In -Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No.: Skyland Drive Sidewalk Culvert Extension/ TIP No. EB-5923 Date: 02/04/2020
DOT Division: 14 County: Jackson DWR Project No. / Permit Type: 20190909 / Water Quality Certification #4135
DOT Staff: Dave McHenry DWR Staff: Kevin Mitchell
ACE Staff: Crystal Amschler DWR Regional Office: Asheville Regional Office
A..
Icauon uescrlpuon:
Additional stream impacts requested at Site #2 for 25 linear feet of permanent impact. Fill will include replacing an
existing deteriorating pipe and extending it 15 feet plus 10 feet of rip rap at the inlet and outlet.
Modification Sketch: See attached Figures.
e-�jQE North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: 468D2DC3-97EF-44C4-ADF3-999C3172828F
In -Field Modification
Page 2 of 3
This in -field modification is required for the following reason(s):
■ The information contained in the application or presented in support thereof is incorrect in the
following manner:
The original permit application did not include these additional impacts at Site 2.
■ Conditions under which the original certification was issued have changed in the following
manner:
Additional stream impacts are necessary to replace a deteriorating pipe while providing a
sidewalk and sufficient shoulder width to increase vehicle recovery area.
This in -field modification is valid only if issued by an authorized agent of the Division of Water Resources,
Transportation Permitting Unit'
This in -field modification authorizes the NCDOT to impact 25 linear feet of stream at Site 2 in Jackson
County. The project shall be constructed as described in the Modification Description and Sketch on
Page 1 of this document dated January 6, 2020 to improve the section of Skyland Drive in Sylva. The
approved design is that described in the Modification Description and Modification Sketch on Page 1 of
this document dated February 4, 2020. Any further changes to the original Water Quality Certification
dated July 19, 2019 may require a formal written modification request.
The description of the proposed action provides adequate assurance that the proposed action in the
Little Tennessee River Basin in conjunction with the proposed development will not result in a violation of
applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina
certifies that this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL
92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set
forth. Should your project change, you are required to notify the DWR and submit a new application. If
the property is sold, the new owner must be given a copy of this Certification and approval letter, and is
thereby responsible for complying with all conditions. For this approval to remain valid, you are required
to comply with all the conditions listed below. In addition, you should obtain all other federal, state, or
local permits before proceeding with your project including (but not limited to) Sediment and Erosion
control, Coastal Stormwater, Non -discharge and Water Supply watershed regulations. This Modification
Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers
Permit.
Conditions(s) of Modification Approval:
1. As -built drawings of the proposed action shall be submitted to the NC DWR Transportation
Permitting Unit within 30 days of completion of the action.
2. All the authorized action activities and conditions of the certification associated with the original
Water Quality Certification dated July 19, 2019 and all other corresponding modification still apply
except where superseded by this certification.
Failure to construct the proposed action as described in the Modification Description and Sketch on
Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this
modification approval and may result in criminal and/or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in -field modification is invalid. If additional (wetland, stream, buffer) impacts for this
project (now or in the future) exceed (one acre, 300 linear feet, or one-third of an acre/150 linear feet,
respectively), or if mitigation is required above and beyond the current mitigation requirement for this
project, this in -field modification is invalid and a formal written modification is required.
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
`�" -� 919.707.9000
DocuSign Envelope ID: 468D2DC3-97EF-44C4-ADF3-999C3172828F
In -Field Modification
Page 3 of 3
This in -field modification is effective upon the date the last party signs this document. This in -field
modification is made upon mutual agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. §150B-23 et seq.
DWR Staff Signature:
Date: 2/4/2020
DOT Staff Signature:
Date: 2/4/2020
Staff Signature:
Date:
EDocuSigned by:
tw H4c4a
naorcnannsFaas'A
by:
0
— An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT -funded and
review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional
Office personnel.
