance standards for development set forth in the Town Unified Development Ordinance (UDO). These are as follows: 6.1.4 General A) Development Review All development within the Watershed Protection Overlay Districts shall comply with the watershed protection standards of this Sec. 6.1 Watershed Protection Overlay Districts, and shall demonstrate compliance concurrent with the submission for approval of a site plan (major or minor) (Sec. 2.3.6), master plan for subdivision (Sec. 2.3.7(D)) or development plan for MEC-CZ, PUD-CZ or TND-CZ (Sec. 2.3.4), whichever occurs first. B) Compliance Prior to Approval of Certificate of Occupancy Prior to approval of a final plat (with respect to a subdivision), issuance of a certificate of occupancy (with respect to a site plan), or commencement of a use, in addition to meeting all other requirements of this ordinance, all of the watershed protection standards required by Sec. 6.1 must be met, all required facilities must be in place, be operational, and be approved by the Environmental Programs Manager. C) Definitions Certain words in this Section have meanings that are specific for the purposes of Sec. 6.1 Watershed Protection Overlay Districts. Such words shall be defined in Article 12, Definitions. 6.1.7 High-Density Development Option Developers wishing to exceed the built-upon limitations for low-density development within either the Primary Watershed Protection District or the Secondary Watershed Protection District, as set forth in Sec. 6.1.6(B) Standards, shall submit an appropriate development plan per Section 2.3 Development Approvals, which shall meet the following standards: NARRATIVE > DRB-19010 creating experiences through experience 2 of 4 A) Within the Primary Watershed Protection District 1) Built-Upon Area Within the Primary Watershed Protection District, all development shall comply with the built-upon area limitations for the underlying district found in Sec. 5.1 Table of Intensity and Dimensional Standards. 2) Vegetated Conveyances Stormwater runoff from the development may be transported from the development by vegetated conveyances to the maximum extent practicable provided that the standards of Article 7.5.4(B)(4) are met. 3) Structural BMPs Within the Primary Watershed Protection District, structural BMPs shall be used to collect and hold the runoff from the first one-inch of rainfall. These stormwater control structures shall meet the requirements in Sec. 6.1.12 Structural BMPs. In addition, the post-development peak runoff rate shall be limited to the pre-development peak runoff rate for the 1-year, 24-hour and the 10-year, 24-hour storms. Detention volumes stored to reduce peak flows shall drain within seventy-two (72) hours to allow for subsequent storms. A storm water impact statement shall be prepared by a qualified professional engineer registered to practice in North Carolina and submitted with the initial application for any development or activity that is not exempt from the requirements of Sec. 6.1 Watershed Protection Overlay Districts showing the impacts from the development site to the confluence point downstream where the area of the proposed development is less than 10% of the total drainage area (the “10% point”). The impact statement shall verify the effects of detention on the downstream hydrographs to ensure that the peaks do not increase for a given storm. The impact statement shall list the infrastructure (ditches, culverts, etc.) and indicate all the adverse effects and impacts (to roads, culverts, businesses, homes, lawns, etc.) from the development to the 10% point. If backwater from detention appears to be a problem, then the impact statement shall also consider potential effects on upstream properties for the 100-year, 24-hour storm. 4) Riparian Buffers for Perennial Streams Within the Primary Watershed Protection District, a vegetative buffer of not less than 100 feet shall be maintained along each side of a perennial stream. All buffers shall meet the requirements in Sec. 6.1.11 Riparian Buffers. 5) Riparian Buffers for Intermittent Streams Within the Primary Watershed Protection District, a vegetative buffer with a width of not less than fifty (50) feet shall be maintained along each side of an NARRATIVE > DRB-19010 creating experiences through experience 3 of 4 intermittent stream. All buffers shall meet the requirements in Sec. 6.1.11 Riparian Buffers. This report contains calculations detailing the expected stormwater impacts as a result of the proposed development, along with design calculations for the stormwater control measure that will be used to alleviate those impacts and meet the requirements of the Town of Apex. Please refer to the appropriate sections of this report for additional information. CALCULATION METHODOLOGY  Rainfall data for the Apex, NC region is from NOAA Atlas 14. This data describes a depth-duration- frequency (DDF) table describing rainfall depth versus time for varying return periods in the Apex, NC area. These rainfall depths are input into the meteorological model within PondPack for peak flow rate calculations. Please reference the rainfall data section within this report for additional information.  The on-site topography used in the analysis is from a field survey performed by Bass, Nixon, & Kennedy, Inc. The offsite topography used in the analysis is from Wake County GIS data.  