Loading...
HomeMy WebLinkAbout20190909 Ver 1_EB-5923 Skyland Dr PERMIT DRAWINGS_annotated_updated January 2020_Site 2_20200124W STATE OF NORTH C A ROLINA DIVISION OF HIGHWAYS JACKSON COUNTY LOCATION: SR 1432 (SKYLAND DRIVE) FROM US 23 BUS (ASHEVILLE HWY) TO SR 1429 (CHIPPER CURVE RD. ) TYPE OF WORK: SIDEWALK, GRADING, DRAINAGE, RETAINING WALL, PAVING $TATR IT PRO—r REPeRRN BHEBT N0. TOTAL SHRRTS Nod. EB-5923 8TAT6 PROI. NO. A.APAOS.N0. DEHCRIPTION 47589.1.1 WA PE 47589.2.1 WA RrW & UTIL 47589.3.1 WA CONST. PERMIT DRAWINGS Modified January 6, 2020 �DocuSigned by: � /01 4., Mattern & Craig SURVEYORS 12 BROAD STREET ASHEVILLE, NORTH CAROLINA 28801 (828) 254-2201 DOCUMENT NOT CONSIDERED FINAL CLEARING ON THIS AROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD IL FAX (828) 254-4562 UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 1 OF 4 GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 30 15 0 30 60 V = 40 MPH FUNC CLASS = LENGTH OF ROADWAY TIP PROJECT EB-5923 = 0.645 MILES PLANS SUB —REGIONAL TIER AADT: 6900 A. TOTAL LENGTH OF TIP PROJECT EB-5923 — 0.645 MILES Prepared In me Off7ce of: HYDRAULICS ENGINEER MATTERNaA& T CRAIG 12 BRASHEVILLE, NC IS ' FOR NCDOT DIVISION OF HIGh*AYS 2018 STANDARD SPECIFICATIONS P.E. SIGNATURE: RIGHT OF WAY DATE: AARON CARVER, PE J U N E 2 018 PROJECT ENGINEER ROADWAY DESIGN ENGINEER NICK WOODS LETTING DATE: PROJECT DESIGN ENGINEER APRIL 2019 WES JAMESON, PE P.E. NCDOT DIVISION 14 CONTACT ,,......T....., DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Z o= w—� Mattern & Craig � O 'n TWY PROPERiffS. cd \9 y6' ADJUST MH � N 84.01'33' IY OB 2054 PG 471 22.06' W N EIP 27•Sy,05,E W WI' G SITE 2 p3,253A' N O \42.90 fj I93.39. �i TOP=20T0.95' A 2 TGSVS GEOTEXTILE INV=205CIE B RIP 3.95' >.y 60 E N 89.30'IS' µ INV=2069.05' N N 03°03'4T' 25 Y8'09•E 8�83' N OS°48'23' E 3 O tz ( - TINSEL T0*'N. INC. 125.23' 112.10' a 'S N i3 to Scotl Creek ,S NOT°46'35' E J� N 86°3058' W DB 2029 PG 643 £INV SO.II' INV_ 2060.42• 16°05T' E e•,a° rcF p II 16T.43' ADJUST VALVE 20 16 ,� 80.78' INV_ IF'� -2 $O N 04°46'S3'E J n ADJUST MH 51.81 4 O 2059.08' F 20]G. -:. SS B• DBR 334 PC OpINV `' 9,]6' 2 0.09' 8•p\P W g0 NV-205 c T4C0N E E F EG'. o .00 +a 4 INVP 20TI 30 m I 205444' N 84°01'33• O +6,4 b END y� CLIFTON JONES .., s E E HMO _---_—____�N F — FE21 xTI 3F W -81.77• I ti 19 V, 1208 PG 815 E �E F z.• a 91 BTINY PROPERTIES, LLC �� )�OE� T5' ,- 2R aLT _ DB 2054 PG 805 n 265H 1N E �e _ NAIL -EL- 6 I �' II _ ?062.12' DJUST MH 60 fy j19 ELOCATE I RID 4 �4 x. 6 III NOT DISTURB EXISTING UIG U SM2 ELEVATIp O \NN;205 /� 1A 06 NAINQ2064.T4 CONTRACTORUTIL TIES BM21S 233 � L r n W � tOP_205 I�OPv?206t 5'0, 3 PRIOR CONSTRUCTIOONLL RRNSP kEON 2�T100 404 RIOHi3q �li"rc' SEi IN BASE v INV_2063.6g 4Y[A�'0 DRNEI Q � y y Z \N THE OF 18' MAP LE — F ¢2 cc��> j ALONG THE OUTSIDE OF EXISTING WHITE A NG OUTSIDE OF EXEXISTIISTING N TJ 28 EDGELINE. INSTALL 2'4i"GONG. CURB AND CONCRETE APRON PER NCDOT STD 84B.03 �J 44 ,_.:.,.. J� ,:,� GUTTER TO EXISTING ROAD GRADE PER NCDOT +o (TYPICAL). DEPRESS SIDEWALK AS REQUIRED. MAIN TA IN MIN. 4' SIDEWALK SAWCUT AND REMOVE EXISTING ASPHALT ALONG THE OUTSIDE OF EXISTING MITE W 27y STD DETAIL 84601. (TYPICAL) NADTH BEHIND APRON. SEE EDGELINE. INSTALL CONIC. CURB AND I 4 ADJUST MH G DETAIL NO, 3 FOR DRIVEWAY PAVING DETAIL GUTTER G R W GUTTER TO EXISTING ROAD GRADE PER NCDOTLE yl �N 2 Tm TO R1 REMAIN REMAIN STD DETAIL 846.01.(TYPICAL) 'Z a¢R T y MEDATA TRANSITION FROM 2'E" CONIC. CURB AND SSW O MSM ��% GUTTER TO 2' CONIC. VALLEY GUTTER xwwIw1 Sy �. � D'�5 ICI PROP TDEPRESSED CONIC )�pjR�, T� CONCRETE APRONPER NCDOT STD 848.03 BIDEWALK.CONSTRUCT T05'BACK OF q Q R /pAOpO' R I,y�r�• (TYPICAL). DEPRESS SIDEWALK AS PROPOSED VALLEY GUTTER k\ \ N REQUIRED. MAINTAIN MIN. 4' SIDEWALK WIDTH BEHIND APRON. SEE TYPICALSECTION E EXISTING INSTALL SIDEWALK FLUSH WITH EXISTING PARKING LOT. SEE TYPICAL SECTION NO. 2 Q� p NO. 3 FOR DRIVEWAY PAVING DETAIL SHEET 2A-1. MAINTAIN MIN 4'SIDEWALK I, I, WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACT Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) IH -L- 43+73 LT TO 43+83 LT Creek Excavation/Armoring 0.01 < 0.01 17 1 B -L- 42+84 RT TO 43+24 RT Creek Excavation/Bank Stabilization 0.01 80 80 1 -L- 43+21 RT TO 43+53 RT 60" CSP 10 1 -L- 43+64 LT TO 43+94 LT 60" CSP 7 1 C Temporary Dewater Work Area 2 42" CSP 2A Temporary Dewater Work Area 26 rip rap 2C rip rap TOTALS*: 0.02 < 0.01 16 9 0 *Rounded totals are sum of actual impacts NOTES: 139 355 2018 Feb