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: 468D2DC3-97EF-44C4-ADF3-999C3172828F
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
JACKSON COUNTY
LOCATION: SR 1432 (SKYLAND DRIVE) FROM
US 23 BUS (ASHEVILLE HWY) TO
SR 1429 (CHIPPER CURVE RD.)
TYPE OF WORK: SIDEWALK, GRADING, DRAINAGE, RETAINING WALL, PAVING
STATE
STATE PRO]ECT REFeRENCe
BHBBT
N0.
TOTAL
SHEETS
Novo
EB-5923
I
8TAT8 PROI. NO.
A.APAOS.N0.
DEHCRIPTION
47589.1.1
WA
PE
47589.2.1
WA
R/W & UTIL
47589.3.1
WA
CONST.
PERMIT DRAWINGS Modified January 6, 2020
DocuSigned by:
�--) /on _ 41,
Mattern & Craig
SURVEYORS
12 BROAD STREET
ASHEVILLE, NORTH CAROLINA 28801
(828) 254-2201 DOCUMENT NOT CONSIDERED FINAL
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD 77. FAX (828) 254-a562 UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
SHEET 1 OF 4
HYDRAULICS ENGINEER
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared in tie Off ce r.
19ATTERNNA& T. CRAIG
12 BRASHEVILLE,
30 15 0 30 60
V = 40 MPH
LENGTH OF ROADWAY TIP PROJECT EB-5923 = 0.645 MILES
NC 28801
FOH NCDOI DIVISION OF HIGh*AYS
2078 STANDARD SPECIFICATIONS
PLANS
FUNC CLASS =
P5.
® 5r
SUB -REGIONAL TIER
RIGHT OF WAY DATE:
AARON CARVER, PE
SIGNATURE:
m
a
J U N E 2018
ROADWAY DESIGN
PROJECT ENGINEER
AADT: 6900
TOTAL LENGTH OF TIP PROJECT EB-5923 - 0.645 MILES
NICK WOODS
ENGINEER
P.E.
SIGNATURE:
®F Tim
LETTING DATE:
APRIL 2019
PROJECT DESIGN ENGINEER
WES JAMESON, PE
NCDOT DIVISION 14 CONTACT
DocuSign Envelope ID: 468D2DC3-97EF-44C4-ADF3-999C3172828F
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Z
o=
w—�
Mattern & Craig
�
O
'n
TWY PROPERTES. LLC
cd
\9 y6'
ADJUST MH
N 84°01'33' IY OB 2054 PC 471
22.06'
W N
EIP 27.5y,O5,E
W
G
SITE 2
p3,253A'
N O
fj I93.39.
�i
TOP=20]0.95' A 2 TGSVB GEOTEXTILE
INV=2053.95' fy 60
N 89.30'IS' µ
WI'
w �vl i
\42.90
INV=2069.05'
N N 03°03'4T' E
25
883' N OS°48'23' E
3
- TINSEL T0*'N. INC.
Y8'09•E 125.23'
112.10'
a 'S
i3
I, Scoff Creek ,S
NOT°46'35' E J�
N 86°30'58' W DB 2029 PG 643
£INV
50.II'
2060.g2•
N 16°OS'll' E
e•,a°
rcF
p
II
16T.43
ADJUSTVALVE 20 16'
,� B0.]8'
$O
N 04°46'S3'E
J n ADJUST MH
51.81 4 Z
O
2059.08'
F 2010._:..
SS 6,
DBR 334 PGPSRS
Op 9
INV 2 0.09' 8•p\P
W
g0
NV-205
c
1CONy
___. E
E
F
o .00
+a 4 INVP 20]I 30 m l
205444'
N 84°01'33• O
CLIFTON JOKES
+6,4 b END
HMOEN
F
— FE21 xT I
3F
W
ti
aDB 1208 PG 815 E �E F
z.• a za'
TINY PROPERTIES, LLC
I
,-
2R
A
aLT _ DB 2054 PG 805 n
��
265H
V _
1N E �e _
F,
-EL- NAIL
IL (v
6
W
2C NC E�EPpW.