Using maps from the NRCS Web Soil Survey, the on- and off-site soils were determined to be from hydrologic soil group (HSG) ‘D’ soils. Since the method chosen to compute both pre- and post- development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Number (SCS CN). Within the site boundary, an approximate proportion of each soil group was determined using NRCS Soil Survey Maps. Once an approximate proportion was determined, a composite SCS CN was computed for each cover condition.  Land cover conditions for the pre-development condition were taken from site aerial. Land cover conditions for the post-development condition were taken from the proposed development plan. Please refer to the pre- and post-development watershed maps for additional information.  The times of concentration are calculated using the SCS TR-55 Segmental Approach. The Tc flow paths are divided into three segments: overland flow, concentrated flow, and channel flow. The travel time is then computed for each segment, from which the overall time of concentration is determined by taking the sum of each segmental time.  The post-development times of concentration to the proposed stormwater management facility is assumed to be 5 minutes. This provides a conservative estimate of facility size for design purposes.  PondPack Version V8i, by Bentley Systems, Inc., was used in determining the pre- & post-development peak flow rates for the 1- and 10-year storm events, as well as routing calculations for the proposed stormwater control measure.  For 100- year storm routing calculations, a “worst case condition” was modeled in order to insure the proposed SCMs would safely pass the 100-year storm event. The assumption used in this scenario is as follows: o The starting water surface elevation in each facility, just prior to the 100-year storm event, is at the secondary spillway elevation. This scenario could occur as a result of a clogged water NARRATIVE > DRB-19010 creating experiences through experience 4 of 4 quality siphon or a rainfall event that lingers for several days. This could also occur as a result of several rainfall events in a series, before the siphon has an opportunity to draw down the storage pool. o Approximately 1-foot of freeboard is provided between the peak elevation during the “worst- case” scenario and the top of the dam for the proposed facilities.  Impervious area is captured to the maximum extent practicable. The northern most half of the offsite road is being captured and treated by our onsite SCM, in lieu of the three southern most lots on the site. The impervious area related to the offsite road represents nearly twice as much as impervious area treatment than that related to the three lots being bypassed onsite. DISCUSSION OF RESULTS PEAK RUNOFF CONTROL REQUIREMENTS The proposed project will result in an increase in peak flow rates. To mitigate this impact, the proposed facilities have been designed such that post-development peak flow rates resulting from on-site development are no greater than pre-development levels in the 1- and 10-year storm events. POLLUTANT AND NUTRIENT CONTROL REQUIREMENTS The site is treated for water quality per 6.1.7 (A) (3) and 6.1.12, using a stormwater wetland to capture runoff from the developed areas of the site and aforementioned portion of offsite road. The SCM meets the design requirements of the Town of Apex and the North Carolina Department of Environmental Quality Minimum Design Criteria. CONCLUSION If the development on this tract is built as proposed within this report, then the requirements set forth in the Town of Apex Unified Development Ordinance will be met with the proposed stormwater management facilities. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: 1. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The post-development watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. LINDEN - LOT 22 DRB-19010 SUMMARY OF RESULTS N. BOHORQUEZ, EI 12/23/2019 RELEASE RATE MANAGEMENT RESULTS Return Period Pre-Dev Post-Dev % Increase [cfs][cfs][%] 1-Year 9.38 8.86 -6% 10-Year 20.35 19.04 -6% POINT OF ANALYSIS #1 LINDEN - LOT 22 DRB-19010 SUMMARY OF RESULTS N. BOHORQUEZ, EI 12/23/2019 STORMWATER CONTROL MEASURE SUMMARY Design Drainage Area =3.27 ac Design Impervious Area =1.53 ac % Impervious =46.8% Top of Dam =320.00 ft NWSE =315.00 ft WQv Ponding Elevation = 316.21 ft Required Surface Area at NWSE =4,469 sf Provided Surface Area at NWSE =4,618 sf WQv Orifice Diameter =1.00 in WQv Orifice Invert Elevation =315.00 ft Riser Size =4' x 4' Riser Crest =319.00 ft Number of Orifices =1 Orifice Bottom Elevation =316.00 ft Orifice Dimensions 3' W x 1' H Barrel Diameter =24 in # of Barrels =1 Upstream Invert =314.50 ft Downstream Invert =313.00 ft Length =32.4 ft Slope =0.0463 ft/ft STORMWATER CONTROL MEASURE ROUTING RESULTS Return Period Inflow Outflow Max. WSE Freeboard [cfs][cfs][ft][ft] 1-Year 10.57 5.81 316.77 3.23 10-Year 18.88 12.34 317.30 2.70 25-Year 21.52 13.23 317.51 2.49 100-Year 25.04 14.39 317.78 2.22 100-Year - Worst Case***25.04 14.39 317.78 2.22 *** See narrative for explanation of the modeled worst case scenario DRAINAGE AREAS 1 Is this a high density project?Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions?No FORMS LOADED Entire Site 1 4 Type of SCM N/A Stormwater Wetland 5 Total BUA in project (sq ft)79095 sf 66585 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft)45870 sf 33360 sf 7 New BUA outside of subdivided lots (subject to permitting) (sf)11981 sf 11981 sf 8 Offsite - total area (sq ft)35383 sf 35383 sf 9 Offsite BUA (sq ft)21244 sf 21244 sf 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) - Sidewalk (sq ft)2831 sf 2831 sf - Roof (sq ft) - Roadway (sq ft)9150 sf 9150 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft)21244 sf 21244 sf 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 34%29% 17 Design storm (inches)1 in 18 Design volume of SCM (cu ft)28773 cf 19 Calculation method for design volume SA/DA 20 DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION Please see pre- and post- development hydrology sheets for further information. Please use this space to provide any additional information about the drainage area(s): STORMWATER WETLAND 1 Drainage area number 1 to SCM 2 Design volume of SCM (cu ft)28773 cf 3 Is the SCM sized to treat the SW from all surfaces at build-out?Yes 4 Is the SCM located away from contaminated soils?Yes 5 What are the side slopes of the SCM (H:V)?3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)?Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume?Yes 9 What is the method for dewatering the SCM for maintenance?\Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction?Yes 11 Does the maintenance access comply with General MDC (8)?Yes 12 Does the drainage easement comply with General MDC (9)?Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)?No 14 Is there an O&M Agreement that complies with General MDC (11)?Yes 15 Is there an O&M Plan that complies with General MDC (12)?Yes 16 Does the SCM follow the device specific MDC? 17 Was the SCM designed by an NC licensed professional? 18 Are the inlet(s) and outlet located in a manner that avoids short-circuiting?Yes 19 Are berms or baffles provided to improve the flow path?No 20 Does the orifice drawdown from below the top surface of the permanent pool?Yes 21 Does the wetland minimize impacts to the receiving channel from the 1-yr, 24-hr storm?Yes 22 Is a trash rack or other device provided to protect the outlet system?Yes 23 Elevation, peak attenuation above temporary pool (if applicable) (fmsl)320.00 24 Elevation, temporary pool (top of the temporary inundation zone) (fmsl)316.25 25 Elevation, permanent pool (top of the shallow water zone) (fmsl)315.00 26 Elevation, bottom of shallow water zone (fmsl)314.50 27 Elevation, bottom of forebay deep pool at deepest point (at forebay entrance) (fmsl)311.67 28 Elevation, bottom of forebay deep pool at shallowest point (at forebay exit) (fmsl)314.50 29 Elevation, bottom of non-forebay deep pool at deepest point (fmsl)311.67 30 Area, total surface area of the SW wetland at temporary pool elev. (sq ft)4,618.00 31 Area, temporary inundation zone at temporary pool elev. (sq ft)1,697.00 32 Area, shallow water zone at temporary pool elev. (sq ft)1,874.00 33 Area, forebay at temporary pool elev. (sq ft)591.00 34 Area, non-forebay deep pool at temporary pool elev .(sq ft)456.00 35 Percent area provided, temporary inundation zone (should be 30-45%)37% 36 Percent area provided, shallow water zone (should be 35-45%)41% 37 Percent area provided, deep pool (forebay) (should be 10-15%)13% 38 Percent area provided, deep pool (non-forebay) (should be 5-15%)10% 39 Peak attenuation depth above temporary inundation zone (inches)45 in 40 Temporary inundation zone depth (temporary pool to permanent pool) (inches)15 in 41 Shallow water zone depth (permanent pool to bottom of wetland) (inches)6 in 42 Depth, forebay at entrance (permanent pool to bottom of forebay entrance) (inches)40 in 43 Depth, forebay at exit (permanent pool to bottom of forebay exit) (inches)6 in 44 Depth, non-forebay deep pools (permanent pool to deep pool bottom) (inches)40 in 45 If there is an orifice, diameter (inches)1 in 46 If there is a weir, weir height (inches)12 in 47 If there is a weir, weir length (inches)36 in 48 Drawdown time for the temporary pool (days)2.27 49 Soil amendment depth (inches)12 in 50 Has a soil amendment specification been provided?Yes 51 Has a landscaping plan that meets SW Wetland MDC (12) been provided?Yes 52 Number of plants per 200 square feet (#) in the shallow water zone: 53 Does the temporary inundation zone planting comply with SW Wetland MDC (14)?Yes 54 Are the dam structure and temporary fill slopes planted in non-clumping turfgrass?Yes 55 Will cattails be planted in the wetland?No 56 Please use this space to provide any additional information about the stormwater wetland(s): ADDITIONAL INFORMATION Item #52 cannot be filled out due to data restrictions on the vell. However, the SCM is planted at a ratio of 1 stem per 4 sf (i.e. 50 plants per 200 sf). The shallow water zone has 470 stems proposed. GENERAL MDC FROM 02H .1050 STORMWATER WETLAND MDC FROM 02H .1054 Elevations Planting Zones Soil and Plants Depths and Outlet Wetland 3 4:00 PM 1/6/2020 1 STORMWATER IMPACT STATEMENT 2 MISCELLANEOUS SITE INFORMATION 5 DESIGN OF STORMWATER CONTROL MEASURE 3 PRE-DEVELOPMENT HYDROLOGIC CALCULATIONS 4 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS Linden – Lot 22 DRB-19010 STORMWATER IMPACT STATEMENT Linden – Lot 22 Stormwater Impact Statement Stormwater Impact Statement Per Town of Apex UDO section 6.1.7 (A) (3), a downstream Stormwater Impact Statement (SIS) is required documenting any adverse impacts to downstream areas that may result as a “by- product” of on-site detention. The SIS is to extend from the site discharge point downstream to a point at which the area of the proposed development is 10% or less of the overall total drainage area to that point. This site has one 10% analysis point which drains the entirety of the site. The drainage area consists of 1744.66 acres, of which 4.46 acres is onsite, roughly 0.26% of the total area. It is made up of mixed zoning districts, mainly single-family residential and is located on Reedy Branch just upstream of Olive Chapel Road. To determine each basin’s hydrograph and peak flows, current zoning was used to generate SCS Curve Numbers in accordance with the underlying soils obtained from Web Soil Survey. Time of concentrations for each basin was estimated using Kirpich’s equation and the resulting data input into PondPack. Hydrographs generated for each basin was then overlaid with on-site pre- development and post-development hydrographs to confirm no adverse impacts. At the Point of Analysis, post-development flow rates were held below their pre-development flow rates and was shown to not adversely impact the overall watershed hydrograph for the 1 Year 24 Hour and 10 Year 24 storms. Please refer to the calculations in this section in the Stormwater Impact Analysis for additional information. LINDEN - LOT 22 DRB-16010 POST-DEVELOPMENT HYDROLOGY Subbasin SIS N. BOHORQUEZ, EI 8/30/2019 I. SCS CURVE NUMBERS HSG Commercial Industrial Open Area ROW 1/8 acre 1/6 acre 1/3 acre 1 acre 2 acre A 89 81 68 83 77 72 57 51 46 B 92 88 79 89 85 82 72 68 65 C 94 91 86 92 90 88 81 79 77 D 95 93 89 93 92 90 86 84 82 Assume:HSG 'A' =0.0% HSG 'B' =15.5% HSG 'C' =0.4% HSG 'D' =84.1% Cover Condition SCS CN Commercial 95 Industrial 92 Open Area 87 ROW 92 1/8 acre 91 1/6 acre 89 1/3 acre 84 1 acre 82 2 acre 79 II. POST-DEVELOPMENT C. Watershed Breakdown Contributing Area SCS CN Area [acres] Planned Unit Development 84 472.05 Neighborhood Business 95 5.56 Conservation Buffer 87 10.07 High Density Multi-family 91 33.52 Light Industrial 92 13.29 Planned Commercial 95 59.62 Tech/Flex 95 19.43 Residential Agricultural 79 2.61 Rural Residential 82 399.85 Medium Density Residential 89 498.70 Highway Residential District 79 1.83 Residential 40W District 82 0.91 Office and Institutional 95 6.26 ROW 92 220.96 Total area =1744.66 acres 75,997,390 sq. ft. Composite SCS CN =86 III. Time of Concentration Information Time of concentration is calculated using the Kirpich Equation. Length =18,316 ft Top Elev =438 ft Bot Elev =256 ft Height =182 ft Slope =0.0099 ft/ft Surface Roughness Factor =1.00 Segment Time =88.21 minutes Time of Concentration =88.21 minutes SCS Lag Time =52.93 minutes (SCS Lag = 0.6* Tc) Time Increment =15.35 minutes (= 0.29*SCS Lag) - Residential Comments - - - - - Assume good condition - - Assume good condition - - - - Assume good condition - - Assume good condition - Comments Assume good condition - Assume good condition - POINT OF ANALYSIS #11 YEAR - 24 HOUR STORMX:\Projects\DRB\DRB-19010\Storm\Site Plan - Construction Drawings\SIS\CRS16000-SIS-EXHIBITS.dwg, 8/30/2019 1:29:42 PM, Bohorquez, NatalieLINDEN - LOT 22MASTER SUBDIVISIONAPEX, NCThe John R. McAdams Company, Inc.2905 Meridian ParkwayDurham, NC 27713phone 919. 361. 5000fax 919. 361. 2269license number: C-0293, C-187www.mcadamsco.comPROJECT NO.DRB-19010FILENAMEDRB19010-SISCHECKED BYDCWDRAWN BYNBSCALENTSDATE08.30. 2019PLAN INFORMATION POINT OF ANALYSIS #110 YEAR - 24 HOUR STORMX:\Projects\DRB\DRB-19010\Storm\Site Plan - Construction Drawings\SIS\CRS16000-SIS-EXHIBITS.dwg, 8/30/2019 1:31:02 PM, Bohorquez, NatalieLINDEN - LOT 22MASTER SUBDIVISIONAPEX, NCThe John R. McAdams Company, Inc.2905 Meridian ParkwayDurham, NC 27713phone 919. 361. 5000fax 919. 361. 2269license number: C-0293, C-187www.mcadamsco.comPROJECT NO.DRB-19010FILENAMEDRB19010-SISCHECKED BYDCWDRAWN BYNBSCALENTSDATE08.30. 2019PLAN INFORMATION GRAPHIC SCALE 0 100 200 400 1 inch = 200 ft. CLIENT REVISIONS PROJECT NO.DRB-19010 FILENAME CHECKED BY DRAWN BY SCALE DATE 09. 03. 2019 N0.DATE X:\Projects\DRB\DRB-19010\Storm\Site Plan - Construction Drawings\SIS\DRB19010-SIS.dwg, 8/30/2019 1:50:44 PM, Bohorquez, NatalieThe John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com LINDEN - LOT 22MASTER SUBDIVISION PLANAPEX, NORTH CAROLINASHEET PLAN INFORMATION FIELDING HOMES 3000 RDU CENTER DRIVE, SUITE 202 MORRISVILLE, NORTH CAROLINA 27560 PHONE: 919. 747. 4970 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION DRB19010-SIS DCW NB 1" = 200' SIS Linden – Lot 22 DRB-19010 STORMWATER CONTROL MEASURE DESIGN CALCULATIONS LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE SSFxn Above NP L. KABRICH, EI 12/23/2019 STAGE-STORAGE FUNCTION - ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet)(feet)(SF)(SF)(CF)(CF)(feet) 315.00 0.00 2,921 316.25 1.25 4,618 3770 4712 4712 1.26 318.00 3.00 6,267 5443 9524 14236 2.94 320.00 5.00 8,270 7269 14537 28773 5.06 1.300610629 8.158749223 3493.813888 KS =3494 b =1.301 y = 3493.8x1.3006 R² = 0.9995 0 5000 10000 15000 20000 25000 30000 35000 0.00 1.00 2.00 3.00 4.00 5.00 6.00Storage (CF)Stage (feet) Storage vs. Stage LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE SSFxn Below NP L. KABRICH, EI 12/23/2019 WETLAND ZONE TABULATION Per NCDEQ "Stormwater Design Manual" Minimum Design Criteria Deep Pool - Forebay 6 to 40 21 to 55 10 - 15% Deep Pool - Non Forebay 6 to 40 21 to 55 5 - 15% Shallow Water 0 to 6 15 to 21 35 - 45% Shallow Land -to -0 to 15 30 - 45% Permanent Pool Elevation = Temporary Pool Elevation = Wetland Surface Area at Temporary Pool = Deep Pool - Forebay 314.50 to 311.67 12.8% Deep Pool - Non Forebay 314.50 to 311.67 9.9% Shallow Water 315.00 to 314.50 40.6% Shallow Land 316.25 to 315.00 36.7% Zone 591 1,874 Zone Depth at Temp Pool (inches) 1,697 456 316.25 Portion of Wetland Surface Area 315.00 4,618 Depth at Normal Pool (inches) Elevation (ft)Measured Area (sf) Portion of Wetland Surface Area LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE WQV Calculation - MDC L. KABRICH, EI 12/23/2019 DETERMINATION OF WATER QUALITY VOLUME WQ V = (P)(R V )(A)/12 where, WQV = water quality volume (in acre-ft) RV = 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A =3.27 acres Impervious area =1.53 acres Percent impervious cover, I =46.8 % Rainfall, P =1.00 inches Calculated values: RV =0.47 WQV =0.13 acre-ft =5587 cf. SURFACE AREA CALCULATION Per NCDEQ "Stormwater Design Manual" Wetland MDC 3. Surface Area WQV =5587 cf. Max. ponding depth =15 inches Min. surface area (at temp. pool) =4469 sf. Surface area provided at temp. pool =4618 sf. Approximate ponding depth =1.21 feet =14.52 inches LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE WQV Drawdown Calculation L. KABRICH, EI 12/23/2019 DRAWDOWN ORIFICE DESIGN D orifice =1 inch # orifices =1 Ks =3494 b =1.301 Cd orifice =0.60 Normal Pool Elevation =315.00 feet Volume @ Normal Pool =0 cf Orifice Invert =315.00 feet WSEL @ 1" Runoff Volume =316.21 feet WSEL Vol. Stored Orifice Flow Avg. Flow Incr. Vol.Incr. Time (feet)(cf)(cfs)(cfs)(cf)(sec) 316.21 4476 0.028 316.11 4017 0.027 0.028 459 16542 316.02 3570 0.026 0.027 447 16860 315.92 3135 0.025 0.025 434 17219 315.82 2714 0.023 0.024 421 17628 315.73 2308 0.022 0.022 406 18104 315.63 1917 0.020 0.021 390 18668 315.53 1545 0.018 0.019 373 19358 315.44 1192 0.016 0.017 353 20234 315.34 862 0.014 0.015 330 21415 315.24 559 0.012 0.013 303 23173 Drawdown Time =2.19 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.389 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of siphon = 0.005 sf Q =0.0164 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.16 days LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE Temp Pool Drawdown Calculation L. KABRICH, EI 12/23/2019 DRAWDOWN ORIFICE DESIGN D orifice =1 inch # orifices =1 Ks =3494 b =1.301 Cd orifice =0.60 Normal Pool Elevation =315.00 feet Volume @ Normal Pool =0 cf Orifice Invert =315.00 feet Temp Pool Elevation Volume =316.25 feet WSEL Vol. Stored Orifice Flow Avg. Flow Incr. Vol.Incr. Time (feet)(cf)(cfs)(cfs)(cf)(sec) 316.25 4670 0.029 316.15 4188 0.028 0.028 483 17111 316.05 3717 0.026 0.027 470 17442 315.95 3261 0.025 0.026 457 17815 315.85 2818 0.024 0.024 442 18242 315.75 2391 0.022 0.023 427 18738 315.65 1981 0.020 0.021 410 19329 315.55 1590 0.019 0.020 391 20051 315.45 1220 0.017 0.018 370 20972 315.34 875 0.014 0.016 346 22221 315.24 559 0.012 0.013 316 24099 Drawdown Time =2.27 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.403 feet Orifice composite loss coefficient = 0.600 Cross-sectional area of siphon = 0.005 sf Q =0.0167 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.24 days Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Elevation-Area Volume Curve Volume (Total) (ft³) Volume (ft³) A1+A2+sqr (A1*A2) (ft²) Area (ft²) Planimeter (ft²) Elevation (ft) 0002,9210.0315.00 4,6724,67211,2124,6180.0316.25 14,1599,48816,2656,2670.0318.00 28,65014,49121,7368,2700.0320.00 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Outlet Input Data Requested Pond Water Surface Elevations ft315.00Minimum (Headwater) ft0.10Increment (Headwater) ft321.00Maximum (Headwater) Outlet Connectivity E2 (ft) E1 (ft) OutfallDirectionOutlet IDStructure Type 317.00316.00CulvertForwardWeirRectangular Weir 320.00317.00CulvertForwardOrificeOrifice-Area 320.00319.00CulvertForwardRiserInlet Box 320.00315.00CulvertForwardWQ OrificeOrifice-Circular 320.00314.50TWForwardCulvertCulvert-Circular (N/A)(N/A)TailwaterTailwater Settings 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Outlet Input Data Structure ID: Culvert Structure Type: Culvert-Circular 1Number of Barrels in24.0Diameter ft32.40Length ft32.43Length (Computed Barrel) ft/ft0.046Slope (Computed) Outlet Control Data 0.013Manning's n 0.5Ke 0.0Kb 0.0Kr ft0.00Convergence Tolerance Inlet Control Data Form 1Equation Form 0.0098K 2.0000M 0.0398C 0.6700Y 0.0T1 ratio (HW/D) 1.3T2 ratio (HW/D) -0.5Slope Correction Factor Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ft314.50T1 Elevation ft³/s15.55T1 Flow ft317.07T2 Elevation ft³/s17.77T2 Flow 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Outlet Input Data Structure ID: Riser Structure Type: Inlet Box 1Number of Openings ft319.00Elevation ft²16.0Orifice Area 0.6Orifice Coefficient ft16.00Weir Length (ft^0.5)/s3.00Weir Coefficient 1.0K Reverse 0.0Manning's n 0.0Kev, Charged Riser FalseWeir Submergence FalseOrifice H to crest Structure ID: WQ Orifice Structure Type: Orifice-Circular 1Number of Openings ft315.00Elevation in1.0Orifice Diameter 0.6Orifice Coefficient Structure ID: Orifice Structure Type: Orifice-Area 1Number of Openings ft316.00Elevation ft²3.0Orifice Area ft317.00Top Elevation ft316.50Datum Elevation 0.6Orifice Coefficient Structure ID: Weir Structure Type: Rectangular Weir 1Number of Openings ft316.00Elevation ft3.00Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: TW Structure Type: TW Setup, DS Channel Free OutfallTailwater Type Convergence Tolerances 30Maximum Iterations ft0.01Tailwater Tolerance (Minimum) ft0.50Tailwater Tolerance (Maximum) ft0.01Headwater Tolerance (Minimum) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Outlet Input Data Convergence Tolerances ft0.50Headwater Tolerance (Maximum) ft³/s0.001Flow Tolerance (Minimum) ft³/s10.000Flow Tolerance (Maximum) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Composite Rating Curve Composite Outflow Summary Contributing StructuresConvergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) (no Q: Weir,Orifice,Riser,WQ Orifice,Culvert) 0.00(N/A)0.00315.00 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.01315.10 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.01315.20 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.01315.30 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.40 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.50 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.60 