654 �
o \F I_
�' II
'S. 2 �1 y
?062.12'
DJUST MH 60
fy
I RELOCATE
METER �
4 �
III
NOT DISTURB EXISTING UIG
_
SM2 ELEVATIO
h
YA 06 NAINQ2064.T4
LOCCATON LL UTIL TIED S
TC
2
6M21S
_
SS?
L
rn W
tOP_205
I�OPv?206t 5'0, 3
PRIOR CONSTOR TRUCTION.
RRNSP kEON 2�j100 404 RIOHi3q �li"rc'
v INV_2063.6g
SEi IN BASSAWCE
DRNEI Q
y EXISTING
y Z \N
THE
OF 18' MAP LE
—
¢2
cc��>
ALONG
ALONG THE OUTSIDE OF EXISTING WHITE
OUTSIDE OF MITE
28 EDGELINE. INSTALL 2'4i"GONG. CURB AND
CONCRETE APRON PER NCDOT STD 84B.03
it
�J
44
J
J� ,:,I GUTTER TO EXISTING ROAD GRADE PER NCDOT
+o
(TYPICAL). DEPRESS SIDEWALK AS
REQUIRED. MAINTAIN MIN. 4'SIDEWALK
SAWCUT AND REMOVE EXISTING ASPHALT
ALONG THE OUTSIDE OF EXISTING MITE27y
W
STD DETAIL 84601. (TYPICAL)
NADTH BEHIND APRON. SEE ALSECTION
EDGELINE. INSTALL CONIC. CURB AND
I
4
ADJUST MH
N0, 3 FOR DRIVEWAY PAVINGG DETAIL
GUTTER TO EXISTINGG ROAD GRADE PER NCDOT W
�� yl
N 2
m POLE TO
R1 REMAIN
STD DETAIL 848.01. (TYPICAL)
'Z
Ta¢R
y
4— ONE DATA TRANSITION FROM 2'E" CONC. CURB AND
W O
GUTTERTO 2' CON.. VALLEY GUTTER
MSM
twY
S�
�.
0'�55 I29 IRTI
PROP 6"DEPRESSED CONIC
)�pjR�,
T� W CONCRETE APRON PER NCDOT STD B48O3
SIDEWALK.CONSTRUCTTO6BACKOF
q Q
R /LbOW'
R I,y�r�• (TYPICAL). DEPRESS SIDEWALK A$
PROPOSED VALLEY GUTTER 84
k\ \
REQUIRED. MAINTAIN MIN. 4' SIDEWALK
WIDTH BEHIND APRON. SEE TYPICALSECTION
E XIS
INSTALL SIDEWALK FLUSHWITHSE EXISTING
PARKING LOT. SEE TYPICAL SECTION NO. 2
N
Q� p
NO. 3 FOR DRIVEWAY PAVING DETAIL.
SHEET 2A-1. MAINTAIN MIN 4'SIDEWALK
I,
I,
DocuSign Envelope ID: 468D2DC3-97EF-44C4-ADF3-999C3172828F
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACT
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
IH
-L- 43+73 LT TO 43+83 LT
Creek Excavation/Armoring
0.01
< 0.01
17
1 B
-L- 42+84 RT TO 43+24 RT
Creek Excavation/Bank Stabilization
0.01
80
80
1
-L- 43+21 RT TO 43+53 RT
60" CSP
10
1
-L- 43+64 LT TO 43+94 LT
60" CSP
7
1 C
Temporary Dewater Work Area
15
2
42" CSP
2A
Temporary Dewater Work Area
26
rip rap
5
2C
rip rap
5
TOTALS*:
0.02
< 0.01
16
9
0
*Rounded totals are sum of actual impacts
NOTES:
2018 Feb
7N ew impacts
New Total
139
NC DEPARTMENT OF TRANSPORTATION
SHEET
DIVISION OF HIGHWAYS
JULY 3, 2019
JACKSON
EB-5923
4 OF
0