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.70 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.80 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.02315.90 WQ Orifice,Culvert (no Q: Weir,Orifice,Riser) 0.00(N/A)0.03316.00 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)0.31316.10 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)0.82316.20 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)1.48316.30 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)2.24316.40 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)3.10316.50 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)4.04316.60 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)5.05316.70 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)6.12316.80 Weir,WQ Orifice,Culvert (no Q: Orifice,Riser) 0.00(N/A)7.24316.90 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)10.22317.00 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)11.21317.10 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)11.87317.20 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)12.32317.30 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)12.77317.40 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)13.21317.50 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Composite Rating Curve Composite Outflow Summary Contributing StructuresConvergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)13.63317.60 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)14.07317.70 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)14.47317.80 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)14.88317.90 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)15.29318.00 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)15.68318.10 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)16.08318.20 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)16.45318.30 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)16.83318.40 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)17.22318.50 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)17.58318.60 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)17.94318.70 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)18.30318.80 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)18.65318.90 Orifice,WQ Orifice,Culvert (no Q: Weir,Riser) 0.00(N/A)19.01319.00 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)20.15319.10 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)21.87319.20 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)23.84319.30 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)25.86319.40 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)27.86319.50 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)29.66319.60 Orifice,Riser,WQ Orifice,Culvert (no Q: Weir) 0.00(N/A)30.96319.70 Riser,Culvert (no Q: Weir,Orifice,WQ Orifice) 0.00(N/A)31.52319.80 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM Return Event: 1 yearsSubsection: Composite Rating Curve Composite Outflow Summary Contributing StructuresConvergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) Riser,Culvert (no Q: Weir,Orifice,WQ Orifice) 0.00(N/A)31.91319.90 Riser,Culvert (no Q: Weir,Orifice,WQ Orifice) 0.00(N/A)32.29320.00 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 1-yrLabel: SCM (IN) Return Event: 1 yearsSubsection: Level Pool Pond Routing Summary Infiltration No InfiltrationInfiltration Method (Computed) Initial Conditions ft315.00Elevation (Water Surface, Initial) ft³0Volume (Initial) ft³/s0.00Flow (Initial Outlet) ft³/s0.00Flow (Initial Infiltration) ft³/s0.00Flow (Initial, Total) min1.00Time Increment Inflow/Outflow Hydrograph Summary ft³/s10.57Flow (Peak In) min721.00Time to Peak (Flow, In) ft³/s5.81Flow (Peak Outlet) min727.00Time to Peak (Flow, Outlet) ft316.77Elevation (Water Surface, Peak) ft³7,197Volume (Peak) Mass Balance (ft³) ft³0Volume (Initial) ft³21,213Volume (Total Inflow) ft³0Volume (Total Infiltration) ft³17,526Volume (Total Outlet Outflow) ft³3,679Volume (Retained) ft³-8Volume (Unrouted) %0.0Error (Mass Balance) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 10-yrLabel: SCM (IN) Return Event: 10 yearsSubsection: Level Pool Pond Routing Summary Infiltration No InfiltrationInfiltration Method (Computed) Initial Conditions ft315.00Elevation (Water Surface, Initial) ft³0Volume (Initial) ft³/s0.00Flow (Initial Outlet) ft³/s0.00Flow (Initial Infiltration) ft³/s0.00Flow (Initial, Total) min1.00Time Increment Inflow/Outflow Hydrograph Summary ft³/s18.88Flow (Peak In) min721.00Time to Peak (Flow, In) ft³/s12.34Flow (Peak Outlet) min726.00Time to Peak (Flow, Outlet) ft317.30Elevation (Water Surface, Peak) ft³10,035Volume (Peak) Mass Balance (ft³) ft³0Volume (Initial) ft³45,232Volume (Total Inflow) ft³0Volume (Total Infiltration) ft³41,398Volume (Total Outlet Outflow) ft³3,821Volume (Retained) ft³-14Volume (Unrouted) %0.0Error (Mass Balance) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 25-yrLabel: SCM (IN) Return Event: 25 yearsSubsection: Level Pool Pond Routing Summary Infiltration No InfiltrationInfiltration Method (Computed) Initial Conditions ft315.00Elevation (Water Surface, Initial) ft³0Volume (Initial) ft³/s0.00Flow (Initial Outlet) ft³/s0.00Flow (Initial Infiltration) ft³/s0.00Flow (Initial, Total) min1.00Time Increment Inflow/Outflow Hydrograph Summary ft³/s21.52Flow (Peak In) min721.00Time to Peak (Flow, In) ft³/s13.23Flow (Peak Outlet) min726.00Time to Peak (Flow, Outlet) ft317.51Elevation (Water Surface, Peak) ft³11,185Volume (Peak) Mass Balance (ft³) ft³0Volume (Initial) ft³56,077Volume (Total Inflow) ft³0Volume (Total Infiltration) ft³52,191Volume (Total Outlet Outflow) ft³3,871Volume (Retained) ft³-15Volume (Unrouted) %0.0Error (Mass Balance) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM (IN) Return Event: 100 yearsSubsection: Level Pool Pond Routing Summary Infiltration No InfiltrationInfiltration Method (Computed) Initial Conditions ft315.00Elevation (Water Surface, Initial) ft³0Volume (Initial) ft³/s0.00Flow (Initial Outlet) ft³/s0.00Flow (Initial Infiltration) ft³/s0.00Flow (Initial, Total) min1.00Time Increment Inflow/Outflow Hydrograph Summary ft³/s25.04Flow (Peak In) min721.00Time to Peak (Flow, In) ft³/s14.39Flow (Peak Outlet) min727.00Time to Peak (Flow, Outlet) ft317.78Elevation (Water Surface, Peak) ft³12,802Volume (Peak) Mass Balance (ft³) ft³0Volume (Initial) ft³73,507Volume (Total Inflow) ft³0Volume (Total Infiltration) ft³69,588Volume (Total Outlet Outflow) ft³3,903Volume (Retained) ft³-16Volume (Unrouted) %0.0Error (Mass Balance) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM WC Return Event: 100 yearsSubsection: Outlet Input Data Requested Pond Water Surface Elevations ft314.00Minimum (Headwater) ft0.10Increment (Headwater) ft320.00Maximum (Headwater) Outlet Connectivity E2 (ft) E1 (ft) OutfallDirectionOutlet IDStructure Type 320.00317.00CulvertForwardOrificeOrifice-Area 320.00319.00CulvertForwardRiserInlet Box 317.00316.00CulvertForwardWeirRectangular Weir 320.00314.50TWForwardCulvertCulvert-Circular (N/A)(N/A)TailwaterTailwater Settings 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM WC Return Event: 100 yearsSubsection: Outlet Input Data Structure ID: Culvert Structure Type: Culvert-Circular 1Number of Barrels in24.0Diameter ft32.40Length ft32.43Length (Computed Barrel) ft/ft0.046Slope (Computed) Outlet Control Data 0.013Manning's n 0.5Ke 0.0Kb 0.0Kr ft0.00Convergence Tolerance Inlet Control Data Form 1Equation Form 0.0098K 2.0000M 0.0398C 0.6700Y 1.1T1 ratio (HW/D) 1.3T2 ratio (HW/D) -0.5Slope Correction Factor Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... ft316.77T1 Elevation ft³/s15.55T1 Flow ft317.07T2 Elevation ft³/s17.77T2 Flow 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM WC Return Event: 100 yearsSubsection: Outlet Input Data Structure ID: Riser Structure Type: Inlet Box 1Number of Openings ft319.00Elevation ft²16.0Orifice Area 0.6Orifice Coefficient ft16.00Weir Length (ft^0.5)/s3.00Weir Coefficient 1.0K Reverse 0.0Manning's n 0.0Kev, Charged Riser FalseWeir Submergence FalseOrifice H to crest Structure ID: Orifice Structure Type: Orifice-Area 1Number of Openings ft316.00Elevation ft²3.0Orifice Area ft317.00Top Elevation ft316.50Datum Elevation 0.6Orifice Coefficient Structure ID: Weir Structure Type: Rectangular Weir 1Number of Openings ft316.00Elevation ft3.00Weir Length (ft^0.5)/s3.00Weir Coefficient Structure ID: TW Structure Type: TW Setup, DS Channel Free OutfallTailwater Type Convergence Tolerances 30Maximum Iterations ft0.01Tailwater Tolerance (Minimum) ft0.50Tailwater Tolerance (Maximum) ft0.01Headwater Tolerance (Minimum) ft0.50Headwater Tolerance (Maximum) ft³/s0.001Flow Tolerance (Minimum) ft³/s10.000Flow Tolerance (Maximum) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM WC Return Event: 100 yearsSubsection: Composite Rating Curve Composite Outflow Summary Contributing StructuresConvergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.00 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.10 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.20 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.30 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.40 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.50 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.60 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.70 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.80 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00315.90 (no Q: Orifice,Riser,Weir,Culvert) 0.00(N/A)0.00316.00 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)0.28316.10 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)0.79316.20 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)1.45316.30 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)2.22316.40 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)3.08316.50 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)4.02316.60 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)5.03316.70 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)6.10316.80 Weir,Culvert (no Q: Orifice,Riser) 0.00(N/A)7.21316.90 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)10.21317.00 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)11.19317.10 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)11.86317.20 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)12.31317.30 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)12.76317.40 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)13.19317.50 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)13.62317.60 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM WC Return Event: 100 yearsSubsection: Composite Rating Curve Composite Outflow Summary Contributing StructuresConvergence Error (ft) Tailwater Elevation (ft) Flow (ft³/s) Water Surface Elevation (ft) Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)14.06317.70 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)14.47317.80 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)14.87317.90 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)15.28318.00 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)15.66318.10 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)16.05318.20 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)16.45318.30 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)16.82318.40 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)17.21318.50 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)17.56318.60 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)17.94318.70 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)18.28318.80 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)18.65318.90 Orifice,Culvert (no Q: Riser,Weir) 0.00(N/A)19.00319.00 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)20.13319.10 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)21.85319.20 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)23.83319.30 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)25.85319.40 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)27.86319.50 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)29.66319.60 Orifice,Riser,Culvert (no Q: Weir) 0.00(N/A)30.96319.70 Riser,Culvert (no Q: Orifice,Weir) 0.00(N/A)31.52319.80 Riser,Culvert (no Q: Orifice,Weir) 0.00(N/A)31.91319.90 Riser,Culvert (no Q: Orifice,Weir) 0.00(N/A)32.29320.00 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 Storm Event: 100-yrLabel: SCM (IN) Return Event: 100 yearsSubsection: Level Pool Pond Routing Summary Infiltration No InfiltrationInfiltration Method (Computed) Initial Conditions ft315.50Elevation (Water Surface, Initial) ft³1,616Volume (Initial) ft³/s0.00Flow (Initial Outlet) ft³/s0.00Flow (Initial Infiltration) ft³/s0.00Flow (Initial, Total) min1.00Time Increment Inflow/Outflow Hydrograph Summary ft³/s25.04Flow (Peak In) min721.00Time to Peak (Flow, In) ft³/s14.39Flow (Peak Outlet) min727.00Time to Peak (Flow, Outlet) ft317.78Elevation (Water Surface, Peak) ft³12,812Volume (Peak) Mass Balance (ft³) ft³1,616Volume (Initial) ft³73,507Volume (Total Inflow) ft³0Volume (Total Infiltration) ft³71,164Volume (Total Outlet Outflow) ft³3,944Volume (Retained) ft³-16Volume (Unrouted) %0.0Error (Mass Balance) 12/23/2019DRB19010.ppc N. Bohorquez, EILinden - Lot 22 LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE Anti-Flotation Block Calculations N. BOHORQUEZ, EI 12/22/2019 RISER ANTI-FLOTATION CALCULATION Input Data ==> Safety Factor: Safety factor to use =1.15 (recommend 1.15 or higher) Concrete: Concrete unit weight =142.0 PCF Note: NC Products lists unit wt. of manhole concrete at 142 PCF. Riser: Inside height of Riser =4.50 feet Inside length of riser =4.00 feet Inside width of riser =4.00 feet Wall thickness of riser =6.00 inches Base thickness of riser =6.00 inches Base length of riser =5.00 feet Base width of riser =5.00 feet Openings: Total Orifice Area = 3.087 SF OD of barrel exiting manhole =30.00 inches Size of drain pipe (if present) =6.0 inches Trash Rack: Bottom Length = 7.00 feet Bottom Width = 7.00 feet Top Length = 1.00 feet Top Width = 1.00 feet Height = 2.00 feet Trash Rack water displacement =38.00 CF Concrete Present in Riser Structure ==> Total amount of concrete: Base of Riser =12.50 CF Riser Walls =40.50 CF Adjust for openings: Opening for Orifices = 1.54 CF Opening for barrel =2.45 CF Opening for drain pipe =0.10 CF Total Concrete present, adjusted for openings =48.904 CF Weight of concrete present =6,944 lbs LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE Anti-Flotation Block Calculations N. BOHORQUEZ, EI 12/22/2019 Amount of water displaced by Riser Structure ==> Displacement by concrete =48.90 CF Displacement by open air in riser =72.00 CF Displacement by trash rack =38.00 CF Total water displaced by riser/barrel structure =158.90 CF Weight of water displaced =9,916 lbs Calculate size of base for riser assembly ==> Length =8.00 feet Width =8.00 feet Thickness =12 inches Concrete Present =64.00 CF Check validity of base as designed ==> Total Water Displaced =210.40 CF Total Concrete Present =112.90 CF Total Water Displaced =13,129 lbs Total Concrete Present =16,032 lbs Actual safety factor =1.22 OK Results of design ==> Base length =8.00 feet Base width =8.00 feet Base Thickness =12.00 inches CY of concrete total in base =2.37 CY Concrete unit weight in added base >=142.0 PCF LINDEN - LOT 22 DRB-19010 STORMWATER CONTROL MEASURE Steel Calculations N. BOHORQUEZ, EI 12/22/2019 II. CALCULATION FOR RISER ANTI-FLOTATION STEEL Input Data ==> Anti-Floatation Block Length =8.0 feet Anti-Floatation Block Width =8.0 feet Anti-Floatation Block Thickness =12 inches Asteel to Aconcrete Ratio =0.0020 (recommend 0.0018 or higher) Cross-Section Calculations==> Cross-Section Area* =8.00 SF Minimum Steel Area Required =0.016 SF 2.30 SI *Note: Assumes a "square" x-sec (L and W same) Rebar Calculations ==> Bar Size 4 5 6 7 8 Diameter (inches)0.500 0.625 0.750 0.875 1.000 X-Sec Area (SI)0.196 0.307 0.442 0.601 0.785 Minimum Number of Bars Each X-Sec 12 8 6 4 3 Project Date 12/23/2019 Project No.Designer LK Outlet ID Flow, Q10-yr 12.34 cfs Slope, S 4.63 % Pipe Diameter, Do 24 inches Pipe Diameter, Do 2.0 feet Number of pipes 1 Pipe separation 0 feet Manning's n 0.013 Zone from graph above =3 Outlet pipe diameter 24 in.Length =16.0 ft. Outlet flowrate 12.3 cfs Width =6.0 ft. Outlet velocity 13.0 ft/sec Stone diameter =13 in. Material =Class I Thickness =22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o)3 x D(o) 2 Class B 6 22 6 x D(o)3 x D(o) 3 Class I 13 22 8 x D(o)3 x D(o) 4 Class I 13 22 8 x D(o)3 x D(o) 5 Class II 23 27 10 x D(o)3 x D(o) 6 Class II 23 27 10 x D(o)3 x D(o) 7 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Linden - Lot 22 DRB-19010 SCM Special study required 13.0 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 SCM - Rip Rap Outlet Protection Design12/23/2019